Tectonic Engineering & Surveying Consultants P C: New York City Government Payments
as recorded by New York City: TECTONIC ENGINEERING & SURVEYING CONSULTANTS P C
Tectonic Engineering & Surveying Consultants P C is the 480th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 8th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 73.7% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| POLLUTION REMEDIATION OBLIGATIONS | 2 | $90,743 | Nov 21, 2014 – Apr 20, 2015 |
| JUDGMENTS AND CLAIMS-NONEMP COMP | 1 | $71,669 | Jul 31, 2017 – Jul 31, 2017 |
| MAINT & REP GENERAL | 4 | $66,160 | Jul 1, 2010 – Aug 14, 2017 |
| PROF SERV OTHER | 4 | $60,362 | May 3, 2012 – May 29, 2018 |
| DESIGN-CONSULTANT-IOTB | 1,265 | $47,399,735 | Jan 6, 2010 – Feb 3, 2020 |
| PROF SERV ENGINEER & ARCHITECT | 6 | $43,516 | Mar 2, 2017 – Apr 3, 2019 |
| CONSTRUCTION-BUILDINGS | 5,566 | $35,904,960 | Jan 4, 2010 – Feb 5, 2020 |
| PROMPT PAYMENT INTEREST | 2 | $354 | Dec 14, 2015 – Sep 20, 2017 |
| IOTB CONSTRUCTION | 337 | $35,350,895 | Jan 19, 2010 – Jan 27, 2020 |
| OTHR SERV AND CHRGS-GENERAL | 39 | $3,033,509 | Dec 8, 2010 – Jun 13, 2018 |
| IFA-OTHER THAN BUILDINGS | 1 | $28,158 | Mar 13, 2013 – Mar 13, 2013 |
| DESIGN-CONSULTANT-BUILDINGS | 918 | $25,320,597 | Feb 9, 2010 – Feb 5, 2020 |
| N/A | 409 | $2,271,088 | Nov 21, 2014 – Jun 4, 2025 |
| IFA-BUILDINGS | 2 | $2,145 | Dec 16, 2013 – Sep 6, 2017 |
| DEMOLITION | 5 | $21,131 | Jun 29, 2015 – Jul 23, 2018 |
| CONTRACTUAL SERVICES GENERAL | 79 | $1,779,836 | Jan 12, 2010 – Mar 26, 2019 |
| IOTB SITE ACQUISITION | 1 | $1,269 | Jun 4, 2019 – Jun 4, 2019 |
| <Non-Applicable Expenditure Object> | 4 | -$1,050 | Feb 13, 2012 – Sep 11, 2013 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 20 payments$59,940
FY 2024top 20 of 30 payments$227,645
FY 2023top 20 of 44 payments$299,582
FY 2022top 20 of 41 payments$103,177
FY 2021top 20 of 34 payments$76,557
FY 2020top 20 of 928 payments$16,805,760
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 15, 2019 | Department of Transportation | $745,022.58 | IOTB CONSTRUCTION | – |
| Aug 5, 2019 | Department of Environmental Protection | $442,967.30 | IOTB CONSTRUCTION | – |
| Jul 3, 2019 | Department of Transportation | $431,247.00 | IOTB CONSTRUCTION | – |
| Aug 26, 2019 | Department of Environmental Protection | $393,636.50 | IOTB CONSTRUCTION | – |
| Aug 13, 2019 | Department of Environmental Protection | $332,917.13 | IOTB CONSTRUCTION | – |
| Sep 17, 2019 | Department of Environmental Protection | $324,189.11 | IOTB CONSTRUCTION | – |
| Jul 23, 2019 | Department of Environmental Protection | $297,666.14 | IOTB CONSTRUCTION | – |
| Aug 5, 2019 | Department of Environmental Protection | $277,749.86 | IOTB CONSTRUCTION | – |
| Jul 23, 2019 | Department of Transportation | $270,938.50 | IOTB CONSTRUCTION | – |
| Sep 23, 2019 | Department of Environmental Protection | $269,543.00 | IOTB CONSTRUCTION | – |
| Sep 16, 2019 | Department of Transportation | $241,086.24 | IOTB CONSTRUCTION | – |
| Sep 30, 2019 | Department of Environmental Protection | $239,045.65 | IOTB CONSTRUCTION | – |
| Jan 21, 2020 | Department of Environmental Protection | $219,382.28 | IOTB CONSTRUCTION | – |
| Dec 30, 2019 | Department of Environmental Protection | $212,845.26 | IOTB CONSTRUCTION | – |
| Jul 8, 2019 | Housing Preservation and Development | $211,004.66 | IOTB CONSTRUCTION | – |
| Dec 23, 2019 | Department of Environmental Protection | $202,427.85 | IOTB CONSTRUCTION | – |
| Dec 11, 2019 | Department of Transportation | $201,796.76 | IOTB CONSTRUCTION | – |
| Dec 16, 2019 | Department of Transportation | $200,593.50 | IOTB CONSTRUCTION | – |
| Nov 18, 2019 | Department of Environmental Protection | $200,151.78 | IOTB CONSTRUCTION | – |
| Sep 17, 2019 | Department of Transportation | $199,304.75 | IOTB CONSTRUCTION | – |
FY 2019top 20 of 1,248 payments$20,880,502
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 19, 2019 | Department of Environmental Protection | $702,949.55 | IOTB CONSTRUCTION | – |
| Jul 1, 2018 | Department of Environmental Protection | $591,871.32 | IOTB CONSTRUCTION | – |
| Jun 14, 2019 | Department of Environmental Protection | $544,473.21 | IOTB CONSTRUCTION | – |
