Arnell Construction Corp.: New York City Government Payments

as recorded by New York City: ARNELL CONSTRUCTION CORP.

Arnell Construction Corp. is the 103rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 18th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 1.4% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 64.1% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$619,909,211total received
660payments
3agencies
Jan 26, 2010May 21, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Arnell Construction Corp.. No spam.

Payments by fiscal year

FY 2025$14,278,154
FY 2024$39,762,952
FY 2023$15,165,036
FY 2022$21,991,919
FY 2021$20,670,801
FY 2020$35,523,353
FY 2019$56,390,058
FY 2018$37,149,286
FY 2017$86,727,982
FY 2016$75,603,886
FY 2015$63,453,596
FY 2014$32,386,510
FY 2013$35,347,751
FY 2012$42,895,776
FY 2011$30,498,745
FY 2010$12,063,406

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority16$14,278,154
FY 2024School Construction Authority27$39,762,952
FY 2023School Construction Authority42$15,165,036
FY 2022School Construction Authority30$21,991,919
FY 2021School Construction Authority41$20,670,801
FY 2020School Construction Authority40$35,517,971
FY 2020Law Department3$5,383
FY 2019School Construction Authority58$56,390,058
FY 2018School Construction Authority56$37,149,286
FY 2017School Construction Authority67$86,727,982
FY 2016School Construction Authority66$75,603,886
FY 2015School Construction Authority45$63,453,596
FY 2014School Construction Authority36$32,386,510
FY 2013School Construction Authority35$35,347,751
FY 2012School Construction Authority41$42,895,776
FY 2011School Construction Authority44$30,498,745
FY 2010School Construction Authority11$12,010,489
FY 2010Department of Sanitation2$52,917
Total660$619,909,211

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS657$619,903,829Jan 26, 2010 May 21, 2025
OFF SVC-MEMBERSHIP DUES & FEES3$5,383Feb 19, 2020 Feb 25, 2020

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 16 of 16 payments$14,278,154
DateAgencyAmountCategoryPurchase order
Aug 5, 2024School Construction Authority$3,919,752.40CONSTRUCTION-BUILDINGS
Sep 4, 2024School Construction Authority$3,236,091.31CONSTRUCTION-BUILDINGS
Oct 2, 2024School Construction Authority$2,683,658.61CONSTRUCTION-BUILDINGS
Mar 31, 2025School Construction Authority$1,516,780.87CONSTRUCTION-BUILDINGS
Mar 26, 2025School Construction Authority$1,377,087.24CONSTRUCTION-BUILDINGS
Dec 3, 2024School Construction Authority$616,357.68CONSTRUCTION-BUILDINGS
Mar 31, 2025School Construction Authority$516,647.34CONSTRUCTION-BUILDINGS
Dec 31, 2024School Construction Authority$515,061.77CONSTRUCTION-BUILDINGS
Nov 6, 2024School Construction Authority$509,684.03CONSTRUCTION-BUILDINGS
Feb 24, 2025School Construction Authority$498,229.05CONSTRUCTION-BUILDINGS
May 21, 2025School Construction Authority$183,026.73CONSTRUCTION-BUILDINGS
Dec 20, 2024School Construction Authority$102,895.41CONSTRUCTION-BUILDINGS
Dec 18, 2024School Construction Authority$66,592.93CONSTRUCTION-BUILDINGS
Jul 2, 2024School Construction Authority$44,588.01CONSTRUCTION-BUILDINGS
Dec 20, 2024School Construction Authority$8,481.20CONSTRUCTION-BUILDINGS
Mar 31, 2025School Construction Authority-$1,516,780.87CONSTRUCTION-BUILDINGS
FY 2024top 20 of 27 payments$39,762,952
DateAgencyAmountCategoryPurchase order
Apr 15, 2024School Construction Authority$4,371,311.66CONSTRUCTION-BUILDINGS
May 22, 2024School Construction Authority$3,892,888.36CONSTRUCTION-BUILDINGS
Jun 24, 2024School Construction Authority$3,635,640.90CONSTRUCTION-BUILDINGS
Oct 16, 2023School Construction Authority$3,409,233.84CONSTRUCTION-BUILDINGS
