Sew Construction - JV: New York City Government Payments

as recorded by New York City: SEW CONSTRUCTION - JV

Sew Construction - JV is the 91st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 10th in IOTB CONSTRUCTION spending. Its payments amount to 1.9% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$687,835,200total received
264payments
1agency
Jan 29, 2010Jul 15, 2020first / last payment
Follow this vendorGet an email when New York City publishes new payments to Sew Construction - JV. No spam.

Payments by fiscal year

FY 2021$102,677
FY 2020$1,673,267
FY 2019$836,780
FY 2018$475,745
FY 2016$7,157,288
FY 2015$11,961,666
FY 2014$26,739,913
FY 2013$85,580,853
FY 2012$172,740,172
FY 2011$228,488,575
FY 2010$152,078,264

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2021Department of Environmental Protection2$102,677
FY 2020Department of Environmental Protection2$1,673,267
FY 2019Department of Environmental Protection10$836,780
FY 2018Department of Environmental Protection3$475,745
FY 2016Department of Environmental Protection29$7,157,288
FY 2015Department of Environmental Protection37$11,961,666
FY 2014Department of Environmental Protection65$26,739,913
FY 2013Department of Environmental Protection49$85,580,853
FY 2012Department of Environmental Protection30$172,740,172
FY 2011Department of Environmental Protection25$228,488,575
FY 2010Department of Environmental Protection12$152,078,264
Total264$687,835,200

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
IOTB CONSTRUCTION264$687,835,200Jan 29, 2010 Jul 15, 2020

