Ace American Insurance Co.: New York City Government Payments

as recorded by New York City: ACE AMERICAN INSURANCE CO.

Ace American Insurance Co. is the 26th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 5th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 4.1% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 24% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$2,212,697,850total received
581payments
5agencies
Jan 19, 2010 – May 28, 2025first / last payment
Find this supplier’s buyersCompare with other suppliers

Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.

Follow this vendorGet an email when the recorded payment summary for Ace American Insurance Co. in New York City changes. Confirm by email to start. Self-service follows are free.

Payments by fiscal year

The payment history

Select a column to see the agencies behind that fiscal year.

16 fiscal years on record. The incoming flows below combine all recorded years.

Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.

Who pays this supplier?

Select a paying agency to inspect the relationship, then open its profile.

Jan 19, 2010 to May 28, 2025 · All recorded fiscal years

Showing 5 of 5 positive agencies in these records.

Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $2,212,697,850.13. Zero and net-negative relationships are excluded from positive flows.

The relationships at a glance

Total shown
$2,212,697,850.13
Payments represented
581
Paying agencies shown
5
Largest share of supplier total
79.8%

Largest displayed relationship: School Construction Authority. Select a flow to explore its details.

Jan 19, 2010 to May 28, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.

Receiving supplier

Ace American Insurance Co.

$2,212,697,850from the agencies shown

Ace American Insurance Co.
$2,212,697,850 from the agencies shown

  1. $1,766,191,96079.8% of supplier total
  2. $389,377,87717.6% of supplier total
  3. $40,280,1601.8% of supplier total
  4. $9,360,9960.4% of supplier total
  5. $7,486,8570.3% of supplier total

This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority13$127,927,876
FY 2025Department of Youth and Community Development6$825,201
FY 2024School Construction Authority6$102,867,143
FY 2024Department of Youth and Community Development6$999,776
FY 2023School Construction Authority13$115,824,093
FY 2023Department of Youth and Community Development24$583,823
FY 2022School Construction Authority13$180,111,452
FY 2022Department of Youth and Community Development28$878,447
FY 2021School Construction Authority31$258,305,397
FY 2021Department of Youth and Community Development4$616,531
FY 2020School Construction Authority23$61,823,556
FY 2020Department of Youth and Community Development20$1,024,638
FY 2019School Construction Authority4$572,800
FY 2019Department of Youth and Community Development13$484,609
FY 2018School Construction Authority7$209,660,172
FY 2018Department of Youth and Community Development27$839,844
FY 2017School Construction Authority14$145,579,760
FY 2017Department of Youth and Community Development11$755,406
FY 2016School Construction Authority24$133,900,287
FY 2016Department of Youth and Community Development4$551,257
FY 2016Administration for Children's Services1$314,553
FY 2015School Construction Authority28$221,846,643
FY 2015Department of Youth and Community Development12$471,170
FY 2014School Construction Authority23$207,747,780
FY 2014Administration for Children's Services5$3,822,158
FY 2014Department of Youth and Community Development8$248,667
FY 2014Department of Social Services4$320
FY 2013Department of Social Services10$90,355,945
FY 2013Administration for Children's Services15$8,208,169
FY 2013Department for the Aging2$471,084
FY 2013Department of Youth and Community Development28$256,481
FY 2012Department of Social Services5$139,308,265
FY 2012Administration for Children's Services11$12,002,438
FY 2012Department for the Aging4$3,858,603
FY 2012Department of Youth and Community Development29$188,335
FY 2011Department of Social Services12$121,636,091
FY 2011Administration for Children's Services23$10,875,972
FY 2011Department for the Aging5$2,495,255
FY 2011Department of Youth and Community Development26$533,761
FY 2010Department of Social Services7$38,077,257
FY 2010Administration for Children's Services10$5,056,871
FY 2010Department for the Aging4$661,916
FY 2010Department of Youth and Community Development17$103,050
FY 2010School Construction Authority1$25,000
Total581$2,212,697,850

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
ADMINISTRATIVE EXPENSES40$6,010,198Apr 10, 2015 – Sep 11, 2024
FIXED CHARGES - GENERAL65$40,280,160Jan 25, 2010 – May 9, 2016
HOME CARE SERVICES32$389,376,573Feb 10, 2010 – Aug 12, 2013
AUDIO VISUAL SUPPLIES-BOE ONLY5$291,626Apr 28, 2010 – Nov 13, 2014
CONSTRUCTION-BUILDINGS155$1,759,890,136Feb 5, 2014 – May 28, 2025
PAY FOR SURETY BOND/INSUR PREM278$16,847,853Jan 19, 2010 – Oct 28, 2024
EMPLOYMENT SERVICES6$1,304Jan 19, 2010 – Mar 7, 2011

