Silverite Construction Company Inc: New York City Government Payments

as recorded by New York City: SILVERITE CONSTRUCTION COMPANY INC

Silverite Construction Company Inc is the 110th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 13th in IOTB CONSTRUCTION spending. Its payments amount to 0.9% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 18.3% year over year.

Primary spending category: IOTB CONSTRUCTION

$588,483,782total received
2,567payments
3agencies
Jan 13, 2010 – Jun 17, 2025first / last payment
Find this supplier’s buyersCompare with other suppliers

Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.

Follow this vendorGet an email when the recorded payment summary for Silverite Construction Company Inc in New York City changes. Confirm by email to start. Self-service follows are free.

Payments by fiscal year

The payment history

Select a column to see the agencies behind that fiscal year.

16 fiscal years on record. The incoming flows below combine all recorded years.

Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.

Who pays this supplier?

Select a paying agency to inspect the relationship, then open its profile.

Jan 13, 2010 to Jun 17, 2025 · All recorded fiscal years

Showing 3 of 3 positive agencies in these records.

Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $588,483,782.42. Zero and net-negative relationships are excluded from positive flows.

The relationships at a glance

Total shown
$588,483,782.42
Payments represented
2,567
Paying agencies shown
3
Largest share of supplier total
53.5%

Largest displayed relationship: Department of Environmental Protection. Select a flow to explore its details.

Jan 13, 2010 to Jun 17, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.

Receiving supplier

Silverite Construction Company Inc

$588,483,782from the agencies shown

Silverite Construction Company Inc
$588,483,782 from the agencies shown

  1. $314,967,29253.5% of supplier total
  2. $273,416,49046.5% of supplier total
  3. $100,000<0.1% of supplier total

This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority63$6,864,056
FY 2025Department of Environmental Protection6$648,225
FY 2024School Construction Authority59$8,332,693
FY 2024Department of Environmental Protection18$863,673
FY 2023School Construction Authority54$5,956,574
FY 2023Department of Environmental Protection23$628,272
FY 2023Miscellaneous1$100,000
FY 2022School Construction Authority47$8,172,194
FY 2022Department of Environmental Protection8$1,361,582
FY 2021School Construction Authority64$5,134,464
FY 2021Department of Environmental Protection25$3,533,027
FY 2020Department of Environmental Protection16$6,828,780
FY 2020School Construction Authority17$2,399,245
FY 2019School Construction Authority52$9,119,661
FY 2019Department of Environmental Protection6$2,103,555
FY 2018School Construction Authority111$14,610,691
FY 2018Department of Environmental Protection18$588,572
FY 2017School Construction Authority99$13,473,328
FY 2017Department of Environmental Protection28$2,037,168
FY 2016School Construction Authority102$40,774,866
FY 2016Department of Environmental Protection28$2,885,101
FY 2015School Construction Authority37$93,089,907
FY 2015Department of Environmental Protection75$9,412,134
FY 2014School Construction Authority36$48,112,322
FY 2014Department of Environmental Protection194$13,265,253
FY 2013Department of Environmental Protection402$36,334,666
FY 2013School Construction Authority13$17,376,489
FY 2012Department of Environmental Protection424$83,276,471
FY 2011Department of Environmental Protection430$110,555,264
FY 2010Department of Environmental Protection111$40,645,548
Total2,567$588,483,782

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROMPT PAYMENT INTEREST1$617Feb 4, 2010 – Feb 4, 2010
IOTB CONSTRUCTION1,778$301,403,655Jan 13, 2010 – Dec 17, 2024
CONSTRUCTION-BUILDINGS754$273,416,490Feb 26, 2013 – Jun 17, 2025
OTHR SERV AND CHRGS-GENERAL33$13,563,020Dec 26, 2013 – Nov 29, 2017
JUDGMENTS AND CLAIMS-NONEMP COMP1$100,000Dec 23, 2022 – Dec 23, 2022