Mar 13, 2024School Construction Authority$3,275,380.85CONSTRUCTION-BUILDINGS
Jul 6, 2023School Construction Authority$3,196,440.01CONSTRUCTION-BUILDINGS
Jan 19, 2024School Construction Authority$2,819,053.47CONSTRUCTION-BUILDINGS
Feb 16, 2024School Construction Authority$2,641,526.01CONSTRUCTION-BUILDINGS
Nov 13, 2023School Construction Authority$2,521,963.77CONSTRUCTION-BUILDINGS
Dec 18, 2023School Construction Authority$2,454,794.02CONSTRUCTION-BUILDINGS
Aug 17, 2023School Construction Authority$2,255,621.76CONSTRUCTION-BUILDINGS
Sep 18, 2023School Construction Authority$1,894,431.76CONSTRUCTION-BUILDINGS
Dec 12, 2023School Construction Authority$1,700,000.00CONSTRUCTION-BUILDINGS
Apr 10, 2024School Construction Authority$592,500.00CONSTRUCTION-BUILDINGS
Dec 8, 2023School Construction Authority$273,243.92CONSTRUCTION-BUILDINGS
May 15, 2024School Construction Authority$187,535.70CONSTRUCTION-BUILDINGS
Apr 11, 2024School Construction Authority$152,196.13CONSTRUCTION-BUILDINGS
Oct 2, 2023School Construction Authority$137,115.62CONSTRUCTION-BUILDINGS
Oct 11, 2023School Construction Authority$136,332.89CONSTRUCTION-BUILDINGS
Aug 21, 2023School Construction Authority$79,547.15CONSTRUCTION-BUILDINGS
FY 2023top 20 of 42 payments$15,165,036
DateAgencyAmountCategoryPurchase order
Jun 15, 2023School Construction Authority$2,862,059.02CONSTRUCTION-BUILDINGS
May 16, 2023School Construction Authority$2,433,931.03CONSTRUCTION-BUILDINGS
Apr 11, 2023School Construction Authority$1,804,413.53CONSTRUCTION-BUILDINGS
Mar 17, 2023School Construction Authority$1,693,190.21CONSTRUCTION-BUILDINGS
Nov 29, 2022School Construction Authority$1,050,867.11CONSTRUCTION-BUILDINGS
Jul 14, 2022School Construction Authority$899,637.16CONSTRUCTION-BUILDINGS
Aug 24, 2022School Construction Authority$553,162.61CONSTRUCTION-BUILDINGS
Jan 19, 2023School Construction Authority$550,982.53CONSTRUCTION-BUILDINGS
Dec 13, 2022School Construction Authority$520,427.41CONSTRUCTION-BUILDINGS
Sep 14, 2022School Construction Authority$497,446.63CONSTRUCTION-BUILDINGS
Feb 17, 2023School Construction Authority$259,346.74CONSTRUCTION-BUILDINGS
Jul 12, 2022School Construction Authority$235,192.67CONSTRUCTION-BUILDINGS
Oct 24, 2022School Construction Authority$215,964.86CONSTRUCTION-BUILDINGS
Apr 24, 2023School Construction Authority$212,995.91CONSTRUCTION-BUILDINGS
May 3, 2023School Construction Authority$193,194.20CONSTRUCTION-BUILDINGS
Nov 28, 2022School Construction Authority$187,069.54CONSTRUCTION-BUILDINGS
Jul 19, 2022School Construction Authority$174,399.36CONSTRUCTION-BUILDINGS
Dec 1, 2022School Construction Authority$141,345.43CONSTRUCTION-BUILDINGS
Jun 14, 2023School Construction Authority$120,000.00CONSTRUCTION-BUILDINGS
Apr 4, 2023School Construction Authority$113,946.56CONSTRUCTION-BUILDINGS
FY 2022top 20 of 30 payments$21,991,919
DateAgencyAmountCategoryPurchase order
Jul 9, 2021School Construction Authority$2,857,680.75CONSTRUCTION-BUILDINGS
Aug 6, 2021School Construction Authority$2,378,577.94CONSTRUCTION-BUILDINGS
Sep 10, 2021School Construction Authority$2,093,915.19CONSTRUCTION-BUILDINGS
Oct 20, 2021School Construction Authority$1,904,406.58CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$1,577,721.00CONSTRUCTION-BUILDINGS
Mar 8, 2022School Construction Authority$1,565,779.86CONSTRUCTION-BUILDINGS
Feb 15, 2022School Construction Authority$1,542,929.83CONSTRUCTION-BUILDINGS
Nov 15, 2021School Construction Authority$1,507,614.14CONSTRUCTION-BUILDINGS
Dec 17, 2021School Construction Authority$1,244,421.15CONSTRUCTION-BUILDINGS
May 10, 2022School Construction Authority$1,097,650.78CONSTRUCTION-BUILDINGS
