Primer Construction Corp.: New York City Government Payments

as recorded by New York City: PRIMER CONSTRUCTION CORP.

Primer Construction Corp. is the 993rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 125th in IOTB CONSTRUCTION spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$57,774,091total received
692payments
6agencies
Jan 12, 2010Oct 10, 2023first / last payment
Follow this vendorGet an email when New York City publishes new payments to Primer Construction Corp.. No spam.

Payments by fiscal year

FY 2024$536,780
FY 2022$258,371
FY 2021$2,398,236
FY 2020$3,705,184
FY 2019$6,964,835
FY 2018$6,428,694
FY 2017$9,436,616
FY 2016$7,957,176
FY 2015$3,454,988
FY 2014$1,930,112
FY 2013$5,869,937
FY 2012$3,501,558
FY 2011$3,910,551
FY 2010$1,421,052

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2024Department of Environmental Protection62$536,780
FY 2022Department of Environmental Protection3$258,371
FY 2021Department of Environmental Protection26$2,066,901
FY 2021Department of Parks and Recreation37$304,606
FY 2021Department of Transportation6$26,729
FY 2020Department of Environmental Protection58$3,503,699
FY 2020Department of Parks and Recreation8$154,908
FY 2020Department of Transportation5$46,577
FY 2019Department of Environmental Protection51$4,530,800
FY 2019Department of Transportation64$2,176,870
FY 2019Department of Parks and Recreation8$257,165
FY 2018Department of Environmental Protection25$4,755,373
FY 2018Department of Parks and Recreation25$1,235,851
FY 2018Department of Transportation15$422,171
FY 2018Miscellaneous1$16,000
FY 2018Department of Design and Construction2-$700
FY 2017Department of Parks and Recreation17$5,068,531
FY 2017Department of Environmental Protection53$4,368,085
FY 2016Department of Parks and Recreation12$4,493,203
FY 2016Department of Environmental Protection31$3,463,973
FY 2015Department of Environmental Protection27$3,454,988
FY 2014Department of Environmental Protection39$1,923,232
FY 2014Department of Sanitation1$6,880
FY 2013Department of Environmental Protection41$5,754,619
FY 2013Department of Sanitation1$66,394
FY 2013Department of Parks and Recreation2$48,924
FY 2012Department of Environmental Protection16$3,174,589
FY 2012Department of Parks and Recreation25$326,969
FY 2011Department of Parks and Recreation20$3,095,468
FY 2011Department of Environmental Protection6$815,083
FY 2010Department of Parks and Recreation5$1,421,052
Total692$57,774,091

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
SNOW REMOVAL SERVICES1$6,880May 6, 2014 May 6, 2014
CONTRACTUAL SERVICES GENERAL1$66,394Jan 30, 2013 Jan 30, 2013
OTHR SERV AND CHRGS-GENERAL1$6,059Apr 26, 2013 Apr 26, 2013
IOTB CONSTRUCTION631$52,788,094Aug 23, 2010 Oct 10, 2023
CONSTRUCTION-BUILDINGS52$4,892,413Jan 12, 2010 Aug 20, 2012
JUDGMENTS AND CLAIMS-NOT REPORTABLE1$16,000May 7, 2018 May 7, 2018
<Non-Applicable Expenditure Object>5-$1,750Mar 19, 2012 Apr 16, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2024top 20 of 62 payments$536,780
DateAgencyAmountCategoryPurchase order
