Hazen & Sawyer: New York City Government Payments
as recorded by New York City: HAZEN & SAWYER
Hazen & Sawyer is the 121st-largest recipient of New York City government payments tracked by SpendLedger, and ranks first in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 1.2% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it rose 24.1% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| TELEPHONE & OTHER COMMUNICATNS | 1 | $7,668 | Jul 11, 2018 – Jul 11, 2018 |
| OTHR SERV AND CHRGS-GENERAL | 184 | $7,646,157 | May 9, 2014 – Jun 30, 2025 |
| DATA PROCESSING EQUIPMENT MAINTENANCE | 74 | $5,840,317 | May 5, 2014 – Jun 12, 2025 |
| SUPPLIES + MATERIALS - GENERAL | 17 | $569,446 | Sep 18, 2018 – Mar 11, 2020 |
| TELECOMMUNICATIONS MAINT | 2 | $54,000 | Jul 9, 2018 – Jul 11, 2018 |
| IOTB CONSTRUCTION | 847 | $40,567,418 | May 30, 2017 – Jun 25, 2025 |
| DESIGN-CONSULTANT-IOTB | 4,641 | $399,407,111 | Jan 11, 2010 – Jun 30, 2025 |
| CONTRACTUAL SERVICES GENERAL | 508 | $31,499,248 | Mar 27, 2014 – Jun 17, 2025 |
| PROMPT PAYMENT INTEREST | 110 | $29,667 | Feb 2, 2010 – Jun 30, 2025 |
| TRAINING PRGM CITY EMPLOYEES | 1 | $19,929 | Nov 17, 2015 – Nov 17, 2015 |
| PROF SERV OTHER | 53 | $1,989,203 | Apr 15, 2013 – Aug 17, 2020 |
| N/A | 702 | $18,834,085 | May 31, 2014 – Jun 5, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 2 | $163,829 | Apr 20, 2017 – Apr 20, 2017 |
| MAINT & REP GENERAL | 3 | $109,943 | Aug 1, 2016 – Jun 15, 2022 |
| <Non-Applicable Expenditure Object> | 3 | -$1,050 | Aug 29, 2011 – Apr 25, 2018 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 934 payments$48,402,310
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2024 | Department of Environmental Protection | $756,088.33 | CONTRACTUAL SERVICES GENERAL | – |
| May 23, 2025 | Department of Environmental Protection | $711,476.32 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 25, 2024 | Department of Environmental Protection | $628,482.79 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 25, 2025 | Department of Environmental Protection | $608,963.63 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2025 | Department of Environmental Protection | $515,187.39 | DESIGN-CONSULTANT-IOTB | – |
| Aug 6, 2024 | Department of Environmental Protection | $493,646.25 | DESIGN-CONSULTANT-IOTB | – |
| Apr 14, 2025 | Department of Environmental Protection | $486,813.90 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2024 | Department of Environmental Protection | $457,179.73 | DESIGN-CONSULTANT-IOTB | – |
| Jun 30, 2025 | Department of Environmental Protection | $420,824.50 | DESIGN-CONSULTANT-IOTB | – |
| May 13, 2025 | Department of Environmental Protection | $413,506.66 | DESIGN-CONSULTANT-IOTB | – |
| May 21, 2025 | Department of Environmental Protection | $404,481.58 | DESIGN-CONSULTANT-IOTB | – |
| Jan 24, 2025 | Department of Environmental Protection | $402,506.92 | DESIGN-CONSULTANT-IOTB | – |
| Feb 6, 2025 | Department of Environmental Protection | $365,997.87 | DESIGN-CONSULTANT-IOTB | – |
| Jan 22, 2025 | Department of Environmental Protection | $326,443.88 | DESIGN-CONSULTANT-IOTB | – |
| Jul 29, 2024 | Department of Environmental Protection | $320,465.73 | DESIGN-CONSULTANT-IOTB | – |
| Mar 12, 2025 | Department of Environmental Protection | $320,239.46 | DESIGN-CONSULTANT-IOTB | – |
| Dec 11, 2024 | Department of Environmental Protection | $314,398.91 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2024 | Department of Environmental Protection | $308,203.87 | DESIGN-CONSULTANT-IOTB | – |
| Apr 1, 2025 | Water Supply | $297,900.59 | DESIGN-CONSULTANT-IOTB | – |
| Aug 6, 2024 | Department of Environmental Protection | $289,919.24 | DESIGN-CONSULTANT-IOTB | – |
FY 2024top 20 of 865 payments$39,009,246
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 6, 2023 | Water Supply | $1,486,611.34 | DESIGN-CONSULTANT-IOTB | – |
| Mar 14, 2024 | Water Supply | $1,099,763.77 | DESIGN-CONSULTANT-IOTB | – |
| May 14, 2024 | Department of Environmental Protection | $468,540.45 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2023 | Department of Environmental Protection | $429,125.85 | DESIGN-CONSULTANT-IOTB | – |
| Jul 7, 2023 | Water Supply | $377,153.68 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2024 | Water Supply | $356,336.68 | DESIGN-CONSULTANT-IOTB | – |
| Jul 11, 2023 | Department of Environmental Protection | $347,629.62 | OTHR SERV AND CHRGS-GENERAL | – |
| Oct 13, 2023 | Department of Environmental Protection | $346,615.34 | DESIGN-CONSULTANT-IOTB | – |
