as recorded by New York City: PICONE-SCHIAVONE JV

Picone-Schiavone JV is the 558th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 82nd in IOTB CONSTRUCTION spending. Its payments amount to 0.3% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$119,863,599total received
882payments
2agencies
Jan 13, 2010Dec 10, 2021first / last payment
Follow this vendorGet an email when New York City publishes new payments to Picone-Schiavone JV. No spam.

Payments by fiscal year

FY 2022$1,179,497
FY 2021$5,975,000
FY 2017$2,371,407
FY 2016$8,326,249
FY 2015$8,450,785
FY 2014$9,037,215
FY 2013$15,194,817
FY 2012$29,621,412
FY 2011$29,880,309
FY 2010$9,826,909

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2022Department of Environmental Protection19$1,179,497
FY 2021Miscellaneous1$5,975,000
FY 2017Department of Environmental Protection101$2,371,407
FY 2016Department of Environmental Protection201$8,326,249
FY 2015Department of Environmental Protection180$8,450,785
FY 2014Department of Environmental Protection125$9,037,215
FY 2013Department of Environmental Protection107$15,194,817
FY 2012Department of Environmental Protection93$29,621,412
FY 2011Department of Environmental Protection46$29,880,309
FY 2010Department of Environmental Protection9$9,826,909
Total882$119,863,599

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
JUDGMENTS AND CLAIMS-NOT REPORTABLE1$5,975,000Dec 2, 2020 Dec 2, 2020
IOTB CONSTRUCTION881$113,888,599Jan 13, 2010 Dec 10, 2021

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2022top 19 of 19 payments$1,179,497
DateAgencyAmountCategoryPurchase order
Nov 19, 2021Department of Environmental Protection$747,557.07IOTB CONSTRUCTION
Dec 10, 2021Department of Environmental Protection$210,891.98IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$60,931.50IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$28,656.00IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$17,111.30IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$16,352.92IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$16,158.14IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$15,802.75IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$11,725.34IOTB CONSTRUCTION
Dec 10, 2021Department of Environmental Protection$9,274.74IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$8,716.50IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$8,483.86IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$7,050.41IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$6,886.00IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$6,864.20IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$3,902.99IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$1,981.28IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$711.79IOTB CONSTRUCTION
Nov 29, 2021Department of Environmental Protection$438.53IOTB CONSTRUCTION
FY 2021top 1 of 1 payments$5,975,000
DateAgencyAmountCategoryPurchase order
Dec 2, 2020Miscellaneous$5,975,000.00JUDGMENTS AND CLAIMS-NOT REPORTABLE
FY 2017top 20 of 101 payments$2,371,407
DateAgencyAmountCategoryPurchase order
Aug 24, 2016Department of Environmental Protection$366,885.24IOTB CONSTRUCTION
Aug 8, 2016Department of Environmental Protection$204,207.06IOTB CONSTRUCTION
Aug 12, 2016Department of Environmental Protection$134,615.67IOTB CONSTRUCTION
Aug 8, 2016Department of Environmental Protection$127,383.34IOTB CONSTRUCTION
Dec 27, 2016Department of Environmental Protection$123,917.01IOTB CONSTRUCTION
