A Russo Wrecking Inc: New York City Government Payments

as recorded by New York City: A RUSSO WRECKING INC

A Russo Wrecking Inc is the 1,248th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 183rd in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span.

Primary spending category: CONSTRUCTION-BUILDINGS

$40,580,700total received
630payments
6agencies
Jan 13, 2010Oct 7, 2021first / last payment
Follow this vendorGet an email when New York City publishes new payments to A Russo Wrecking Inc. No spam.

Payments by fiscal year

FY 2022$38,770
FY 2020$119,191
FY 2018$68,948
FY 2017$386,833
FY 2016$3,561,274
FY 2015$4,121,156
FY 2014$5,798,968
FY 2013$2,627,440
FY 2012$9,011,690
FY 2011$6,938,397
FY 2010$7,908,033

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2022School Construction Authority1$38,770
FY 2020Housing Preservation and Development2$119,191
FY 2018Department of Design and Construction1$68,948
FY 2017Department of Design and Construction3$336,649
FY 2017Housing Preservation and Development3$50,184
FY 2016Housing Preservation and Development12$2,932,591
FY 2016Department of Design and Construction6$417,695
FY 2016School Construction Authority4$205,943
FY 2016Miscellaneous2$5,045
FY 2015Housing Preservation and Development85$1,853,480
FY 2015School Construction Authority7$1,018,283
FY 2015Department of Design and Construction3$855,000
FY 2015Department of Transportation2$394,392
FY 2014Housing Preservation and Development133$4,644,988
FY 2014School Construction Authority4$1,086,466
FY 2014Miscellaneous7$67,514
FY 2013Housing Preservation and Development39$1,791,158
FY 2013School Construction Authority7$836,282
FY 2012School Construction Authority26$7,571,058
FY 2012Housing Preservation and Development33$1,421,444
FY 2012Miscellaneous1$19,188
FY 2011School Construction Authority13$4,530,921
FY 2011Housing Preservation and Development71$2,041,661
FY 2011Department of Sanitation131$365,816
FY 2010School Construction Authority5$7,330,606
FY 2010Housing Preservation and Development25$572,175
FY 2010Miscellaneous4$5,252
Total630$40,580,700

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
JUDGMENTS AND CLAIMS-NOT REPORTABLE14$96,999Mar 4, 2010 Aug 20, 2015
OTHR SERV AND CHRGS-GENERAL21$580,739Aug 13, 2014 Jul 9, 2015
DEMOLITION15$3,942,797Jul 5, 2011 Dec 12, 2016
SNOW REMOVAL SERVICES131$365,816Jul 28, 2010 Mar 28, 2011
MAINT & REP GENERAL25$354,250Mar 1, 2010 Feb 28, 2011
CONSTRUCTION-BUILDINGS67$22,618,328Jan 13, 2010 Oct 7, 2021
N/A17$1,775,211Mar 11, 2015 Jul 25, 2017
CONTRACTUAL SERVICES GENERAL299$10,853,910Jan 25, 2010 Feb 6, 2020
<Non-Applicable Expenditure Object>41-$7,350Feb 28, 2011 Jan 26, 2015

