Wade Electric Inc: New York City Government Payments
as recorded by New York City: WADE ELECTRIC INC
Wade Electric Inc is the 775th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 103rd in IOTB CONSTRUCTION spending. Its payments amount to 0.2% of everything the Department of Environmental Protection has paid vendors in that span.
Primary spending category: IOTB CONSTRUCTION
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| RENTALS OF MISC.EQUIP | 1 | $947 | Mar 25, 2013 – Mar 25, 2013 |
| IOTB CONSTRUCTION | 978 | $70,964,094 | Jan 19, 2010 – Jul 25, 2023 |
| CONSTRUCTION-BUILDINGS | 152 | $7,015,161 | Jan 19, 2010 – Feb 19, 2019 |
| MAINT & REP GENERAL | 2 | $5,988 | Jan 9, 2012 – Jan 14, 2016 |
| N/A | 1 | $4,043 | Aug 9, 2017 – Aug 9, 2017 |
| SUPPLIES + MATERIALS - GENERAL | 1 | $306 | Jul 7, 2011 – Jul 7, 2011 |
| PROMPT PAYMENT INTEREST | 54 | $12,387 | Sep 6, 2022 – Jul 31, 2023 |
| OTHR SERV AND CHRGS-GENERAL | 11 | $118,770 | Sep 3, 2015 – Aug 23, 2021 |
| CONTRACTUAL SERVICES GENERAL | 20 | $1,095,865 | Mar 12, 2012 – Apr 13, 2023 |
| <Non-Applicable Expenditure Object> | 4 | -$1,400 | Dec 19, 2011 – Dec 8, 2014 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2024top 20 of 53 payments$946,938
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2023 | Department of Environmental Protection | $625,161.03 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $121,308.09 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $30,041.63 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $29,272.50 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $26,513.15 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $14,590.80 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $11,383.68 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $9,553.29 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $9,402.77 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $8,821.12 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $7,742.80 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $7,331.69 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $7,112.84 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $5,240.66 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $4,807.52 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $3,694.32 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $3,531.54 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $3,453.84 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $2,942.94 | IOTB CONSTRUCTION | – |
| Jul 11, 2023 | Department of Environmental Protection | $2,408.78 | IOTB CONSTRUCTION | – |
FY 2023top 20 of 93 payments$473,248
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 12, 2023 | Department of Environmental Protection | $41,045.76 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $32,963.11 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $30,788.47 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $25,845.09 | IOTB CONSTRUCTION | – |
| Aug 15, 2022 | Department of Environmental Protection | $22,346.93 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 22, 2022 | Department of Environmental Protection | $17,148.31 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $15,170.51 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $14,983.90 | IOTB CONSTRUCTION | – |
| Apr 12, 2023 | Department of Environmental Protection | $14,711.02 | IOTB CONSTRUCTION | – |
| Apr 12, 2023 | Department of Environmental Protection | $13,409.24 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $13,043.79 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $12,809.14 | IOTB CONSTRUCTION | – |
| Dec 14, 2022 | Department of Environmental Protection | $12,267.60 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $12,161.35 | IOTB CONSTRUCTION | – |