Jun 15, 2017Department of Environmental Protection$87,884.28IOTB CONSTRUCTION
Oct 3, 2016Department of Environmental Protection$81,149.06IOTB CONSTRUCTION
Oct 3, 2016Department of Environmental Protection$74,156.79IOTB CONSTRUCTION
Aug 11, 2016Department of Environmental Protection$71,220.27IOTB CONSTRUCTION
Aug 15, 2016Department of Environmental Protection$62,704.01IOTB CONSTRUCTION
Oct 3, 2016Department of Environmental Protection$56,000.00IOTB CONSTRUCTION
Nov 16, 2016Department of Environmental Protection$54,876.40IOTB CONSTRUCTION
Jun 15, 2017Department of Environmental Protection$48,617.00IOTB CONSTRUCTION
Dec 27, 2016Department of Environmental Protection$44,022.94IOTB CONSTRUCTION
Aug 15, 2016Department of Environmental Protection$38,746.67IOTB CONSTRUCTION
Sep 19, 2016Department of Environmental Protection$38,112.78IOTB CONSTRUCTION
Dec 29, 2016Department of Environmental Protection$35,551.73IOTB CONSTRUCTION
Dec 27, 2016Department of Environmental Protection$33,098.98IOTB CONSTRUCTION
Sep 19, 2016Department of Environmental Protection$32,501.57IOTB CONSTRUCTION
Oct 3, 2016Department of Environmental Protection$29,323.99IOTB CONSTRUCTION
FY 2016top 20 of 201 payments$8,326,249
DateAgencyAmountCategoryPurchase order
Oct 20, 2015Department of Environmental Protection$709,987.05IOTB CONSTRUCTION
Dec 7, 2015Department of Environmental Protection$474,493.10IOTB CONSTRUCTION
Aug 24, 2015Department of Environmental Protection$358,914.96IOTB CONSTRUCTION
Oct 14, 2015Department of Environmental Protection$318,320.58IOTB CONSTRUCTION
Mar 7, 2016Department of Environmental Protection$295,807.00IOTB CONSTRUCTION
Jul 31, 2015Department of Environmental Protection$278,632.67IOTB CONSTRUCTION
Mar 7, 2016Department of Environmental Protection$236,115.00IOTB CONSTRUCTION
Jan 4, 2016Department of Environmental Protection$235,062.48IOTB CONSTRUCTION
Jun 6, 2016Department of Environmental Protection$206,845.58IOTB CONSTRUCTION
Aug 24, 2015Department of Environmental Protection$189,770.72IOTB CONSTRUCTION
Mar 7, 2016Department of Environmental Protection$173,005.50IOTB CONSTRUCTION
Jul 20, 2015Department of Environmental Protection$162,861.25IOTB CONSTRUCTION
Dec 17, 2015Department of Environmental Protection$161,193.29IOTB CONSTRUCTION
Oct 5, 2015Department of Environmental Protection$147,729.50IOTB CONSTRUCTION
Dec 24, 2015Department of Environmental Protection$132,467.16IOTB CONSTRUCTION
Mar 7, 2016Department of Environmental Protection$132,267.91IOTB CONSTRUCTION
Jul 31, 2015Department of Environmental Protection$130,537.06IOTB CONSTRUCTION
Aug 26, 2015Department of Environmental Protection$125,732.14IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$118,572.32IOTB CONSTRUCTION
Dec 24, 2015Department of Environmental Protection$115,677.57IOTB CONSTRUCTION
FY 2015top 20 of 180 payments$8,450,785
DateAgencyAmountCategoryPurchase order
Dec 1, 2014Department of Environmental Protection$566,334.23IOTB CONSTRUCTION
Jul 24, 2014Department of Environmental Protection$560,572.73IOTB CONSTRUCTION
Jun 1, 2015Department of Environmental Protection$325,114.74IOTB CONSTRUCTION
May 11, 2015Department of Environmental Protection$292,068.08IOTB CONSTRUCTION
Feb 4, 2015Department of Environmental Protection$276,560.17IOTB CONSTRUCTION
Oct 20, 2014Department of Environmental Protection$271,645.69IOTB CONSTRUCTION
Jun 18, 2015Department of Environmental Protection$251,942.65IOTB CONSTRUCTION