| Oct 24, 2023 | Department of Environmental Protection | $342,404.55 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2024 | Department of Environmental Protection | $341,669.81 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2024 | Department of Environmental Protection | $330,299.88 | DESIGN-CONSULTANT-IOTB | – |
| Jan 16, 2024 | Water Supply | $305,940.55 | DESIGN-CONSULTANT-IOTB | – |
| Sep 14, 2023 | Department of Environmental Protection | $304,058.59 | DESIGN-CONSULTANT-IOTB | – |
| May 1, 2024 | Water Supply | $297,875.90 | DESIGN-CONSULTANT-IOTB | – |
| May 3, 2024 | Department of Environmental Protection | $295,420.94 | DESIGN-CONSULTANT-IOTB | – |
| Apr 19, 2024 | Department of Environmental Protection | $294,612.77 | DESIGN-CONSULTANT-IOTB | – |
| Feb 21, 2024 | Department of Environmental Protection | $292,054.76 | DESIGN-CONSULTANT-IOTB | – |
| Jun 17, 2024 | Department of Environmental Protection | $289,281.13 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2024 | Department of Environmental Protection | $288,119.48 | OTHR SERV AND CHRGS-GENERAL | – |
| Nov 20, 2023 | Water Supply | $283,873.78 | DESIGN-CONSULTANT-IOTB | – |
FY 2023top 20 of 531 payments$33,304,405
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 28, 2022 | Water Supply | $938,566.22 | DESIGN-CONSULTANT-IOTB | – |
| Oct 27, 2022 | Water Supply | $919,049.33 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2022 | Water Supply | $915,032.55 | DESIGN-CONSULTANT-IOTB | – |
| Jan 5, 2023 | Water Supply | $877,547.33 | DESIGN-CONSULTANT-IOTB | – |
| Sep 22, 2022 | Water Supply | $791,832.67 | DESIGN-CONSULTANT-IOTB | – |
| Apr 5, 2023 | Water Supply | $692,703.08 | DESIGN-CONSULTANT-IOTB | – |
| Mar 10, 2023 | Water Supply | $629,398.14 | DESIGN-CONSULTANT-IOTB | – |
| Jun 8, 2023 | Water Supply | $614,782.48 | DESIGN-CONSULTANT-IOTB | – |
| Jul 20, 2022 | Water Supply | $410,605.41 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2023 | Water Supply | $403,065.86 | DESIGN-CONSULTANT-IOTB | – |
| Sep 8, 2022 | Water Supply | $393,997.64 | DESIGN-CONSULTANT-IOTB | – |
| Aug 30, 2022 | Department of Environmental Protection | $341,143.84 | DESIGN-CONSULTANT-IOTB | – |
| Nov 30, 2022 | Department of Environmental Protection | $306,572.03 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2023 | Department of Environmental Protection | $274,079.41 | DESIGN-CONSULTANT-IOTB | – |
| May 1, 2023 | Department of Environmental Protection | $270,079.00 | DESIGN-CONSULTANT-IOTB | – |
| Jan 27, 2023 | Department of Environmental Protection | $262,968.64 | DESIGN-CONSULTANT-IOTB | – |
| Sep 26, 2022 | Department of Environmental Protection | $254,049.93 | DESIGN-CONSULTANT-IOTB | – |
| Feb 6, 2023 | Department of Environmental Protection | $238,345.45 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 9, 2022 | Department of Environmental Protection | $235,324.63 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2022 | Department of Environmental Protection | $234,702.95 | DESIGN-CONSULTANT-IOTB | – |
FY 2022top 20 of 560 payments$37,722,039
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 4, 2022 | Water Supply | $968,889.05 | DESIGN-CONSULTANT-IOTB | – |
| Jun 9, 2022 | Water Supply | $925,901.02 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2022 | Water Supply | $890,254.27 | DESIGN-CONSULTANT-IOTB | – |
| Jun 30, 2022 | Water Supply | $867,024.63 | DESIGN-CONSULTANT-IOTB | – |
| Apr 27, 2022 | Water Supply | $836,291.09 | DESIGN-CONSULTANT-IOTB | – |
| Aug 2, 2021 | Water Supply | $717,064.35 | DESIGN-CONSULTANT-IOTB | – |
| Sep 14, 2021 | Water Supply | $685,193.09 | DESIGN-CONSULTANT-IOTB | – |
| Oct 27, 2021 | Water Supply | $637,503.04 | DESIGN-CONSULTANT-IOTB | – |
| Jan 26, 2022 | Water Supply | $536,832.32 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2022 | Water Supply | $520,638.08 | DESIGN-CONSULTANT-IOTB | – |
| Sep 28, 2021 | Water Supply | $507,078.43 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2022 | Water Supply | $492,102.14 | DESIGN-CONSULTANT-IOTB | – |
| Nov 22, 2021 | Water Supply | $457,451.68 | DESIGN-CONSULTANT-IOTB | – |
| Nov 29, 2021 | Water Supply | $455,708.59 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2022 | Water Supply | $419,913.91 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2022 | Department of Environmental Protection | $412,527.41 | DESIGN-CONSULTANT-IOTB | – |
| May 25, 2022 | Water Supply | $372,215.45 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2022 | Water Supply | $325,490.97 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2021 | Water Supply | $323,626.64 | DESIGN-CONSULTANT-IOTB | – |