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 19 of 19 payments$128,753,077
DateAgencyAmountCategoryPurchase order
May 13, 2025School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
May 21, 2025School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
Sep 9, 2024School Construction Authority$11,911,758.00CONSTRUCTION-BUILDINGS–
May 28, 2025School Construction Authority$11,911,756.00CONSTRUCTION-BUILDINGS–
May 20, 2025School Construction Authority$10,617,811.00CONSTRUCTION-BUILDINGS–
Sep 10, 2024School Construction Authority$921,447.00CONSTRUCTION-BUILDINGS–
Sep 9, 2024School Construction Authority$846,666.00CONSTRUCTION-BUILDINGS–
May 16, 2025School Construction Authority$846,646.00CONSTRUCTION-BUILDINGS–
Sep 10, 2024School Construction Authority$825,906.00ADMINISTRATIVE EXPENSES–
Oct 28, 2024Department of Youth and Community Development$470,425.98PAY FOR SURETY BOND/INSUR PREM–
Oct 28, 2024Department of Youth and Community Development$253,304.47PAY FOR SURETY BOND/INSUR PREM–
Oct 28, 2024Department of Youth and Community Development$59,801.57PAY FOR SURETY BOND/INSUR PREM–
Sep 11, 2024School Construction Authority$45,864.00ADMINISTRATIVE EXPENSES–
Oct 28, 2024Department of Youth and Community Development$32,200.61PAY FOR SURETY BOND/INSUR PREM–
Oct 28, 2024Department of Youth and Community Development$6,154.45PAY FOR SURETY BOND/INSUR PREM–
Oct 28, 2024Department of Youth and Community Development$3,313.92PAY FOR SURETY BOND/INSUR PREM–
May 20, 2025School Construction Authority$20.00CONSTRUCTION-BUILDINGS–
May 28, 2025School Construction Authority$2.00CONSTRUCTION-BUILDINGS–
May 13, 2025School Construction Authority-$90,000,000.00CONSTRUCTION-BUILDINGS–
FY 2024top 12 of 12 payments$103,866,919
DateAgencyAmountCategoryPurchase order
May 24, 2024School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
May 21, 2024School Construction Authority$10,617,811.00CONSTRUCTION-BUILDINGS–
Jul 3, 2023School Construction Authority$1,500,000.00CONSTRUCTION-BUILDINGS–
Jan 16, 2024Department of Youth and Community Development$587,461.81PAY FOR SURETY BOND/INSUR PREM–
Mar 6, 2024School Construction Authority$388,433.00CONSTRUCTION-BUILDINGS–
Dec 26, 2023School Construction Authority$341,063.00ADMINISTRATIVE EXPENSES–
Jan 16, 2024Department of Youth and Community Development$276,584.61PAY FOR SURETY BOND/INSUR PREM–
Jan 16, 2024Department of Youth and Community Development$83,691.15PAY FOR SURETY BOND/INSUR PREM–
Jan 16, 2024Department of Youth and Community Development$39,402.87PAY FOR SURETY BOND/INSUR PREM–
Jul 3, 2023School Construction Authority$19,836.29ADMINISTRATIVE EXPENSES–
Jan 16, 2024Department of Youth and Community Development$8,590.87PAY FOR SURETY BOND/INSUR PREM–
Jan 16, 2024Department of Youth and Community Development$4,044.69PAY FOR SURETY BOND/INSUR PREM–
FY 2023top 20 of 37 payments$116,407,916
DateAgencyAmountCategoryPurchase order
Jun 23, 2023School Construction Authority$99,999,999.98CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$11,911,760.00CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$846,644.00CONSTRUCTION-BUILDINGS–
Jun 23, 2023School Construction Authority$617,811.02CONSTRUCTION-BUILDINGS–
Jun 13, 2023School Construction Authority$484,127.00CONSTRUCTION-BUILDINGS–
Dec 9, 2022School Construction Authority$380,511.00CONSTRUCTION-BUILDINGS–
Jun 13, 2023School Construction Authority$342,913.00ADMINISTRATIVE EXPENSES–
Jul 15, 2022School Construction Authority$287,980.00CONSTRUCTION-BUILDINGS–
Dec 13, 2022School Construction Authority$286,630.00ADMINISTRATIVE EXPENSES–
Dec 20, 2022Department of Youth and Community Development$234,637.51PAY FOR SURETY BOND/INSUR PREM–
Aug 8, 2022School Construction Authority$219,038.00ADMINISTRATIVE EXPENSES–
Oct 4, 2022School Construction Authority$219,037.00CONSTRUCTION-BUILDINGS–
Aug 8, 2022School Construction Authority$186,409.00ADMINISTRATIVE EXPENSES–
Nov 28, 2022Department of Youth and Community Development$116,670.49PAY FOR SURETY BOND/INSUR PREM–
Dec 20, 2022Department of Youth and Community Development$95,945.13PAY FOR SURETY BOND/INSUR PREM–
Nov 28, 2022Department of Youth and Community Development$47,707.28PAY FOR SURETY BOND/INSUR PREM–