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 69 payments$7,512,282
DateAgencyAmountCategoryPurchase order
Dec 4, 2024School Construction Authority$843,076.42CONSTRUCTION-BUILDINGS–
Jan 3, 2025School Construction Authority$534,677.84CONSTRUCTION-BUILDINGS–
Sep 20, 2024School Construction Authority$373,764.75CONSTRUCTION-BUILDINGS–
Dec 17, 2024Department of Environmental Protection$334,709.24IOTB CONSTRUCTION–
Dec 4, 2024School Construction Authority$315,413.30CONSTRUCTION-BUILDINGS–
Aug 13, 2024School Construction Authority$306,782.66CONSTRUCTION-BUILDINGS–
Mar 25, 2025School Construction Authority$282,499.10CONSTRUCTION-BUILDINGS–
Feb 6, 2025School Construction Authority$262,298.41CONSTRUCTION-BUILDINGS–
Apr 24, 2025School Construction Authority$259,371.74CONSTRUCTION-BUILDINGS–
Nov 6, 2024School Construction Authority$228,907.92CONSTRUCTION-BUILDINGS–
Aug 22, 2024School Construction Authority$214,898.11CONSTRUCTION-BUILDINGS–
Nov 7, 2024School Construction Authority$208,415.75CONSTRUCTION-BUILDINGS–
Jan 8, 2025School Construction Authority$181,785.35CONSTRUCTION-BUILDINGS–
Jul 22, 2024School Construction Authority$170,477.74CONSTRUCTION-BUILDINGS–
Oct 21, 2024School Construction Authority$166,307.95CONSTRUCTION-BUILDINGS–
Dec 17, 2024Department of Environmental Protection$158,921.63IOTB CONSTRUCTION–
Mar 7, 2025School Construction Authority$144,660.79CONSTRUCTION-BUILDINGS–
Jan 7, 2025School Construction Authority$140,942.00CONSTRUCTION-BUILDINGS–
Jul 26, 2024School Construction Authority$132,875.82CONSTRUCTION-BUILDINGS–
Dec 17, 2024Department of Environmental Protection$130,202.84IOTB CONSTRUCTION–
FY 2024top 20 of 77 payments$9,196,367
DateAgencyAmountCategoryPurchase order
Jun 25, 2024School Construction Authority$848,949.62CONSTRUCTION-BUILDINGS–
Jul 24, 2023School Construction Authority$594,742.01CONSTRUCTION-BUILDINGS–
Dec 4, 2023School Construction Authority$456,158.65CONSTRUCTION-BUILDINGS–
Dec 20, 2023School Construction Authority$380,000.00CONSTRUCTION-BUILDINGS–
Jul 17, 2023School Construction Authority$331,656.40CONSTRUCTION-BUILDINGS–
Sep 18, 2023School Construction Authority$324,349.00CONSTRUCTION-BUILDINGS–
Aug 11, 2023Department of Environmental Protection$316,817.83IOTB CONSTRUCTION–
Aug 9, 2023Department of Environmental Protection$316,817.83IOTB CONSTRUCTION–
Aug 30, 2023School Construction Authority$304,457.90CONSTRUCTION-BUILDINGS–
Nov 21, 2023School Construction Authority$301,402.35CONSTRUCTION-BUILDINGS–
Nov 14, 2023School Construction Authority$297,893.40CONSTRUCTION-BUILDINGS–
Mar 5, 2024School Construction Authority$264,638.65CONSTRUCTION-BUILDINGS–
Jun 3, 2024School Construction Authority$245,486.04CONSTRUCTION-BUILDINGS–
Mar 6, 2024School Construction Authority$242,603.81CONSTRUCTION-BUILDINGS–
Jan 8, 2024School Construction Authority$235,497.40CONSTRUCTION-BUILDINGS–
Mar 22, 2024School Construction Authority$229,084.90CONSTRUCTION-BUILDINGS–
Aug 28, 2023School Construction Authority$226,405.90CONSTRUCTION-BUILDINGS–
Oct 18, 2023School Construction Authority$204,635.70CONSTRUCTION-BUILDINGS–
Aug 17, 2023School Construction Authority$179,268.53CONSTRUCTION-BUILDINGS–
Mar 27, 2024School Construction Authority$163,875.00CONSTRUCTION-BUILDINGS–
FY 2023top 20 of 78 payments$6,684,847
DateAgencyAmountCategoryPurchase order
Feb 14, 2023School Construction Authority$729,429.00CONSTRUCTION-BUILDINGS–
Sep 14, 2022School Construction Authority$584,453.82CONSTRUCTION-BUILDINGS–
Oct 14, 2022School Construction Authority$528,580.00CONSTRUCTION-BUILDINGS–
Dec 1, 2022School Construction Authority$389,850.55CONSTRUCTION-BUILDINGS–
Mar 8, 2023School Construction Authority$287,334.28CONSTRUCTION-BUILDINGS–
Jan 18, 2023School Construction Authority$263,208.19CONSTRUCTION-BUILDINGS–
Nov 15, 2022School Construction Authority$262,504.00CONSTRUCTION-BUILDINGS–
Jun 12, 2023School Construction Authority$259,934.47CONSTRUCTION-BUILDINGS–
Apr 13, 2023School Construction Authority$230,869.00CONSTRUCTION-BUILDINGS–
Jul 14, 2022Department of Environmental Protection$227,487.64IOTB CONSTRUCTION–
May 11, 2023School Construction Authority$195,171.80CONSTRUCTION-BUILDINGS–
Dec 22, 2022School Construction Authority$169,641.50CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$165,078.65CONSTRUCTION-BUILDINGS–
Jan 26, 2023School Construction Authority$163,463.65CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$157,789.70CONSTRUCTION-BUILDINGS–