| Apr 4, 2022 | Water Supply | $306,588.75 | DESIGN-CONSULTANT-IOTB | – |
FY 2021top 20 of 568 payments$32,380,036
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 24, 2021 | Water Supply | $673,972.41 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2021 | Water Supply | $462,557.35 | DESIGN-CONSULTANT-IOTB | – |
| Jan 21, 2021 | Department of Environmental Protection | $410,299.08 | DESIGN-CONSULTANT-IOTB | – |
| May 3, 2021 | Department of Environmental Protection | $377,333.17 | DESIGN-CONSULTANT-IOTB | – |
| Jul 2, 2020 | Department of Environmental Protection | $309,157.60 | DESIGN-CONSULTANT-IOTB | – |
| Apr 14, 2021 | Water Supply | $296,471.70 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2020 | Department of Environmental Protection | $264,653.11 | IOTB CONSTRUCTION | – |
| May 3, 2021 | Water Supply | $247,487.79 | DESIGN-CONSULTANT-IOTB | – |
| Oct 26, 2020 | Department of Environmental Protection | $245,560.60 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2021 | Water Supply | $243,691.27 | DESIGN-CONSULTANT-IOTB | – |
| Aug 25, 2020 | Department of Environmental Protection | $240,195.21 | DESIGN-CONSULTANT-IOTB | – |
| Sep 29, 2020 | Department of Environmental Protection | $240,095.28 | DESIGN-CONSULTANT-IOTB | – |
| Sep 29, 2020 | Department of Environmental Protection | $233,265.38 | DESIGN-CONSULTANT-IOTB | – |
| Jan 14, 2021 | Department of Environmental Protection | $231,890.39 | DESIGN-CONSULTANT-IOTB | – |
| Mar 2, 2021 | Water Supply | $230,915.30 | DESIGN-CONSULTANT-IOTB | – |
| Apr 26, 2021 | Department of Environmental Protection | $226,294.94 | IOTB CONSTRUCTION | – |
| May 25, 2021 | Department of Environmental Protection | $220,780.39 | DESIGN-CONSULTANT-IOTB | – |
| Nov 2, 2020 | Department of Environmental Protection | $217,122.58 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2020 | Department of Environmental Protection | $215,775.72 | DESIGN-CONSULTANT-IOTB | – |
| Oct 21, 2020 | Department of Environmental Protection | $210,790.10 | CONTRACTUAL SERVICES GENERAL | – |
FY 2020top 20 of 492 payments$38,113,300
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 21, 2019 | Department of Environmental Protection | $1,540,201.02 | DESIGN-CONSULTANT-IOTB | – |
| Nov 6, 2019 | Department of Environmental Protection | $1,334,175.32 | DESIGN-CONSULTANT-IOTB | – |
| Oct 2, 2019 | Department of Environmental Protection | $1,247,924.12 | DESIGN-CONSULTANT-IOTB | – |
| Nov 25, 2019 | Department of Environmental Protection | $1,118,529.49 | DESIGN-CONSULTANT-IOTB | – |
| Aug 14, 2019 | Department of Environmental Protection | $1,030,768.07 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2019 | Department of Environmental Protection | $515,355.44 | IOTB CONSTRUCTION | – |
| Dec 4, 2019 | Department of Environmental Protection | $450,301.96 | IOTB CONSTRUCTION | – |
| Aug 5, 2019 | Water Supply | $444,995.91 | DESIGN-CONSULTANT-IOTB | – |
| Nov 15, 2019 | Department of Environmental Protection | $444,025.83 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2019 | Department of Environmental Protection | $409,511.58 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2020 | Department of Environmental Protection | $404,232.79 | IOTB CONSTRUCTION | – |
| Dec 19, 2019 | Department of Environmental Protection | $396,866.25 | DESIGN-CONSULTANT-IOTB | – |
| Sep 12, 2019 | Department of Environmental Protection | $375,946.09 | IOTB CONSTRUCTION | – |
| Aug 5, 2019 | Department of Environmental Protection | $375,911.85 | IOTB CONSTRUCTION | – |
| Mar 20, 2020 | Department of Environmental Protection | $343,102.58 | IOTB CONSTRUCTION | – |
| Mar 30, 2020 | Department of Environmental Protection | $332,305.06 | IOTB CONSTRUCTION | – |
| Jan 6, 2020 | Water Supply | $309,563.32 | DESIGN-CONSULTANT-IOTB | – |
| Feb 24, 2020 | Department of Environmental Protection | $296,412.88 | DESIGN-CONSULTANT-IOTB | – |
| Aug 15, 2019 | Department of Environmental Protection | $293,277.47 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 2, 2019 | Water Supply | $287,916.05 | DESIGN-CONSULTANT-IOTB | – |
FY 2019top 20 of 358 payments$46,646,394
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2018 | Department of Environmental Protection | $1,930,689.65 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2019 | Department of Environmental Protection | $1,883,903.26 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2019 | Department of Environmental Protection | $1,846,914.15 | DESIGN-CONSULTANT-IOTB | – |
| Mar 25, 2019 | Department of Environmental Protection | $1,775,148.53 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2018 | Department of Environmental Protection | $1,626,802.68 | DESIGN-CONSULTANT-IOTB | – |