Jul 5, 2022School Construction Authority$41,232.77ADMINISTRATIVE EXPENSES–
Dec 20, 2022Department of Youth and Community Development$33,553.17PAY FOR SURETY BOND/INSUR PREM–
Nov 28, 2022Department of Youth and Community Development$16,683.87PAY FOR SURETY BOND/INSUR PREM–
Dec 20, 2022Department of Youth and Community Development$11,847.15PAY FOR SURETY BOND/INSUR PREM–
FY 2022top 20 of 41 payments$180,989,899
DateAgencyAmountCategoryPurchase order
Mar 30, 2022School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
Mar 30, 2022School Construction Authority$71,961,936.00CONSTRUCTION-BUILDINGS–
Mar 9, 2022School Construction Authority$13,974,055.00CONSTRUCTION-BUILDINGS–
Mar 9, 2022School Construction Authority$2,734,792.00CONSTRUCTION-BUILDINGS–
Jun 24, 2022School Construction Authority$463,871.00CONSTRUCTION-BUILDINGS–
Jun 21, 2022School Construction Authority$463,871.00CONSTRUCTION-BUILDINGS–
Nov 30, 2021Department of Youth and Community Development$435,439.34PAY FOR SURETY BOND/INSUR PREM–
Oct 25, 2021School Construction Authority$350,396.50CONSTRUCTION-BUILDINGS–
Oct 25, 2021School Construction Authority$237,066.50ADMINISTRATIVE EXPENSES–
Oct 22, 2021School Construction Authority$202,926.00CONSTRUCTION-BUILDINGS–
Jun 24, 2022School Construction Authority$186,409.00ADMINISTRATIVE EXPENSES–
Jun 21, 2022School Construction Authority$186,409.00ADMINISTRATIVE EXPENSES–
Dec 1, 2021Department of Youth and Community Development$152,418.66PAY FOR SURETY BOND/INSUR PREM–
Nov 30, 2021Department of Youth and Community Development$124,996.09PAY FOR SURETY BOND/INSUR PREM–
Dec 1, 2021Department of Youth and Community Development$43,752.91PAY FOR SURETY BOND/INSUR PREM–
Nov 30, 2021Department of Youth and Community Development$43,713.71PAY FOR SURETY BOND/INSUR PREM–
Dec 1, 2021Department of Youth and Community Development$15,301.29PAY FOR SURETY BOND/INSUR PREM–
Nov 30, 2021Department of Youth and Community Development$13,435.94PAY FOR SURETY BOND/INSUR PREM–
Nov 30, 2021Department of Youth and Community Development$6,842.05PAY FOR SURETY BOND/INSUR PREM–
Nov 30, 2021Department of Youth and Community Development$5,494.68PAY FOR SURETY BOND/INSUR PREM–
FY 2021top 20 of 35 payments$258,921,928
DateAgencyAmountCategoryPurchase order
Apr 9, 2021School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
Apr 13, 2021School Construction Authority$71,961,937.00CONSTRUCTION-BUILDINGS–
Jul 17, 2020School Construction Authority$22,148,479.00CONSTRUCTION-BUILDINGS–
Sep 30, 2020School Construction Authority$22,148,479.00CONSTRUCTION-BUILDINGS–
Dec 31, 2020School Construction Authority$22,148,478.00CONSTRUCTION-BUILDINGS–
Apr 9, 2021School Construction Authority$13,974,055.00CONSTRUCTION-BUILDINGS–
Apr 9, 2021School Construction Authority$2,734,792.00CONSTRUCTION-BUILDINGS–
Jul 23, 2020School Construction Authority$1,884,749.00CONSTRUCTION-BUILDINGS–
Oct 2, 2020School Construction Authority$1,884,749.00CONSTRUCTION-BUILDINGS–
Jan 4, 2021School Construction Authority$1,664,747.00CONSTRUCTION-BUILDINGS–
Jul 23, 2020School Construction Authority$1,367,396.00CONSTRUCTION-BUILDINGS–
Oct 2, 2020School Construction Authority$1,367,396.00CONSTRUCTION-BUILDINGS–
Dec 24, 2020School Construction Authority$1,367,396.00CONSTRUCTION-BUILDINGS–
Jun 21, 2021School Construction Authority$462,823.50CONSTRUCTION-BUILDINGS–
Jul 23, 2020School Construction Authority$375,000.00CONSTRUCTION-BUILDINGS–
Dec 18, 2020School Construction Authority$375,000.00CONSTRUCTION-BUILDINGS–
Oct 2, 2020School Construction Authority$375,000.00CONSTRUCTION-BUILDINGS–
Oct 7, 2020School Construction Authority$339,152.00CONSTRUCTION-BUILDINGS–
Jun 22, 2021School Construction Authority$308,000.00ADMINISTRATIVE EXPENSES–
Sep 30, 2020School Construction Authority$254,594.00CONSTRUCTION-BUILDINGS–
FY 2020top 20 of 43 payments$62,848,194
DateAgencyAmountCategoryPurchase order
Feb 7, 2020School Construction Authority$27,346,824.00CONSTRUCTION-BUILDINGS–
Jun 16, 2020School Construction Authority$22,148,479.00CONSTRUCTION-BUILDINGS–
Jun 17, 2020School Construction Authority$8,743,261.00CONSTRUCTION-BUILDINGS–
Jun 8, 2020School Construction Authority$1,367,397.00CONSTRUCTION-BUILDINGS–
Feb 10, 2020School Construction Authority$666,346.00CONSTRUCTION-BUILDINGS–