May 17, 2023School Construction Authority$154,253.40CONSTRUCTION-BUILDINGS–
Apr 13, 2023School Construction Authority$121,975.73CONSTRUCTION-BUILDINGS–
Sep 1, 2022School Construction Authority$113,281.87CONSTRUCTION-BUILDINGS–
Dec 23, 2022Miscellaneous$100,000.00JUDGMENTS AND CLAIMS-NONEMP COMP–
May 24, 2023School Construction Authority$85,022.61CONSTRUCTION-BUILDINGS–
FY 2022top 20 of 55 payments$9,533,777
DateAgencyAmountCategoryPurchase order
Mar 25, 2022School Construction Authority$3,257,836.42CONSTRUCTION-BUILDINGS–
Mar 25, 2022School Construction Authority$1,133,000.00CONSTRUCTION-BUILDINGS–
Jan 14, 2022Department of Environmental Protection$705,565.00IOTB CONSTRUCTION–
Mar 25, 2022School Construction Authority$389,154.77CONSTRUCTION-BUILDINGS–
Aug 16, 2021School Construction Authority$312,916.32CONSTRUCTION-BUILDINGS–
Sep 23, 2021School Construction Authority$275,106.32CONSTRUCTION-BUILDINGS–
Oct 19, 2021School Construction Authority$270,141.24CONSTRUCTION-BUILDINGS–
Nov 10, 2021Department of Environmental Protection$237,319.50IOTB CONSTRUCTION–
Dec 1, 2021School Construction Authority$228,000.00CONSTRUCTION-BUILDINGS–
Sep 13, 2021Department of Environmental Protection$204,297.50IOTB CONSTRUCTION–
Jul 14, 2021School Construction Authority$197,681.32CONSTRUCTION-BUILDINGS–
Jul 14, 2021School Construction Authority$147,535.00CONSTRUCTION-BUILDINGS–
Mar 14, 2022School Construction Authority$116,755.00CONSTRUCTION-BUILDINGS–
Dec 2, 2021Department of Environmental Protection$116,280.00IOTB CONSTRUCTION–
Dec 1, 2021School Construction Authority$113,905.00CONSTRUCTION-BUILDINGS–
Feb 8, 2022School Construction Authority$105,212.50CONSTRUCTION-BUILDINGS–
Aug 16, 2021School Construction Authority$101,175.00CONSTRUCTION-BUILDINGS–
Dec 1, 2021School Construction Authority$101,175.00CONSTRUCTION-BUILDINGS–
Jan 24, 2022School Construction Authority$94,050.00CONSTRUCTION-BUILDINGS–
Apr 20, 2022School Construction Authority$92,577.50CONSTRUCTION-BUILDINGS–
FY 2021top 20 of 89 payments$8,667,491
DateAgencyAmountCategoryPurchase order
Sep 15, 2020Department of Environmental Protection$729,219.26IOTB CONSTRUCTION–
Nov 30, 2020Department of Environmental Protection$534,512.12IOTB CONSTRUCTION–
Dec 21, 2020Department of Environmental Protection$430,414.50IOTB CONSTRUCTION–
Nov 4, 2020School Construction Authority$429,881.01CONSTRUCTION-BUILDINGS–
Mar 8, 2021School Construction Authority$402,029.93CONSTRUCTION-BUILDINGS–
Oct 20, 2020Department of Environmental Protection$391,067.50IOTB CONSTRUCTION–
Aug 11, 2020Department of Environmental Protection$314,633.58IOTB CONSTRUCTION–
Apr 16, 2021School Construction Authority$254,103.39CONSTRUCTION-BUILDINGS–
Apr 16, 2021School Construction Authority$253,541.32CONSTRUCTION-BUILDINGS–
May 19, 2021School Construction Authority$234,256.32CONSTRUCTION-BUILDINGS–
Jul 20, 2020Department of Environmental Protection$225,815.00IOTB CONSTRUCTION–
Aug 28, 2020School Construction Authority$220,008.34CONSTRUCTION-BUILDINGS–
Mar 9, 2021School Construction Authority$214,355.01CONSTRUCTION-BUILDINGS–
Mar 16, 2021School Construction Authority$201,210.00CONSTRUCTION-BUILDINGS–
Oct 14, 2020School Construction Authority$190,194.54CONSTRUCTION-BUILDINGS–
Feb 16, 2021School Construction Authority$180,916.10CONSTRUCTION-BUILDINGS–
Mar 16, 2021School Construction Authority$179,441.32CONSTRUCTION-BUILDINGS–
Oct 26, 2020School Construction Authority$168,823.21CONSTRUCTION-BUILDINGS–
Jul 20, 2020Department of Environmental Protection$165,145.81IOTB CONSTRUCTION–
Jun 16, 2021School Construction Authority$161,547.50CONSTRUCTION-BUILDINGS–
FY 2020top 20 of 33 payments$9,228,025
DateAgencyAmountCategoryPurchase order
Oct 7, 2019Department of Environmental Protection$1,013,464.64IOTB CONSTRUCTION–
Jul 15, 2019Department of Environmental Protection$812,772.50IOTB CONSTRUCTION–
Dec 9, 2019Department of Environmental Protection$803,202.00IOTB CONSTRUCTION–
Nov 12, 2019Department of Environmental Protection$735,015.00IOTB CONSTRUCTION–
Aug 7, 2019Department of Environmental Protection$654,103.50IOTB CONSTRUCTION–
Jun 8, 2020Department of Environmental Protection$497,923.50IOTB CONSTRUCTION–
Apr 23, 2020School Construction Authority$444,505.00CONSTRUCTION-BUILDINGS–
Nov 21, 2019School Construction Authority$427,543.70CONSTRUCTION-BUILDINGS–