| Feb 12, 2019 | Department of Environmental Protection | $487,132.75 | IOTB CONSTRUCTION | – |
| Feb 19, 2019 | Department of Environmental Protection | $423,758.79 | IOTB CONSTRUCTION | – |
| Nov 14, 2018 | Department of Environmental Protection | $414,817.08 | IOTB CONSTRUCTION | – |
| Aug 6, 2018 | Department of Environmental Protection | $377,890.50 | IOTB CONSTRUCTION | – |
| Nov 13, 2018 | Department of Transportation | $344,545.43 | IOTB CONSTRUCTION | – |
| Feb 11, 2019 | Department of Transportation | $322,130.03 | IOTB CONSTRUCTION | – |
| Jul 1, 2018 | Department of Environmental Protection | $301,000.00 | IOTB CONSTRUCTION | – |
| Sep 4, 2018 | Department of Transportation | $287,204.58 | IOTB CONSTRUCTION | – |
| May 28, 2019 | Department of Transportation | $286,076.00 | IOTB CONSTRUCTION | – |
| Dec 24, 2018 | Department of Environmental Protection | $274,952.83 | IOTB CONSTRUCTION | – |
| Feb 28, 2019 | Department of Environmental Protection | $273,207.27 | DESIGN-CONSULTANT-IOTB | – |
| Nov 26, 2018 | Department of Environmental Protection | $262,268.41 | IOTB CONSTRUCTION | – |
| Aug 27, 2018 | Department of Environmental Protection | $253,350.35 | IOTB CONSTRUCTION | – |
| Mar 26, 2019 | Department of Environmental Protection | $240,754.23 | IOTB CONSTRUCTION | – |
| Feb 20, 2019 | Department of Environmental Protection | $222,004.80 | IOTB CONSTRUCTION | – |
| Feb 12, 2019 | Department of Environmental Protection | $221,626.39 | IOTB CONSTRUCTION | – |
| Nov 13, 2018 | Department of Environmental Protection | $219,629.31 | IOTB CONSTRUCTION | – |
FY 2018top 20 of 880 payments$15,918,025
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 26, 2017 | Department of Environmental Protection | $815,382.78 | DESIGN-CONSULTANT-IOTB | – |
| May 15, 2018 | Department of Environmental Protection | $674,942.65 | IOTB CONSTRUCTION | – |
| Jul 24, 2017 | Department of Environmental Protection | $525,796.62 | DESIGN-CONSULTANT-IOTB | – |
| Jul 17, 2017 | Department of Transportation | $307,639.44 | DESIGN-CONSULTANT-IOTB | – |
| Dec 4, 2017 | Department of Environmental Protection | $303,391.80 | IOTB CONSTRUCTION | – |
| May 10, 2018 | Department of Transportation | $254,458.45 | IOTB CONSTRUCTION | – |
| Dec 26, 2017 | Department of Environmental Protection | $219,148.25 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2017 | Department of Transportation | $210,619.17 | IOTB CONSTRUCTION | – |
| Jul 5, 2017 | Department of Environmental Protection | $202,262.07 | IOTB CONSTRUCTION | – |
| Oct 10, 2017 | Department of Transportation | $196,538.59 | IOTB CONSTRUCTION | – |
| Mar 28, 2018 | Department of Environmental Protection | $174,792.56 | DESIGN-CONSULTANT-IOTB | – |
| Jun 13, 2018 | Department of Environmental Protection | $172,678.80 | IOTB CONSTRUCTION | – |
| Oct 30, 2017 | Department of Environmental Protection | $171,801.13 | DESIGN-CONSULTANT-IOTB | – |
| Jul 24, 2017 | Department of Environmental Protection | $165,002.46 | DESIGN-CONSULTANT-IOTB | – |
| Dec 18, 2017 | Department of Transportation | $156,257.75 | IOTB CONSTRUCTION | – |
| Jan 16, 2018 | Department of Environmental Protection | $155,917.66 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2017 | Department of Environmental Protection | $152,752.60 | IOTB CONSTRUCTION | – |
| Nov 27, 2017 | Department of Environmental Protection | $152,489.53 | DESIGN-CONSULTANT-IOTB | – |
| Nov 22, 2017 | Department of Transportation | $149,335.79 | IOTB CONSTRUCTION | – |
| Nov 20, 2017 | Department of Environmental Protection | $147,818.29 | DESIGN-CONSULTANT-IOTB | – |
FY 2017top 20 of 485 payments$8,953,368
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 23, 2017 | Department of Environmental Protection | $436,618.18 | DESIGN-CONSULTANT-IOTB | – |
| Mar 6, 2017 | Department of Environmental Protection | $335,434.71 | DESIGN-CONSULTANT-IOTB | – |
| Mar 15, 2017 | Housing Preservation and Development | $331,372.08 | IOTB CONSTRUCTION | – |
| Jun 6, 2017 | Department of Environmental Protection | $293,939.18 | IOTB CONSTRUCTION | – |
| Mar 22, 2017 | Department of Transportation | $290,088.35 | DESIGN-CONSULTANT-IOTB | – |