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2022top 1 of 1 payments$38,770
DateAgencyAmountCategoryPurchase order
Oct 7, 2021School Construction Authority$38,769.69CONSTRUCTION-BUILDINGS
FY 2020top 2 of 2 payments$119,191
DateAgencyAmountCategoryPurchase order
Feb 6, 2020Housing Preservation and Development$59,595.63CONTRACTUAL SERVICES GENERAL
Feb 6, 2020Housing Preservation and Development$59,595.62CONTRACTUAL SERVICES GENERAL
FY 2018top 1 of 1 payments$68,948
DateAgencyAmountCategoryPurchase order
Jul 25, 2017Department of Design and Construction$68,948.15N/A
FY 2017top 6 of 6 payments$386,833
DateAgencyAmountCategoryPurchase order
Oct 12, 2016Department of Design and Construction$189,024.84N/A
Oct 26, 2016Department of Design and Construction$93,460.80N/A
Oct 19, 2016Department of Design and Construction$54,163.44N/A
Dec 7, 2016Housing Preservation and Development$20,186.86CONTRACTUAL SERVICES GENERAL
Dec 7, 2016Housing Preservation and Development$20,186.86CONTRACTUAL SERVICES GENERAL
Dec 12, 2016Housing Preservation and Development$9,810.69DEMOLITION
FY 2016top 20 of 24 payments$3,561,274
DateAgencyAmountCategoryPurchase order
Sep 17, 2015Housing Preservation and Development$1,544,833.53DEMOLITION
Jul 9, 2015Housing Preservation and Development$1,136,888.80DEMOLITION
Sep 16, 2015Department of Design and Construction$161,808.26N/A
Sep 23, 2015Department of Design and Construction$161,808.25N/A
Jan 27, 2016School Construction Authority$146,325.96CONSTRUCTION-BUILDINGS
Mar 3, 2016Housing Preservation and Development$130,499.67DEMOLITION
Oct 14, 2015Department of Design and Construction$83,990.63N/A
Jan 28, 2016School Construction Authority$47,853.14CONSTRUCTION-BUILDINGS
Dec 23, 2015Housing Preservation and Development$46,462.41N/A
Nov 11, 2015Housing Preservation and Development$40,040.92N/A
Jul 23, 2015Housing Preservation and Development$12,303.51CONTRACTUAL SERVICES GENERAL
Feb 26, 2016School Construction Authority$10,285.69CONSTRUCTION-BUILDINGS
Aug 26, 2015Department of Design and Construction$9,500.00N/A
Dec 18, 2015Housing Preservation and Development$8,448.33N/A
Apr 4, 2016Housing Preservation and Development$8,054.00DEMOLITION
Aug 20, 2015Miscellaneous$3,580.00JUDGMENTS AND CLAIMS-NOT REPORTABLE
Jul 9, 2015Housing Preservation and Development$2,000.00OTHR SERV AND CHRGS-GENERAL
Jan 8, 2016Housing Preservation and Development$1,967.31N/A
Feb 26, 2016School Construction Authority$1,478.04CONSTRUCTION-BUILDINGS
Aug 20, 2015Miscellaneous$1,465.00JUDGMENTS AND CLAIMS-NOT REPORTABLE
FY 2015top 20 of 97 payments$4,121,156
DateAgencyAmountCategoryPurchase order
Jul 28, 2014Department of Transportation$392,892.00DEMOLITION
Apr 16, 2015Department of Design and Construction$348,650.00N/A
Oct 29, 2014School Construction Authority$303,260.90CONSTRUCTION-BUILDINGS
Jan 6, 2015Housing Preservation and Development$300,000.00CONTRACTUAL SERVICES GENERAL
Jan 6, 2015Housing Preservation and Development$300,000.00CONTRACTUAL SERVICES GENERAL
Dec 4, 2014School Construction Authority$292,063.74CONSTRUCTION-BUILDINGS
Mar 11, 2015Department of Design and Construction$255,550.00N/A
May 14, 2015Department of Design and Construction$250,800.00N/A
Mar 30, 2015School Construction Authority$242,859.90CONSTRUCTION-BUILDINGS
Sep 24, 2014Housing Preservation and Development$160,700.25CONTRACTUAL SERVICES GENERAL
Mar 2, 2015School Construction Authority$138,955.97CONSTRUCTION-BUILDINGS
Aug 14, 2014Housing Preservation and Development$98,222.00CONTRACTUAL SERVICES GENERAL
Aug 20, 2014Housing Preservation and Development$87,211.00CONTRACTUAL SERVICES GENERAL
Nov 12, 2014Housing Preservation and Development$86,444.00OTHR SERV AND CHRGS-GENERAL
Aug 13, 2014Housing Preservation and Development$83,222.00OTHR SERV AND CHRGS-GENERAL
Sep 2, 2014Housing Preservation and Development$82,222.00CONTRACTUAL SERVICES GENERAL
Jun 12, 2015Housing Preservation and Development$79,222.00OTHR SERV AND CHRGS-GENERAL
Jan 2, 2015Housing Preservation and Development$74,055.20OTHR SERV AND CHRGS-GENERAL
Aug 15, 2014Housing Preservation and Development$63,222.00CONTRACTUAL SERVICES GENERAL
Nov 12, 2014Housing Preservation and Development$56,444.00OTHR SERV AND CHRGS-GENERAL
FY 2014top 20 of 144 payments$5,798,968