Sep 29, 2023Department of Environmental Protection$43,155.00IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$26,359.10IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$18,815.40IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$18,526.00IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$18,399.99IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$16,431.25IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$15,370.32IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$14,143.75IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$13,598.46IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$12,641.88IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$12,135.17IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$12,019.06IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$11,736.45IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$11,364.25IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$11,200.80IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$10,950.00IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$10,780.75IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$10,779.00IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$10,702.34IOTB CONSTRUCTION
Oct 10, 2023Department of Environmental Protection$9,885.69IOTB CONSTRUCTION
FY 2022top 3 of 3 payments$258,371
DateAgencyAmountCategoryPurchase order
Nov 19, 2021Department of Environmental Protection$208,259.75IOTB CONSTRUCTION
Nov 19, 2021Department of Environmental Protection$34,633.06IOTB CONSTRUCTION
Nov 19, 2021Department of Environmental Protection$15,477.97IOTB CONSTRUCTION
FY 2021top 20 of 69 payments$2,398,236
DateAgencyAmountCategoryPurchase order
Nov 6, 2020Department of Environmental Protection$276,354.62IOTB CONSTRUCTION
May 5, 2021Department of Environmental Protection$218,111.06IOTB CONSTRUCTION
Mar 11, 2021Department of Environmental Protection$214,801.00IOTB CONSTRUCTION
Jun 21, 2021Department of Environmental Protection$189,175.00IOTB CONSTRUCTION
Feb 4, 2021Department of Environmental Protection$164,520.00IOTB CONSTRUCTION
Aug 13, 2020Department of Environmental Protection$159,372.50IOTB CONSTRUCTION
May 7, 2021Department of Environmental Protection$151,200.50IOTB CONSTRUCTION
May 11, 2021Department of Environmental Protection$140,917.42IOTB CONSTRUCTION
Nov 4, 2020Department of Parks and Recreation$117,660.95IOTB CONSTRUCTION
Jan 25, 2021Department of Environmental Protection$92,845.00IOTB CONSTRUCTION
Dec 10, 2020Department of Environmental Protection$88,388.00IOTB CONSTRUCTION
Aug 6, 2020Department of Environmental Protection$81,333.95IOTB CONSTRUCTION
Sep 8, 2020Department of Environmental Protection$63,032.50IOTB CONSTRUCTION
May 11, 2021Department of Environmental Protection$46,851.60IOTB CONSTRUCTION
Jul 23, 2020Department of Environmental Protection$43,462.50IOTB CONSTRUCTION
Nov 4, 2020Department of Parks and Recreation$39,748.55IOTB CONSTRUCTION
Apr 12, 2021Department of Environmental Protection$27,787.50IOTB CONSTRUCTION
Feb 16, 2021Department of Environmental Protection$24,652.26IOTB CONSTRUCTION
Oct 28, 2020Department of Parks and Recreation$20,363.99IOTB CONSTRUCTION
May 7, 2021Department of Environmental Protection$17,111.00IOTB CONSTRUCTION
FY 2020top 20 of 71 payments$3,705,184
DateAgencyAmountCategoryPurchase order
Nov 15, 2019Department of Environmental Protection$357,492.60IOTB CONSTRUCTION
Sep 5, 2019Department of Environmental Protection$312,193.75IOTB CONSTRUCTION
Jan 16, 2020Department of Environmental Protection$254,837.75IOTB CONSTRUCTION
Nov 20, 2019Department of Environmental Protection$218,195.67IOTB CONSTRUCTION
Jul 16, 2019Department of Environmental Protection$204,834.25IOTB CONSTRUCTION
Aug 14, 2019Department of Environmental Protection$203,344.39IOTB CONSTRUCTION
Oct 9, 2019Department of Environmental Protection$200,231.25IOTB CONSTRUCTION
Nov 14, 2019Department of Environmental Protection$187,828.31IOTB CONSTRUCTION
May 22, 2020Department of Environmental Protection$166,621.31IOTB CONSTRUCTION
