STV Inc. is the 296th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 46th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.3% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 15.2% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OTHER EXPENDITURES-REPORTABLE | 3 | $76,390 | Sep 21, 2015 – Dec 14, 2015 |
| PROF SERV OTHER | 334 | $6,468,468 | Jan 11, 2010 – Jun 27, 2016 |
| MAINT & REP GENERAL | 3 | $60,719 | May 28, 2024 – May 6, 2025 |
| OTHR SERV AND CHRGS-GENERAL | 2 | $60,481 | Sep 10, 2024 – Sep 10, 2024 |
| PROMPT PAYMENT INTEREST | 14 | $5,686 | Nov 20, 2023 – Aug 27, 2024 |
| DESIGN-CONSULTANT-IOTB | 1,525 | $39,508,063 | Jan 11, 2010 – Jun 25, 2025 |
| CAPITAL PURCHASED EQUIPMENT | 7 | $36,335 | Apr 12, 2011 – Feb 27, 2012 |
| IOTB CONSTRUCTION | 186 | $32,710,938 | Jul 25, 2016 – May 19, 2025 |
| CONTRACTUAL SERVICES GENERAL | 12 | $229,848 | Oct 12, 2018 – Apr 21, 2025 |
| OTHER EXPENDITURES-GENERAL | 4 | $20,586 | Feb 28, 2013 – May 28, 2013 |
| CONSTRUCTION-BUILDINGS | 15,968 | $126,496,544 | Jan 4, 2010 – Jun 23, 2025 |
| DESIGN-CONSULTANT-BUILDINGS | 145 | $10,965,170 | Jan 13, 2010 – Jun 10, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 226 | $10,483,527 | Mar 22, 2010 – Jun 23, 2025 |
| <Non-Applicable Expenditure Object> | 1 | -$350 | Jan 25, 2011 – Jan 25, 2011 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 1,604 payments$16,606,629
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 7, 2024 | Department of Environmental Protection | $1,187,087.55 | IOTB CONSTRUCTION | – |
| Aug 12, 2024 | Department of Environmental Protection | $699,752.85 | IOTB CONSTRUCTION | – |
| May 19, 2025 | Department of Environmental Protection | $589,143.91 | IOTB CONSTRUCTION | – |
| Nov 12, 2024 | Health and Hospitals Corporation | $554,756.61 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 19, 2025 | Department of Citywide Administrative Services | $545,519.67 | IOTB CONSTRUCTION | – |
| Sep 3, 2024 | Health and Hospitals Corporation | $399,575.88 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 11, 2024 | Department of Environmental Protection | $387,288.45 | IOTB CONSTRUCTION | – |
| Nov 12, 2024 | Health and Hospitals Corporation | $372,959.35 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 11, 2024 | Department of Citywide Administrative Services | $357,922.18 | IOTB CONSTRUCTION | – |
| May 19, 2025 | Department of Citywide Administrative Services | $226,456.18 | IOTB CONSTRUCTION | – |
| Aug 28, 2024 | Department of Environmental Protection | $178,753.26 | DESIGN-CONSULTANT-IOTB | – |
| Jun 16, 2025 | School Construction Authority | $169,173.66 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2025 | School Construction Authority | $154,627.41 | CONSTRUCTION-BUILDINGS | – |
| Dec 11, 2024 | Department of Citywide Administrative Services | $148,580.69 | IOTB CONSTRUCTION | – |
| Sep 16, 2024 | School Construction Authority | $143,361.66 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2024 | School Construction Authority | $141,690.06 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2025 | Department of Environmental Protection | $135,580.98 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2025 | School Construction Authority | $133,871.55 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2024 | Department of Transportation | $121,955.90 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2025 | School Construction Authority | $121,073.08 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 1,054 payments$19,573,851
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 28, 2024 | Department of Environmental Protection | $893,268.70 | IOTB CONSTRUCTION | – |
| Nov 27, 2023 | Department of Citywide Administrative Services | $484,844.93 | IOTB CONSTRUCTION | – |
| Oct 11, 2023 | Department of Citywide Administrative Services | $454,159.79 | IOTB CONSTRUCTION | – |
| Mar 11, 2024 | Department of Citywide Administrative Services | $400,486.21 | IOTB CONSTRUCTION | – |
| Jul 7, 2023 | School Construction Authority | $370,856.24 | CONSTRUCTION-BUILDINGS | – |
| Sep 25, 2023 | Department of Citywide Administrative Services | $356,276.38 | IOTB CONSTRUCTION | – |
| Oct 30, 2023 | Department of City Planning | $310,529.53 | PROF SERV ENGINEER & ARCHITECT | – |
| Aug 14, 2023 | Department of Transportation | $308,430.85 | IOTB CONSTRUCTION | – |