Jun 6, 2022School Construction Authority$1,019,145.66CONSTRUCTION-BUILDINGS
Apr 11, 2022School Construction Authority$1,003,348.15CONSTRUCTION-BUILDINGS
Oct 7, 2021School Construction Authority$418,753.51CONSTRUCTION-BUILDINGS
Dec 14, 2021School Construction Authority$332,108.93CONSTRUCTION-BUILDINGS
Jul 6, 2021School Construction Authority$197,460.11CONSTRUCTION-BUILDINGS
Mar 8, 2022School Construction Authority$188,172.05CONSTRUCTION-BUILDINGS
Feb 2, 2022School Construction Authority$170,531.02CONSTRUCTION-BUILDINGS
Jul 28, 2021School Construction Authority$152,114.63CONSTRUCTION-BUILDINGS
Jan 24, 2022School Construction Authority$115,449.89CONSTRUCTION-BUILDINGS
Apr 25, 2022School Construction Authority$115,039.28CONSTRUCTION-BUILDINGS
FY 2021top 20 of 41 payments$20,670,801
DateAgencyAmountCategoryPurchase order
May 7, 2021School Construction Authority$2,636,145.50CONSTRUCTION-BUILDINGS
Dec 15, 2020School Construction Authority$2,245,762.00CONSTRUCTION-BUILDINGS
Oct 14, 2020School Construction Authority$2,120,092.99CONSTRUCTION-BUILDINGS
Jun 7, 2021School Construction Authority$2,073,598.25CONSTRUCTION-BUILDINGS
Jan 13, 2021School Construction Authority$1,657,987.25CONSTRUCTION-BUILDINGS
Feb 12, 2021School Construction Authority$1,432,260.75CONSTRUCTION-BUILDINGS
Apr 7, 2021School Construction Authority$1,261,614.25CONSTRUCTION-BUILDINGS
Mar 8, 2021School Construction Authority$675,467.00CONSTRUCTION-BUILDINGS
Nov 16, 2020School Construction Authority$664,762.50CONSTRUCTION-BUILDINGS
Apr 14, 2021School Construction Authority$648,601.60CONSTRUCTION-BUILDINGS
Oct 14, 2020School Construction Authority$627,076.00CONSTRUCTION-BUILDINGS
Nov 10, 2020School Construction Authority$601,681.73CONSTRUCTION-BUILDINGS
Feb 24, 2021School Construction Authority$540,386.72CONSTRUCTION-BUILDINGS
Jun 14, 2021School Construction Authority$347,979.97CONSTRUCTION-BUILDINGS
Jan 15, 2021School Construction Authority$336,749.09CONSTRUCTION-BUILDINGS
Apr 15, 2021School Construction Authority$330,999.50CONSTRUCTION-BUILDINGS
Dec 17, 2020School Construction Authority$321,529.63CONSTRUCTION-BUILDINGS
May 5, 2021School Construction Authority$279,926.13CONSTRUCTION-BUILDINGS
Jul 16, 2020School Construction Authority$249,014.00CONSTRUCTION-BUILDINGS
Aug 13, 2020School Construction Authority$174,695.50CONSTRUCTION-BUILDINGS
FY 2020top 20 of 43 payments$35,523,353
DateAgencyAmountCategoryPurchase order
Jul 8, 2019School Construction Authority$3,750,716.05CONSTRUCTION-BUILDINGS
Nov 13, 2019School Construction Authority$3,668,269.50CONSTRUCTION-BUILDINGS
Aug 6, 2019School Construction Authority$3,099,206.99CONSTRUCTION-BUILDINGS
Oct 9, 2019School Construction Authority$2,746,544.37CONSTRUCTION-BUILDINGS
Mar 27, 2020School Construction Authority$2,301,859.50CONSTRUCTION-BUILDINGS
Jan 16, 2020School Construction Authority$2,114,444.50CONSTRUCTION-BUILDINGS
Apr 15, 2020School Construction Authority$1,792,464.75CONSTRUCTION-BUILDINGS
Sep 30, 2019School Construction Authority$1,773,554.44CONSTRUCTION-BUILDINGS
Sep 13, 2019School Construction Authority$1,773,554.44CONSTRUCTION-BUILDINGS
Mar 2, 2020School Construction Authority$1,735,080.00CONSTRUCTION-BUILDINGS
Feb 18, 2020School Construction Authority$1,402,411.26CONSTRUCTION-BUILDINGS
Sep 10, 2019School Construction Authority$1,390,177.34CONSTRUCTION-BUILDINGS
Jan 3, 2020School Construction Authority$1,341,590.00CONSTRUCTION-BUILDINGS
Dec 17, 2019School Construction Authority$1,241,697.50CONSTRUCTION-BUILDINGS
Dec 16, 2019School Construction Authority$1,199,876.84CONSTRUCTION-BUILDINGS
Mar 11, 2020School Construction Authority$1,143,979.93CONSTRUCTION-BUILDINGS