Jan 9, 2020Department of Environmental Protection$379,083.00IOTB CONSTRUCTION–
Sep 10, 2019Department of Environmental Protection$366,600.97IOTB CONSTRUCTION–
Apr 23, 2020School Construction Authority$341,667.50CONSTRUCTION-BUILDINGS–
Feb 4, 2020Department of Environmental Protection$321,213.17IOTB CONSTRUCTION–
Feb 19, 2020School Construction Authority$311,647.50CONSTRUCTION-BUILDINGS–
Apr 13, 2020Department of Environmental Protection$290,532.80IOTB CONSTRUCTION–
Jun 1, 2020Department of Environmental Protection$275,233.67IOTB CONSTRUCTION–
Jan 14, 2020School Construction Authority$247,948.22CONSTRUCTION-BUILDINGS–
Mar 16, 2020Department of Environmental Protection$240,160.75IOTB CONSTRUCTION–
Mar 10, 2020Department of Environmental Protection$211,763.66IOTB CONSTRUCTION–
Dec 18, 2019School Construction Authority$192,185.00CONSTRUCTION-BUILDINGS–
Jun 26, 2020Department of Environmental Protection$151,029.76IOTB CONSTRUCTION–
FY 2019top 20 of 58 payments$11,223,216
DateAgencyAmountCategoryPurchase order
Sep 18, 2018School Construction Authority$5,708,057.98CONSTRUCTION-BUILDINGS–
Oct 3, 2018School Construction Authority$695,856.47CONSTRUCTION-BUILDINGS–
Feb 26, 2019Department of Environmental Protection$557,523.65IOTB CONSTRUCTION–
May 14, 2019Department of Environmental Protection$498,968.50IOTB CONSTRUCTION–
Jun 19, 2019Department of Environmental Protection$412,575.50IOTB CONSTRUCTION–
Apr 22, 2019Department of Environmental Protection$402,918.75IOTB CONSTRUCTION–
Nov 19, 2018School Construction Authority$254,715.69CONSTRUCTION-BUILDINGS–
Aug 23, 2018School Construction Authority$223,368.40CONSTRUCTION-BUILDINGS–
Apr 9, 2019Department of Environmental Protection$203,803.50IOTB CONSTRUCTION–
Aug 9, 2018School Construction Authority$190,085.15CONSTRUCTION-BUILDINGS–
Aug 14, 2018School Construction Authority$132,428.41CONSTRUCTION-BUILDINGS–
Dec 12, 2018School Construction Authority$126,154.84CONSTRUCTION-BUILDINGS–
Oct 16, 2018School Construction Authority$117,951.12CONSTRUCTION-BUILDINGS–
Dec 7, 2018School Construction Authority$117,951.12CONSTRUCTION-BUILDINGS–
Jun 4, 2019School Construction Authority$109,692.46CONSTRUCTION-BUILDINGS–
Jul 19, 2018School Construction Authority$105,239.78CONSTRUCTION-BUILDINGS–
Sep 18, 2018School Construction Authority$104,899.80CONSTRUCTION-BUILDINGS–
Mar 12, 2019School Construction Authority$101,100.95CONSTRUCTION-BUILDINGS–
Nov 21, 2018School Construction Authority$100,746.28CONSTRUCTION-BUILDINGS–
Oct 15, 2018School Construction Authority$95,343.33CONSTRUCTION-BUILDINGS–
FY 2018top 20 of 129 payments$15,199,263
DateAgencyAmountCategoryPurchase order
Oct 20, 2017School Construction Authority$1,116,563.54CONSTRUCTION-BUILDINGS–
Aug 18, 2017School Construction Authority$567,667.50CONSTRUCTION-BUILDINGS–
Jan 5, 2018School Construction Authority$563,762.32CONSTRUCTION-BUILDINGS–
Nov 20, 2017School Construction Authority$540,591.49CONSTRUCTION-BUILDINGS–
Oct 18, 2017School Construction Authority$498,577.18CONSTRUCTION-BUILDINGS–
Jan 8, 2018School Construction Authority$475,441.96CONSTRUCTION-BUILDINGS–
Dec 15, 2017School Construction Authority$475,441.96CONSTRUCTION-BUILDINGS–
Feb 13, 2018School Construction Authority$463,516.92CONSTRUCTION-BUILDINGS–
Nov 9, 2017School Construction Authority$455,889.42CONSTRUCTION-BUILDINGS–
Nov 29, 2017School Construction Authority$418,981.99CONSTRUCTION-BUILDINGS–
Jan 8, 2018School Construction Authority$414,520.15CONSTRUCTION-BUILDINGS–
Dec 15, 2017School Construction Authority$414,520.15CONSTRUCTION-BUILDINGS–
Aug 24, 2017School Construction Authority$409,922.72CONSTRUCTION-BUILDINGS–
Jan 24, 2018School Construction Authority$384,280.66CONSTRUCTION-BUILDINGS–
Jan 23, 2018School Construction Authority$366,879.99CONSTRUCTION-BUILDINGS–
Oct 3, 2017School Construction Authority$320,398.11CONSTRUCTION-BUILDINGS–
Jul 12, 2017School Construction Authority$311,103.05CONSTRUCTION-BUILDINGS–
Nov 21, 2017School Construction Authority$298,888.54CONSTRUCTION-BUILDINGS–
Apr 10, 2018School Construction Authority$286,299.60CONSTRUCTION-BUILDINGS–
Apr 10, 2018School Construction Authority$283,419.93CONSTRUCTION-BUILDINGS–
FY 2017top 20 of 127 payments$15,510,496
DateAgencyAmountCategoryPurchase order
Aug 18, 2016School Construction Authority$580,642.80CONSTRUCTION-BUILDINGS–
Oct 18, 2016School Construction Authority$576,096.47CONSTRUCTION-BUILDINGS–