Jan 22, 2020Department of Youth and Community Development$558,542.11PAY FOR SURETY BOND/INSUR PREM–
May 29, 2020School Construction Authority$458,543.00CONSTRUCTION-BUILDINGS–
Jun 10, 2020School Construction Authority$458,543.00CONSTRUCTION-BUILDINGS–
Jun 17, 2020School Construction Authority$375,000.00CONSTRUCTION-BUILDINGS–
Jun 22, 2020School Construction Authority$254,594.50CONSTRUCTION-BUILDINGS–
Jun 17, 2020School Construction Authority$254,594.50CONSTRUCTION-BUILDINGS–
Jun 8, 2020School Construction Authority$247,762.00ADMINISTRATIVE EXPENSES–
Jan 22, 2020Department of Youth and Community Development$197,937.11PAY FOR SURETY BOND/INSUR PREM–
Jun 8, 2020School Construction Authority$175,000.00ADMINISTRATIVE EXPENSES–
May 29, 2020School Construction Authority$175,000.00ADMINISTRATIVE EXPENSES–
Jan 22, 2020Department of Youth and Community Development$116,038.89PAY FOR SURETY BOND/INSUR PREM–
Dec 23, 2019Department of Youth and Community Development$91,630.13PAY FOR SURETY BOND/INSUR PREM–
Jun 17, 2020School Construction Authority$31,431.50ADMINISTRATIVE EXPENSES–
Jun 22, 2020School Construction Authority$31,431.50ADMINISTRATIVE EXPENSES–
Dec 23, 2019Department of Youth and Community Development$23,302.49PAY FOR SURETY BOND/INSUR PREM–
FY 2019top 17 of 17 payments$1,057,409
DateAgencyAmountCategoryPurchase order
Apr 3, 2019School Construction Authority$417,150.00ADMINISTRATIVE EXPENSES–
Feb 4, 2019Department of Youth and Community Development$246,216.52PAY FOR SURETY BOND/INSUR PREM–
Apr 4, 2019School Construction Authority$141,948.58CONSTRUCTION-BUILDINGS–
Feb 4, 2019Department of Youth and Community Development$115,816.48PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$107,621.96PAY FOR SURETY BOND/INSUR PREM–
May 20, 2019School Construction Authority$11,294.00CONSTRUCTION-BUILDINGS–
Feb 4, 2019Department of Youth and Community Development$6,537.76PAY FOR SURETY BOND/INSUR PREM–
May 22, 2019School Construction Authority$2,407.00ADMINISTRATIVE EXPENSES–
Feb 4, 2019Department of Youth and Community Development$1,859.25PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$1,582.22PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$1,019.26PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$927.41PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$878.52PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$814.81PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$737.78PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$574.81PAY FOR SURETY BOND/INSUR PREM–
Feb 4, 2019Department of Youth and Community Development$22.22PAY FOR SURETY BOND/INSUR PREM–
FY 2018top 20 of 34 payments$210,500,016
DateAgencyAmountCategoryPurchase order
Jan 23, 2018School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2018School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGS–
Jan 22, 2018School Construction Authority$21,894,660.00CONSTRUCTION-BUILDINGS–
Jun 22, 2018School Construction Authority$4,196,748.00CONSTRUCTION-BUILDINGS–
Jan 19, 2018School Construction Authority$2,004,531.25CONSTRUCTION-BUILDINGS–
Mar 26, 2018School Construction Authority$1,160,464.00CONSTRUCTION-BUILDINGS–
Mar 26, 2018School Construction Authority$403,769.00ADMINISTRATIVE EXPENSES–
Jan 29, 2018Department of Youth and Community Development$400,254.44PAY FOR SURETY BOND/INSUR PREM–
Jan 30, 2018Department of Youth and Community Development$142,478.90PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$81,893.27PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$81,893.27PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$81,341.56PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$16,642.73PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$16,642.73PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$8,055.98PAY FOR SURETY BOND/INSUR PREM–
Jan 29, 2018Department of Youth and Community Development$2,588.07PAY FOR SURETY BOND/INSUR PREM–
Jan 30, 2018Department of Youth and Community Development$1,682.68PAY FOR SURETY BOND/INSUR PREM–
Jan 30, 2018Department of Youth and Community Development$1,575.87PAY FOR SURETY BOND/INSUR PREM–
Jan 30, 2018Department of Youth and Community Development$1,292.93PAY FOR SURETY BOND/INSUR PREM–