Sep 24, 2014Department of Environmental Protection$214,672.80IOTB CONSTRUCTION
Aug 29, 2014Department of Environmental Protection$201,790.92IOTB CONSTRUCTION
Dec 29, 2014Department of Environmental Protection$201,216.25IOTB CONSTRUCTION
Oct 9, 2014Department of Environmental Protection$196,000.00IOTB CONSTRUCTION
Nov 14, 2014Department of Environmental Protection$175,984.02IOTB CONSTRUCTION
Jan 20, 2015Department of Environmental Protection$174,357.99IOTB CONSTRUCTION
Oct 9, 2014Department of Environmental Protection$172,265.54IOTB CONSTRUCTION
Dec 8, 2014Department of Environmental Protection$172,076.35IOTB CONSTRUCTION
Jul 28, 2014Department of Environmental Protection$171,347.72IOTB CONSTRUCTION
Oct 9, 2014Department of Environmental Protection$162,155.48IOTB CONSTRUCTION
Jan 5, 2015Department of Environmental Protection$144,742.20IOTB CONSTRUCTION
Oct 9, 2014Department of Environmental Protection$134,000.00IOTB CONSTRUCTION
Dec 17, 2014Department of Environmental Protection$130,565.21IOTB CONSTRUCTION
FY 2014top 20 of 125 payments$9,037,215
DateAgencyAmountCategoryPurchase order
Jun 26, 2014Department of Environmental Protection$470,152.05IOTB CONSTRUCTION
Aug 1, 2013Department of Environmental Protection$453,234.67IOTB CONSTRUCTION
Sep 23, 2013Department of Environmental Protection$449,565.56IOTB CONSTRUCTION
Aug 15, 2013Department of Environmental Protection$442,707.27IOTB CONSTRUCTION
Dec 16, 2013Department of Environmental Protection$422,710.73IOTB CONSTRUCTION
Nov 21, 2013Department of Environmental Protection$411,265.70IOTB CONSTRUCTION
Apr 30, 2014Department of Environmental Protection$369,111.37IOTB CONSTRUCTION
Oct 23, 2013Department of Environmental Protection$367,273.79IOTB CONSTRUCTION
Jan 10, 2014Department of Environmental Protection$269,684.93IOTB CONSTRUCTION
Mar 26, 2014Department of Environmental Protection$228,773.34IOTB CONSTRUCTION
May 15, 2014Department of Environmental Protection$224,783.59IOTB CONSTRUCTION
Jul 15, 2013Department of Environmental Protection$174,790.57IOTB CONSTRUCTION
Jul 15, 2013Department of Environmental Protection$174,790.54IOTB CONSTRUCTION
Jul 15, 2013Department of Environmental Protection$174,790.52IOTB CONSTRUCTION
Dec 6, 2013Department of Environmental Protection$166,263.80IOTB CONSTRUCTION
Aug 29, 2013Department of Environmental Protection$164,599.63IOTB CONSTRUCTION
Mar 17, 2014Department of Environmental Protection$163,887.78IOTB CONSTRUCTION
Nov 15, 2013Department of Environmental Protection$154,034.27IOTB CONSTRUCTION
Jul 15, 2013Department of Environmental Protection$139,832.44IOTB CONSTRUCTION
Jan 21, 2014Department of Environmental Protection$138,524.96IOTB CONSTRUCTION
FY 2013top 20 of 107 payments$15,194,817
DateAgencyAmountCategoryPurchase order
Aug 1, 2012Department of Environmental Protection$1,537,256.73IOTB CONSTRUCTION
Oct 4, 2012Department of Environmental Protection$1,176,857.01IOTB CONSTRUCTION
Oct 24, 2012Department of Environmental Protection$1,079,381.05IOTB CONSTRUCTION
Aug 27, 2012Department of Environmental Protection$1,067,681.26IOTB CONSTRUCTION
Feb 1, 2013Department of Environmental Protection$1,025,575.82IOTB CONSTRUCTION
Dec 3, 2012Department of Environmental Protection$928,217.01IOTB CONSTRUCTION
Feb 19, 2013Department of Environmental Protection$713,083.19IOTB CONSTRUCTION
Aug 10, 2012Department of Environmental Protection$620,224.79IOTB CONSTRUCTION
Jul 11, 2012Department of Environmental Protection$557,569.45IOTB CONSTRUCTION