| Apr 12, 2023 | Department of Environmental Protection | $10,023.05 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $9,921.97 | IOTB CONSTRUCTION | – |
| Apr 12, 2023 | Department of Environmental Protection | $9,781.12 | IOTB CONSTRUCTION | – |
| Oct 17, 2022 | Department of Environmental Protection | $9,062.61 | IOTB CONSTRUCTION | – |
| Aug 22, 2022 | Department of Environmental Protection | $8,718.66 | IOTB CONSTRUCTION | – |
| Dec 14, 2022 | Department of Environmental Protection | $8,332.65 | IOTB CONSTRUCTION | – |
FY 2022top 9 of 9 payments$1,035,280
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 2, 2021 | Department of Environmental Protection | $342,904.29 | IOTB CONSTRUCTION | – |
| Dec 2, 2021 | Department of Environmental Protection | $334,564.96 | IOTB CONSTRUCTION | – |
| Feb 22, 2022 | Department of Environmental Protection | $264,649.86 | IOTB CONSTRUCTION | – |
| Aug 23, 2021 | Department of Environmental Protection | $43,715.84 | CONTRACTUAL SERVICES GENERAL | – |
| May 9, 2022 | Department of Environmental Protection | $27,038.60 | IOTB CONSTRUCTION | – |
| Aug 23, 2021 | Department of Environmental Protection | $9,000.05 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 31, 2022 | Department of Environmental Protection | $6,961.53 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 23, 2021 | Department of Environmental Protection | $4,744.95 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 23, 2021 | Department of Environmental Protection | $1,700.00 | OTHR SERV AND CHRGS-GENERAL | – |
FY 2021top 20 of 39 payments$5,022,351
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 25, 2020 | Department of Environmental Protection | $581,070.72 | IOTB CONSTRUCTION | – |
| Jan 27, 2021 | Department of Environmental Protection | $498,893.56 | IOTB CONSTRUCTION | – |
| Oct 5, 2020 | Department of Environmental Protection | $408,299.68 | IOTB CONSTRUCTION | – |
| Apr 1, 2021 | Department of Environmental Protection | $394,891.12 | IOTB CONSTRUCTION | – |
| Jul 13, 2020 | Department of Environmental Protection | $383,506.11 | IOTB CONSTRUCTION | – |
| Apr 1, 2021 | Department of Environmental Protection | $348,940.29 | IOTB CONSTRUCTION | – |
| Sep 9, 2020 | Department of Environmental Protection | $328,478.83 | IOTB CONSTRUCTION | – |
| Jul 23, 2020 | Department of Environmental Protection | $307,697.14 | IOTB CONSTRUCTION | – |
| May 4, 2021 | Department of Environmental Protection | $171,232.93 | IOTB CONSTRUCTION | – |
| Nov 27, 2020 | Department of Environmental Protection | $142,957.05 | IOTB CONSTRUCTION | – |
| Oct 2, 2020 | Department of Environmental Protection | $138,522.65 | IOTB CONSTRUCTION | – |
| Oct 2, 2020 | Department of Environmental Protection | $138,522.64 | IOTB CONSTRUCTION | – |
| May 12, 2021 | Department of Environmental Protection | $132,935.60 | IOTB CONSTRUCTION | – |
| Jul 10, 2020 | Department of Environmental Protection | $114,569.72 | IOTB CONSTRUCTION | – |
| Jul 10, 2020 | Department of Environmental Protection | $106,685.78 | IOTB CONSTRUCTION | – |
| Jan 27, 2021 | Department of Environmental Protection | $97,183.02 | IOTB CONSTRUCTION | – |
| Oct 2, 2020 | Department of Environmental Protection | $95,532.86 | IOTB CONSTRUCTION | – |
| Apr 15, 2021 | Department of Environmental Protection | $88,503.76 | IOTB CONSTRUCTION | – |
| May 4, 2021 | Department of Environmental Protection | $74,606.15 | IOTB CONSTRUCTION | – |
| Dec 22, 2020 | Department of Environmental Protection | $53,396.35 | IOTB CONSTRUCTION | – |
FY 2020top 20 of 59 payments$3,382,776
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 3, 2020 | Department of Environmental Protection | $601,112.53 | IOTB CONSTRUCTION | – |