Dec 2, 2019Department of Environmental Protection$121,975.25IOTB CONSTRUCTION
Oct 15, 2019Department of Environmental Protection$118,629.45IOTB CONSTRUCTION
Jan 16, 2020Department of Environmental Protection$115,287.78IOTB CONSTRUCTION
Jul 16, 2019Department of Environmental Protection$105,404.03IOTB CONSTRUCTION
Sep 5, 2019Department of Environmental Protection$98,901.55IOTB CONSTRUCTION
May 22, 2020Department of Environmental Protection$94,301.60IOTB CONSTRUCTION
Aug 14, 2019Department of Environmental Protection$90,134.89IOTB CONSTRUCTION
Dec 24, 2019Department of Environmental Protection$84,835.00IOTB CONSTRUCTION
Mar 2, 2020Department of Parks and Recreation$75,525.00IOTB CONSTRUCTION
Oct 15, 2019Department of Environmental Protection$52,563.50IOTB CONSTRUCTION
Apr 16, 2020Department of Environmental Protection$51,900.66IOTB CONSTRUCTION
FY 2019top 20 of 123 payments$6,964,835
DateAgencyAmountCategoryPurchase order
May 8, 2019Department of Environmental Protection$500,822.90IOTB CONSTRUCTION
Oct 29, 2018Department of Transportation$356,169.20IOTB CONSTRUCTION
Nov 5, 2018Department of Environmental Protection$349,600.01IOTB CONSTRUCTION
Aug 13, 2018Department of Transportation$292,907.63IOTB CONSTRUCTION
Apr 25, 2019Department of Environmental Protection$292,036.08IOTB CONSTRUCTION
Dec 5, 2018Department of Transportation$256,257.37IOTB CONSTRUCTION
Aug 29, 2018Department of Environmental Protection$230,568.15IOTB CONSTRUCTION
Jul 23, 2018Department of Environmental Protection$225,601.25IOTB CONSTRUCTION
Sep 4, 2018Department of Transportation$214,796.56IOTB CONSTRUCTION
May 8, 2019Department of Environmental Protection$212,815.05IOTB CONSTRUCTION
Dec 14, 2018Department of Environmental Protection$208,050.00IOTB CONSTRUCTION
Aug 20, 2018Department of Environmental Protection$192,929.15IOTB CONSTRUCTION
May 28, 2019Department of Environmental Protection$184,751.25IOTB CONSTRUCTION
Oct 29, 2018Department of Environmental Protection$182,120.65IOTB CONSTRUCTION
Oct 29, 2018Department of Transportation$179,258.72IOTB CONSTRUCTION
Feb 7, 2019Department of Environmental Protection$166,958.12IOTB CONSTRUCTION
Jan 7, 2019Department of Environmental Protection$149,150.00IOTB CONSTRUCTION
Oct 12, 2018Department of Environmental Protection$144,875.00IOTB CONSTRUCTION
Mar 18, 2019Department of Environmental Protection$142,583.23IOTB CONSTRUCTION
Jun 5, 2019Department of Parks and Recreation$122,278.03IOTB CONSTRUCTION
FY 2018top 20 of 68 payments$6,428,694
DateAgencyAmountCategoryPurchase order
Nov 15, 2017Department of Environmental Protection$624,962.25IOTB CONSTRUCTION
Jun 13, 2018Department of Environmental Protection$479,938.65IOTB CONSTRUCTION
Sep 19, 2017Department of Environmental Protection$472,555.34IOTB CONSTRUCTION
Mar 14, 2018Department of Environmental Protection$326,317.08IOTB CONSTRUCTION
Jul 17, 2017Department of Environmental Protection$319,824.82IOTB CONSTRUCTION
Oct 19, 2017Department of Environmental Protection$306,345.17IOTB CONSTRUCTION
Dec 5, 2017Department of Environmental Protection$279,312.99IOTB CONSTRUCTION
May 9, 2018Department of Environmental Protection$277,196.78IOTB CONSTRUCTION
Jan 5, 2018Department of Environmental Protection$247,570.58IOTB CONSTRUCTION
Mar 14, 2018Department of Environmental Protection$228,362.05IOTB CONSTRUCTION
Feb 15, 2018Department of Environmental Protection$217,741.48IOTB CONSTRUCTION
Aug 21, 2017Department of Environmental Protection$208,461.25IOTB CONSTRUCTION
Apr 9, 2018Department of Environmental Protection$199,492.08IOTB CONSTRUCTION