Jan 30, 2018Department of Youth and Community Development$1,154.27PAY FOR SURETY BOND/INSUR PREM–
FY 2017top 20 of 25 payments$146,335,166
DateAgencyAmountCategoryPurchase order
Jan 30, 2017School Construction Authority$98,000,000.00CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$17,783,131.52CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$14,624,346.00CONSTRUCTION-BUILDINGS–
Jan 31, 2017School Construction Authority$6,189,056.00CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$4,009,062.50CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$1,918,973.00CONSTRUCTION-BUILDINGS–
Mar 23, 2017School Construction Authority$1,156,224.00CONSTRUCTION-BUILDINGS–
Mar 22, 2017School Construction Authority$393,662.00ADMINISTRATIVE EXPENSES–
Jan 30, 2017School Construction Authority$360,000.00CONSTRUCTION-BUILDINGS–
Sep 27, 2016School Construction Authority$359,580.00CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$259,875.00CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$259,875.00CONSTRUCTION-BUILDINGS–
Jan 30, 2017School Construction Authority$259,200.00CONSTRUCTION-BUILDINGS–
Nov 7, 2016Department of Youth and Community Development$226,013.00PAY FOR SURETY BOND/INSUR PREM–
Nov 9, 2016Department of Youth and Community Development$170,513.00PAY FOR SURETY BOND/INSUR PREM–
Nov 7, 2016Department of Youth and Community Development$94,420.00PAY FOR SURETY BOND/INSUR PREM–
Nov 7, 2016Department of Youth and Community Development$70,376.00PAY FOR SURETY BOND/INSUR PREM–
Nov 9, 2016Department of Youth and Community Development$55,502.00PAY FOR SURETY BOND/INSUR PREM–
Nov 7, 2016Department of Youth and Community Development$51,952.00PAY FOR SURETY BOND/INSUR PREM–
Nov 9, 2016Department of Youth and Community Development$39,194.00PAY FOR SURETY BOND/INSUR PREM–
FY 2016top 20 of 29 payments$134,766,098
DateAgencyAmountCategoryPurchase order
Jan 6, 2016School Construction Authority$99,000,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$12,993,598.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$10,616,439.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$3,024,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$1,512,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$1,512,000.00CONSTRUCTION-BUILDINGS–
Jun 10, 2016School Construction Authority$854,910.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$630,630.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$630,628.18CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$466,830.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$466,830.00CONSTRUCTION-BUILDINGS–
Apr 13, 2016School Construction Authority$401,022.00ADMINISTRATIVE EXPENSES–
Oct 19, 2015Department of Youth and Community Development$372,786.06PAY FOR SURETY BOND/INSUR PREM–
May 9, 2016Administration for Children's Services$314,553.14FIXED CHARGES - GENERAL–
Jan 6, 2016School Construction Authority$252,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 6, 2016School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
FY 2015top 20 of 40 payments$222,317,813
DateAgencyAmountCategoryPurchase order
Jan 15, 2015School Construction Authority$99,000,000.00CONSTRUCTION-BUILDINGS–
Jan 16, 2015School Construction Authority$61,207,890.00CONSTRUCTION-BUILDINGS–
Jan 16, 2015School Construction Authority$51,000,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$3,024,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$1,512,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$1,512,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$630,630.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$630,628.17CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$466,830.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$466,830.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$252,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 23, 2015School Construction Authority$189,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2015School Construction Authority$155,610.00CONSTRUCTION-BUILDINGS–
Jul 9, 2014School Construction Authority$138,593.00CONSTRUCTION-BUILDINGS–
Jun 10, 2015School Construction Authority$125,002.00CONSTRUCTION-BUILDINGS–
Jun 25, 2015School Construction Authority$125,001.00CONSTRUCTION-BUILDINGS–