Jan 24, 2020School Construction Authority$1,078,468.50CONSTRUCTION-BUILDINGS
Dec 12, 2019School Construction Authority$470,962.21CONSTRUCTION-BUILDINGS
May 19, 2020School Construction Authority$453,691.50CONSTRUCTION-BUILDINGS
Oct 28, 2019School Construction Authority$306,084.72CONSTRUCTION-BUILDINGS
FY 2019top 20 of 58 payments$56,390,058
DateAgencyAmountCategoryPurchase order
Jan 7, 2019School Construction Authority$5,346,267.97CONSTRUCTION-BUILDINGS
Feb 12, 2019School Construction Authority$4,893,268.07CONSTRUCTION-BUILDINGS
Apr 4, 2019School Construction Authority$4,610,891.10CONSTRUCTION-BUILDINGS
May 6, 2019School Construction Authority$4,469,974.41CONSTRUCTION-BUILDINGS
Mar 14, 2019School Construction Authority$4,006,764.10CONSTRUCTION-BUILDINGS
Dec 10, 2018School Construction Authority$3,717,160.71CONSTRUCTION-BUILDINGS
Jun 10, 2019School Construction Authority$3,492,464.01CONSTRUCTION-BUILDINGS
Nov 14, 2018School Construction Authority$3,057,521.56CONSTRUCTION-BUILDINGS
Oct 5, 2018School Construction Authority$2,984,091.55CONSTRUCTION-BUILDINGS
Oct 24, 2018School Construction Authority$2,145,228.25CONSTRUCTION-BUILDINGS
Jul 31, 2018School Construction Authority$1,795,745.80CONSTRUCTION-BUILDINGS
Apr 3, 2019School Construction Authority$1,783,513.73CONSTRUCTION-BUILDINGS
Sep 11, 2018School Construction Authority$1,654,674.38CONSTRUCTION-BUILDINGS
Sep 20, 2018School Construction Authority$1,636,048.20CONSTRUCTION-BUILDINGS
Aug 16, 2018School Construction Authority$1,466,724.00CONSTRUCTION-BUILDINGS
Jul 3, 2018School Construction Authority$1,339,984.50CONSTRUCTION-BUILDINGS
Aug 16, 2018School Construction Authority$910,337.50CONSTRUCTION-BUILDINGS
May 10, 2019School Construction Authority$679,680.06CONSTRUCTION-BUILDINGS
Nov 20, 2018School Construction Authority$670,434.00CONSTRUCTION-BUILDINGS
Jan 14, 2019School Construction Authority$574,189.31CONSTRUCTION-BUILDINGS
FY 2018top 20 of 56 payments$37,149,286
DateAgencyAmountCategoryPurchase order
Mar 7, 2018School Construction Authority$4,306,734.75CONSTRUCTION-BUILDINGS
Feb 15, 2018School Construction Authority$3,871,506.50CONSTRUCTION-BUILDINGS
Jul 27, 2017School Construction Authority$3,786,703.80CONSTRUCTION-BUILDINGS
Nov 21, 2017School Construction Authority$2,553,552.50CONSTRUCTION-BUILDINGS
Apr 9, 2018School Construction Authority$2,369,300.00CONSTRUCTION-BUILDINGS
May 8, 2018School Construction Authority$2,344,258.00CONSTRUCTION-BUILDINGS
Sep 29, 2017School Construction Authority$2,015,942.28CONSTRUCTION-BUILDINGS
Aug 29, 2017School Construction Authority$1,779,253.63CONSTRUCTION-BUILDINGS
Jan 23, 2018School Construction Authority$1,679,077.50CONSTRUCTION-BUILDINGS
Dec 4, 2017School Construction Authority$1,089,454.30CONSTRUCTION-BUILDINGS
Jun 7, 2018School Construction Authority$946,366.25CONSTRUCTION-BUILDINGS
Oct 30, 2017School Construction Authority$694,520.30CONSTRUCTION-BUILDINGS
Jan 8, 2018School Construction Authority$686,161.25CONSTRUCTION-BUILDINGS
Dec 28, 2017School Construction Authority$554,310.75CONSTRUCTION-BUILDINGS
Aug 8, 2017School Construction Authority$548,695.88CONSTRUCTION-BUILDINGS
Jun 21, 2018School Construction Authority$519,650.00CONSTRUCTION-BUILDINGS
Oct 6, 2017School Construction Authority$488,884.09CONSTRUCTION-BUILDINGS
Feb 14, 2018School Construction Authority$481,650.00CONSTRUCTION-BUILDINGS
Jun 27, 2018School Construction Authority$473,745.05CONSTRUCTION-BUILDINGS
Sep 1, 2017School Construction Authority$403,029.36CONSTRUCTION-BUILDINGS
FY 2017top 20 of 67 payments$86,727,982
DateAgencyAmountCategoryPurchase order
Nov 23, 2016School Construction Authority$6,804,764.50CONSTRUCTION-BUILDINGS