| Jul 31, 2023 | Department of Environmental Protection | $306,660.42 | DESIGN-CONSULTANT-IOTB | – |
| Nov 8, 2023 | School Construction Authority | $303,383.11 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2023 | Department of City Planning | $301,861.45 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 5, 2023 | Department of Environmental Protection | $226,841.29 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2024 | School Construction Authority | $225,508.58 | CONSTRUCTION-BUILDINGS | – |
| Nov 27, 2023 | Department of Citywide Administrative Services | $201,268.88 | IOTB CONSTRUCTION | – |
| Sep 27, 2023 | School Construction Authority | $189,887.59 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2023 | Department of Citywide Administrative Services | $188,530.86 | IOTB CONSTRUCTION | – |
| Mar 11, 2024 | Department of Environmental Protection | $181,091.92 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2024 | School Construction Authority | $180,406.86 | CONSTRUCTION-BUILDINGS | – |
| Aug 8, 2023 | School Construction Authority | $177,640.26 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2024 | Department of City Planning | $176,368.68 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2023top 20 of 1,016 payments$15,494,846
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 21, 2023 | School Construction Authority | $362,205.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2023 | School Construction Authority | $320,173.42 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2022 | Department of Environmental Protection | $297,140.35 | IOTB CONSTRUCTION | – |
| May 23, 2023 | Department of Citywide Administrative Services | $294,771.63 | IOTB CONSTRUCTION | – |
| Dec 27, 2022 | Department of Transportation | $260,685.22 | IOTB CONSTRUCTION | – |
| Jul 11, 2022 | School Construction Authority | $255,285.14 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2022 | School Construction Authority | $246,209.49 | CONSTRUCTION-BUILDINGS | – |
| Dec 20, 2022 | School Construction Authority | $241,470.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2023 | Department of Citywide Administrative Services | $219,043.15 | IOTB CONSTRUCTION | – |
| Sep 20, 2022 | School Construction Authority | $215,559.80 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2023 | School Construction Authority | $214,046.92 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2023 | Department of Environmental Protection | $206,930.93 | IOTB CONSTRUCTION | – |
| Jan 9, 2023 | Department of Environmental Protection | $201,171.68 | IOTB CONSTRUCTION | – |
| Jan 13, 2023 | Department of Transportation | $200,228.80 | IOTB CONSTRUCTION | – |
| Oct 31, 2022 | Department of Transportation | $200,228.80 | IOTB CONSTRUCTION | – |
| Aug 29, 2022 | Department of Transportation | $193,375.00 | IOTB CONSTRUCTION | – |
| Apr 12, 2023 | School Construction Authority | $181,103.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 11, 2022 | School Construction Authority | $155,951.32 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2023 | Department of City Planning | $147,410.05 | PROF SERV ENGINEER & ARCHITECT | – |
| Mar 20, 2023 | Department of Correction | $140,508.69 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2022top 20 of 774 payments$18,472,045
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 23, 2022 | Department of Transportation | $554,973.61 | IOTB CONSTRUCTION | – |
| Jul 26, 2021 | Department of Correction | $486,161.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 18, 2022 | Department of Environmental Protection | $419,963.57 | IOTB CONSTRUCTION | – |
| Jan 10, 2022 | Department of Environmental Protection | $349,530.64 | DESIGN-CONSULTANT-IOTB | – |
| Aug 16, 2021 | Department of Transportation | $324,535.70 | IOTB CONSTRUCTION | – |
| Jun 7, 2022 | School Construction Authority | $315,266.31 | CONSTRUCTION-BUILDINGS | – |
| Aug 16, 2021 | Department of Transportation | $284,747.39 | IOTB CONSTRUCTION | – |
| Dec 13, 2021 | Department of Transportation | $271,019.96 | IOTB CONSTRUCTION | – |
| Jun 27, 2022 | Department of Environmental Protection | $268,659.29 | IOTB CONSTRUCTION | – |
| Dec 23, 2021 | Department of Environmental Protection | $263,749.09 | IOTB CONSTRUCTION | – |
| Aug 24, 2021 | Department of Environmental Protection | $246,160.85 | IOTB CONSTRUCTION | – |