Jan 22, 2018Department of Parks and Recreation$183,102.65IOTB CONSTRUCTION
Jan 2, 2018Department of Environmental Protection$175,391.53IOTB CONSTRUCTION
Aug 7, 2017Department of Parks and Recreation$161,336.53IOTB CONSTRUCTION
May 14, 2018Department of Environmental Protection$146,187.34IOTB CONSTRUCTION
Jun 11, 2018Department of Transportation$142,154.20IOTB CONSTRUCTION
Jan 18, 2018Department of Parks and Recreation$141,201.25IOTB CONSTRUCTION
Nov 27, 2017Department of Parks and Recreation$88,559.35IOTB CONSTRUCTION
FY 2017top 20 of 70 payments$9,436,616
DateAgencyAmountCategoryPurchase order
Dec 6, 2016Department of Parks and Recreation$2,477,517.99IOTB CONSTRUCTION
Jan 9, 2017Department of Parks and Recreation$755,222.45IOTB CONSTRUCTION
Aug 1, 2016Department of Environmental Protection$693,535.49IOTB CONSTRUCTION
Sep 12, 2016Department of Environmental Protection$565,701.27IOTB CONSTRUCTION
Jun 19, 2017Department of Environmental Protection$542,257.78IOTB CONSTRUCTION
Aug 24, 2016Department of Parks and Recreation$434,637.82IOTB CONSTRUCTION
Mar 28, 2017Department of Environmental Protection$372,432.78IOTB CONSTRUCTION
May 24, 2017Department of Environmental Protection$354,559.62IOTB CONSTRUCTION
Apr 11, 2017Department of Parks and Recreation$272,037.10IOTB CONSTRUCTION
Oct 7, 2016Department of Parks and Recreation$268,347.92IOTB CONSTRUCTION
Jan 30, 2017Department of Environmental Protection$263,933.75IOTB CONSTRUCTION
Dec 20, 2016Department of Environmental Protection$260,775.00IOTB CONSTRUCTION
Feb 13, 2017Department of Environmental Protection$233,453.95IOTB CONSTRUCTION
Jun 26, 2017Department of Parks and Recreation$221,664.22IOTB CONSTRUCTION
Oct 24, 2016Department of Environmental Protection$208,205.59IOTB CONSTRUCTION
Apr 19, 2017Department of Environmental Protection$194,361.94IOTB CONSTRUCTION
Jan 30, 2017Department of Parks and Recreation$178,075.09IOTB CONSTRUCTION
Jun 7, 2017Department of Parks and Recreation$141,096.85IOTB CONSTRUCTION
Jul 5, 2016Department of Parks and Recreation$101,203.50IOTB CONSTRUCTION
Mar 24, 2017Department of Environmental Protection$87,790.51IOTB CONSTRUCTION
FY 2016top 20 of 43 payments$7,957,176
DateAgencyAmountCategoryPurchase order
May 4, 2016Department of Parks and Recreation$814,943.49IOTB CONSTRUCTION
Jan 27, 2016Department of Parks and Recreation$744,524.17IOTB CONSTRUCTION
Sep 23, 2015Department of Parks and Recreation$713,324.86IOTB CONSTRUCTION
Feb 2, 2016Department of Environmental Protection$705,471.14IOTB CONSTRUCTION
Aug 10, 2015Department of Environmental Protection$493,829.87IOTB CONSTRUCTION
Jul 13, 2015Department of Parks and Recreation$460,679.70IOTB CONSTRUCTION
Oct 13, 2015Department of Parks and Recreation$441,917.09IOTB CONSTRUCTION
Jan 11, 2016Department of Parks and Recreation$438,629.25IOTB CONSTRUCTION
Jun 24, 2016Department of Environmental Protection$413,250.00IOTB CONSTRUCTION
May 31, 2016Department of Parks and Recreation$378,854.30IOTB CONSTRUCTION
Dec 15, 2015Department of Environmental Protection$327,026.86IOTB CONSTRUCTION
Oct 19, 2015Department of Environmental Protection$324,236.86IOTB CONSTRUCTION
Jan 27, 2016Department of Parks and Recreation$303,886.33IOTB CONSTRUCTION
Feb 16, 2016Department of Environmental Protection$197,730.40IOTB CONSTRUCTION
Aug 19, 2015Department of Parks and Recreation$185,170.84IOTB CONSTRUCTION
Mar 30, 2016Department of Environmental Protection$158,811.54IOTB CONSTRUCTION
Jul 14, 2015Department of Environmental Protection$136,784.08IOTB CONSTRUCTION