Sep 15, 2016School Construction Authority$576,094.31CONSTRUCTION-BUILDINGS–
Oct 27, 2016School Construction Authority$552,756.03CONSTRUCTION-BUILDINGS–
Sep 15, 2016School Construction Authority$549,159.45CONSTRUCTION-BUILDINGS–
Jun 21, 2017School Construction Authority$519,879.79CONSTRUCTION-BUILDINGS–
May 16, 2017School Construction Authority$444,677.90CONSTRUCTION-BUILDINGS–
May 19, 2017School Construction Authority$394,707.92CONSTRUCTION-BUILDINGS–
May 15, 2017School Construction Authority$383,160.27CONSTRUCTION-BUILDINGS–
Aug 1, 2016Department of Environmental Protection$363,687.62OTHR SERV AND CHRGS-GENERAL–
Nov 9, 2016School Construction Authority$358,185.90CONSTRUCTION-BUILDINGS–
Aug 18, 2016School Construction Authority$353,827.50CONSTRUCTION-BUILDINGS–
Jan 18, 2017School Construction Authority$342,822.03CONSTRUCTION-BUILDINGS–
Sep 15, 2016Department of Environmental Protection$342,747.67IOTB CONSTRUCTION–
Apr 18, 2017School Construction Authority$340,765.00CONSTRUCTION-BUILDINGS–
Jul 11, 2016Department of Environmental Protection$333,825.21OTHR SERV AND CHRGS-GENERAL–
Aug 30, 2016School Construction Authority$310,142.13CONSTRUCTION-BUILDINGS–
Aug 18, 2016School Construction Authority$292,095.62CONSTRUCTION-BUILDINGS–
Aug 29, 2016School Construction Authority$288,455.45CONSTRUCTION-BUILDINGS–
Aug 29, 2016School Construction Authority$273,685.99CONSTRUCTION-BUILDINGS–
FY 2016top 20 of 130 payments$43,659,968
DateAgencyAmountCategoryPurchase order
Aug 4, 2015School Construction Authority$4,311,562.14CONSTRUCTION-BUILDINGS–
Sep 9, 2015School Construction Authority$3,403,059.72CONSTRUCTION-BUILDINGS–
Jan 14, 2016School Construction Authority$2,149,960.37CONSTRUCTION-BUILDINGS–
Jul 2, 2015School Construction Authority$2,101,364.62CONSTRUCTION-BUILDINGS–
Nov 19, 2015School Construction Authority$2,045,799.42CONSTRUCTION-BUILDINGS–
Jul 27, 2015School Construction Authority$1,847,589.92CONSTRUCTION-BUILDINGS–
Jul 2, 2015School Construction Authority$1,833,692.05CONSTRUCTION-BUILDINGS–
Aug 21, 2015School Construction Authority$1,796,985.33CONSTRUCTION-BUILDINGS–
Jul 27, 2015School Construction Authority$1,730,127.46CONSTRUCTION-BUILDINGS–
Aug 13, 2015School Construction Authority$1,553,390.60CONSTRUCTION-BUILDINGS–
Dec 21, 2015School Construction Authority$1,518,547.79CONSTRUCTION-BUILDINGS–
May 4, 2016School Construction Authority$1,335,171.83CONSTRUCTION-BUILDINGS–
Jul 13, 2015School Construction Authority$906,013.86CONSTRUCTION-BUILDINGS–
Feb 18, 2016School Construction Authority$763,705.00CONSTRUCTION-BUILDINGS–
May 4, 2016School Construction Authority$738,822.26CONSTRUCTION-BUILDINGS–
Feb 16, 2016School Construction Authority$727,280.38CONSTRUCTION-BUILDINGS–
Jul 14, 2015School Construction Authority$699,266.33CONSTRUCTION-BUILDINGS–
Dec 18, 2015School Construction Authority$634,980.48CONSTRUCTION-BUILDINGS–
Sep 1, 2015School Construction Authority$578,686.52CONSTRUCTION-BUILDINGS–
Jun 13, 2016School Construction Authority$502,960.00CONSTRUCTION-BUILDINGS–
FY 2015top 20 of 112 payments$102,502,041
DateAgencyAmountCategoryPurchase order
Oct 15, 2014School Construction Authority$6,930,910.89CONSTRUCTION-BUILDINGS–
Oct 6, 2014School Construction Authority$4,687,810.83CONSTRUCTION-BUILDINGS–
Aug 21, 2014School Construction Authority$3,429,456.32CONSTRUCTION-BUILDINGS–
May 26, 2015School Construction Authority$3,330,121.26CONSTRUCTION-BUILDINGS–
Dec 4, 2014School Construction Authority$3,293,656.11CONSTRUCTION-BUILDINGS–
Sep 17, 2014School Construction Authority$3,171,850.03CONSTRUCTION-BUILDINGS–
Sep 25, 2014School Construction Authority$3,123,508.63CONSTRUCTION-BUILDINGS–
Mar 20, 2015School Construction Authority$3,100,487.80CONSTRUCTION-BUILDINGS–
Nov 19, 2014School Construction Authority$3,047,581.40CONSTRUCTION-BUILDINGS–
Jan 26, 2015School Construction Authority$2,957,928.38CONSTRUCTION-BUILDINGS–
Aug 21, 2014School Construction Authority$2,830,407.77CONSTRUCTION-BUILDINGS–
Aug 5, 2014School Construction Authority$2,818,246.11CONSTRUCTION-BUILDINGS–
Oct 27, 2014School Construction Authority$2,744,037.27CONSTRUCTION-BUILDINGS–
Apr 29, 2015School Construction Authority$2,723,619.56CONSTRUCTION-BUILDINGS–
Nov 24, 2014School Construction Authority$2,652,554.33CONSTRUCTION-BUILDINGS–
Oct 21, 2014School Construction Authority$2,649,080.64CONSTRUCTION-BUILDINGS–