| Feb 14, 2022 | Department of Environmental Protection | $223,550.54 | IOTB CONSTRUCTION | – |
| Nov 17, 2021 | Department of Transportation | $223,489.24 | IOTB CONSTRUCTION | – |
| Jun 14, 2022 | Department of Transportation | $205,632.00 | IOTB CONSTRUCTION | – |
| Aug 16, 2021 | Department of Environmental Protection | $199,845.37 | IOTB CONSTRUCTION | – |
| Aug 18, 2021 | School Construction Authority | $195,412.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2021 | Department of Environmental Protection | $193,377.38 | IOTB CONSTRUCTION | – |
| Aug 9, 2021 | Department of Environmental Protection | $175,638.53 | IOTB CONSTRUCTION | – |
| Mar 30, 2022 | School Construction Authority | $173,067.55 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2022 | School Construction Authority | $165,199.00 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 465 payments$13,308,195
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 7, 2020 | Department of Environmental Protection | $464,298.11 | IOTB CONSTRUCTION | – |
| Nov 23, 2020 | Department of Environmental Protection | $390,945.19 | IOTB CONSTRUCTION | – |
| Feb 5, 2021 | School Construction Authority | $390,825.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 5, 2020 | Department of Correction | $375,892.64 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 22, 2021 | Department of Environmental Protection | $373,159.96 | IOTB CONSTRUCTION | – |
| May 18, 2021 | Department of Environmental Protection | $340,669.44 | IOTB CONSTRUCTION | – |
| Jan 7, 2021 | Department of Transportation | $332,050.63 | IOTB CONSTRUCTION | – |
| Dec 7, 2020 | Department of Transportation | $321,882.81 | IOTB CONSTRUCTION | – |
| Sep 30, 2020 | School Construction Authority | $320,039.29 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2021 | Department of Environmental Protection | $319,657.12 | IOTB CONSTRUCTION | – |
| Aug 31, 2020 | Department of Environmental Protection | $313,016.74 | IOTB CONSTRUCTION | – |
| May 25, 2021 | Department of Environmental Protection | $307,353.20 | IOTB CONSTRUCTION | – |
| May 18, 2021 | Department of Transportation | $289,648.49 | IOTB CONSTRUCTION | – |
| Mar 1, 2021 | Department of Transportation | $287,438.50 | IOTB CONSTRUCTION | – |
| Mar 22, 2021 | Department of Transportation | $287,188.94 | IOTB CONSTRUCTION | – |
| Nov 20, 2020 | School Construction Authority | $261,776.61 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2020 | Department of Transportation | $261,402.85 | DESIGN-CONSULTANT-IOTB | – |
| Sep 18, 2020 | Department of Transportation | $260,204.15 | IOTB CONSTRUCTION | – |
| May 26, 2021 | Department of Transportation | $256,235.95 | IOTB CONSTRUCTION | – |
| Sep 24, 2020 | Department of Transportation | $255,361.62 | IOTB CONSTRUCTION | – |
FY 2020top 20 of 1,227 payments$24,800,383
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 1, 2020 | Department of Correction | $939,093.51 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2019 | Department of Correction | $828,755.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 1, 2019 | Department of Correction | $738,401.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 30, 2019 | Department of Correction | $570,392.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 13, 2019 | Department of Environmental Protection | $528,545.20 | DESIGN-CONSULTANT-IOTB | – |
| Jul 1, 2019 | Department of Correction | $449,464.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 14, 2020 | Department of Correction | $406,569.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 13, 2020 | Department of Environmental Protection | $404,977.90 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2020 | Department of Environmental Protection | $337,031.23 | DESIGN-CONSULTANT-IOTB | – |
| Jul 8, 2019 | Department of City Planning | $330,446.65 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 18, 2019 | Department of Transportation | $325,853.61 | IOTB CONSTRUCTION | – |
| May 14, 2020 | School Construction Authority | $320,039.30 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2020 | Department of Environmental Protection | $289,905.74 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2020 | Department of Transportation | $289,677.61 | IOTB CONSTRUCTION | – |
| Dec 9, 2019 | Department of Transportation | $289,547.52 | IOTB CONSTRUCTION | – |