FY 2014top 20 of 40 payments$211,818,925
DateAgencyAmountCategoryPurchase order
Feb 7, 2014School Construction Authority$99,087,905.00CONSTRUCTION-BUILDINGS–
Feb 5, 2014School Construction Authority$98,175,810.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$2,956,800.00CONSTRUCTION-BUILDINGS–
Feb 28, 2014Administration for Children's Services$2,064,198.37FIXED CHARGES - GENERAL–
Feb 13, 2014School Construction Authority$1,478,400.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$1,296,000.00CONSTRUCTION-BUILDINGS–
Feb 5, 2014School Construction Authority$912,095.00CONSTRUCTION-BUILDINGS–
Feb 28, 2014Administration for Children's Services$808,605.00FIXED CHARGES - GENERAL–
May 12, 2014Administration for Children's Services$691,880.00FIXED CHARGES - GENERAL–
Feb 13, 2014School Construction Authority$616,616.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$616,614.96CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$456,456.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$400,140.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$246,400.00CONSTRUCTION-BUILDINGS–
Nov 12, 2013Administration for Children's Services$191,974.12FIXED CHARGES - GENERAL–
Feb 13, 2014School Construction Authority$184,800.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$162,000.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$162,000.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$162,000.00CONSTRUCTION-BUILDINGS–
Feb 13, 2014School Construction Authority$162,000.00CONSTRUCTION-BUILDINGS–
FY 2013top 20 of 55 payments$99,291,678
DateAgencyAmountCategoryPurchase order
May 9, 2013Department of Social Services$27,033,777.73HOME CARE SERVICES–
Mar 27, 2013Department of Social Services$19,314,014.00HOME CARE SERVICES–
Sep 7, 2012Department of Social Services$19,314,014.00HOME CARE SERVICES–
Dec 26, 2012Department of Social Services$19,314,013.99HOME CARE SERVICES–
Nov 30, 2012Administration for Children's Services$2,176,010.00FIXED CHARGES - GENERAL–
Mar 27, 2013Department of Social Services$1,716,524.00HOME CARE SERVICES–
Sep 7, 2012Department of Social Services$1,716,524.00HOME CARE SERVICES–
Dec 26, 2012Department of Social Services$1,716,523.99HOME CARE SERVICES–
Feb 28, 2013Administration for Children's Services$1,056,266.00FIXED CHARGES - GENERAL–
Nov 29, 2012Administration for Children's Services$905,518.00FIXED CHARGES - GENERAL–
Jan 31, 2013Administration for Children's Services$452,759.00FIXED CHARGES - GENERAL–
May 10, 2013Administration for Children's Services$452,759.00FIXED CHARGES - GENERAL–
Mar 1, 2013Administration for Children's Services$444,161.65FIXED CHARGES - GENERAL–
Mar 1, 2013Administration for Children's Services$394,428.60FIXED CHARGES - GENERAL–
Mar 1, 2013Administration for Children's Services$363,310.48FIXED CHARGES - GENERAL–
Feb 28, 2013Administration for Children's Services$348,504.55FIXED CHARGES - GENERAL–
May 10, 2013Administration for Children's Services$337,478.00FIXED CHARGES - GENERAL–
Mar 11, 2013Administration for Children's Services$337,478.00FIXED CHARGES - GENERAL–
Mar 11, 2013Administration for Children's Services$337,478.00FIXED CHARGES - GENERAL–
Feb 11, 2013Department for the Aging$303,893.83PAY FOR SURETY BOND/INSUR PREM–
FY 2012top 20 of 49 payments$155,357,640
DateAgencyAmountCategoryPurchase order
Jan 5, 2012Department of Social Services$51,148,400.80HOME CARE SERVICES–
Jun 14, 2012Department of Social Services$26,041,369.00HOME CARE SERVICES–
Jun 21, 2012Department of Social Services$26,040,423.00HOME CARE SERVICES–
Oct 17, 2011Department of Social Services$18,039,036.00HOME CARE SERVICES–
Oct 24, 2011Department of Social Services$18,039,035.99HOME CARE SERVICES–
Dec 21, 2011Administration for Children's Services$2,417,013.00FIXED CHARGES - GENERAL–
Jan 11, 2012Administration for Children's Services$1,994,425.00FIXED CHARGES - GENERAL–
Jun 8, 2012Administration for Children's Services$1,861,460.59FIXED CHARGES - GENERAL–
Aug 1, 2011Administration for Children's Services$1,848,920.09FIXED CHARGES - GENERAL–
Aug 1, 2011Administration for Children's Services$1,714,057.18FIXED CHARGES - GENERAL–
Dec 22, 2011Administration for Children's Services$1,097,894.00FIXED CHARGES - GENERAL–