Mar 31, 2015School Construction Authority$2,568,084.03CONSTRUCTION-BUILDINGS–
Sep 17, 2014School Construction Authority$2,529,755.09CONSTRUCTION-BUILDINGS–
Jun 8, 2015School Construction Authority$2,438,330.19CONSTRUCTION-BUILDINGS–
Jun 12, 2015School Construction Authority$2,427,210.85CONSTRUCTION-BUILDINGS–
FY 2014top 20 of 230 payments$61,377,575
DateAgencyAmountCategoryPurchase order
Dec 26, 2013Department of Environmental Protection$3,624,737.18OTHR SERV AND CHRGS-GENERAL–
Jan 14, 2014School Construction Authority$2,922,258.61CONSTRUCTION-BUILDINGS–
Jul 31, 2013School Construction Authority$2,489,146.87CONSTRUCTION-BUILDINGS–
Jun 19, 2014School Construction Authority$2,108,615.46CONSTRUCTION-BUILDINGS–
Jun 12, 2014School Construction Authority$2,088,025.76CONSTRUCTION-BUILDINGS–
Jan 29, 2014School Construction Authority$1,832,375.44CONSTRUCTION-BUILDINGS–
Feb 27, 2014School Construction Authority$1,729,878.60CONSTRUCTION-BUILDINGS–
Nov 14, 2013School Construction Authority$1,699,441.23CONSTRUCTION-BUILDINGS–
Jan 8, 2014School Construction Authority$1,678,177.35CONSTRUCTION-BUILDINGS–
Oct 4, 2013School Construction Authority$1,651,838.53CONSTRUCTION-BUILDINGS–
Oct 1, 2013School Construction Authority$1,528,622.34CONSTRUCTION-BUILDINGS–
Oct 28, 2013School Construction Authority$1,389,839.08CONSTRUCTION-BUILDINGS–
Sep 20, 2013School Construction Authority$1,373,084.14CONSTRUCTION-BUILDINGS–
Dec 12, 2013School Construction Authority$1,358,819.22CONSTRUCTION-BUILDINGS–
May 8, 2014School Construction Authority$1,327,568.00CONSTRUCTION-BUILDINGS–
Dec 20, 2013School Construction Authority$1,294,560.73CONSTRUCTION-BUILDINGS–
Jan 29, 2014School Construction Authority$1,277,417.97CONSTRUCTION-BUILDINGS–
Nov 20, 2013School Construction Authority$1,272,380.50CONSTRUCTION-BUILDINGS–
Jun 20, 2014School Construction Authority$1,192,915.46CONSTRUCTION-BUILDINGS–
Apr 11, 2014School Construction Authority$1,148,273.26CONSTRUCTION-BUILDINGS–
FY 2013top 20 of 415 payments$53,711,155
DateAgencyAmountCategoryPurchase order
Mar 11, 2013School Construction Authority$2,372,866.30CONSTRUCTION-BUILDINGS–
Feb 26, 2013School Construction Authority$2,123,069.59CONSTRUCTION-BUILDINGS–
Apr 8, 2013School Construction Authority$2,059,404.21CONSTRUCTION-BUILDINGS–
May 6, 2013School Construction Authority$1,995,070.01CONSTRUCTION-BUILDINGS–
May 21, 2013School Construction Authority$1,890,256.22CONSTRUCTION-BUILDINGS–
Sep 24, 2012Department of Environmental Protection$1,824,271.04IOTB CONSTRUCTION–
Jul 18, 2012Department of Environmental Protection$1,643,131.17IOTB CONSTRUCTION–
Aug 1, 2012Department of Environmental Protection$1,514,146.41IOTB CONSTRUCTION–
Nov 15, 2012Department of Environmental Protection$1,462,307.05IOTB CONSTRUCTION–
Apr 22, 2013Department of Environmental Protection$1,392,424.97IOTB CONSTRUCTION–
Jun 13, 2013School Construction Authority$1,318,097.45CONSTRUCTION-BUILDINGS–
Jun 18, 2013School Construction Authority$1,170,085.10CONSTRUCTION-BUILDINGS–
Aug 22, 2012Department of Environmental Protection$1,165,941.91IOTB CONSTRUCTION–
Dec 24, 2012Department of Environmental Protection$1,130,263.83IOTB CONSTRUCTION–
Oct 18, 2012Department of Environmental Protection$1,091,571.65IOTB CONSTRUCTION–
May 28, 2013School Construction Authority$1,045,651.94CONSTRUCTION-BUILDINGS–
May 1, 2013School Construction Authority$1,021,824.98CONSTRUCTION-BUILDINGS–
Nov 26, 2012Department of Environmental Protection$1,007,267.88IOTB CONSTRUCTION–
Jun 21, 2013School Construction Authority$923,224.23CONSTRUCTION-BUILDINGS–
Sep 17, 2012Department of Environmental Protection$804,171.83IOTB CONSTRUCTION–
FY 2012top 20 of 424 payments$83,276,471
DateAgencyAmountCategoryPurchase order
Feb 22, 2012Department of Environmental Protection$4,232,041.14IOTB CONSTRUCTION–
Oct 7, 2011Department of Environmental Protection$3,934,389.15IOTB CONSTRUCTION–
Apr 12, 2012Department of Environmental Protection$3,567,495.35IOTB CONSTRUCTION–
Jul 7, 2011Department of Environmental Protection$3,554,800.17IOTB CONSTRUCTION–
Jan 17, 2012Department of Environmental Protection$3,032,664.99IOTB CONSTRUCTION–
Dec 12, 2011Department of Environmental Protection$2,803,375.44IOTB CONSTRUCTION–
Sep 12, 2011Department of Environmental Protection$2,683,239.43IOTB CONSTRUCTION–
May 29, 2012Department of Environmental Protection$2,634,895.95IOTB CONSTRUCTION–