| Jul 17, 2019 | Department of Transportation | $279,623.34 | IOTB CONSTRUCTION | – |
| Oct 16, 2019 | Department of Correction | $272,179.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 2, 2020 | Department of Transportation | $266,318.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2019 | Department of Transportation | $262,818.34 | IOTB CONSTRUCTION | – |
| Nov 20, 2019 | School Construction Authority | $249,940.00 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 1,229 payments$16,917,350
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 8, 2019 | Department of Transportation | $485,183.14 | IOTB CONSTRUCTION | – |
| Jun 24, 2019 | Department of Environmental Protection | $406,741.76 | DESIGN-CONSULTANT-IOTB | – |
| Jul 12, 2018 | School Construction Authority | $332,388.80 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2018 | School Construction Authority | $325,339.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2018 | Department of Environmental Protection | $312,173.31 | IOTB CONSTRUCTION | – |
| Jul 12, 2018 | School Construction Authority | $310,968.06 | CONSTRUCTION-BUILDINGS | – |
| Oct 2, 2018 | Department of Correction | $300,712.48 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 5, 2019 | Department of Transportation | $265,982.90 | IOTB CONSTRUCTION | – |
| Jul 12, 2018 | School Construction Authority | $230,270.78 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2018 | School Construction Authority | $229,411.09 | CONSTRUCTION-BUILDINGS | – |
| Jun 10, 2019 | Department of Environmental Protection | $223,284.60 | IOTB CONSTRUCTION | – |
| Apr 30, 2019 | Department of Environmental Protection | $222,708.41 | IOTB CONSTRUCTION | – |
| Apr 1, 2019 | Department of Environmental Protection | $218,028.68 | IOTB CONSTRUCTION | – |
| Jul 5, 2018 | School Construction Authority | $203,246.29 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2019 | School Construction Authority | $199,061.63 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2018 | Department of Environmental Protection | $190,932.81 | DESIGN-CONSULTANT-IOTB | – |
| Apr 18, 2019 | School Construction Authority | $185,905.18 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2018 | School Construction Authority | $178,583.49 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2018 | Department of Transportation | $171,618.18 | IOTB CONSTRUCTION | – |
| Jul 16, 2018 | Department of Environmental Protection | $170,987.01 | IOTB CONSTRUCTION | – |
FY 2018top 20 of 1,109 payments$10,670,905
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 24, 2017 | Department of Parks and Recreation | $520,708.76 | IOTB CONSTRUCTION | – |
| Feb 13, 2018 | Department of Transportation | $272,274.13 | DESIGN-CONSULTANT-IOTB | – |
| Jun 1, 2018 | Police Department | $256,600.09 | IOTB CONSTRUCTION | – |
| May 21, 2018 | Department of Transportation | $232,009.44 | IOTB CONSTRUCTION | – |
| May 2, 2018 | School Construction Authority | $216,893.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 5, 2018 | Department of Parks and Recreation | $202,770.36 | IOTB CONSTRUCTION | – |
| May 22, 2018 | Department of Transportation | $200,286.23 | DESIGN-CONSULTANT-IOTB | – |
| May 22, 2018 | Department of Correction | $191,588.45 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 5, 2018 | Department of Parks and Recreation | $181,122.54 | IOTB CONSTRUCTION | – |
| Jul 12, 2017 | Department of Correction | $161,719.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 16, 2018 | Department of Transportation | $157,876.90 | IOTB CONSTRUCTION | – |
| Mar 6, 2018 | Department of Transportation | $145,351.46 | DESIGN-CONSULTANT-IOTB | – |
| Jun 5, 2018 | School Construction Authority | $129,911.69 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2017 | Department of City Planning | $121,095.64 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 6, 2017 | School Construction Authority | $120,518.53 | CONSTRUCTION-BUILDINGS | – |
| Sep 22, 2017 | School Construction Authority | $117,205.90 | CONSTRUCTION-BUILDINGS | – |
| Nov 24, 2017 | Department of Parks and Recreation | $115,929.57 | DESIGN-CONSULTANT-IOTB | – |
| Nov 8, 2017 | School Construction Authority | $110,173.55 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2018 | School Construction Authority | $108,447.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2017 | School Construction Authority | $108,446.00 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 1,323 payments$13,858,518