DateAgencyAmountCategoryPurchase order
Oct 22, 2013School Construction Authority$492,554.10CONSTRUCTION-BUILDINGS
Feb 20, 2014Housing Preservation and Development$466,599.67CONTRACTUAL SERVICES GENERAL
Nov 20, 2013School Construction Authority$423,172.96CONSTRUCTION-BUILDINGS
Jun 2, 2014Housing Preservation and Development$420,155.00CONTRACTUAL SERVICES GENERAL
Feb 7, 2014Housing Preservation and Development$407,222.00CONTRACTUAL SERVICES GENERAL
Feb 7, 2014Housing Preservation and Development$326,333.00CONTRACTUAL SERVICES GENERAL
Oct 18, 2013Housing Preservation and Development$232,347.00CONTRACTUAL SERVICES GENERAL
Jul 25, 2013Housing Preservation and Development$215,111.00CONTRACTUAL SERVICES GENERAL
Oct 18, 2013Housing Preservation and Development$179,111.00CONTRACTUAL SERVICES GENERAL
Jun 2, 2014Housing Preservation and Development$156,055.00CONTRACTUAL SERVICES GENERAL
May 22, 2014Housing Preservation and Development$151,111.00CONTRACTUAL SERVICES GENERAL
Sep 18, 2013School Construction Authority$143,022.50CONSTRUCTION-BUILDINGS
Oct 18, 2013Housing Preservation and Development$142,544.00CONTRACTUAL SERVICES GENERAL
May 29, 2014Housing Preservation and Development$140,799.78CONTRACTUAL SERVICES GENERAL
Jun 2, 2014Housing Preservation and Development$118,555.00CONTRACTUAL SERVICES GENERAL
Apr 17, 2014Housing Preservation and Development$109,619.98CONTRACTUAL SERVICES GENERAL
Mar 24, 2014Housing Preservation and Development$106,444.00CONTRACTUAL SERVICES GENERAL
Nov 25, 2013Housing Preservation and Development$81,722.00CONTRACTUAL SERVICES GENERAL
Sep 26, 2013Housing Preservation and Development$76,111.00CONTRACTUAL SERVICES GENERAL
May 22, 2014Housing Preservation and Development$60,655.00CONTRACTUAL SERVICES GENERAL
FY 2013top 20 of 46 payments$2,627,440
DateAgencyAmountCategoryPurchase order
Jul 19, 2012School Construction Authority$323,142.50CONSTRUCTION-BUILDINGS
May 28, 2013Housing Preservation and Development$304,544.00DEMOLITION
Dec 20, 2012Housing Preservation and Development$292,444.00CONTRACTUAL SERVICES GENERAL
Dec 17, 2012School Construction Authority$185,841.63CONSTRUCTION-BUILDINGS
Aug 27, 2012Housing Preservation and Development$172,899.90CONTRACTUAL SERVICES GENERAL
Aug 27, 2012Housing Preservation and Development$172,899.90CONTRACTUAL SERVICES GENERAL
Sep 26, 2012School Construction Authority$145,328.72CONSTRUCTION-BUILDINGS
Mar 14, 2013Housing Preservation and Development$126,053.25CONTRACTUAL SERVICES GENERAL
Dec 21, 2012Housing Preservation and Development$109,555.00CONTRACTUAL SERVICES GENERAL
Sep 13, 2012School Construction Authority$90,007.42CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$75,504.48CONSTRUCTION-BUILDINGS
Apr 8, 2013Housing Preservation and Development$71,722.00CONTRACTUAL SERVICES GENERAL
Aug 27, 2012Housing Preservation and Development$71,722.00CONTRACTUAL SERVICES GENERAL
Mar 18, 2013Housing Preservation and Development$71,555.00CONTRACTUAL SERVICES GENERAL
May 10, 2013Housing Preservation and Development$59,333.00CONTRACTUAL SERVICES GENERAL
Dec 3, 2012Housing Preservation and Development$53,399.56CONTRACTUAL SERVICES GENERAL
Mar 18, 2013Housing Preservation and Development$52,222.00CONTRACTUAL SERVICES GENERAL
Apr 18, 2013Housing Preservation and Development$42,021.10CONTRACTUAL SERVICES GENERAL
Oct 26, 2012Housing Preservation and Development$40,974.00CONTRACTUAL SERVICES GENERAL
Apr 11, 2013Housing Preservation and Development$32,222.00CONTRACTUAL SERVICES GENERAL
FY 2012top 20 of 60 payments$9,011,690
DateAgencyAmountCategoryPurchase order
Dec 6, 2011School Construction Authority$1,187,029.75CONSTRUCTION-BUILDINGS
Sep 2, 2011School Construction Authority$1,132,400.00CONSTRUCTION-BUILDINGS
Oct 3, 2011School Construction Authority$828,685.00CONSTRUCTION-BUILDINGS
Aug 18, 2011School Construction Authority$656,515.55CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$578,165.25CONSTRUCTION-BUILDINGS
Dec 7, 2011School Construction Authority$550,605.75CONSTRUCTION-BUILDINGS
Jul 28, 2011School Construction Authority$422,485.90CONSTRUCTION-BUILDINGS
May 21, 2012School Construction Authority$347,510.00CONSTRUCTION-BUILDINGS
Jun 26, 2012School Construction Authority$337,879.02CONSTRUCTION-BUILDINGS
Mar 1, 2012School Construction Authority$261,821.70CONSTRUCTION-BUILDINGS