| Mar 15, 2017 | Department of Environmental Protection | $241,958.33 | DESIGN-CONSULTANT-IOTB | – |
| Aug 23, 2016 | Department of Environmental Protection | $232,051.44 | DESIGN-CONSULTANT-IOTB | – |
| May 9, 2017 | Department of Environmental Protection | $219,036.99 | DESIGN-CONSULTANT-IOTB | – |
| Jun 19, 2017 | Department of Environmental Protection | $203,526.60 | IOTB CONSTRUCTION | – |
| Dec 27, 2016 | Department of Transportation | $202,679.55 | DESIGN-CONSULTANT-IOTB | – |
| Jun 5, 2017 | Department of Environmental Protection | $187,032.16 | DESIGN-CONSULTANT-IOTB | – |
| Nov 22, 2016 | Department of Environmental Protection | $182,728.34 | DESIGN-CONSULTANT-IOTB | – |
| Nov 15, 2016 | Department of Environmental Protection | $177,761.08 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2017 | Department of Environmental Protection | $162,564.18 | DESIGN-CONSULTANT-IOTB | – |
| Jun 26, 2017 | Department of Environmental Protection | $158,423.34 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2016 | Department of Environmental Protection | $154,155.90 | DESIGN-CONSULTANT-IOTB | – |
| Dec 19, 2016 | Department of Environmental Protection | $150,842.65 | DESIGN-CONSULTANT-IOTB | – |
| Oct 3, 2016 | Department of Environmental Protection | $150,756.06 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2016 | Department of Environmental Protection | $147,891.27 | DESIGN-CONSULTANT-IOTB | – |
| Nov 14, 2016 | Department of Sanitation | $146,088.50 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2016top 20 of 606 payments$10,506,225
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 22, 2016 | Department of Environmental Protection | $440,223.27 | DESIGN-CONSULTANT-IOTB | – |
| Sep 8, 2015 | Department of Environmental Protection | $371,871.64 | DESIGN-CONSULTANT-IOTB | – |
| Aug 24, 2015 | Police Department | $360,831.62 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 22, 2015 | Department of Environmental Protection | $358,907.04 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2016 | Department of Environmental Protection | $301,879.69 | DESIGN-CONSULTANT-IOTB | – |
| Jul 13, 2015 | Department of Environmental Protection | $255,943.63 | DESIGN-CONSULTANT-IOTB | – |
| Jul 27, 2015 | Department of Parks and Recreation | $255,428.13 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 14, 2016 | Department of Transportation | $191,065.37 | DESIGN-CONSULTANT-IOTB | – |
| May 24, 2016 | Department of Environmental Protection | $188,549.95 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2016 | Department of Environmental Protection | $183,696.33 | DESIGN-CONSULTANT-IOTB | – |
| Sep 21, 2015 | Department of Transportation | $157,901.76 | CONSTRUCTION-BUILDINGS | – |
| Jun 29, 2016 | Department of Health and Mental Hygiene | $153,886.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 12, 2016 | Department of Environmental Protection | $150,691.12 | DESIGN-CONSULTANT-IOTB | – |
| Aug 31, 2015 | Department of Information Technology and Telecommunications | $150,575.97 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 15, 2016 | Department of Environmental Protection | $138,361.20 | DESIGN-CONSULTANT-IOTB | – |
| Jul 7, 2015 | Department of Environmental Protection | $131,991.68 | DESIGN-CONSULTANT-IOTB | – |
| Apr 19, 2016 | Department of Environmental Protection | $128,272.42 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2016 | Department of Environmental Protection | $124,393.03 | DESIGN-CONSULTANT-IOTB | – |
| May 18, 2016 | Department of Environmental Protection | $122,482.83 | DESIGN-CONSULTANT-IOTB | – |
| Nov 24, 2015 | Department of Environmental Protection | $119,718.50 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 1,223 payments$15,133,199
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 10, 2014 | Department of Transportation | $1,027,797.08 | DESIGN-CONSULTANT-IOTB | – |
| Jun 9, 2015 | Police Department | $355,258.95 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 22, 2014 | Police Department | $285,757.26 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 9, 2015 | Police Department | $280,494.78 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 10, 2014 | Department of Environmental Protection | $266,667.15 | DESIGN-CONSULTANT-IOTB | – |