Jan 25, 2016Department of Environmental Protection$127,895.71IOTB CONSTRUCTION
May 16, 2016Department of Environmental Protection$108,991.97IOTB CONSTRUCTION
Oct 5, 2015Department of Environmental Protection$98,683.70IOTB CONSTRUCTION
FY 2015top 20 of 27 payments$3,454,988
DateAgencyAmountCategoryPurchase order
Sep 15, 2014Department of Environmental Protection$451,257.93IOTB CONSTRUCTION
Jan 12, 2015Department of Environmental Protection$370,746.37IOTB CONSTRUCTION
Sep 2, 2014Department of Environmental Protection$333,954.96IOTB CONSTRUCTION
Feb 2, 2015Department of Environmental Protection$298,164.67IOTB CONSTRUCTION
Jul 7, 2014Department of Environmental Protection$274,916.92IOTB CONSTRUCTION
Oct 14, 2014Department of Environmental Protection$232,611.13IOTB CONSTRUCTION
Sep 29, 2014Department of Environmental Protection$222,564.30IOTB CONSTRUCTION
Nov 18, 2014Department of Environmental Protection$188,731.06IOTB CONSTRUCTION
Apr 27, 2015Department of Environmental Protection$161,040.97IOTB CONSTRUCTION
Feb 11, 2015Department of Environmental Protection$148,258.94IOTB CONSTRUCTION
Nov 18, 2014Department of Environmental Protection$144,407.21IOTB CONSTRUCTION
Mar 18, 2015Department of Environmental Protection$123,802.33IOTB CONSTRUCTION
Jul 23, 2014Department of Environmental Protection$116,681.22IOTB CONSTRUCTION
Feb 27, 2015Department of Environmental Protection$106,452.62IOTB CONSTRUCTION
Apr 15, 2015Department of Environmental Protection$80,064.61IOTB CONSTRUCTION
Sep 2, 2014Department of Environmental Protection$40,172.62IOTB CONSTRUCTION
May 20, 2015Department of Environmental Protection$34,793.75IOTB CONSTRUCTION
Dec 11, 2014Department of Environmental Protection$27,450.32IOTB CONSTRUCTION
Nov 24, 2014Department of Environmental Protection$20,333.13IOTB CONSTRUCTION
Nov 24, 2014Department of Environmental Protection$19,716.20IOTB CONSTRUCTION
FY 2014top 20 of 40 payments$1,930,112
DateAgencyAmountCategoryPurchase order
Jan 27, 2014Department of Environmental Protection$240,037.15IOTB CONSTRUCTION
Apr 17, 2014Department of Environmental Protection$204,119.60IOTB CONSTRUCTION
May 21, 2014Department of Environmental Protection$189,625.34IOTB CONSTRUCTION
Sep 3, 2013Department of Environmental Protection$158,559.33IOTB CONSTRUCTION
May 21, 2014Department of Environmental Protection$152,515.51IOTB CONSTRUCTION
Aug 12, 2013Department of Environmental Protection$134,100.56IOTB CONSTRUCTION
Jan 27, 2014Department of Environmental Protection$114,158.42IOTB CONSTRUCTION
Oct 7, 2013Department of Environmental Protection$81,874.08IOTB CONSTRUCTION
Nov 25, 2013Department of Environmental Protection$62,584.80IOTB CONSTRUCTION
Feb 18, 2014Department of Environmental Protection$52,804.00IOTB CONSTRUCTION
Oct 15, 2013Department of Environmental Protection$51,098.98IOTB CONSTRUCTION
Oct 8, 2013Department of Environmental Protection$42,066.45IOTB CONSTRUCTION
Aug 5, 2013Department of Environmental Protection$41,109.89IOTB CONSTRUCTION
Nov 19, 2013Department of Environmental Protection$35,999.64IOTB CONSTRUCTION
Sep 27, 2013Department of Environmental Protection$33,770.66IOTB CONSTRUCTION
Apr 17, 2014Department of Environmental Protection$33,271.57IOTB CONSTRUCTION
Sep 27, 2013Department of Environmental Protection$27,182.04IOTB CONSTRUCTION
Oct 8, 2013Department of Environmental Protection$25,847.06IOTB CONSTRUCTION
Nov 25, 2013Department of Environmental Protection$25,540.59IOTB CONSTRUCTION
Sep 27, 2013Department of Environmental Protection$25,000.00IOTB CONSTRUCTION
FY 2013top 20 of 44 payments$5,869,937