| Nov 1, 2019 | Department of Environmental Protection | $375,368.25 | IOTB CONSTRUCTION | – |
| Mar 26, 2020 | Department of Environmental Protection | $190,080.01 | IOTB CONSTRUCTION | – |
| Mar 26, 2020 | Department of Environmental Protection | $174,460.79 | IOTB CONSTRUCTION | – |
| Jan 13, 2020 | Department of Environmental Protection | $160,346.52 | IOTB CONSTRUCTION | – |
| Sep 6, 2019 | Department of Environmental Protection | $139,443.40 | IOTB CONSTRUCTION | – |
| Mar 24, 2020 | Department of Environmental Protection | $119,808.07 | IOTB CONSTRUCTION | – |
| Jan 13, 2020 | Department of Environmental Protection | $113,784.26 | IOTB CONSTRUCTION | – |
| Jul 5, 2019 | Department of Environmental Protection | $107,709.06 | IOTB CONSTRUCTION | – |
| Sep 6, 2019 | Department of Environmental Protection | $103,927.14 | IOTB CONSTRUCTION | – |
| Sep 6, 2019 | Department of Environmental Protection | $103,927.14 | IOTB CONSTRUCTION | – |
| Mar 26, 2020 | Department of Environmental Protection | $101,285.75 | IOTB CONSTRUCTION | – |
| Jan 13, 2020 | Department of Environmental Protection | $85,442.01 | IOTB CONSTRUCTION | – |
| Jan 13, 2020 | Department of Environmental Protection | $85,442.01 | IOTB CONSTRUCTION | – |
| Sep 6, 2019 | Department of Environmental Protection | $69,284.76 | IOTB CONSTRUCTION | – |
| Jan 13, 2020 | Department of Environmental Protection | $63,692.19 | IOTB CONSTRUCTION | – |
| Mar 26, 2020 | Department of Environmental Protection | $63,195.92 | IOTB CONSTRUCTION | – |
| Mar 26, 2020 | Department of Environmental Protection | $61,708.54 | IOTB CONSTRUCTION | – |
| Nov 1, 2019 | Department of Environmental Protection | $55,498.80 | IOTB CONSTRUCTION | – |
| Feb 14, 2020 | Department of Environmental Protection | $49,671.39 | IOTB CONSTRUCTION | – |
FY 2019top 20 of 153 payments$3,822,517
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 9, 2018 | Department of Environmental Protection | $330,351.86 | IOTB CONSTRUCTION | – |
| Nov 9, 2018 | Department of Environmental Protection | $247,737.81 | IOTB CONSTRUCTION | – |
| Nov 9, 2018 | Department of Environmental Protection | $247,737.81 | IOTB CONSTRUCTION | – |
| Feb 19, 2019 | Department of Citywide Administrative Services | $238,070.10 | CONSTRUCTION-BUILDINGS | – |
| Jan 28, 2019 | Department of Citywide Administrative Services | $181,372.20 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2018 | Department of Environmental Protection | $165,158.54 | IOTB CONSTRUCTION | – |
| Aug 6, 2018 | Department of Environmental Protection | $117,379.55 | IOTB CONSTRUCTION | – |
| May 13, 2019 | Department of Environmental Protection | $85,653.99 | IOTB CONSTRUCTION | – |
| Mar 13, 2019 | Department of Environmental Protection | $78,465.50 | IOTB CONSTRUCTION | – |
| Sep 7, 2018 | Department of Environmental Protection | $69,098.00 | IOTB CONSTRUCTION | – |
| Sep 6, 2018 | Department of Environmental Protection | $64,455.99 | IOTB CONSTRUCTION | – |
| Oct 9, 2018 | Department of Environmental Protection | $63,996.17 | IOTB CONSTRUCTION | – |
| Jan 10, 2019 | Department of Environmental Protection | $63,066.18 | IOTB CONSTRUCTION | – |
| Jun 7, 2019 | Department of Environmental Protection | $61,606.48 | IOTB CONSTRUCTION | – |
| Sep 6, 2018 | Department of Environmental Protection | $60,761.67 | IOTB CONSTRUCTION | – |
| Jan 10, 2019 | Department of Environmental Protection | $58,789.39 | IOTB CONSTRUCTION | – |
| Nov 30, 2018 | Department of Environmental Protection | $53,891.50 | IOTB CONSTRUCTION | – |
| Sep 7, 2018 | Department of Environmental Protection | $52,301.03 | IOTB CONSTRUCTION | – |
| Sep 7, 2018 | Department of Environmental Protection | $52,301.03 | IOTB CONSTRUCTION | – |