Dec 23, 2016School Construction Authority$5,570,733.50CONSTRUCTION-BUILDINGS
May 2, 2017School Construction Authority$5,190,133.57CONSTRUCTION-BUILDINGS
Mar 6, 2017School Construction Authority$5,117,675.65CONSTRUCTION-BUILDINGS
Jun 2, 2017School Construction Authority$5,048,186.00CONSTRUCTION-BUILDINGS
Jun 20, 2017School Construction Authority$4,921,308.04CONSTRUCTION-BUILDINGS
Jul 27, 2016School Construction Authority$4,440,434.87CONSTRUCTION-BUILDINGS
Jan 26, 2017School Construction Authority$4,420,630.25CONSTRUCTION-BUILDINGS
Oct 21, 2016School Construction Authority$4,372,818.38CONSTRUCTION-BUILDINGS
Aug 18, 2016School Construction Authority$4,203,020.56CONSTRUCTION-BUILDINGS
Sep 22, 2016School Construction Authority$4,006,017.00CONSTRUCTION-BUILDINGS
Apr 5, 2017School Construction Authority$3,912,077.50CONSTRUCTION-BUILDINGS
Sep 26, 2016School Construction Authority$3,904,050.01CONSTRUCTION-BUILDINGS
Jul 18, 2016School Construction Authority$3,003,045.00CONSTRUCTION-BUILDINGS
Apr 5, 2017School Construction Authority$1,734,259.38CONSTRUCTION-BUILDINGS
Aug 25, 2016School Construction Authority$1,707,577.50CONSTRUCTION-BUILDINGS
Nov 23, 2016School Construction Authority$1,505,243.91CONSTRUCTION-BUILDINGS
Dec 29, 2016School Construction Authority$1,398,581.85CONSTRUCTION-BUILDINGS
Jul 22, 2016School Construction Authority$1,184,916.00CONSTRUCTION-BUILDINGS
Aug 18, 2016School Construction Authority$1,169,500.35CONSTRUCTION-BUILDINGS
FY 2016top 20 of 66 payments$75,603,886
DateAgencyAmountCategoryPurchase order
Sep 14, 2015School Construction Authority$4,311,666.20CONSTRUCTION-BUILDINGS
Jun 17, 2016School Construction Authority$4,015,142.51CONSTRUCTION-BUILDINGS
Jul 24, 2015School Construction Authority$3,964,141.00CONSTRUCTION-BUILDINGS
Sep 18, 2015School Construction Authority$3,636,009.48CONSTRUCTION-BUILDINGS
Jan 27, 2016School Construction Authority$3,330,701.29CONSTRUCTION-BUILDINGS
Jul 17, 2015School Construction Authority$3,195,109.35CONSTRUCTION-BUILDINGS
Sep 3, 2015School Construction Authority$2,877,977.50CONSTRUCTION-BUILDINGS
Jun 7, 2016School Construction Authority$2,839,976.72CONSTRUCTION-BUILDINGS
Mar 2, 2016School Construction Authority$2,769,952.82CONSTRUCTION-BUILDINGS
Aug 6, 2015School Construction Authority$2,737,615.47CONSTRUCTION-BUILDINGS
Jun 13, 2016School Construction Authority$2,268,688.35CONSTRUCTION-BUILDINGS
Oct 27, 2015School Construction Authority$2,260,594.35CONSTRUCTION-BUILDINGS
Mar 31, 2016School Construction Authority$2,009,589.15CONSTRUCTION-BUILDINGS
Jun 17, 2016School Construction Authority$1,941,990.00CONSTRUCTION-BUILDINGS
Mar 25, 2016School Construction Authority$1,935,245.41CONSTRUCTION-BUILDINGS
Apr 25, 2016School Construction Authority$1,924,282.41CONSTRUCTION-BUILDINGS
Dec 17, 2015School Construction Authority$1,846,547.30CONSTRUCTION-BUILDINGS
Dec 4, 2015School Construction Authority$1,815,780.31CONSTRUCTION-BUILDINGS
May 3, 2016School Construction Authority$1,790,132.50CONSTRUCTION-BUILDINGS
Aug 31, 2015School Construction Authority$1,763,261.75CONSTRUCTION-BUILDINGS
FY 2015top 20 of 45 payments$63,453,596
DateAgencyAmountCategoryPurchase order
May 27, 2015School Construction Authority$4,887,688.25CONSTRUCTION-BUILDINGS
Jun 26, 2015School Construction Authority$3,797,219.35CONSTRUCTION-BUILDINGS
Apr 22, 2015School Construction Authority$3,718,751.25CONSTRUCTION-BUILDINGS
May 27, 2015School Construction Authority$2,953,628.85CONSTRUCTION-BUILDINGS
Apr 29, 2015School Construction Authority$2,695,766.55CONSTRUCTION-BUILDINGS
Jun 18, 2015School Construction Authority$2,690,317.35CONSTRUCTION-BUILDINGS