Nov 23, 2011Department for the Aging$971,145.00PAY FOR SURETY BOND/INSUR PREM–
Nov 23, 2011Department for the Aging$971,145.00PAY FOR SURETY BOND/INSUR PREM–
Feb 21, 2012Department for the Aging$971,145.00PAY FOR SURETY BOND/INSUR PREM–
Aug 16, 2011Department for the Aging$945,167.50PAY FOR SURETY BOND/INSUR PREM–
Dec 22, 2011Administration for Children's Services$814,015.00FIXED CHARGES - GENERAL–
Aug 1, 2011Administration for Children's Services$191,119.65FIXED CHARGES - GENERAL–
Nov 7, 2011Department of Youth and Community Development$51,777.80PAY FOR SURETY BOND/INSUR PREM–
Nov 9, 2011Department of Youth and Community Development$51,777.80PAY FOR SURETY BOND/INSUR PREM–
Dec 21, 2011Administration for Children's Services$31,328.00FIXED CHARGES - GENERAL–
FY 2011top 20 of 66 payments$135,541,078
DateAgencyAmountCategoryPurchase order
Sep 27, 2010Department of Social Services$36,133,140.87HOME CARE SERVICES–
Jan 24, 2011Department of Social Services$21,217,956.73HOME CARE SERVICES–
Apr 7, 2011Department of Social Services$21,217,956.73HOME CARE SERVICES–
Feb 22, 2011Department of Social Services$21,217,956.73HOME CARE SERVICES–
Oct 14, 2010Department of Social Services$11,217,957.73HOME CARE SERVICES–
Aug 11, 2010Department of Social Services$9,999,999.00HOME CARE SERVICES–
Jun 6, 2011Administration for Children's Services$1,163,798.69FIXED CHARGES - GENERAL–
Mar 17, 2011Administration for Children's Services$1,091,019.11FIXED CHARGES - GENERAL–
Dec 17, 2010Administration for Children's Services$1,091,019.11FIXED CHARGES - GENERAL–
Feb 4, 2011Administration for Children's Services$1,091,019.11FIXED CHARGES - GENERAL–
Dec 17, 2010Administration for Children's Services$1,091,019.11FIXED CHARGES - GENERAL–
Feb 17, 2011Administration for Children's Services$1,014,749.90FIXED CHARGES - GENERAL–
Dec 13, 2010Administration for Children's Services$992,722.16FIXED CHARGES - GENERAL–
Feb 17, 2011Administration for Children's Services$977,896.93FIXED CHARGES - GENERAL–
Nov 9, 2010Department for the Aging$871,583.03PAY FOR SURETY BOND/INSUR PREM–
Feb 17, 2011Administration for Children's Services$642,741.32FIXED CHARGES - GENERAL–
Jun 8, 2011Administration for Children's Services$496,361.08FIXED CHARGES - GENERAL–
Mar 14, 2011Administration for Children's Services$496,361.08FIXED CHARGES - GENERAL–
Jul 2, 2010Administration for Children's Services$430,097.00FIXED CHARGES - GENERAL–
Nov 9, 2010Department for the Aging$405,917.98PAY FOR SURETY BOND/INSUR PREM–
FY 2010top 20 of 39 payments$43,924,094
DateAgencyAmountCategoryPurchase order
Apr 23, 2010Department of Social Services$16,997,375.65HOME CARE SERVICES–
Feb 10, 2010Department of Social Services$12,999,999.90HOME CARE SERVICES–
Mar 4, 2010Department of Social Services$3,997,375.75HOME CARE SERVICES–
Feb 10, 2010Department of Social Services$3,997,375.75HOME CARE SERVICES–
Jan 25, 2010Administration for Children's Services$1,569,935.02FIXED CHARGES - GENERAL–
Feb 1, 2010Administration for Children's Services$961,395.60FIXED CHARGES - GENERAL–
Apr 22, 2010Administration for Children's Services$903,319.43FIXED CHARGES - GENERAL–
Jun 16, 2010Administration for Children's Services$815,750.85FIXED CHARGES - GENERAL–
Apr 22, 2010Administration for Children's Services$446,925.03FIXED CHARGES - GENERAL–
May 4, 2010Department for the Aging$330,953.79PAY FOR SURETY BOND/INSUR PREM–
Apr 22, 2010Administration for Children's Services$269,902.99FIXED CHARGES - GENERAL–
Feb 23, 2010Department for the Aging$247,291.21PAY FOR SURETY BOND/INSUR PREM–
Feb 24, 2010Department of Social Services$84,144.12HOME CARE SERVICES–
Feb 23, 2010Department for the Aging$83,666.77PAY FOR SURETY BOND/INSUR PREM–
Apr 22, 2010Administration for Children's Services$58,076.17FIXED CHARGES - GENERAL–
Apr 12, 2010Department of Youth and Community Development$37,372.71PAY FOR SURETY BOND/INSUR PREM–
Jan 19, 2010Department of Youth and Community Development$35,071.97PAY FOR SURETY BOND/INSUR PREM–
Apr 28, 2010School Construction Authority$25,000.00AUDIO VISUAL SUPPLIES-BOE ONLY–
Jan 25, 2010Administration for Children's Services$20,995.71FIXED CHARGES - GENERAL–
Jan 19, 2010Department of Youth and Community Development$11,077.66PAY FOR SURETY BOND/INSUR PREM–