| May 13, 2019 | Department of Environmental Protection | $51,802.38 | IOTB CONSTRUCTION | – |
FY 2018top 20 of 116 payments$8,435,546
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 22, 2018 | Department of Environmental Protection | $396,952.67 | IOTB CONSTRUCTION | – |
| Aug 30, 2017 | Department of Environmental Protection | $365,651.21 | IOTB CONSTRUCTION | – |
| Aug 30, 2017 | Department of Environmental Protection | $351,060.43 | IOTB CONSTRUCTION | – |
| Oct 5, 2017 | Department of Environmental Protection | $334,022.84 | IOTB CONSTRUCTION | – |
| Aug 30, 2017 | Department of Environmental Protection | $277,390.59 | IOTB CONSTRUCTION | – |
| Feb 26, 2018 | Department of Environmental Protection | $247,959.18 | IOTB CONSTRUCTION | – |
| Feb 26, 2018 | Department of Environmental Protection | $240,846.37 | IOTB CONSTRUCTION | – |
| Aug 11, 2017 | Department of Environmental Protection | $219,755.42 | IOTB CONSTRUCTION | – |
| Jul 28, 2017 | Department of Environmental Protection | $203,809.04 | IOTB CONSTRUCTION | – |
| Jul 18, 2017 | Department of Environmental Protection | $203,574.20 | IOTB CONSTRUCTION | – |
| Sep 25, 2017 | Department of Environmental Protection | $190,667.59 | IOTB CONSTRUCTION | – |
| Feb 26, 2018 | Department of Environmental Protection | $188,106.99 | IOTB CONSTRUCTION | – |
| Jun 13, 2018 | Department of Environmental Protection | $146,280.68 | IOTB CONSTRUCTION | – |
| Aug 30, 2017 | Department of Environmental Protection | $138,695.30 | IOTB CONSTRUCTION | – |
| Oct 2, 2017 | Department of Environmental Protection | $136,340.10 | IOTB CONSTRUCTION | – |
| Sep 5, 2017 | Department of Environmental Protection | $134,025.02 | IOTB CONSTRUCTION | – |
| May 31, 2018 | Department of Environmental Protection | $132,563.36 | IOTB CONSTRUCTION | – |
| Jan 10, 2018 | Department of Environmental Protection | $128,938.34 | IOTB CONSTRUCTION | – |
| Oct 2, 2017 | Department of Environmental Protection | $126,937.33 | IOTB CONSTRUCTION | – |
| Jun 13, 2018 | Department of Environmental Protection | $109,062.06 | IOTB CONSTRUCTION | – |
FY 2017top 20 of 192 payments$9,402,129
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 22, 2017 | Department of Environmental Protection | $376,838.58 | IOTB CONSTRUCTION | – |
| May 22, 2017 | Department of Environmental Protection | $350,325.44 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $342,631.17 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $342,631.17 | IOTB CONSTRUCTION | – |
| May 22, 2017 | Department of Environmental Protection | $285,877.55 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $229,885.43 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $197,343.98 | IOTB CONSTRUCTION | – |
| Aug 22, 2016 | Department of Environmental Protection | $193,899.12 | IOTB CONSTRUCTION | – |
| Oct 3, 2016 | Department of Environmental Protection | $180,142.57 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $168,071.48 | IOTB CONSTRUCTION | – |
| Nov 14, 2016 | Department of Environmental Protection | $164,851.86 | IOTB CONSTRUCTION | – |
| Aug 2, 2016 | Department of Environmental Protection | $157,814.82 | IOTB CONSTRUCTION | – |
| Nov 14, 2016 | Department of Environmental Protection | $153,468.22 | IOTB CONSTRUCTION | – |
| Dec 13, 2016 | Department of Environmental Protection | $150,013.25 | IOTB CONSTRUCTION | – |
| Feb 21, 2017 | Department of Environmental Protection | $149,709.23 | IOTB CONSTRUCTION | – |
| Aug 22, 2016 | Department of Environmental Protection | $145,424.34 | IOTB CONSTRUCTION | – |
| Aug 22, 2016 | Department of Environmental Protection | $145,424.34 | IOTB CONSTRUCTION | – |
| Apr 10, 2017 | Department of Environmental Protection | $143,990.51 | IOTB CONSTRUCTION | – |