| Nov 19, 2018 | Department of Environmental Protection | $1,531,877.75 | DESIGN-CONSULTANT-IOTB | – |
| Dec 21, 2018 | Department of Environmental Protection | $1,473,939.34 | DESIGN-CONSULTANT-IOTB | – |
| Feb 11, 2019 | Department of Environmental Protection | $1,445,128.04 | DESIGN-CONSULTANT-IOTB | – |
| Aug 9, 2018 | Department of Environmental Protection | $1,439,940.95 | DESIGN-CONSULTANT-IOTB | – |
| Jun 3, 2019 | Department of Environmental Protection | $1,341,021.26 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2019 | Department of Environmental Protection | $1,158,425.33 | DESIGN-CONSULTANT-IOTB | – |
| Aug 27, 2018 | Department of Environmental Protection | $1,157,309.33 | DESIGN-CONSULTANT-IOTB | – |
| Dec 6, 2018 | Department of Environmental Protection | $508,959.86 | IOTB CONSTRUCTION | – |
| Sep 13, 2018 | Department of Environmental Protection | $467,584.22 | IOTB CONSTRUCTION | – |
| Feb 25, 2019 | Department of Environmental Protection | $458,094.69 | IOTB CONSTRUCTION | – |
| Jan 18, 2019 | Department of Environmental Protection | $365,034.77 | IOTB CONSTRUCTION | – |
| Apr 9, 2019 | Department of Environmental Protection | $299,683.35 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2019 | Department of Environmental Protection | $298,427.56 | DESIGN-CONSULTANT-IOTB | – |
| Nov 2, 2018 | Department of Environmental Protection | $290,940.44 | CONTRACTUAL SERVICES GENERAL | – |
| May 6, 2019 | Department of Environmental Protection | $283,801.07 | DESIGN-CONSULTANT-IOTB | – |
FY 2018top 20 of 259 payments$32,761,214
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 15, 2017 | Department of Environmental Protection | $1,577,771.88 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2018 | Department of Environmental Protection | $1,346,107.70 | DESIGN-CONSULTANT-IOTB | – |
| Feb 16, 2018 | Department of Environmental Protection | $1,302,349.58 | DESIGN-CONSULTANT-IOTB | – |
| Jul 5, 2017 | Department of Environmental Protection | $1,300,761.95 | DESIGN-CONSULTANT-IOTB | – |
| Sep 27, 2017 | Department of Environmental Protection | $1,292,245.42 | DESIGN-CONSULTANT-IOTB | – |
| Nov 30, 2017 | Department of Environmental Protection | $1,289,641.13 | DESIGN-CONSULTANT-IOTB | – |
| Mar 28, 2018 | Department of Environmental Protection | $1,227,455.06 | DESIGN-CONSULTANT-IOTB | – |
| Apr 30, 2018 | Department of Environmental Protection | $1,223,142.98 | DESIGN-CONSULTANT-IOTB | – |
| Oct 23, 2017 | Department of Environmental Protection | $1,213,041.53 | DESIGN-CONSULTANT-IOTB | – |
| Jun 22, 2018 | Department of Environmental Protection | $984,182.92 | DESIGN-CONSULTANT-IOTB | – |
| Jan 5, 2018 | Department of Environmental Protection | $742,063.00 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2017 | Department of Environmental Protection | $504,477.94 | IOTB CONSTRUCTION | – |
| Aug 14, 2017 | Department of Environmental Protection | $330,817.65 | DESIGN-CONSULTANT-IOTB | – |
| Nov 20, 2017 | Department of Environmental Protection | $302,610.63 | IOTB CONSTRUCTION | – |
| Jan 24, 2018 | Department of Environmental Protection | $290,454.48 | IOTB CONSTRUCTION | – |
| Jun 18, 2018 | Department of Environmental Protection | $289,051.97 | IOTB CONSTRUCTION | – |
| May 30, 2018 | Department of Environmental Protection | $263,850.69 | IOTB CONSTRUCTION | – |
| Dec 20, 2017 | Department of Environmental Protection | $262,552.85 | IOTB CONSTRUCTION | – |
| Apr 23, 2018 | Department of Environmental Protection | $262,200.68 | IOTB CONSTRUCTION | – |
| Aug 30, 2017 | Department of Environmental Protection | $257,885.46 | IOTB CONSTRUCTION | – |
FY 2017top 20 of 222 payments$21,953,118
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2016 | Department of Environmental Protection | $1,467,430.68 | DESIGN-CONSULTANT-IOTB | – |
| Jun 16, 2017 | Department of Environmental Protection | $1,229,611.02 | DESIGN-CONSULTANT-IOTB | – |
| Mar 13, 2017 | Department of Environmental Protection | $913,146.91 | DESIGN-CONSULTANT-IOTB | – |
| Apr 10, 2017 | Department of Environmental Protection | $912,787.19 | DESIGN-CONSULTANT-IOTB | – |
| Feb 28, 2017 | Department of Environmental Protection | $860,534.49 | DESIGN-CONSULTANT-IOTB | – |
| Dec 16, 2016 | Department of Environmental Protection | $730,341.41 | DESIGN-CONSULTANT-IOTB | – |
| Jan 23, 2017 | Department of Design and Construction | $656,856.88 | N/A | – |
| Nov 28, 2016 | Department of Environmental Protection | $536,053.54 | DESIGN-CONSULTANT-IOTB | – |