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2021top 2 of 2 payments$102,677
DateAgencyAmountCategoryPurchase order
Jul 15, 2020Department of Environmental Protection$63,716.23IOTB CONSTRUCTION
Jul 15, 2020Department of Environmental Protection$38,960.35IOTB CONSTRUCTION
FY 2020top 2 of 2 payments$1,673,267
DateAgencyAmountCategoryPurchase order
Jun 24, 2020Department of Environmental Protection$1,161,538.36IOTB CONSTRUCTION
Jun 24, 2020Department of Environmental Protection$511,728.55IOTB CONSTRUCTION
FY 2019top 10 of 10 payments$836,780
DateAgencyAmountCategoryPurchase order
Mar 7, 2019Department of Environmental Protection$551,897.21IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$129,177.44IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$54,318.93IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$44,877.11IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$21,095.55IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$13,429.05IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$9,643.35IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$6,036.61IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$5,531.77IOTB CONSTRUCTION
Mar 11, 2019Department of Environmental Protection$773.13IOTB CONSTRUCTION
FY 2018top 3 of 3 payments$475,745
DateAgencyAmountCategoryPurchase order
Nov 20, 2017Department of Environmental Protection$267,153.11IOTB CONSTRUCTION
Nov 20, 2017Department of Environmental Protection$124,797.46IOTB CONSTRUCTION
Nov 20, 2017Department of Environmental Protection$83,794.30IOTB CONSTRUCTION
FY 2016top 20 of 29 payments$7,157,288
DateAgencyAmountCategoryPurchase order
Nov 4, 2015Department of Environmental Protection$1,748,904.45IOTB CONSTRUCTION
Jul 8, 2015Department of Environmental Protection$1,496,535.09IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$722,306.00IOTB CONSTRUCTION
Jul 30, 2015Department of Environmental Protection$586,000.00IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$378,362.47IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$310,422.56IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$299,466.46IOTB CONSTRUCTION
Aug 3, 2015Department of Environmental Protection$235,429.75IOTB CONSTRUCTION
Jul 8, 2015Department of Environmental Protection$233,993.72IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$185,288.30IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$153,513.20IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$140,312.68IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$107,842.89IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$103,075.35IOTB CONSTRUCTION
Aug 3, 2015Department of Environmental Protection$89,277.25IOTB CONSTRUCTION
Jul 1, 2015Department of Environmental Protection$79,040.86IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$68,397.00IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$32,270.95IOTB CONSTRUCTION
Nov 4, 2015Department of Environmental Protection$29,084.25IOTB CONSTRUCTION
Aug 3, 2015Department of Environmental Protection$28,757.91IOTB CONSTRUCTION
FY 2015top 20 of 37 payments$11,961,666
DateAgencyAmountCategoryPurchase order
Jun 29, 2015Department of Environmental Protection$4,434,954.00IOTB CONSTRUCTION
Feb 17, 2015Department of Environmental Protection$1,230,000.00IOTB CONSTRUCTION
Sep 22, 2014Department of Environmental Protection$962,427.69IOTB CONSTRUCTION
Jul 21, 2014Department of Environmental Protection$774,112.27IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$560,400.00IOTB CONSTRUCTION
Feb 17, 2015Department of Environmental Protection$450,000.00IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$373,868.38IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$358,285.59IOTB CONSTRUCTION
Sep 22, 2014Department of Environmental Protection$280,000.00IOTB CONSTRUCTION
Dec 22, 2014Department of Environmental Protection$242,041.56IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$241,706.08IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$227,231.90IOTB CONSTRUCTION
Dec 22, 2014Department of Environmental Protection$170,000.80IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$166,546.84IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$166,374.85IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$166,236.00IOTB CONSTRUCTION
Sep 22, 2014Department of Environmental Protection$116,981.13IOTB CONSTRUCTION
Sep 22, 2014Department of Environmental Protection$113,062.40IOTB CONSTRUCTION
Jul 21, 2014Department of Environmental Protection$113,062.40IOTB CONSTRUCTION
Feb 17, 2015Department of Environmental Protection$104,950.64IOTB CONSTRUCTION
FY 2014top 20 of 65 payments$26,739,913
DateAgencyAmountCategoryPurchase order
Mar 28, 2014Department of Environmental Protection$7,429,043.73IOTB CONSTRUCTION