Jan 9, 2012School Construction Authority$252,559.40CONSTRUCTION-BUILDINGS
Nov 7, 2011Housing Preservation and Development$240,611.00CONTRACTUAL SERVICES GENERAL
Jun 13, 2012School Construction Authority$205,105.00CONSTRUCTION-BUILDINGS
May 29, 2012Housing Preservation and Development$193,944.00CONTRACTUAL SERVICES GENERAL
Nov 25, 2011Housing Preservation and Development$185,725.86CONTRACTUAL SERVICES GENERAL
Jul 5, 2011Housing Preservation and Development$181,499.67DEMOLITION
Dec 2, 2011School Construction Authority$181,245.00CONSTRUCTION-BUILDINGS
Dec 2, 2011School Construction Authority$177,986.65CONSTRUCTION-BUILDINGS
Dec 23, 2011Housing Preservation and Development$131,222.00DEMOLITION
Jun 1, 2012Housing Preservation and Development$86,555.00CONTRACTUAL SERVICES GENERAL
FY 2011top 20 of 215 payments$6,938,397
DateAgencyAmountCategoryPurchase order
Feb 15, 2011School Construction Authority$1,220,944.60CONSTRUCTION-BUILDINGS
Feb 11, 2011School Construction Authority$1,168,831.71CONSTRUCTION-BUILDINGS
Dec 22, 2010School Construction Authority$1,151,191.88CONSTRUCTION-BUILDINGS
Oct 19, 2010School Construction Authority$730,587.05CONSTRUCTION-BUILDINGS
Aug 23, 2010Housing Preservation and Development$355,555.00CONTRACTUAL SERVICES GENERAL
Aug 18, 2010Housing Preservation and Development$230,596.30CONTRACTUAL SERVICES GENERAL
Apr 26, 2011School Construction Authority$192,305.69CONSTRUCTION-BUILDINGS
Oct 8, 2010Housing Preservation and Development$185,000.00CONTRACTUAL SERVICES GENERAL
Sep 7, 2010Housing Preservation and Development$122,937.60CONTRACTUAL SERVICES GENERAL
Jan 3, 2011Housing Preservation and Development$118,999.80CONTRACTUAL SERVICES GENERAL
Jan 14, 2011Housing Preservation and Development$109,000.00CONTRACTUAL SERVICES GENERAL
Apr 7, 2011Housing Preservation and Development$81,642.00CONTRACTUAL SERVICES GENERAL
Aug 9, 2010Housing Preservation and Development$52,255.00CONTRACTUAL SERVICES GENERAL
Jan 27, 2011Housing Preservation and Development$51,555.00CONTRACTUAL SERVICES GENERAL
Mar 24, 2011Housing Preservation and Development$48,444.00CONTRACTUAL SERVICES GENERAL
Jul 12, 2010Housing Preservation and Development$45,444.00CONTRACTUAL SERVICES GENERAL
Mar 25, 2011Housing Preservation and Development$37,763.80CONTRACTUAL SERVICES GENERAL
Feb 16, 2011Housing Preservation and Development$33,284.40CONTRACTUAL SERVICES GENERAL
Dec 9, 2010Housing Preservation and Development$27,444.00MAINT & REP GENERAL
Sep 27, 2010Housing Preservation and Development$27,444.00CONTRACTUAL SERVICES GENERAL
FY 2010top 20 of 34 payments$7,908,033
DateAgencyAmountCategoryPurchase order
Mar 24, 2010School Construction Authority$3,443,655.00CONSTRUCTION-BUILDINGS
Jun 14, 2010School Construction Authority$3,381,746.35CONSTRUCTION-BUILDINGS
Mar 16, 2010School Construction Authority$431,775.00CONSTRUCTION-BUILDINGS
Mar 8, 2010Housing Preservation and Development$85,111.20CONTRACTUAL SERVICES GENERAL
May 24, 2010Housing Preservation and Development$80,231.00CONTRACTUAL SERVICES GENERAL
Mar 15, 2010Housing Preservation and Development$62,444.00CONTRACTUAL SERVICES GENERAL
Jan 13, 2010School Construction Authority$46,592.18CONSTRUCTION-BUILDINGS
Mar 1, 2010Housing Preservation and Development$46,256.56MAINT & REP GENERAL
Mar 24, 2010Housing Preservation and Development$45,174.40CONTRACTUAL SERVICES GENERAL
Jun 3, 2010Housing Preservation and Development$44,444.00CONTRACTUAL SERVICES GENERAL
Mar 11, 2010Housing Preservation and Development$37,444.00MAINT & REP GENERAL
Apr 2, 2010Housing Preservation and Development$30,622.00CONTRACTUAL SERVICES GENERAL
Jan 21, 2010School Construction Authority$26,837.50CONSTRUCTION-BUILDINGS
Mar 31, 2010Housing Preservation and Development$26,444.00MAINT & REP GENERAL
Jan 25, 2010Housing Preservation and Development$21,732.94CONTRACTUAL SERVICES GENERAL
Mar 11, 2010Housing Preservation and Development$17,555.00MAINT & REP GENERAL
Feb 16, 2010Housing Preservation and Development$16,361.10CONTRACTUAL SERVICES GENERAL
May 3, 2010Housing Preservation and Development$13,318.17CONTRACTUAL SERVICES GENERAL
Mar 24, 2010Housing Preservation and Development$10,814.58CONTRACTUAL SERVICES GENERAL
Feb 24, 2010Housing Preservation and Development$8,444.00CONTRACTUAL SERVICES GENERAL