May 16, 2012Department of Environmental Protection$2,602,569.67IOTB CONSTRUCTION–
Nov 2, 2011Department of Environmental Protection$2,412,084.00IOTB CONSTRUCTION–
Mar 5, 2012Department of Environmental Protection$2,333,150.73IOTB CONSTRUCTION–
Aug 15, 2011Department of Environmental Protection$1,993,403.48IOTB CONSTRUCTION–
Aug 15, 2011Department of Environmental Protection$1,847,311.31IOTB CONSTRUCTION–
May 8, 2012Department of Environmental Protection$1,707,737.78IOTB CONSTRUCTION–
Jul 11, 2011Department of Environmental Protection$1,562,749.25IOTB CONSTRUCTION–
Jun 27, 2012Department of Environmental Protection$1,553,084.43IOTB CONSTRUCTION–
Oct 12, 2011Department of Environmental Protection$1,494,239.92IOTB CONSTRUCTION–
Nov 14, 2011Department of Environmental Protection$1,338,562.50IOTB CONSTRUCTION–
Apr 11, 2012Department of Environmental Protection$1,294,548.65IOTB CONSTRUCTION–
Oct 11, 2011Department of Environmental Protection$1,205,714.32IOTB CONSTRUCTION–
FY 2011top 20 of 430 payments$110,555,264
DateAgencyAmountCategoryPurchase order
Jan 13, 2011Department of Environmental Protection$5,630,156.86IOTB CONSTRUCTION–
Oct 4, 2010Department of Environmental Protection$5,205,871.56IOTB CONSTRUCTION–
Nov 8, 2010Department of Environmental Protection$4,894,352.32IOTB CONSTRUCTION–
Mar 3, 2011Department of Environmental Protection$4,823,295.89IOTB CONSTRUCTION–
Aug 5, 2010Department of Environmental Protection$4,398,999.02IOTB CONSTRUCTION–
Jul 15, 2010Department of Environmental Protection$3,905,508.40IOTB CONSTRUCTION–
May 25, 2011Department of Environmental Protection$3,792,866.76IOTB CONSTRUCTION–
May 6, 2011Department of Environmental Protection$3,653,159.85IOTB CONSTRUCTION–
Sep 16, 2010Department of Environmental Protection$3,473,062.31IOTB CONSTRUCTION–
Dec 15, 2010Department of Environmental Protection$3,105,632.80IOTB CONSTRUCTION–
Nov 26, 2010Department of Environmental Protection$2,698,304.27IOTB CONSTRUCTION–
Aug 9, 2010Department of Environmental Protection$2,641,397.60IOTB CONSTRUCTION–
Jan 31, 2011Department of Environmental Protection$2,383,379.39IOTB CONSTRUCTION–
Jun 8, 2011Department of Environmental Protection$2,161,978.17IOTB CONSTRUCTION–
Oct 25, 2010Department of Environmental Protection$1,977,134.28IOTB CONSTRUCTION–
Apr 19, 2011Department of Environmental Protection$1,871,112.39IOTB CONSTRUCTION–
Mar 16, 2011Department of Environmental Protection$1,805,808.10IOTB CONSTRUCTION–
Jul 21, 2010Department of Environmental Protection$1,738,347.54IOTB CONSTRUCTION–
Apr 11, 2011Department of Environmental Protection$1,675,645.67IOTB CONSTRUCTION–
Jun 27, 2011Department of Environmental Protection$1,670,270.78IOTB CONSTRUCTION–
FY 2010top 20 of 111 payments$40,645,548
DateAgencyAmountCategoryPurchase order
Jun 16, 2010Department of Environmental Protection$4,962,215.49IOTB CONSTRUCTION–
Jan 13, 2010Department of Environmental Protection$4,087,234.42IOTB CONSTRUCTION–
Mar 11, 2010Department of Environmental Protection$2,921,253.75IOTB CONSTRUCTION–
Feb 10, 2010Department of Environmental Protection$2,900,708.87IOTB CONSTRUCTION–
May 10, 2010Department of Environmental Protection$2,846,074.26IOTB CONSTRUCTION–
Jun 30, 2010Department of Environmental Protection$2,343,435.87IOTB CONSTRUCTION–
Apr 12, 2010Department of Environmental Protection$1,690,618.01IOTB CONSTRUCTION–
Jun 1, 2010Department of Environmental Protection$1,567,168.41IOTB CONSTRUCTION–
Feb 22, 2010Department of Environmental Protection$1,010,939.90IOTB CONSTRUCTION–
Apr 2, 2010Department of Environmental Protection$963,549.88IOTB CONSTRUCTION–
Apr 30, 2010Department of Environmental Protection$910,543.87IOTB CONSTRUCTION–
May 26, 2010Department of Environmental Protection$904,870.90IOTB CONSTRUCTION–
Apr 16, 2010Department of Environmental Protection$891,035.49IOTB CONSTRUCTION–
Feb 26, 2010Department of Environmental Protection$838,035.70IOTB CONSTRUCTION–
May 27, 2010Department of Environmental Protection$828,114.41IOTB CONSTRUCTION–
Jan 21, 2010Department of Environmental Protection$790,611.44IOTB CONSTRUCTION–
Apr 5, 2010Department of Environmental Protection$740,886.25IOTB CONSTRUCTION–
Apr 23, 2010Department of Environmental Protection$711,946.96IOTB CONSTRUCTION–
Jan 14, 2010Department of Environmental Protection$653,421.87IOTB CONSTRUCTION–
Jan 13, 2010Department of Environmental Protection$586,083.24IOTB CONSTRUCTION–