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2016 | Department of Environmental Protection | $459,001.82 | IOTB CONSTRUCTION | – |
| Oct 31, 2016 | School Construction Authority | $398,331.60 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2017 | Police Department | $396,988.73 | IOTB CONSTRUCTION | – |
| Jul 13, 2016 | Department of City Planning | $337,539.53 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 19, 2016 | School Construction Authority | $270,633.50 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2017 | School Construction Authority | $239,870.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2017 | Department of Correction | $227,053.13 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 27, 2017 | Police Department | $218,406.02 | IOTB CONSTRUCTION | – |
| Apr 14, 2017 | School Construction Authority | $207,920.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 31, 2016 | School Construction Authority | $206,840.16 | CONSTRUCTION-BUILDINGS | – |
| Aug 8, 2016 | School Construction Authority | $199,651.25 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2017 | Department of Parks and Recreation | $197,821.41 | DESIGN-CONSULTANT-IOTB | – |
| Aug 11, 2016 | School Construction Authority | $194,005.50 | CONSTRUCTION-BUILDINGS | – |
| May 8, 2017 | Department of City Planning | $192,158.51 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 7, 2016 | School Construction Authority | $150,835.90 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2016 | School Construction Authority | $146,998.39 | CONSTRUCTION-BUILDINGS | – |
| Feb 23, 2017 | School Construction Authority | $141,785.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 15, 2017 | School Construction Authority | $138,480.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2016 | School Construction Authority | $131,706.86 | CONSTRUCTION-BUILDINGS | – |
| Feb 23, 2017 | School Construction Authority | $128,211.20 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 2,129 payments$16,375,158
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 28, 2015 | School Construction Authority | $1,036,365.08 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2015 | School Construction Authority | $690,910.16 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2015 | School Construction Authority | $518,182.38 | CONSTRUCTION-BUILDINGS | – |
| Nov 23, 2015 | Department of Parks and Recreation | $408,478.57 | DESIGN-CONSULTANT-IOTB | – |
| Jul 28, 2015 | School Construction Authority | $345,454.92 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2015 | School Construction Authority | $345,454.92 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2016 | Department of Parks and Recreation | $236,167.62 | DESIGN-CONSULTANT-IOTB | – |
| Dec 7, 2015 | School Construction Authority | $208,505.47 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2015 | School Construction Authority | $207,273.02 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2015 | School Construction Authority | $207,273.02 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2016 | Department of Parks and Recreation | $203,448.88 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2016 | School Construction Authority | $183,747.99 | CONSTRUCTION-BUILDINGS | – |
| May 31, 2016 | School Construction Authority | $164,625.44 | CONSTRUCTION-BUILDINGS | – |
| Mar 1, 2016 | Department of Parks and Recreation | $142,294.82 | DESIGN-CONSULTANT-IOTB | – |
| Jul 22, 2015 | School Construction Authority | $140,896.35 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2015 | School Construction Authority | $139,003.65 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2015 | School Construction Authority | $130,289.06 | CONSTRUCTION-BUILDINGS | – |
| Jul 22, 2015 | School Construction Authority | $129,642.53 | CONSTRUCTION-BUILDINGS | – |
| May 12, 2016 | School Construction Authority | $122,498.66 | CONSTRUCTION-BUILDINGS | – |
| Nov 23, 2015 | School Construction Authority | $117,630.71 | CONSTRUCTION-BUILDINGS | – |
FY 2015top 20 of 1,539 payments$12,053,283
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 11, 2015 | Police Department | $363,314.93 | DESIGN-CONSULTANT-IOTB | – |
| Feb 10, 2015 | Department of Transportation | $301,503.80 | DESIGN-CONSULTANT-IOTB | – |