| May 22, 2017 | Department of Environmental Protection | $142,938.78 | IOTB CONSTRUCTION | – |
| Oct 3, 2016 | Department of Environmental Protection | $135,106.92 | IOTB CONSTRUCTION | – |
FY 2016top 20 of 182 payments$14,178,326
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 17, 2016 | Department of Environmental Protection | $858,882.61 | IOTB CONSTRUCTION | – |
| Dec 9, 2015 | Department of Environmental Protection | $479,173.00 | IOTB CONSTRUCTION | – |
| Oct 7, 2015 | Department of Environmental Protection | $473,376.67 | IOTB CONSTRUCTION | – |
| Feb 17, 2016 | Department of Environmental Protection | $420,924.31 | IOTB CONSTRUCTION | – |
| Sep 28, 2015 | Department of Environmental Protection | $384,855.93 | IOTB CONSTRUCTION | – |
| Dec 9, 2015 | Department of Environmental Protection | $359,379.75 | IOTB CONSTRUCTION | – |
| Dec 9, 2015 | Department of Environmental Protection | $359,379.75 | IOTB CONSTRUCTION | – |
| Oct 7, 2015 | Department of Environmental Protection | $355,032.51 | IOTB CONSTRUCTION | – |
| Oct 7, 2015 | Department of Environmental Protection | $355,032.51 | IOTB CONSTRUCTION | – |
| Oct 1, 2015 | Department of Environmental Protection | $331,043.21 | IOTB CONSTRUCTION | – |
| Jun 6, 2016 | Department of Environmental Protection | $311,473.65 | IOTB CONSTRUCTION | – |
| Apr 7, 2016 | Department of Environmental Protection | $293,997.49 | IOTB CONSTRUCTION | – |
| Feb 17, 2016 | Department of Environmental Protection | $289,372.64 | IOTB CONSTRUCTION | – |
| Feb 17, 2016 | Department of Environmental Protection | $273,775.24 | IOTB CONSTRUCTION | – |
| Sep 28, 2015 | Department of Environmental Protection | $261,702.03 | IOTB CONSTRUCTION | – |
| Sep 28, 2015 | Department of Environmental Protection | $261,702.03 | IOTB CONSTRUCTION | – |
| Sep 28, 2015 | Department of Environmental Protection | $261,702.03 | IOTB CONSTRUCTION | – |
| Sep 28, 2015 | Department of Environmental Protection | $261,702.03 | IOTB CONSTRUCTION | – |
| Dec 9, 2015 | Department of Environmental Protection | $239,586.50 | IOTB CONSTRUCTION | – |
| Oct 7, 2015 | Department of Environmental Protection | $236,688.34 | IOTB CONSTRUCTION | – |
FY 2015top 20 of 188 payments$12,879,687
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 29, 2014 | Department of Environmental Protection | $506,348.65 | IOTB CONSTRUCTION | – |
| Mar 24, 2015 | Department of Environmental Protection | $445,002.02 | IOTB CONSTRUCTION | – |
| Dec 29, 2014 | Department of Environmental Protection | $359,312.47 | IOTB CONSTRUCTION | – |
| Jan 2, 2015 | Department of Environmental Protection | $348,908.73 | IOTB CONSTRUCTION | – |
| Feb 9, 2015 | Department of Environmental Protection | $323,322.44 | IOTB CONSTRUCTION | – |
| Mar 24, 2015 | Department of Environmental Protection | $280,186.46 | IOTB CONSTRUCTION | – |
| Mar 24, 2015 | Department of Environmental Protection | $280,186.46 | IOTB CONSTRUCTION | – |
| Mar 24, 2015 | Department of Environmental Protection | $280,186.46 | IOTB CONSTRUCTION | – |
| Dec 29, 2014 | Department of Environmental Protection | $269,812.20 | IOTB CONSTRUCTION | – |
| Dec 29, 2014 | Department of Environmental Protection | $269,812.20 | IOTB CONSTRUCTION | – |
| Mar 24, 2015 | Department of Environmental Protection | $247,223.35 | IOTB CONSTRUCTION | – |
| Sep 29, 2014 | Department of Environmental Protection | $233,830.82 | IOTB CONSTRUCTION | – |
| Feb 9, 2015 | Department of Environmental Protection | $229,434.38 | IOTB CONSTRUCTION | – |
| Jan 2, 2015 | Department of Environmental Protection | $219,683.27 | IOTB CONSTRUCTION | – |
| Jan 2, 2015 | Department of Environmental Protection | $219,683.27 | IOTB CONSTRUCTION | – |