Mar 25, 2013Department of Environmental Protection$446,915.93IOTB CONSTRUCTION
Jun 28, 2013Department of Environmental Protection$402,196.85IOTB CONSTRUCTION
Jun 5, 2013Department of Environmental Protection$400,000.00IOTB CONSTRUCTION
Mar 14, 2013Department of Environmental Protection$384,922.86IOTB CONSTRUCTION
May 20, 2013Department of Environmental Protection$371,535.20IOTB CONSTRUCTION
May 1, 2013Department of Environmental Protection$317,654.16IOTB CONSTRUCTION
Oct 9, 2012Department of Environmental Protection$293,876.93IOTB CONSTRUCTION
Nov 19, 2012Department of Environmental Protection$273,343.07IOTB CONSTRUCTION
Mar 11, 2013Department of Environmental Protection$267,629.92IOTB CONSTRUCTION
Jun 5, 2013Department of Environmental Protection$264,367.27IOTB CONSTRUCTION
Oct 9, 2012Department of Environmental Protection$263,767.81IOTB CONSTRUCTION
FY 2012top 20 of 93 payments$29,621,412
DateAgencyAmountCategoryPurchase order
Aug 12, 2011Department of Environmental Protection$2,757,086.17IOTB CONSTRUCTION
Dec 22, 2011Department of Environmental Protection$2,390,209.81IOTB CONSTRUCTION
Apr 9, 2012Department of Environmental Protection$1,876,230.70IOTB CONSTRUCTION
Jun 27, 2012Department of Environmental Protection$1,772,314.05IOTB CONSTRUCTION
Nov 28, 2011Department of Environmental Protection$1,582,769.78IOTB CONSTRUCTION
Sep 19, 2011Department of Environmental Protection$1,539,242.53IOTB CONSTRUCTION
Jan 23, 2012Department of Environmental Protection$1,452,639.75IOTB CONSTRUCTION
Oct 25, 2011Department of Environmental Protection$1,404,128.86IOTB CONSTRUCTION
May 18, 2012Department of Environmental Protection$1,382,485.31IOTB CONSTRUCTION
Aug 1, 2011Department of Environmental Protection$1,273,752.07IOTB CONSTRUCTION
Mar 12, 2012Department of Environmental Protection$1,095,045.40IOTB CONSTRUCTION
Feb 24, 2012Department of Environmental Protection$1,021,409.87IOTB CONSTRUCTION
Mar 28, 2012Department of Environmental Protection$1,006,937.13IOTB CONSTRUCTION
Feb 13, 2012Department of Environmental Protection$983,978.94IOTB CONSTRUCTION
Jun 6, 2012Department of Environmental Protection$784,375.09IOTB CONSTRUCTION
Mar 12, 2012Department of Environmental Protection$757,882.48IOTB CONSTRUCTION
Apr 18, 2012Department of Environmental Protection$703,946.29IOTB CONSTRUCTION
Jun 5, 2012Department of Environmental Protection$561,404.51IOTB CONSTRUCTION
Dec 27, 2011Department of Environmental Protection$345,437.92IOTB CONSTRUCTION
Oct 5, 2011Department of Environmental Protection$340,609.13IOTB CONSTRUCTION
FY 2011top 20 of 46 payments$29,880,309
DateAgencyAmountCategoryPurchase order
May 9, 2011Department of Environmental Protection$3,429,358.12IOTB CONSTRUCTION
Oct 20, 2010Department of Environmental Protection$3,315,698.06IOTB CONSTRUCTION
Jan 20, 2011Department of Environmental Protection$3,073,224.27IOTB CONSTRUCTION
Feb 14, 2011Department of Environmental Protection$2,665,928.68IOTB CONSTRUCTION
Nov 15, 2010Department of Environmental Protection$2,496,707.74IOTB CONSTRUCTION
Sep 20, 2010Department of Environmental Protection$2,237,845.36IOTB CONSTRUCTION
Dec 13, 2010Department of Environmental Protection$1,819,947.28IOTB CONSTRUCTION
Jul 8, 2010Department of Environmental Protection$1,523,983.15IOTB CONSTRUCTION
May 23, 2011Department of Environmental Protection$1,405,991.26IOTB CONSTRUCTION
Aug 19, 2010Department of Environmental Protection$1,217,732.77IOTB CONSTRUCTION