| Oct 29, 2014 | Police Department | $202,835.61 | DESIGN-CONSULTANT-IOTB | – |
| May 20, 2015 | Police Department | $194,991.77 | DESIGN-CONSULTANT-IOTB | – |
| Sep 30, 2014 | Police Department | $194,599.86 | DESIGN-CONSULTANT-IOTB | – |
| Mar 25, 2015 | School Construction Authority | $158,723.02 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2015 | School Construction Authority | $157,814.41 | CONSTRUCTION-BUILDINGS | – |
| Aug 18, 2014 | Police Department | $157,695.56 | DESIGN-CONSULTANT-IOTB | – |
| Dec 2, 2014 | School Construction Authority | $155,382.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2015 | School Construction Authority | $149,229.48 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2015 | School Construction Authority | $148,302.25 | CONSTRUCTION-BUILDINGS | – |
| Jun 29, 2015 | Police Department | $139,455.59 | DESIGN-CONSULTANT-IOTB | – |
| Mar 25, 2015 | School Construction Authority | $133,070.55 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2015 | School Construction Authority | $127,475.98 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2015 | School Construction Authority | $118,198.45 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2014 | School Construction Authority | $115,010.17 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2015 | School Construction Authority | $112,681.68 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2015 | School Construction Authority | $111,760.98 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2014 | School Construction Authority | $111,729.52 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2015 | Police Department | $110,625.41 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 989 payments$10,041,256
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 28, 2014 | Police Department | $197,034.86 | DESIGN-CONSULTANT-IOTB | – |
| Apr 1, 2014 | Department of Environmental Protection | $181,108.13 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2013 | Department of Transportation | $156,013.04 | DESIGN-CONSULTANT-IOTB | – |
| Sep 4, 2013 | Department of Environmental Protection | $154,793.56 | DESIGN-CONSULTANT-IOTB | – |
| Sep 23, 2013 | Department of Transportation | $138,326.84 | DESIGN-CONSULTANT-IOTB | – |
| Sep 23, 2013 | Department of Environmental Protection | $135,523.81 | DESIGN-CONSULTANT-IOTB | – |
| Dec 24, 2013 | Department of Transportation | $124,963.36 | DESIGN-CONSULTANT-IOTB | – |
| May 12, 2014 | Department of Transportation | $122,037.23 | DESIGN-CONSULTANT-IOTB | – |
| Jan 6, 2014 | School Construction Authority | $121,628.72 | CONSTRUCTION-BUILDINGS | – |
| Oct 22, 2013 | School Construction Authority | $112,249.81 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2014 | Department of Transportation | $109,740.07 | DESIGN-CONSULTANT-IOTB | – |
| Jun 2, 2014 | Department of Transportation | $106,402.91 | DESIGN-CONSULTANT-IOTB | – |
| Jul 31, 2013 | School Construction Authority | $95,783.61 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2014 | School Construction Authority | $95,327.53 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2013 | Department of Transportation | $90,604.80 | PROF SERV OTHER | – |
| Jun 11, 2014 | School Construction Authority | $81,424.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2014 | Department of Transportation | $80,527.42 | DESIGN-CONSULTANT-IOTB | – |
| Feb 19, 2014 | Police Department | $78,941.32 | DESIGN-CONSULTANT-IOTB | – |
| Mar 31, 2014 | School Construction Authority | $76,053.22 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2013 | School Construction Authority | $74,725.19 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 981 payments$11,308,540
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 9, 2012 | Department of Transportation | $293,752.69 | PROF SERV OTHER | – |
| Oct 23, 2012 | Department of Environmental Protection | $200,777.26 | DESIGN-CONSULTANT-IOTB | – |
| Feb 27, 2013 | Department of Transportation | $167,575.34 | DESIGN-CONSULTANT-IOTB | – |
| Apr 22, 2013 | Department of Transportation | $156,820.31 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2013 | Department of Transportation | $156,000.00 | DESIGN-CONSULTANT-IOTB | – |
| Apr 1, 2013 | Department of Transportation | $154,530.22 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2012 | Department of Transportation | $153,056.17 | DESIGN-CONSULTANT-IOTB | – |