Jun 16, 2015School Construction Authority$2,659,302.20CONSTRUCTION-BUILDINGS
May 29, 2015School Construction Authority$2,656,084.10CONSTRUCTION-BUILDINGS
Oct 24, 2014School Construction Authority$2,109,809.40CONSTRUCTION-BUILDINGS
Nov 21, 2014School Construction Authority$2,032,685.45CONSTRUCTION-BUILDINGS
Apr 21, 2015School Construction Authority$1,953,965.22CONSTRUCTION-BUILDINGS
Nov 24, 2014School Construction Authority$1,897,444.50CONSTRUCTION-BUILDINGS
Mar 26, 2015School Construction Authority$1,758,813.85CONSTRUCTION-BUILDINGS
Mar 23, 2015School Construction Authority$1,734,734.20CONSTRUCTION-BUILDINGS
Mar 23, 2015School Construction Authority$1,644,949.70CONSTRUCTION-BUILDINGS
Jul 28, 2014School Construction Authority$1,495,815.85CONSTRUCTION-BUILDINGS
Aug 21, 2014School Construction Authority$1,458,487.50CONSTRUCTION-BUILDINGS
Dec 31, 2014School Construction Authority$1,410,162.90CONSTRUCTION-BUILDINGS
Jun 12, 2015School Construction Authority$1,390,143.36CONSTRUCTION-BUILDINGS
Oct 6, 2014School Construction Authority$1,381,996.35CONSTRUCTION-BUILDINGS
FY 2014top 20 of 36 payments$32,386,510
DateAgencyAmountCategoryPurchase order
Aug 16, 2013School Construction Authority$2,536,129.11CONSTRUCTION-BUILDINGS
Dec 9, 2013School Construction Authority$2,475,076.40CONSTRUCTION-BUILDINGS
Mar 3, 2014School Construction Authority$1,889,228.75CONSTRUCTION-BUILDINGS
Jan 13, 2014School Construction Authority$1,863,760.17CONSTRUCTION-BUILDINGS
Oct 29, 2013School Construction Authority$1,813,988.33CONSTRUCTION-BUILDINGS
Jun 20, 2014School Construction Authority$1,697,960.65CONSTRUCTION-BUILDINGS
Aug 1, 2013School Construction Authority$1,633,753.00CONSTRUCTION-BUILDINGS
Oct 7, 2013School Construction Authority$1,482,044.46CONSTRUCTION-BUILDINGS
Apr 7, 2014School Construction Authority$1,424,938.13CONSTRUCTION-BUILDINGS
Aug 22, 2013School Construction Authority$1,407,609.13CONSTRUCTION-BUILDINGS
Jul 25, 2013School Construction Authority$1,274,870.11CONSTRUCTION-BUILDINGS
May 1, 2014School Construction Authority$1,135,584.40CONSTRUCTION-BUILDINGS
Dec 18, 2013School Construction Authority$1,067,454.30CONSTRUCTION-BUILDINGS
Jan 23, 2014School Construction Authority$1,010,082.75CONSTRUCTION-BUILDINGS
Nov 13, 2013School Construction Authority$1,006,806.29CONSTRUCTION-BUILDINGS
Jul 25, 2013School Construction Authority$980,170.27CONSTRUCTION-BUILDINGS
Mar 21, 2014School Construction Authority$959,870.50CONSTRUCTION-BUILDINGS
Jul 9, 2013School Construction Authority$810,038.95CONSTRUCTION-BUILDINGS
Mar 11, 2014School Construction Authority$734,117.25CONSTRUCTION-BUILDINGS
Mar 31, 2014School Construction Authority$657,291.70CONSTRUCTION-BUILDINGS
FY 2013top 20 of 35 payments$35,347,751
DateAgencyAmountCategoryPurchase order
Dec 28, 2012School Construction Authority$2,753,303.49CONSTRUCTION-BUILDINGS
Jan 29, 2013School Construction Authority$2,635,242.48CONSTRUCTION-BUILDINGS
Mar 22, 2013School Construction Authority$2,492,554.47CONSTRUCTION-BUILDINGS
Oct 22, 2012School Construction Authority$2,329,920.99CONSTRUCTION-BUILDINGS
Nov 28, 2012School Construction Authority$2,196,411.77CONSTRUCTION-BUILDINGS
Jan 18, 2013School Construction Authority$2,056,401.26CONSTRUCTION-BUILDINGS
Sep 24, 2012School Construction Authority$1,681,071.96CONSTRUCTION-BUILDINGS
Jul 24, 2012School Construction Authority$1,587,093.80CONSTRUCTION-BUILDINGS
May 6, 2013School Construction Authority$1,581,932.54CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$1,566,376.01CONSTRUCTION-BUILDINGS
Mar 5, 2013School Construction Authority$1,550,905.84CONSTRUCTION-BUILDINGS
Jul 26, 2012School Construction Authority$1,355,575.98CONSTRUCTION-BUILDINGS