Sep 23, 2013Department of Environmental Protection$6,215,657.96IOTB CONSTRUCTION
Jun 4, 2014Department of Environmental Protection$1,111,033.23IOTB CONSTRUCTION
May 14, 2014Department of Environmental Protection$991,060.62IOTB CONSTRUCTION
May 14, 2014Department of Environmental Protection$888,972.34IOTB CONSTRUCTION
Dec 20, 2013Department of Environmental Protection$836,180.03IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$636,558.61IOTB CONSTRUCTION
May 14, 2014Department of Environmental Protection$604,315.63IOTB CONSTRUCTION
Dec 20, 2013Department of Environmental Protection$534,743.69IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$518,483.28IOTB CONSTRUCTION
Dec 20, 2013Department of Environmental Protection$464,586.30IOTB CONSTRUCTION
Jun 4, 2014Department of Environmental Protection$449,309.00IOTB CONSTRUCTION
Dec 20, 2013Department of Environmental Protection$439,694.91IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$365,820.00IOTB CONSTRUCTION
Dec 20, 2013Department of Environmental Protection$363,647.67IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$358,388.10IOTB CONSTRUCTION
Dec 30, 2013Department of Environmental Protection$321,498.93IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$274,804.83IOTB CONSTRUCTION
May 14, 2014Department of Environmental Protection$266,949.90IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$266,656.31IOTB CONSTRUCTION
FY 2013top 20 of 49 payments$85,580,853
DateAgencyAmountCategoryPurchase order
Sep 19, 2012Department of Environmental Protection$13,551,938.61IOTB CONSTRUCTION
Oct 18, 2012Department of Environmental Protection$9,567,687.98IOTB CONSTRUCTION
Dec 24, 2012Department of Environmental Protection$8,197,265.66IOTB CONSTRUCTION
Jul 30, 2012Department of Environmental Protection$7,187,665.87IOTB CONSTRUCTION
Apr 23, 2013Department of Environmental Protection$6,902,536.70IOTB CONSTRUCTION
Nov 23, 2012Department of Environmental Protection$6,886,233.25IOTB CONSTRUCTION
Jan 31, 2013Department of Environmental Protection$6,108,479.66IOTB CONSTRUCTION
May 24, 2013Department of Environmental Protection$5,989,039.62IOTB CONSTRUCTION
Aug 29, 2012Department of Environmental Protection$5,674,738.26IOTB CONSTRUCTION
Mar 7, 2013Department of Environmental Protection$5,210,343.92IOTB CONSTRUCTION
Jan 28, 2013Department of Environmental Protection$1,420,185.10IOTB CONSTRUCTION
Jan 28, 2013Department of Environmental Protection$1,261,006.24IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$795,348.15IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$713,259.93IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$664,182.44IOTB CONSTRUCTION
May 24, 2013Department of Environmental Protection$557,758.00IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$524,007.86IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$503,562.53IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$378,298.21IOTB CONSTRUCTION
Feb 11, 2013Department of Environmental Protection$362,433.33IOTB CONSTRUCTION
FY 2012top 20 of 30 payments$172,740,172
DateAgencyAmountCategoryPurchase order
Jan 6, 2012Department of Environmental Protection$18,642,180.79IOTB CONSTRUCTION
Sep 26, 2011Department of Environmental Protection$17,157,767.18IOTB CONSTRUCTION
Aug 25, 2011Department of Environmental Protection$16,254,129.63IOTB CONSTRUCTION
Mar 5, 2012Department of Environmental Protection$15,809,155.02IOTB CONSTRUCTION
May 11, 2012Department of Environmental Protection$15,111,614.80IOTB CONSTRUCTION
Oct 27, 2011Department of Environmental Protection$14,259,876.07IOTB CONSTRUCTION
Feb 13, 2012Department of Environmental Protection$14,127,018.05IOTB CONSTRUCTION
Jun 22, 2012Department of Environmental Protection$12,619,466.49IOTB CONSTRUCTION
Jul 29, 2011Department of Environmental Protection$12,431,408.98IOTB CONSTRUCTION
Nov 25, 2011Department of Environmental Protection$10,890,357.51IOTB CONSTRUCTION
May 14, 2012Department of Environmental Protection$9,956,149.37IOTB CONSTRUCTION
May 21, 2012Department of Environmental Protection$2,412,591.46IOTB CONSTRUCTION
May 21, 2012Department of Environmental Protection$1,721,996.00IOTB CONSTRUCTION
May 21, 2012Department of Environmental Protection$1,118,526.79IOTB CONSTRUCTION
Nov 3, 2011Department of Environmental Protection$1,102,146.44IOTB CONSTRUCTION
Jun 4, 2012Department of Environmental Protection$981,167.41IOTB CONSTRUCTION
Feb 16, 2012Department of Environmental Protection$903,040.38IOTB CONSTRUCTION
Feb 16, 2012Department of Environmental Protection$860,135.01IOTB CONSTRUCTION
Jun 4, 2012Department of Environmental Protection$838,771.32IOTB CONSTRUCTION
Feb 16, 2012Department of Environmental Protection$750,519.79IOTB CONSTRUCTION