| Sep 5, 2012 | School Construction Authority | $137,004.83 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2013 | Department of Environmental Protection | $133,057.66 | DESIGN-CONSULTANT-IOTB | – |
| Feb 6, 2013 | Department of Transportation | $130,795.16 | PROF SERV OTHER | – |
| Apr 30, 2013 | Department of Environmental Protection | $123,112.25 | DESIGN-CONSULTANT-IOTB | – |
| May 10, 2013 | Department of Transportation | $117,721.85 | DESIGN-CONSULTANT-IOTB | – |
| Dec 10, 2012 | Department of Environmental Protection | $114,385.45 | DESIGN-CONSULTANT-IOTB | – |
| Feb 7, 2013 | School Construction Authority | $110,864.28 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2013 | Department of Transportation | $107,709.73 | DESIGN-CONSULTANT-IOTB | – |
| May 14, 2013 | Department of Transportation | $100,646.47 | PROF SERV OTHER | – |
| May 21, 2013 | Department of Transportation | $97,785.80 | PROF SERV OTHER | – |
| Jul 31, 2012 | School Construction Authority | $91,350.05 | CONSTRUCTION-BUILDINGS | – |
| Aug 28, 2012 | Department of Transportation | $89,372.75 | DESIGN-CONSULTANT-IOTB | – |
| Apr 5, 2013 | Department of Transportation | $87,197.04 | PROF SERV OTHER | – |
FY 2012top 20 of 816 payments$11,024,681
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 30, 2012 | Department of Transportation | $311,958.33 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2011 | School Construction Authority | $308,028.56 | CONSTRUCTION-BUILDINGS | – |
| Jan 31, 2012 | School Construction Authority | $307,319.45 | CONSTRUCTION-BUILDINGS | – |
| Aug 9, 2011 | School Construction Authority | $265,886.31 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2012 | School Construction Authority | $166,000.03 | CONSTRUCTION-BUILDINGS | – |
| Jun 19, 2012 | Department of Transportation | $142,556.46 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2011 | School Construction Authority | $121,999.98 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2011 | Department of Transportation | $118,102.12 | DESIGN-CONSULTANT-IOTB | – |
| Mar 27, 2012 | School Construction Authority | $113,975.41 | CONSTRUCTION-BUILDINGS | – |
| Nov 16, 2011 | School Construction Authority | $112,936.00 | CONSTRUCTION-BUILDINGS | – |
| May 11, 2012 | School Construction Authority | $111,167.03 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2011 | Department of Transportation | $102,948.39 | PROF SERV OTHER | – |
| Jun 14, 2012 | School Construction Authority | $102,143.45 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2012 | School Construction Authority | $95,783.62 | CONSTRUCTION-BUILDINGS | – |
| May 16, 2012 | Department of Transportation | $91,470.07 | PROF SERV OTHER | – |
| Aug 31, 2011 | Department of Transportation | $88,035.87 | DESIGN-CONSULTANT-IOTB | – |
| Jan 17, 2012 | School Construction Authority | $76,000.00 | CONSTRUCTION-BUILDINGS | – |
| May 16, 2012 | Department of Transportation | $74,146.22 | DESIGN-CONSULTANT-IOTB | – |
| Nov 7, 2011 | School Construction Authority | $73,471.12 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2011 | School Construction Authority | $71,434.54 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 1,459 payments$11,017,950
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 22, 2010 | Department of City Planning | $217,193.73 | PROF SERV ENGINEER & ARCHITECT | – |
| Jul 9, 2010 | School Construction Authority | $210,423.79 | CONSTRUCTION-BUILDINGS | – |
| Aug 2, 2010 | Department of City Planning | $202,469.01 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 20, 2011 | Department of Transportation | $166,588.93 | PROF SERV OTHER | – |
| Feb 18, 2011 | School Construction Authority | $164,306.57 | CONSTRUCTION-BUILDINGS | – |
| Feb 18, 2011 | School Construction Authority | $164,306.57 | CONSTRUCTION-BUILDINGS | – |
| Aug 24, 2010 | Department of Transportation | $159,431.14 | PROF SERV OTHER | – |
| Oct 29, 2010 | School Construction Authority | $151,634.06 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2010 | School Construction Authority | $151,634.06 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2010 | Department of Transportation | $150,205.50 | DESIGN-CONSULTANT-IOTB | – |
| Mar 28, 2011 | Department of Transportation | $147,928.06 | PROF SERV OTHER | – |
| Jul 26, 2010 | Department of City Planning | $146,502.42 | PROF SERV ENGINEER & ARCHITECT | – |