Recent payments

DateAgencyAmountCategoryMethod
May 28, 2025School Construction Authority$11,911,756.00CONSTRUCTION-BUILDINGSCapital Contracts
May 28, 2025School Construction Authority$2.00CONSTRUCTION-BUILDINGSCapital Contracts
May 21, 2025School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$10,617,811.00CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$20.00CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$846,646.00CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority-$90,000,000.00CONSTRUCTION-BUILDINGSCapital Contracts
Oct 28, 2024Department of Youth and Community Development$470,425.98PAY FOR SURETY BOND/INSUR PREMContracts
Oct 28, 2024Department of Youth and Community Development$59,801.57PAY FOR SURETY BOND/INSUR PREMContracts
Oct 28, 2024Department of Youth and Community Development$32,200.61PAY FOR SURETY BOND/INSUR PREMContracts
Oct 28, 2024Department of Youth and Community Development$253,304.47PAY FOR SURETY BOND/INSUR PREMContracts
Oct 28, 2024Department of Youth and Community Development$3,313.92PAY FOR SURETY BOND/INSUR PREMContracts
Oct 28, 2024Department of Youth and Community Development$6,154.45PAY FOR SURETY BOND/INSUR PREMContracts
Sep 11, 2024School Construction Authority$45,864.00ADMINISTRATIVE EXPENSESCapital Contracts
Sep 10, 2024School Construction Authority$825,906.00ADMINISTRATIVE EXPENSESCapital Contracts
Sep 10, 2024School Construction Authority$921,447.00CONSTRUCTION-BUILDINGSCapital Contracts
Sep 9, 2024School Construction Authority$846,666.00CONSTRUCTION-BUILDINGSCapital Contracts
Sep 9, 2024School Construction Authority$11,911,758.00CONSTRUCTION-BUILDINGSCapital Contracts
May 24, 2024School Construction Authority$90,000,000.00CONSTRUCTION-BUILDINGSCapital Contracts
May 21, 2024School Construction Authority$10,617,811.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 6, 2024School Construction Authority$388,433.00CONSTRUCTION-BUILDINGSCapital Contracts
Jan 16, 2024Department of Youth and Community Development$276,584.61PAY FOR SURETY BOND/INSUR PREMContracts
Jan 16, 2024Department of Youth and Community Development$83,691.15PAY FOR SURETY BOND/INSUR PREMContracts
Jan 16, 2024Department of Youth and Community Development$8,590.87PAY FOR SURETY BOND/INSUR PREMContracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data