| Dec 24, 2014 | Police Department | $266,408.46 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 29, 2015 | Department of Environmental Protection | $220,538.95 | DESIGN-CONSULTANT-IOTB | – |
| Sep 8, 2014 | Department of Environmental Protection | $211,912.46 | DESIGN-CONSULTANT-IOTB | – |
| Dec 10, 2014 | Department of Environmental Protection | $191,490.09 | DESIGN-CONSULTANT-IOTB | – |
| Feb 2, 2015 | Department of Environmental Protection | $179,189.24 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2015 | Department of Environmental Protection | $178,515.11 | IOTB CONSTRUCTION | – |
| Oct 7, 2014 | Department of Environmental Protection | $177,479.74 | IOTB CONSTRUCTION | – |
| Mar 3, 2015 | Police Department | $174,997.79 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 22, 2014 | Department of Environmental Protection | $168,475.21 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2014 | Department of Environmental Protection | $167,779.69 | DESIGN-CONSULTANT-IOTB | – |
| May 4, 2015 | Department of Environmental Protection | $157,216.00 | DESIGN-CONSULTANT-IOTB | – |
| May 20, 2015 | Police Department | $156,180.52 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 20, 2014 | Department of Information Technology and Telecommunications | $153,418.74 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 5, 2015 | Department of Environmental Protection | $150,461.33 | DESIGN-CONSULTANT-IOTB | – |
| Oct 20, 2014 | Department of Transportation | $134,959.00 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 927 payments$17,392,373
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 5, 2013 | Police Department | $2,567,495.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 4, 2013 | Department of Parks and Recreation | $972,263.34 | IOTB CONSTRUCTION | – |
| Dec 30, 2013 | Department of Transportation | $569,136.78 | DESIGN-CONSULTANT-IOTB | – |
| Aug 14, 2013 | Police Department | $451,679.68 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 28, 2014 | Department of Environmental Protection | $403,161.71 | DESIGN-CONSULTANT-IOTB | – |
| Jan 27, 2014 | Police Department | $334,146.22 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 6, 2013 | Police Department | $308,783.55 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 28, 2013 | Department of Parks and Recreation | $308,655.83 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 21, 2014 | Department of Environmental Protection | $300,448.75 | DESIGN-CONSULTANT-IOTB | – |
| Sep 3, 2013 | Department of Environmental Protection | $298,846.49 | DESIGN-CONSULTANT-IOTB | – |
| May 6, 2014 | Police Department | $273,045.09 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 3, 2013 | Department of Transportation | $267,233.37 | DESIGN-CONSULTANT-IOTB | – |
| Dec 23, 2013 | Department of Information Technology and Telecommunications | $256,765.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 12, 2013 | Department of Environmental Protection | $246,126.53 | DESIGN-CONSULTANT-IOTB | – |
| Mar 10, 2014 | Police Department | $243,053.26 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 23, 2013 | Department of Environmental Protection | $228,656.40 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2013 | Department of Information Technology and Telecommunications | $220,088.75 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 9, 2013 | Police Department | $205,407.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 29, 2013 | Department of Health and Mental Hygiene | $204,824.63 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 10, 2014 | Department of Information Technology and Telecommunications | $197,432.50 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2013top 20 of 705 payments$15,862,860
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 10, 2012 | Police Department | $1,245,661.63 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 16, 2013 | Department of Design and Construction | $1,023,392.00 | OTHR SERV AND CHRGS-GENERAL | – |