DateAgencyAmountCategoryPurchase order
Aug 21, 2012Department of Environmental Protection$640,818.56IOTB CONSTRUCTION
May 28, 2013Department of Environmental Protection$462,500.85IOTB CONSTRUCTION
Apr 15, 2013Department of Environmental Protection$458,408.85IOTB CONSTRUCTION
Mar 25, 2013Department of Environmental Protection$457,289.82IOTB CONSTRUCTION
Jan 16, 2013Department of Environmental Protection$426,329.49IOTB CONSTRUCTION
Feb 13, 2013Department of Environmental Protection$401,181.14IOTB CONSTRUCTION
Jul 11, 2012Department of Environmental Protection$374,607.70IOTB CONSTRUCTION
Jun 17, 2013Department of Environmental Protection$373,061.12IOTB CONSTRUCTION
Sep 24, 2012Department of Environmental Protection$363,498.26IOTB CONSTRUCTION
Jun 24, 2013Department of Environmental Protection$341,048.00IOTB CONSTRUCTION
Nov 5, 2012Department of Environmental Protection$284,103.14IOTB CONSTRUCTION
Dec 21, 2012Department of Environmental Protection$267,130.50IOTB CONSTRUCTION
Aug 13, 2012Department of Environmental Protection$194,822.13IOTB CONSTRUCTION
Nov 26, 2012Department of Environmental Protection$115,399.98IOTB CONSTRUCTION
Jan 2, 2013Department of Environmental Protection$113,225.70IOTB CONSTRUCTION
Apr 15, 2013Department of Environmental Protection$74,449.99IOTB CONSTRUCTION
Jan 30, 2013Department of Sanitation$66,394.43CONTRACTUAL SERVICES GENERAL
Dec 19, 2012Department of Environmental Protection$62,467.95IOTB CONSTRUCTION
Sep 24, 2012Department of Environmental Protection$41,553.00IOTB CONSTRUCTION
Apr 26, 2013Department of Environmental Protection$41,208.44IOTB CONSTRUCTION
FY 2012top 20 of 41 payments$3,501,558
DateAgencyAmountCategoryPurchase order
Feb 21, 2012Department of Environmental Protection$444,783.67IOTB CONSTRUCTION
Oct 24, 2011Department of Environmental Protection$388,665.09IOTB CONSTRUCTION
Jun 28, 2012Department of Environmental Protection$335,204.06IOTB CONSTRUCTION
Apr 18, 2012Department of Environmental Protection$325,359.17IOTB CONSTRUCTION
Dec 13, 2011Department of Environmental Protection$260,521.67IOTB CONSTRUCTION
May 16, 2012Department of Environmental Protection$253,425.15IOTB CONSTRUCTION
Jan 23, 2012Department of Environmental Protection$242,927.67IOTB CONSTRUCTION
Sep 21, 2011Department of Environmental Protection$210,624.50IOTB CONSTRUCTION
Jun 25, 2012Department of Environmental Protection$202,644.90IOTB CONSTRUCTION
Apr 2, 2012Department of Environmental Protection$168,740.37IOTB CONSTRUCTION
Feb 29, 2012Department of Environmental Protection$133,000.00IOTB CONSTRUCTION
Jun 19, 2012Department of Environmental Protection$94,254.30IOTB CONSTRUCTION
Sep 6, 2011Department of Parks and Recreation$87,607.18CONSTRUCTION-BUILDINGS
Mar 19, 2012Department of Environmental Protection$86,434.17IOTB CONSTRUCTION
Jan 30, 2012Department of Parks and Recreation$44,717.47CONSTRUCTION-BUILDINGS
Jan 30, 2012Department of Parks and Recreation$23,717.97CONSTRUCTION-BUILDINGS
Jan 30, 2012Department of Parks and Recreation$23,566.15CONSTRUCTION-BUILDINGS
Jan 30, 2012Department of Parks and Recreation$18,533.66CONSTRUCTION-BUILDINGS
Jan 26, 2012Department of Parks and Recreation$16,707.12CONSTRUCTION-BUILDINGS
Jan 30, 2012Department of Parks and Recreation$15,595.41CONSTRUCTION-BUILDINGS
FY 2011top 20 of 26 payments$3,910,551
DateAgencyAmountCategoryPurchase order
Dec 20, 2010Department of Parks and Recreation$574,844.05CONSTRUCTION-BUILDINGS
Nov 15, 2010Department of Parks and Recreation$471,917.16CONSTRUCTION-BUILDINGS