Recent payments

DateAgencyAmountCategoryMethod
Jun 17, 2025School Construction Authority$2,470.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 17, 2025School Construction Authority$35,055.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$46,074.09CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$8,744.71CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$2,827.01CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$83,575.36CONSTRUCTION-BUILDINGSCapital Contracts
Jun 2, 2025School Construction Authority$109,240.29CONSTRUCTION-BUILDINGSCapital Contracts
Jun 2, 2025School Construction Authority$13,091.55CONSTRUCTION-BUILDINGSCapital Contracts
Jun 2, 2025School Construction Authority$72,665.50CONSTRUCTION-BUILDINGSCapital Contracts
Apr 30, 2025School Construction Authority$66,500.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 30, 2025School Construction Authority$99,165.75CONSTRUCTION-BUILDINGSCapital Contracts
Apr 24, 2025School Construction Authority$259,371.74CONSTRUCTION-BUILDINGSCapital Contracts
Apr 24, 2025School Construction Authority$3,325.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 4, 2025School Construction Authority$114,855.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 4, 2025School Construction Authority$16,150.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 25, 2025School Construction Authority$282,499.10CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$41,705.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$85,172.25CONSTRUCTION-BUILDINGSCapital Contracts
Mar 10, 2025School Construction Authority$122,692.15CONSTRUCTION-BUILDINGSCapital Contracts
Mar 7, 2025School Construction Authority$18,094.65CONSTRUCTION-BUILDINGSCapital Contracts
Mar 7, 2025School Construction Authority$144,660.79CONSTRUCTION-BUILDINGSCapital Contracts
Feb 7, 2025School Construction Authority$86,228.65CONSTRUCTION-BUILDINGSCapital Contracts
Feb 7, 2025School Construction Authority$9,500.00CONSTRUCTION-BUILDINGSCapital Contracts
Feb 6, 2025School Construction Authority$262,298.41CONSTRUCTION-BUILDINGSCapital Contracts
Jan 8, 2025School Construction Authority$181,785.35CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data