Jul 5, 2012School Construction Authority$1,303,546.78CONSTRUCTION-BUILDINGS
Dec 5, 2012School Construction Authority$1,273,572.89CONSTRUCTION-BUILDINGS
Sep 5, 2012School Construction Authority$1,234,618.86CONSTRUCTION-BUILDINGS
Oct 10, 2012School Construction Authority$1,232,690.49CONSTRUCTION-BUILDINGS
Aug 9, 2012School Construction Authority$1,204,580.73CONSTRUCTION-BUILDINGS
Oct 26, 2012School Construction Authority$1,151,010.64CONSTRUCTION-BUILDINGS
Jun 4, 2013School Construction Authority$923,504.96CONSTRUCTION-BUILDINGS
Mar 25, 2013School Construction Authority$838,644.28CONSTRUCTION-BUILDINGS
FY 2012top 20 of 41 payments$42,895,776
DateAgencyAmountCategoryPurchase order
Dec 19, 2011School Construction Authority$2,733,677.63CONSTRUCTION-BUILDINGS
Mar 13, 2012School Construction Authority$2,713,315.32CONSTRUCTION-BUILDINGS
Apr 11, 2012School Construction Authority$2,415,345.12CONSTRUCTION-BUILDINGS
Nov 16, 2011School Construction Authority$2,403,334.72CONSTRUCTION-BUILDINGS
Jul 29, 2011School Construction Authority$2,124,172.62CONSTRUCTION-BUILDINGS
Sep 15, 2011School Construction Authority$2,095,557.50CONSTRUCTION-BUILDINGS
Jun 13, 2012School Construction Authority$1,984,779.33CONSTRUCTION-BUILDINGS
May 25, 2012School Construction Authority$1,943,399.01CONSTRUCTION-BUILDINGS
Oct 18, 2011School Construction Authority$1,934,471.58CONSTRUCTION-BUILDINGS
Jan 24, 2012School Construction Authority$1,795,112.34CONSTRUCTION-BUILDINGS
Mar 26, 2012School Construction Authority$1,750,610.89CONSTRUCTION-BUILDINGS
Aug 18, 2011School Construction Authority$1,656,441.89CONSTRUCTION-BUILDINGS
Mar 8, 2012School Construction Authority$1,461,553.28CONSTRUCTION-BUILDINGS
Jan 4, 2012School Construction Authority$1,333,101.96CONSTRUCTION-BUILDINGS
Oct 31, 2011School Construction Authority$1,229,396.53CONSTRUCTION-BUILDINGS
Jul 15, 2011School Construction Authority$1,157,151.30CONSTRUCTION-BUILDINGS
Jul 22, 2011School Construction Authority$1,115,601.52CONSTRUCTION-BUILDINGS
Nov 29, 2011School Construction Authority$1,080,874.85CONSTRUCTION-BUILDINGS
May 15, 2012School Construction Authority$1,014,430.33CONSTRUCTION-BUILDINGS
Mar 19, 2012School Construction Authority$1,007,611.71CONSTRUCTION-BUILDINGS
FY 2011top 20 of 44 payments$30,498,745
DateAgencyAmountCategoryPurchase order
Jan 4, 2011School Construction Authority$2,428,138.25CONSTRUCTION-BUILDINGS
Aug 26, 2010School Construction Authority$2,188,925.62CONSTRUCTION-BUILDINGS
Jun 21, 2011School Construction Authority$1,894,674.89CONSTRUCTION-BUILDINGS
Dec 6, 2010School Construction Authority$1,856,642.00CONSTRUCTION-BUILDINGS
Sep 27, 2010School Construction Authority$1,829,885.25CONSTRUCTION-BUILDINGS
Jul 7, 2010School Construction Authority$1,682,013.79CONSTRUCTION-BUILDINGS
Sep 30, 2010School Construction Authority$1,670,008.11CONSTRUCTION-BUILDINGS
Jul 26, 2010School Construction Authority$1,621,522.64CONSTRUCTION-BUILDINGS
May 16, 2011School Construction Authority$1,503,431.74CONSTRUCTION-BUILDINGS
Jun 21, 2011School Construction Authority$1,346,577.03CONSTRUCTION-BUILDINGS
Mar 14, 2011School Construction Authority$1,342,701.50CONSTRUCTION-BUILDINGS
Sep 16, 2010School Construction Authority$1,215,546.85CONSTRUCTION-BUILDINGS
Dec 7, 2010School Construction Authority$1,208,222.44CONSTRUCTION-BUILDINGS
Aug 10, 2010School Construction Authority$1,081,572.15CONSTRUCTION-BUILDINGS
Feb 8, 2011School Construction Authority$1,073,723.25CONSTRUCTION-BUILDINGS
Apr 15, 2011School Construction Authority$1,043,655.75CONSTRUCTION-BUILDINGS
Nov 1, 2010School Construction Authority$1,028,693.25CONSTRUCTION-BUILDINGS