Jun 22, 2011Department of Environmental Protection$438,805.00IOTB CONSTRUCTION
Aug 16, 2010Department of Parks and Recreation$393,007.80CONSTRUCTION-BUILDINGS
Jul 6, 2010Department of Parks and Recreation$352,139.54CONSTRUCTION-BUILDINGS
Nov 15, 2010Department of Parks and Recreation$270,470.21CONSTRUCTION-BUILDINGS
Apr 27, 2011Department of Parks and Recreation$268,078.87CONSTRUCTION-BUILDINGS
Jan 12, 2011Department of Parks and Recreation$168,534.31CONSTRUCTION-BUILDINGS
Aug 16, 2010Department of Parks and Recreation$155,010.41CONSTRUCTION-BUILDINGS
Aug 23, 2010Department of Environmental Protection$145,137.22IOTB CONSTRUCTION
Apr 20, 2011Department of Environmental Protection$122,423.34IOTB CONSTRUCTION
Jun 22, 2011Department of Parks and Recreation$114,506.32CONSTRUCTION-BUILDINGS
Jun 22, 2011Department of Parks and Recreation$95,078.29CONSTRUCTION-BUILDINGS
Aug 23, 2010Department of Environmental Protection$57,896.61IOTB CONSTRUCTION
Jun 22, 2011Department of Parks and Recreation$57,656.88CONSTRUCTION-BUILDINGS
Aug 16, 2010Department of Parks and Recreation$54,749.45CONSTRUCTION-BUILDINGS
Aug 23, 2010Department of Environmental Protection$47,328.98IOTB CONSTRUCTION
Apr 27, 2011Department of Parks and Recreation$28,234.01CONSTRUCTION-BUILDINGS
Jul 6, 2010Department of Parks and Recreation$22,446.12CONSTRUCTION-BUILDINGS
Nov 15, 2010Department of Parks and Recreation$20,696.42CONSTRUCTION-BUILDINGS
FY 2010top 5 of 5 payments$1,421,052
DateAgencyAmountCategoryPurchase order
Jan 12, 2010Department of Parks and Recreation$849,632.03CONSTRUCTION-BUILDINGS
Feb 17, 2010Department of Parks and Recreation$405,746.93CONSTRUCTION-BUILDINGS
Apr 27, 2010Department of Parks and Recreation$94,364.98CONSTRUCTION-BUILDINGS
Feb 17, 2010Department of Parks and Recreation$44,894.40CONSTRUCTION-BUILDINGS
Apr 27, 2010Department of Parks and Recreation$26,413.70CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Oct 10, 2023Department of Environmental Protection$9,325.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$12,135.17IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$7,694.07IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$5,205.35IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$800.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$10,702.34IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$5,083.06IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$7,625.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$12,641.88IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$7,777.50IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$4,465.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$11,364.25IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$4,743.94IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$2,335.90IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$5,547.58IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$12,019.06IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$4,443.78IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$1,462.50IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$3,755.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$7,276.66IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$5,076.44IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$5,568.09IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$10,779.00IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$677.35IOTB CONSTRUCTIONCapital Contracts
Oct 10, 2023Department of Environmental Protection$1,275.00IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data