| Jan 2, 2015 | Department of Environmental Protection | $219,683.27 | IOTB CONSTRUCTION | – |
| Dec 29, 2014 | Department of Environmental Protection | $201,129.75 | IOTB CONSTRUCTION | – |
| Oct 21, 2014 | Department of Environmental Protection | $194,134.18 | IOTB CONSTRUCTION | – |
| Jan 2, 2015 | Department of Environmental Protection | $193,838.18 | IOTB CONSTRUCTION | – |
| Dec 17, 2014 | Department of Environmental Protection | $189,631.35 | IOTB CONSTRUCTION | – |
FY 2014top 20 of 44 payments$3,997,077
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 6, 2013 | Department of Environmental Protection | $348,531.35 | IOTB CONSTRUCTION | – |
| Mar 11, 2014 | Department of Environmental Protection | $313,573.56 | IOTB CONSTRUCTION | – |
| Nov 12, 2013 | Police Department | $295,134.47 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2013 | Department of Environmental Protection | $233,997.12 | IOTB CONSTRUCTION | – |
| May 12, 2014 | Administration for Children's Services | $212,172.41 | CONSTRUCTION-BUILDINGS | – |
| Nov 12, 2013 | Police Department | $204,736.40 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2013 | Department of Environmental Protection | $179,813.30 | IOTB CONSTRUCTION | – |
| Jun 9, 2014 | Department of Environmental Protection | $160,114.24 | IOTB CONSTRUCTION | – |
| Jul 12, 2013 | Department of Environmental Protection | $157,172.06 | IOTB CONSTRUCTION | – |
| Jun 23, 2014 | Police Department | $147,014.53 | CONSTRUCTION-BUILDINGS | – |
| May 8, 2014 | Department of Environmental Protection | $116,965.86 | IOTB CONSTRUCTION | – |
| Apr 14, 2014 | Department of Environmental Protection | $110,266.38 | IOTB CONSTRUCTION | – |
| Apr 28, 2014 | Department of Environmental Protection | $108,983.24 | IOTB CONSTRUCTION | – |
| Jun 9, 2014 | Department of Environmental Protection | $108,877.69 | IOTB CONSTRUCTION | – |
| Jun 9, 2014 | Department of Environmental Protection | $108,877.69 | IOTB CONSTRUCTION | – |
| Jun 9, 2014 | Department of Environmental Protection | $108,877.69 | IOTB CONSTRUCTION | – |
| Jun 9, 2014 | Department of Environmental Protection | $108,877.69 | IOTB CONSTRUCTION | – |
| Apr 28, 2014 | Department of Environmental Protection | $92,949.40 | IOTB CONSTRUCTION | – |
| Apr 28, 2014 | Department of Environmental Protection | $74,108.60 | IOTB CONSTRUCTION | – |
| Apr 28, 2014 | Department of Environmental Protection | $74,108.60 | IOTB CONSTRUCTION | – |
FY 2013top 20 of 22 payments$4,630,592
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 20, 2012 | Department of Environmental Protection | $847,752.97 | IOTB CONSTRUCTION | – |
| Nov 21, 2012 | Department of Environmental Protection | $748,621.66 | IOTB CONSTRUCTION | – |
| Mar 4, 2013 | Department of Environmental Protection | $645,288.29 | IOTB CONSTRUCTION | – |
| Oct 11, 2012 | Department of Environmental Protection | $567,036.45 | IOTB CONSTRUCTION | – |
| Aug 31, 2012 | Department of Environmental Protection | $478,354.74 | IOTB CONSTRUCTION | – |
| Jan 4, 2013 | Department of Environmental Protection | $343,764.34 | IOTB CONSTRUCTION | – |
| Apr 18, 2013 | Department of Environmental Protection | $254,228.07 | IOTB CONSTRUCTION | – |
| May 29, 2013 | Department of Cultural Affairs | $152,289.60 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2012 | Department of Citywide Administrative Services | $128,250.00 | CONSTRUCTION-BUILDINGS | – |
| May 10, 2013 | Department of Environmental Protection | $121,834.90 | IOTB CONSTRUCTION | – |
| Aug 23, 2012 | Department of Citywide Administrative Services | $101,669.00 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2013 | Department of Environmental Protection | $88,775.02 | IOTB CONSTRUCTION | – |