| Feb 22, 2011 | Department of Transportation | $139,928.27 | PROF SERV OTHER | – |
| Dec 20, 2010 | Department of Transportation | $133,589.48 | PROF SERV OTHER | – |
| Apr 5, 2011 | Department of Transportation | $103,120.69 | DESIGN-CONSULTANT-IOTB | – |
| Jan 25, 2011 | School Construction Authority | $100,404.72 | CONSTRUCTION-BUILDINGS | – |
| Mar 15, 2011 | Department of Transportation | $96,945.67 | DESIGN-CONSULTANT-IOTB | – |
| Oct 25, 2010 | Department of Transportation | $96,803.06 | DESIGN-CONSULTANT-IOTB | – |
| Dec 1, 2010 | School Construction Authority | $91,520.23 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2010 | School Construction Authority | $87,236.52 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 20 of 716 payments$5,598,814
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 14, 2010 | Department of Transportation | $398,335.01 | PROF SERV OTHER | – |
| Jun 1, 2010 | School Construction Authority | $360,991.28 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2010 | Department of Transportation | $265,086.96 | PROF SERV OTHER | – |
| May 17, 2010 | Department of City Planning | $236,546.16 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 21, 2010 | Department of City Planning | $209,531.14 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 9, 2010 | Department of Transportation | $204,611.18 | PROF SERV OTHER | – |
| Apr 21, 2010 | Department of City Planning | $192,211.14 | PROF SERV ENGINEER & ARCHITECT | – |
| May 17, 2010 | Department of City Planning | $181,071.51 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 19, 2010 | Department of Transportation | $178,266.58 | PROF SERV OTHER | – |
| May 10, 2010 | Department of Transportation | $138,228.11 | DESIGN-CONSULTANT-IOTB | – |
| Jun 17, 2010 | School Construction Authority | $134,757.10 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2010 | Department of Transportation | $108,916.69 | DESIGN-CONSULTANT-IOTB | – |
| Mar 22, 2010 | Department of City Planning | $100,051.79 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 2, 2010 | Department of Transportation | $99,066.69 | DESIGN-CONSULTANT-IOTB | – |
| Apr 19, 2010 | Department of Transportation | $94,240.59 | PROF SERV OTHER | – |
| May 24, 2010 | Department of Transportation | $89,681.64 | DESIGN-CONSULTANT-IOTB | – |
| Jan 28, 2010 | School Construction Authority | $87,979.29 | CONSTRUCTION-BUILDINGS | – |
| Mar 29, 2010 | Department of City Planning | $79,956.35 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 22, 2010 | Fire Department | $75,035.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 11, 2010 | Department of Transportation | $74,657.91 | PROF SERV OTHER | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 25, 2025 | Department of Environmental Protection | $2,079.71 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $8,847.44 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $2,084.85 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $760.15 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $31,870.20 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $6,841.32 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $598.79 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $1,019.57 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $79,626.93 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $11,648.73 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $264.56 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $18,717.43 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $1,455.09 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $15,064.55 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $135,580.98 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $9,176.12 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $1,294.30 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $5,389.16 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $3,541.13 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $3,084.45 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $6,272.03 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $11,703.76 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $4,365.25 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,823.03 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $763.41 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data