| Dec 22, 2016 | Department of Design and Construction | $525,485.50 | N/A | – |
| Sep 26, 2016 | Department of Environmental Protection | $511,038.70 | DESIGN-CONSULTANT-IOTB | – |
| Apr 14, 2017 | Department of Environmental Protection | $472,244.51 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Jun 26, 2017 | Department of Environmental Protection | $316,242.57 | IOTB CONSTRUCTION | – |
| Aug 31, 2016 | Department of Environmental Protection | $297,521.76 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 3, 2017 | Department of Environmental Protection | $295,234.25 | DATA PROCESSING EQUIPMENT MAINTENANCE | – |
| Sep 26, 2016 | Department of Environmental Protection | $290,772.32 | DESIGN-CONSULTANT-IOTB | – |
| Nov 2, 2016 | Department of Environmental Protection | $281,816.75 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2016 | Department of Environmental Protection | $263,064.70 | DESIGN-CONSULTANT-IOTB | – |
| May 1, 2017 | Department of Design and Construction | $262,742.75 | N/A | – |
| May 12, 2017 | Department of Design and Construction | $262,742.75 | N/A | – |
| Feb 8, 2017 | Department of Design and Construction | $262,742.75 | N/A | – |
FY 2016top 20 of 268 payments$15,861,627
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 28, 2016 | Department of Environmental Protection | $1,156,120.47 | DESIGN-CONSULTANT-IOTB | – |
| May 18, 2016 | Department of Environmental Protection | $441,999.68 | DESIGN-CONSULTANT-IOTB | – |
| Sep 2, 2015 | Department of Environmental Protection | $416,000.00 | OTHR SERV AND CHRGS-GENERAL | – |
| Jul 23, 2015 | Department of Environmental Protection | $385,253.06 | DESIGN-CONSULTANT-IOTB | – |
| Feb 24, 2016 | Department of Environmental Protection | $351,534.01 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2016 | Department of Transportation | $331,788.63 | DESIGN-CONSULTANT-IOTB | – |
| Jul 2, 2015 | Department of Environmental Protection | $303,315.25 | DESIGN-CONSULTANT-IOTB | – |
| May 9, 2016 | Department of Environmental Protection | $302,622.29 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2016 | Department of Environmental Protection | $277,875.12 | DESIGN-CONSULTANT-IOTB | – |
| Jun 3, 2016 | Department of Environmental Protection | $243,497.22 | DESIGN-CONSULTANT-IOTB | – |
| May 31, 2016 | Department of Environmental Protection | $243,000.00 | OTHR SERV AND CHRGS-GENERAL | – |
| Oct 21, 2015 | Department of Environmental Protection | $219,517.72 | DESIGN-CONSULTANT-IOTB | – |
| Aug 3, 2015 | Department of Environmental Protection | $214,133.42 | DESIGN-CONSULTANT-IOTB | – |
| Jul 2, 2015 | Department of Environmental Protection | $213,761.80 | DESIGN-CONSULTANT-IOTB | – |
| Jan 13, 2016 | Department of Environmental Protection | $211,150.90 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2016 | Department of Environmental Protection | $207,122.90 | DESIGN-CONSULTANT-IOTB | – |
| Dec 28, 2015 | Department of Environmental Protection | $186,025.20 | DESIGN-CONSULTANT-IOTB | – |
| Oct 5, 2015 | Department of Environmental Protection | $178,561.43 | DESIGN-CONSULTANT-IOTB | – |
| Oct 7, 2015 | Department of Environmental Protection | $177,397.45 | DESIGN-CONSULTANT-IOTB | – |
| Aug 12, 2015 | Department of Environmental Protection | $163,378.75 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 345 payments$18,191,751
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 19, 2015 | Department of Environmental Protection | $1,167,595.49 | DESIGN-CONSULTANT-IOTB | – |
| Oct 20, 2014 | Department of Environmental Protection | $792,329.25 | DESIGN-CONSULTANT-IOTB | – |
| Apr 20, 2015 | Department of Environmental Protection | $667,691.10 | DESIGN-CONSULTANT-IOTB | – |
| Sep 29, 2014 | Department of Environmental Protection | $658,959.25 | DESIGN-CONSULTANT-IOTB | – |
| Jun 3, 2015 | Department of Environmental Protection | $635,122.27 | DESIGN-CONSULTANT-IOTB | – |
| May 14, 2015 | Department of Environmental Protection | $535,404.34 | DESIGN-CONSULTANT-IOTB | – |
| Nov 21, 2014 | Department of Environmental Protection | $473,036.35 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2015 | Department of Environmental Protection | $445,721.25 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2014 | Department of Environmental Protection | $301,075.30 | DESIGN-CONSULTANT-IOTB | – |
| Aug 11, 2014 | Department of Environmental Protection | $291,149.82 | DESIGN-CONSULTANT-IOTB | – |
| Sep 2, 2014 | Department of Environmental Protection | $277,203.17 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2015 | Department of Environmental Protection | $276,545.97 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2015 | Department of Environmental Protection | $275,214.00 | DESIGN-CONSULTANT-IOTB | – |