| May 28, 2013 | Department of Environmental Protection | $60,402.70 | IOTB CONSTRUCTION | – |
| Jun 24, 2013 | Department of Environmental Protection | $46,343.55 | IOTB CONSTRUCTION | – |
| Nov 7, 2012 | Department of Environmental Protection | $21,847.10 | IOTB CONSTRUCTION | – |
| Jul 9, 2012 | Department of Environmental Protection | $11,409.23 | IOTB CONSTRUCTION | – |
| Aug 23, 2012 | Department of Citywide Administrative Services | $8,949.95 | CONSTRUCTION-BUILDINGS | – |
| May 29, 2013 | Department of Cultural Affairs | $1,875.01 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2012 | Department of Citywide Administrative Services | $1,293.61 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2013 | Department of Environmental Protection | $947.19 | RENTALS OF MISC.EQUIP | – |
FY 2012top 20 of 49 payments$5,570,380
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 22, 2012 | Department of Citywide Administrative Services | $748,867.90 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2011 | Department of Citywide Administrative Services | $650,941.90 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2011 | Department of Environmental Protection | $479,425.98 | IOTB CONSTRUCTION | – |
| Dec 28, 2011 | Department of Environmental Protection | $458,393.40 | IOTB CONSTRUCTION | – |
| Mar 12, 2012 | Department of Design and Construction | $434,519.26 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 11, 2012 | Department of Design and Construction | $409,213.53 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 25, 2011 | Department of Citywide Administrative Services | $272,570.39 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2011 | Department of Environmental Protection | $224,153.11 | IOTB CONSTRUCTION | – |
| Mar 28, 2012 | Department of Citywide Administrative Services | $210,358.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 14, 2012 | Department of Environmental Protection | $203,312.89 | IOTB CONSTRUCTION | – |
| Aug 1, 2011 | Department of Citywide Administrative Services | $167,441.30 | CONSTRUCTION-BUILDINGS | – |
| Sep 15, 2011 | Department of Environmental Protection | $150,607.85 | IOTB CONSTRUCTION | – |
| Nov 25, 2011 | Department of Citywide Administrative Services | $122,051.06 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2012 | Department of Environmental Protection | $114,561.53 | IOTB CONSTRUCTION | – |
| May 21, 2012 | Department of Environmental Protection | $108,639.98 | IOTB CONSTRUCTION | – |
| Dec 19, 2011 | Department of Environmental Protection | $90,104.25 | IOTB CONSTRUCTION | – |
| Jan 17, 2012 | Department of Citywide Administrative Services | $81,433.05 | CONSTRUCTION-BUILDINGS | – |
| Oct 31, 2011 | Department of Environmental Protection | $80,647.90 | IOTB CONSTRUCTION | – |
| Aug 29, 2011 | Department of Citywide Administrative Services | $73,815.95 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2012 | Department of Environmental Protection | $59,962.95 | IOTB CONSTRUCTION | – |
FY 2011top 12 of 12 payments$3,371,604
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 10, 2011 | Department of Environmental Protection | $700,556.66 | IOTB CONSTRUCTION | – |
| Jun 3, 2011 | Department of Citywide Administrative Services | $471,513.98 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2010 | Department of Environmental Protection | $443,140.47 | IOTB CONSTRUCTION | – |
| Aug 25, 2010 | Department of Environmental Protection | $423,334.85 | IOTB CONSTRUCTION | – |
| Apr 22, 2011 | Department of Environmental Protection | $329,946.93 | IOTB CONSTRUCTION | – |
| Feb 23, 2011 | Department of Environmental Protection | $229,571.80 | IOTB CONSTRUCTION | – |
| Mar 7, 2011 | Department of Environmental Protection | $210,412.49 | IOTB CONSTRUCTION | – |