Nov 3, 2010School Construction Authority$714,264.88CONSTRUCTION-BUILDINGS
May 19, 2011School Construction Authority$711,438.85CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$702,367.77CONSTRUCTION-BUILDINGS
FY 2010top 13 of 13 payments$12,063,406
DateAgencyAmountCategoryPurchase order
Apr 28, 2010School Construction Authority$2,445,545.61CONSTRUCTION-BUILDINGS
Jan 26, 2010School Construction Authority$1,599,260.56CONSTRUCTION-BUILDINGS
Mar 30, 2010School Construction Authority$1,426,723.44CONSTRUCTION-BUILDINGS
May 26, 2010School Construction Authority$1,378,005.41CONSTRUCTION-BUILDINGS
Mar 9, 2010School Construction Authority$1,331,979.44CONSTRUCTION-BUILDINGS
Jan 26, 2010School Construction Authority$1,100,549.35CONSTRUCTION-BUILDINGS
Feb 24, 2010School Construction Authority$959,645.35CONSTRUCTION-BUILDINGS
Apr 1, 2010School Construction Authority$768,704.37CONSTRUCTION-BUILDINGS
May 11, 2010School Construction Authority$429,648.43CONSTRUCTION-BUILDINGS
Jun 16, 2010School Construction Authority$360,140.25CONSTRUCTION-BUILDINGS
Feb 23, 2010School Construction Authority$210,286.50CONSTRUCTION-BUILDINGS
Feb 1, 2010Department of Sanitation$50,000.00CONSTRUCTION-BUILDINGS
Feb 1, 2010Department of Sanitation$2,917.12CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
May 21, 2025School Construction Authority$183,026.73CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025School Construction Authority$516,647.34CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025School Construction Authority$1,516,780.87CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025School Construction Authority-$1,516,780.87CONSTRUCTION-BUILDINGSCapital Contracts
Mar 26, 2025School Construction Authority$1,377,087.24CONSTRUCTION-BUILDINGSCapital Contracts
Feb 24, 2025School Construction Authority$498,229.05CONSTRUCTION-BUILDINGSCapital Contracts
Dec 31, 2024School Construction Authority$515,061.77CONSTRUCTION-BUILDINGSCapital Contracts
Dec 20, 2024School Construction Authority$102,895.41CONSTRUCTION-BUILDINGSCapital Contracts
Dec 20, 2024School Construction Authority$8,481.20CONSTRUCTION-BUILDINGSCapital Contracts
Dec 18, 2024School Construction Authority$66,592.93CONSTRUCTION-BUILDINGSCapital Contracts
Dec 3, 2024School Construction Authority$616,357.68CONSTRUCTION-BUILDINGSCapital Contracts
Nov 6, 2024School Construction Authority$509,684.03CONSTRUCTION-BUILDINGSCapital Contracts
Oct 2, 2024School Construction Authority$2,683,658.61CONSTRUCTION-BUILDINGSCapital Contracts
Sep 4, 2024School Construction Authority$3,236,091.31CONSTRUCTION-BUILDINGSCapital Contracts
Aug 5, 2024School Construction Authority$3,919,752.40CONSTRUCTION-BUILDINGSCapital Contracts
Jul 2, 2024School Construction Authority$44,588.01CONSTRUCTION-BUILDINGSCapital Contracts
Jun 25, 2024School Construction Authority$7,500.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 24, 2024School Construction Authority$3,635,640.90CONSTRUCTION-BUILDINGSCapital Contracts
May 22, 2024School Construction Authority$3,892,888.36CONSTRUCTION-BUILDINGSCapital Contracts
May 15, 2024School Construction Authority$187,535.70CONSTRUCTION-BUILDINGSCapital Contracts
Apr 15, 2024School Construction Authority$4,371,311.66CONSTRUCTION-BUILDINGSCapital Contracts
Apr 11, 2024School Construction Authority$7,852.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 11, 2024School Construction Authority$152,196.13CONSTRUCTION-BUILDINGSCapital Contracts
Apr 10, 2024School Construction Authority$592,500.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 13, 2024School Construction Authority$3,275,380.85CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data