| Jan 2, 2015 | Department of Environmental Protection | $257,160.07 | DESIGN-CONSULTANT-IOTB | – |
| Feb 23, 2015 | Department of Environmental Protection | $255,904.38 | DESIGN-CONSULTANT-IOTB | – |
| Feb 17, 2015 | Department of Environmental Protection | $246,171.07 | DESIGN-CONSULTANT-IOTB | – |
| Sep 2, 2014 | Department of Environmental Protection | $235,625.60 | DESIGN-CONSULTANT-IOTB | – |
| Nov 14, 2014 | Department of Environmental Protection | $225,000.00 | OTHR SERV AND CHRGS-GENERAL | – |
| Mar 30, 2015 | Department of Environmental Protection | $224,452.52 | DESIGN-CONSULTANT-IOTB | – |
| Feb 5, 2015 | Department of Environmental Protection | $216,451.04 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 346 payments$22,652,487
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2013 | Department of Environmental Protection | $733,543.58 | DESIGN-CONSULTANT-IOTB | – |
| Aug 26, 2013 | Department of Environmental Protection | $509,585.19 | DESIGN-CONSULTANT-IOTB | – |
| Feb 20, 2014 | Department of Environmental Protection | $395,130.08 | DESIGN-CONSULTANT-IOTB | – |
| Jul 29, 2013 | Department of Environmental Protection | $379,064.08 | DESIGN-CONSULTANT-IOTB | – |
| Sep 23, 2013 | Department of Environmental Protection | $359,543.10 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2013 | Department of Environmental Protection | $330,664.71 | DESIGN-CONSULTANT-IOTB | – |
| Jun 25, 2014 | Department of Environmental Protection | $326,693.31 | DESIGN-CONSULTANT-IOTB | – |
| Jul 25, 2013 | Department of Environmental Protection | $306,303.85 | DESIGN-CONSULTANT-IOTB | – |
| Jul 8, 2013 | Department of Environmental Protection | $300,850.68 | DESIGN-CONSULTANT-IOTB | – |
| Jul 5, 2013 | Department of Environmental Protection | $299,608.64 | DESIGN-CONSULTANT-IOTB | – |
| Dec 24, 2013 | Department of Environmental Protection | $299,351.10 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2013 | Department of Environmental Protection | $297,788.93 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2014 | Department of Environmental Protection | $291,159.39 | DESIGN-CONSULTANT-IOTB | – |
| Nov 18, 2013 | Department of Environmental Protection | $289,378.57 | DESIGN-CONSULTANT-IOTB | – |
| Aug 26, 2013 | Department of Environmental Protection | $283,151.00 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2013 | Department of Environmental Protection | $277,327.53 | DESIGN-CONSULTANT-IOTB | – |
| Nov 27, 2013 | Department of Environmental Protection | $273,362.82 | DESIGN-CONSULTANT-IOTB | – |
| Jan 8, 2014 | Department of Environmental Protection | $272,454.27 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2013 | Department of Environmental Protection | $270,175.19 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2014 | Department of Environmental Protection | $263,917.50 | DESIGN-CONSULTANT-IOTB | – |
FY 2013top 20 of 384 payments$32,945,514
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2012 | Department of Environmental Protection | $4,551,010.34 | DESIGN-CONSULTANT-IOTB | – |
| Nov 19, 2012 | Department of Environmental Protection | $931,759.07 | DESIGN-CONSULTANT-IOTB | – |
| Jun 28, 2013 | Department of Environmental Protection | $825,368.51 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2012 | Department of Environmental Protection | $702,943.44 | DESIGN-CONSULTANT-IOTB | – |
| Jul 20, 2012 | Department of Environmental Protection | $688,225.11 | DESIGN-CONSULTANT-IOTB | – |
| Nov 23, 2012 | Department of Environmental Protection | $644,868.96 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2013 | Department of Environmental Protection | $618,963.73 | DESIGN-CONSULTANT-IOTB | – |
| Mar 20, 2013 | Department of Environmental Protection | $589,810.75 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2012 | Department of Environmental Protection | $474,072.25 | DESIGN-CONSULTANT-IOTB | – |
| Mar 14, 2013 | Department of Environmental Protection | $420,991.49 | DESIGN-CONSULTANT-IOTB | – |
| Nov 15, 2012 | Department of Environmental Protection | $402,671.91 | DESIGN-CONSULTANT-IOTB | – |
| May 31, 2013 | Department of Environmental Protection | $388,243.25 | DESIGN-CONSULTANT-IOTB | – |
| Dec 31, 2012 | Department of Environmental Protection | $387,496.12 | DESIGN-CONSULTANT-IOTB | – |
| Jun 3, 2013 | Department of Environmental Protection | $383,479.47 | DESIGN-CONSULTANT-IOTB | – |
| Feb 21, 2013 | Department of Environmental Protection | $383,289.69 | DESIGN-CONSULTANT-IOTB | – |