| Jun 15, 2011 | Department of Environmental Protection | $193,121.87 | IOTB CONSTRUCTION | – |
| Jul 19, 2010 | Department of Environmental Protection | $177,659.90 | IOTB CONSTRUCTION | – |
| Feb 28, 2011 | Department of Citywide Administrative Services | $132,449.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 16, 2010 | Department of Citywide Administrative Services | $47,395.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 3, 2011 | Department of Citywide Administrative Services | $12,500.16 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 13 of 13 payments$2,067,711
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 1, 2010 | Department of Citywide Administrative Services | $584,632.85 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2010 | Department of Environmental Protection | $395,503.92 | IOTB CONSTRUCTION | – |
| Apr 26, 2010 | Department of Environmental Protection | $326,761.66 | IOTB CONSTRUCTION | – |
| Jun 23, 2010 | Department of Citywide Administrative Services | $198,887.07 | CONSTRUCTION-BUILDINGS | – |
| May 6, 2010 | Department of Citywide Administrative Services | $161,500.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2010 | Department of Citywide Administrative Services | $90,009.65 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2010 | Department of Environmental Protection | $77,506.22 | IOTB CONSTRUCTION | – |
| Jan 19, 2010 | Department of Environmental Protection | $63,867.49 | IOTB CONSTRUCTION | – |
| Mar 8, 2010 | Department of Citywide Administrative Services | $56,525.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2010 | Department of Citywide Administrative Services | $55,575.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2010 | Department of Environmental Protection | $50,529.65 | IOTB CONSTRUCTION | – |
| Jun 1, 2010 | Department of Citywide Administrative Services | $3,562.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2010 | Department of Citywide Administrative Services | $2,850.00 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jul 31, 2023 | Department of Environmental Protection | $7.22 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $1,313.72 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $58.16 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $26.39 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $85.92 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $26.73 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $161.91 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $97.89 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $41.00 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $19.59 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $81.36 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $16.51 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $24.43 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $6.13 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $38.33 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $104.34 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $0.96 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $39.19 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $126.32 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $324.84 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $106.01 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $294.22 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $78.93 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $32.66 | PROMPT PAYMENT INTEREST | Contracts |
| Jul 31, 2023 | Department of Environmental Protection | $53.35 | PROMPT PAYMENT INTEREST | Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data