| Oct 30, 2012 | Department of Information Technology and Telecommunications | $601,577.12 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 5, 2012 | Police Department | $511,499.47 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 22, 2013 | Department of Transportation | $478,101.08 | DESIGN-CONSULTANT-IOTB | – |
| May 20, 2013 | Department of Parks and Recreation | $476,439.32 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 18, 2012 | Police Department | $393,550.91 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 27, 2012 | Police Department | $313,018.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2013 | Department of Information Technology and Telecommunications | $310,733.12 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 29, 2013 | Department of Information Technology and Telecommunications | $248,167.26 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 10, 2012 | Department of Health and Mental Hygiene | $235,085.63 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2013 | Department of Information Technology and Telecommunications | $222,508.75 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 3, 2013 | Department of Design and Construction | $219,417.72 | OTHR SERV AND CHRGS-GENERAL | – |
| Oct 30, 2012 | Department of Environmental Protection | $204,210.48 | DESIGN-CONSULTANT-IOTB | – |
| Dec 4, 2012 | Department of Environmental Protection | $191,054.00 | DESIGN-CONSULTANT-IOTB | – |
| Aug 13, 2012 | Department of Transportation | $183,146.45 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2013 | Department of Environmental Protection | $175,604.39 | DESIGN-CONSULTANT-IOTB | – |
| Oct 10, 2012 | Department of Transportation | $173,159.06 | DESIGN-CONSULTANT-IOTB | – |
| Apr 22, 2013 | Department of Environmental Protection | $166,493.54 | DESIGN-CONSULTANT-IOTB | – |
| Nov 26, 2012 | Department of Transportation | $161,347.35 | DESIGN-CONSULTANT-IOTB | – |
FY 2012top 20 of 622 payments$11,927,516
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 13, 2012 | Department of Design and Construction | $710,954.34 | CONTRACTUAL SERVICES GENERAL | – |
| May 29, 2012 | Department of Design and Construction | $473,865.40 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 9, 2011 | Police Department | $440,473.99 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 11, 2012 | Department of Information Technology and Telecommunications | $346,932.11 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 22, 2011 | Department of Citywide Administrative Services | $307,242.50 | IOTB CONSTRUCTION | – |
| Apr 30, 2012 | Department of Transportation | $302,394.78 | DESIGN-CONSULTANT-IOTB | – |
| Oct 24, 2011 | Department of Citywide Administrative Services | $277,134.80 | IOTB CONSTRUCTION | – |
| Nov 1, 2011 | Department of Transportation | $251,858.07 | OTHR SERV AND CHRGS-GENERAL | – |
| Apr 23, 2012 | Department of Transportation | $246,855.34 | DESIGN-CONSULTANT-IOTB | – |
| Feb 6, 2012 | Department of Transportation | $186,078.78 | DESIGN-CONSULTANT-IOTB | – |
| Dec 13, 2011 | Department of Transportation | $178,880.99 | DESIGN-CONSULTANT-IOTB | – |
| Mar 5, 2012 | Police Department | $168,832.39 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 21, 2011 | Department of Information Technology and Telecommunications | $159,858.10 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2012 | Department of Information Technology and Telecommunications | $159,328.75 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2012 | Department of Citywide Administrative Services | $156,910.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 22, 2011 | Department of Information Technology and Telecommunications | $143,548.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2012 | Department of Transportation | $123,491.51 | DESIGN-CONSULTANT-IOTB | – |
| Jan 9, 2012 | Department of Citywide Administrative Services | $123,217.50 | IOTB CONSTRUCTION | – |
| Oct 17, 2011 | Department of Health and Mental Hygiene | $119,846.31 | CONSTRUCTION-BUILDINGS | – |
| Jul 5, 2011 | Police Department | $119,802.79 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2011top 20 of 650 payments$12,605,939
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 8, 2010 | Department of Transportation | $695,056.52 | OTHR SERV AND CHRGS-GENERAL | – |