| Jul 13, 2012 | Department of Environmental Protection | $363,454.78 | DESIGN-CONSULTANT-IOTB | – |
| Aug 6, 2012 | Department of Environmental Protection | $362,932.18 | DESIGN-CONSULTANT-IOTB | – |
| Nov 7, 2012 | Department of Environmental Protection | $361,082.12 | DESIGN-CONSULTANT-IOTB | – |
| Apr 24, 2013 | Department of Environmental Protection | $358,643.60 | DESIGN-CONSULTANT-IOTB | – |
| May 15, 2013 | Department of Environmental Protection | $352,683.05 | DESIGN-CONSULTANT-IOTB | – |
FY 2012top 20 of 456 payments$32,589,418
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 11, 2012 | Department of Environmental Protection | $3,796,931.73 | DESIGN-CONSULTANT-IOTB | – |
| Sep 6, 2011 | Department of Environmental Protection | $1,763,785.73 | DESIGN-CONSULTANT-IOTB | – |
| Sep 15, 2011 | Department of Environmental Protection | $1,038,845.11 | DESIGN-CONSULTANT-IOTB | – |
| Nov 29, 2011 | Department of Environmental Protection | $836,201.46 | DESIGN-CONSULTANT-IOTB | – |
| Jan 12, 2012 | Department of Environmental Protection | $545,489.05 | DESIGN-CONSULTANT-IOTB | – |
| Oct 28, 2011 | Department of Environmental Protection | $538,474.21 | DESIGN-CONSULTANT-IOTB | – |
| Mar 9, 2012 | Department of Environmental Protection | $491,734.20 | DESIGN-CONSULTANT-IOTB | – |
| Aug 25, 2011 | Department of Environmental Protection | $489,610.62 | DESIGN-CONSULTANT-IOTB | – |
| Feb 21, 2012 | Department of Environmental Protection | $485,977.56 | DESIGN-CONSULTANT-IOTB | – |
| Nov 25, 2011 | Department of Environmental Protection | $467,060.81 | DESIGN-CONSULTANT-IOTB | – |
| Mar 16, 2012 | Department of Environmental Protection | $445,107.56 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2012 | Department of Environmental Protection | $416,416.65 | DESIGN-CONSULTANT-IOTB | – |
| Sep 19, 2011 | Department of Environmental Protection | $402,644.72 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2012 | Department of Environmental Protection | $396,803.12 | DESIGN-CONSULTANT-IOTB | – |
| Sep 19, 2011 | Department of Environmental Protection | $380,496.04 | DESIGN-CONSULTANT-IOTB | – |
| Jun 25, 2012 | Department of Environmental Protection | $299,840.81 | DESIGN-CONSULTANT-IOTB | – |
| Dec 7, 2011 | Department of Environmental Protection | $295,711.48 | DESIGN-CONSULTANT-IOTB | – |
| Mar 26, 2012 | Department of Environmental Protection | $287,785.36 | DESIGN-CONSULTANT-IOTB | – |
| Mar 12, 2012 | Department of Environmental Protection | $260,736.07 | DESIGN-CONSULTANT-IOTB | – |
| Dec 13, 2011 | Department of Environmental Protection | $255,311.59 | DESIGN-CONSULTANT-IOTB | – |
FY 2011top 20 of 400 payments$40,141,160
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2010 | Department of Environmental Protection | $2,479,646.76 | DESIGN-CONSULTANT-IOTB | – |
| Sep 1, 2010 | Department of Environmental Protection | $1,174,180.04 | DESIGN-CONSULTANT-IOTB | – |
| Jun 10, 2011 | Department of Environmental Protection | $1,107,219.10 | DESIGN-CONSULTANT-IOTB | – |
| Sep 7, 2010 | Department of Environmental Protection | $1,031,278.59 | DESIGN-CONSULTANT-IOTB | – |
| Jun 20, 2011 | Department of Environmental Protection | $634,815.22 | DESIGN-CONSULTANT-IOTB | – |
| Oct 22, 2010 | Department of Environmental Protection | $607,367.57 | DESIGN-CONSULTANT-IOTB | – |
| Oct 28, 2010 | Department of Environmental Protection | $582,989.81 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2011 | Department of Environmental Protection | $569,253.21 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2011 | Department of Environmental Protection | $535,990.36 | DESIGN-CONSULTANT-IOTB | – |
| Oct 4, 2010 | Department of Environmental Protection | $500,860.92 | DESIGN-CONSULTANT-IOTB | – |
| Apr 25, 2011 | Department of Environmental Protection | $497,076.81 | DESIGN-CONSULTANT-IOTB | – |
| Nov 26, 2010 | Department of Environmental Protection | $484,028.54 | DESIGN-CONSULTANT-IOTB | – |
| Feb 28, 2011 | Department of Environmental Protection | $483,415.34 | DESIGN-CONSULTANT-IOTB | – |
| Mar 24, 2011 | Department of Environmental Protection | $480,408.64 | DESIGN-CONSULTANT-IOTB | – |
| Jan 18, 2011 | Department of Environmental Protection | $477,145.88 | DESIGN-CONSULTANT-IOTB | – |
| Jul 29, 2010 | Department of Environmental Protection | $448,370.95 | DESIGN-CONSULTANT-IOTB | – |
| Jun 23, 2011 | Department of Environmental Protection | $448,225.52 | DESIGN-CONSULTANT-IOTB | – |
| Jul 6, 2010 | Department of Environmental Protection | $431,935.19 | DESIGN-CONSULTANT-IOTB | – |
| Nov 15, 2010 | Department of Environmental Protection | $418,086.62 | DESIGN-CONSULTANT-IOTB | – |