Recent payments

DateAgencyAmountCategoryMethod
Oct 7, 2021School Construction Authority$38,769.69CONSTRUCTION-BUILDINGSCapital Contracts
Feb 6, 2020Housing Preservation and Development$59,595.62CONTRACTUAL SERVICES GENERALContracts
Feb 6, 2020Housing Preservation and Development$59,595.63CONTRACTUAL SERVICES GENERALContracts
Jul 25, 2017Department of Design and Construction$68,948.15N/AContracts
Dec 12, 2016Housing Preservation and Development$9,810.69DEMOLITIONCapital Contracts
Dec 7, 2016Housing Preservation and Development$20,186.86CONTRACTUAL SERVICES GENERALContracts
Dec 7, 2016Housing Preservation and Development$20,186.86CONTRACTUAL SERVICES GENERALContracts
Oct 26, 2016Department of Design and Construction$93,460.80N/AContracts
Oct 19, 2016Department of Design and Construction$54,163.44N/AContracts
Oct 12, 2016Department of Design and Construction$189,024.84N/AContracts
Jun 2, 2016Housing Preservation and Development$842.82CONTRACTUAL SERVICES GENERALContracts
Apr 4, 2016Housing Preservation and Development$8,054.00DEMOLITIONCapital Contracts
Mar 3, 2016Housing Preservation and Development$130,499.67DEMOLITIONCapital Contracts
Feb 26, 2016School Construction Authority$1,478.04CONSTRUCTION-BUILDINGSCapital Contracts
Feb 26, 2016School Construction Authority$10,285.69CONSTRUCTION-BUILDINGSCapital Contracts
Jan 28, 2016School Construction Authority$47,853.14CONSTRUCTION-BUILDINGSCapital Contracts
Jan 27, 2016School Construction Authority$146,325.96CONSTRUCTION-BUILDINGSCapital Contracts
Jan 8, 2016Housing Preservation and Development$1,967.31N/AContracts
Dec 23, 2015Housing Preservation and Development$46,462.41N/AContracts
Dec 18, 2015Housing Preservation and Development$8,448.33N/AContracts
Nov 18, 2015Housing Preservation and Development$250.00CONTRACTUAL SERVICES GENERALContracts
Nov 11, 2015Housing Preservation and Development$40,040.92N/AContracts
Oct 14, 2015Department of Design and Construction$83,990.63N/AContracts
Sep 23, 2015Department of Design and Construction$161,808.25N/AContracts
Sep 17, 2015Housing Preservation and Development$1,544,833.53DEMOLITIONCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data