FY 2011top 20 of 25 payments$228,488,575
DateAgencyAmountCategoryPurchase order
Sep 7, 2010Department of Environmental Protection$24,312,889.32IOTB CONSTRUCTION
Nov 17, 2010Department of Environmental Protection$23,296,096.02IOTB CONSTRUCTION
Aug 24, 2010Department of Environmental Protection$22,569,878.94IOTB CONSTRUCTION
May 26, 2011Department of Environmental Protection$20,940,782.40IOTB CONSTRUCTION
Jul 23, 2010Department of Environmental Protection$20,598,460.52IOTB CONSTRUCTION
Mar 9, 2011Department of Environmental Protection$20,213,525.87IOTB CONSTRUCTION
Jan 31, 2011Department of Environmental Protection$18,375,916.50IOTB CONSTRUCTION
Dec 20, 2010Department of Environmental Protection$17,548,751.88IOTB CONSTRUCTION
Oct 28, 2010Department of Environmental Protection$16,548,671.89IOTB CONSTRUCTION
Jun 30, 2011Department of Environmental Protection$13,295,693.54IOTB CONSTRUCTION
Apr 25, 2011Department of Environmental Protection$9,951,400.63IOTB CONSTRUCTION
Mar 23, 2011Department of Environmental Protection$8,112,827.12IOTB CONSTRUCTION
Oct 22, 2010Department of Environmental Protection$1,478,813.82IOTB CONSTRUCTION
Oct 22, 2010Department of Environmental Protection$1,440,878.52IOTB CONSTRUCTION
Mar 22, 2011Department of Environmental Protection$1,283,868.02IOTB CONSTRUCTION
Mar 22, 2011Department of Environmental Protection$1,241,332.64IOTB CONSTRUCTION
Mar 22, 2011Department of Environmental Protection$1,174,756.97IOTB CONSTRUCTION
Oct 22, 2010Department of Environmental Protection$1,100,716.71IOTB CONSTRUCTION
Jun 28, 2011Department of Environmental Protection$1,077,189.10IOTB CONSTRUCTION
Jun 28, 2011Department of Environmental Protection$977,661.37IOTB CONSTRUCTION
FY 2010top 12 of 12 payments$152,078,264
DateAgencyAmountCategoryPurchase order
Jun 30, 2010Department of Environmental Protection$27,616,830.70IOTB CONSTRUCTION
Apr 1, 2010Department of Environmental Protection$27,585,662.94IOTB CONSTRUCTION
Jan 29, 2010Department of Environmental Protection$27,265,288.11IOTB CONSTRUCTION
May 26, 2010Department of Environmental Protection$20,951,126.98IOTB CONSTRUCTION
Apr 29, 2010Department of Environmental Protection$19,672,060.45IOTB CONSTRUCTION
Mar 1, 2010Department of Environmental Protection$18,042,307.07IOTB CONSTRUCTION
Mar 16, 2010Department of Environmental Protection$4,029,878.57IOTB CONSTRUCTION
Jun 16, 2010Department of Environmental Protection$3,078,621.24IOTB CONSTRUCTION
Jun 16, 2010Department of Environmental Protection$1,451,877.00IOTB CONSTRUCTION
Jun 16, 2010Department of Environmental Protection$1,435,015.16IOTB CONSTRUCTION
Jun 16, 2010Department of Environmental Protection$949,595.11IOTB CONSTRUCTION
Jun 16, 2010Department of Environmental Protection$0.50IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Jul 15, 2020Department of Environmental Protection$38,960.35IOTB CONSTRUCTIONCapital Contracts
Jul 15, 2020Department of Environmental Protection$63,716.23IOTB CONSTRUCTIONCapital Contracts
Jun 24, 2020Department of Environmental Protection$1,161,538.36IOTB CONSTRUCTIONCapital Contracts
Jun 24, 2020Department of Environmental Protection$511,728.55IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$44,877.11IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$13,429.05IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$5,531.77IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$773.13IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$9,643.35IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$129,177.44IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$6,036.61IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$21,095.55IOTB CONSTRUCTIONCapital Contracts
Mar 11, 2019Department of Environmental Protection$54,318.93IOTB CONSTRUCTIONCapital Contracts
Mar 7, 2019Department of Environmental Protection$551,897.21IOTB CONSTRUCTIONCapital Contracts
Nov 20, 2017Department of Environmental Protection$267,153.11IOTB CONSTRUCTIONCapital Contracts
Nov 20, 2017Department of Environmental Protection$124,797.46IOTB CONSTRUCTIONCapital Contracts
Nov 20, 2017Department of Environmental Protection$83,794.30IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$14,506.39IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$107,842.89IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$13,293.23IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$1,857.90IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$185,288.30IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$23,173.65IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$32,270.95IOTB CONSTRUCTIONCapital Contracts
May 16, 2016Department of Environmental Protection$310,422.56IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data