| Jul 6, 2010 | Department of Environmental Protection | $378,510.83 | DESIGN-CONSULTANT-IOTB | – |
FY 2010top 20 of 160 payments$14,062,950
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 21, 2010 | Department of Environmental Protection | $586,137.13 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2010 | Department of Environmental Protection | $576,119.93 | DESIGN-CONSULTANT-IOTB | – |
| Mar 31, 2010 | Department of Environmental Protection | $550,650.78 | DESIGN-CONSULTANT-IOTB | – |
| Jun 28, 2010 | Department of Environmental Protection | $525,232.36 | DESIGN-CONSULTANT-IOTB | – |
| Mar 1, 2010 | Department of Environmental Protection | $493,503.69 | DESIGN-CONSULTANT-IOTB | – |
| Jun 23, 2010 | Department of Environmental Protection | $433,427.67 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2010 | Department of Environmental Protection | $420,495.04 | DESIGN-CONSULTANT-IOTB | – |
| Mar 11, 2010 | Department of Environmental Protection | $367,219.35 | DESIGN-CONSULTANT-IOTB | – |
| Feb 8, 2010 | Department of Environmental Protection | $358,303.81 | DESIGN-CONSULTANT-IOTB | – |
| Jan 27, 2010 | Department of Environmental Protection | $346,880.22 | DESIGN-CONSULTANT-IOTB | – |
| Jan 11, 2010 | Department of Environmental Protection | $340,562.51 | DESIGN-CONSULTANT-IOTB | – |
| Feb 1, 2010 | Department of Environmental Protection | $304,576.40 | DESIGN-CONSULTANT-IOTB | – |
| Apr 30, 2010 | Department of Environmental Protection | $298,349.24 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2010 | Department of Environmental Protection | $263,462.63 | DESIGN-CONSULTANT-IOTB | – |
| Jun 14, 2010 | Department of Environmental Protection | $259,991.17 | DESIGN-CONSULTANT-IOTB | – |
| May 24, 2010 | Department of Environmental Protection | $258,649.03 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2010 | Department of Environmental Protection | $255,964.96 | DESIGN-CONSULTANT-IOTB | – |
| Jun 1, 2010 | Department of Environmental Protection | $251,644.27 | DESIGN-CONSULTANT-IOTB | – |
| Feb 25, 2010 | Department of Environmental Protection | $248,862.70 | DESIGN-CONSULTANT-IOTB | – |
| Apr 9, 2010 | Department of Environmental Protection | $239,999.99 | DESIGN-CONSULTANT-IOTB | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Department of Environmental Protection | $420,824.50 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $44.55 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $188,176.84 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $9,107.28 | OTHR SERV AND CHRGS-GENERAL | Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $7,726.67 | OTHR SERV AND CHRGS-GENERAL | Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $5,709.42 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $8,916.74 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $28,960.20 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Water Supply | $285,812.14 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 27, 2025 | Department of Environmental Protection | $163,909.69 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 27, 2025 | Department of Environmental Protection | $176,631.05 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $560.11 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $238,160.17 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $608,963.63 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $2,034.24 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $915.82 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $77,959.25 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $1,055.39 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 24, 2025 | Department of Environmental Protection | $4,256.96 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 23, 2025 | Department of Environmental Protection | $10,417.16 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 23, 2025 | Department of Environmental Protection | $18,607.05 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 20, 2025 | Department of Environmental Protection | $165,241.90 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 20, 2025 | Department of Environmental Protection | $42,557.61 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 18, 2025 | Water Supply | $121,134.16 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 18, 2025 | Department of Environmental Protection | $172,313.17 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- New York Power Authority $434,611,466
- Jr Cruz Corp. $373,425,004
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data