Jun 22, 2011Department of Environmental Protection$1,212,597.29IOTB CONSTRUCTION
Mar 24, 2011Department of Environmental Protection$1,142,599.97IOTB CONSTRUCTION
Jun 1, 2011Department of Environmental Protection$1,123,690.70IOTB CONSTRUCTION
Oct 7, 2010Department of Environmental Protection$471,345.01IOTB CONSTRUCTION
Jun 1, 2011Department of Environmental Protection$334,284.36IOTB CONSTRUCTION
Aug 24, 2010Department of Environmental Protection$279,395.17IOTB CONSTRUCTION
Nov 3, 2010Department of Environmental Protection$185,154.26IOTB CONSTRUCTION
Jun 27, 2011Department of Environmental Protection$167,647.29IOTB CONSTRUCTION
Nov 3, 2010Department of Environmental Protection$144,401.39IOTB CONSTRUCTION
Feb 25, 2011Department of Environmental Protection$128,415.04IOTB CONSTRUCTION
FY 2010top 9 of 9 payments$9,826,909
DateAgencyAmountCategoryPurchase order
Feb 10, 2010Department of Environmental Protection$2,234,560.43IOTB CONSTRUCTION
Jun 17, 2010Department of Environmental Protection$2,002,878.95IOTB CONSTRUCTION
Jan 13, 2010Department of Environmental Protection$1,567,604.75IOTB CONSTRUCTION
Mar 17, 2010Department of Environmental Protection$1,232,919.00IOTB CONSTRUCTION
May 24, 2010Department of Environmental Protection$1,220,105.19IOTB CONSTRUCTION
Apr 12, 2010Department of Environmental Protection$937,763.03IOTB CONSTRUCTION
Apr 8, 2010Department of Environmental Protection$292,123.78IOTB CONSTRUCTION
Apr 22, 2010Department of Environmental Protection$220,166.72IOTB CONSTRUCTION
Jan 13, 2010Department of Environmental Protection$118,786.80IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Dec 10, 2021Department of Environmental Protection$210,891.98IOTB CONSTRUCTIONCapital Contracts
Dec 10, 2021Department of Environmental Protection$9,274.74IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$11,725.34IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$60,931.50IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$15,802.75IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$711.79IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$28,656.00IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$3,902.99IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$17,111.30IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$8,483.86IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$16,158.14IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$6,886.00IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$7,050.41IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$8,716.50IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$6,864.20IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$438.53IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$1,981.28IOTB CONSTRUCTIONCapital Contracts
Nov 29, 2021Department of Environmental Protection$16,352.92IOTB CONSTRUCTIONCapital Contracts
Nov 19, 2021Department of Environmental Protection$747,557.07IOTB CONSTRUCTIONCapital Contracts
Dec 2, 2020Miscellaneous$5,975,000.00JUDGMENTS AND CLAIMS-NOT REPORTABLEOthers
Jun 15, 2017Department of Environmental Protection$48,617.00IOTB CONSTRUCTIONCapital Contracts
Jun 15, 2017Department of Environmental Protection$308.55IOTB CONSTRUCTIONCapital Contracts
Jun 15, 2017Department of Environmental Protection$87,884.28IOTB CONSTRUCTIONCapital Contracts
Jun 15, 2017Department of Environmental Protection$22,080.00IOTB CONSTRUCTIONCapital Contracts
Jun 15, 2017Department of Environmental Protection$2,835.00IOTB CONSTRUCTIONCapital Contracts