| May 9, 2011 | Department of Information Technology and Telecommunications | $355,672.13 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2011 | Department of Transportation | $347,714.90 | DESIGN-CONSULTANT-IOTB | – |
| Dec 6, 2010 | Department of Citywide Administrative Services | $250,045.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 10, 2011 | Department of Citywide Administrative Services | $244,834.00 | IOTB CONSTRUCTION | – |
| Aug 23, 2010 | Department of Citywide Administrative Services | $235,323.89 | IOTB CONSTRUCTION | – |
| Mar 7, 2011 | Department of Citywide Administrative Services | $232,136.00 | IOTB CONSTRUCTION | – |
| Dec 6, 2010 | Police Department | $229,719.45 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 6, 2011 | Police Department | $211,980.59 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 31, 2011 | Department of Transportation | $204,943.48 | OTHR SERV AND CHRGS-GENERAL | – |
| Aug 17, 2010 | Department of Transportation | $188,318.52 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2011 | Department of Information Technology and Telecommunications | $169,501.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2010 | Department of Transportation | $166,392.73 | DESIGN-CONSULTANT-IOTB | – |
| Mar 14, 2011 | Department of Citywide Administrative Services | $162,048.61 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 29, 2011 | Department of Citywide Administrative Services | $160,740.00 | IOTB CONSTRUCTION | – |
| Apr 25, 2011 | Department of Transportation | $152,032.08 | OTHR SERV AND CHRGS-GENERAL | – |
| May 4, 2011 | Department of Citywide Administrative Services | $143,772.60 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 1, 2011 | Police Department | $143,659.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 31, 2011 | Department of Transportation | $140,976.17 | OTHR SERV AND CHRGS-GENERAL | – |
| Nov 19, 2010 | Department of Transportation | $135,971.18 | DESIGN-CONSULTANT-IOTB | – |
FY 2010top 20 of 202 payments$4,692,407
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 26, 2010 | Department of Citywide Administrative Services | $529,632.49 | IOTB CONSTRUCTION | – |
| Jan 19, 2010 | Department of Citywide Administrative Services | $302,724.00 | IOTB CONSTRUCTION | – |
| Jun 7, 2010 | School Construction Authority | $133,125.58 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2010 | Department of Transportation | $120,865.87 | DESIGN-CONSULTANT-IOTB | – |
| Apr 6, 2010 | Department of Transportation | $111,414.75 | DESIGN-CONSULTANT-IOTB | – |
| Jun 21, 2010 | Department of Citywide Administrative Services | $109,509.25 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 28, 2010 | Department of Information Technology and Telecommunications | $109,300.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 19, 2010 | Department of Transportation | $105,766.50 | DESIGN-CONSULTANT-IOTB | – |
| Jan 8, 2010 | School Construction Authority | $92,779.49 | CONSTRUCTION-BUILDINGS | – |
| May 26, 2010 | School Construction Authority | $88,647.81 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2010 | School Construction Authority | $84,342.60 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2010 | School Construction Authority | $83,343.19 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2010 | School Construction Authority | $83,141.38 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Department of Parks and Recreation | $77,038.50 | DESIGN-CONSULTANT-IOTB | – |
| Mar 16, 2010 | School Construction Authority | $75,692.84 | CONSTRUCTION-BUILDINGS | – |
| Mar 17, 2010 | School Construction Authority | $72,862.68 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2010 | School Construction Authority | $72,173.19 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2010 | School Construction Authority | $69,673.82 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2010 | School Construction Authority | $69,507.93 | CONSTRUCTION-BUILDINGS | – |
| May 25, 2010 | School Construction Authority | $67,441.85 | CONSTRUCTION-BUILDINGS | – |
Recent payments
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data