Urs/Malcolm Pirnie, Inc. JV is the 468th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 7th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.4% of everything the Department of Environmental Protection has paid vendors in that span.
Primary spending category: DESIGN-CONSULTANT-IOTB
$155,919,031 total received
146 payments
1 agency
Jan 8, 2010 – Oct 19, 2022 first / last payment
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year FY 2023 $12,693
FY 2021 $970,770
FY 2020 $2,311,337
FY 2019 $3,664,675
FY 2018 $6,629,594
FY 2017 $13,730,354
FY 2016 $13,111,520
FY 2015 $19,556,249
FY 2014 $15,628,747
FY 2013 $21,372,056
FY 2012 $24,903,762
FY 2011 $22,522,953
FY 2010 $11,504,320
Payments by fiscal year and agency Fiscal year Agency Payments Total FY 2023 Department of Environmental Protection 1 $12,693 FY 2021 Department of Environmental Protection 10 $970,770 FY 2020 Department of Environmental Protection 12 $2,311,337 FY 2019 Department of Environmental Protection 11 $3,664,675 FY 2018 Department of Environmental Protection 13 $6,629,594 FY 2017 Department of Environmental Protection 12 $13,730,354 FY 2016 Department of Environmental Protection 13 $13,111,520 FY 2015 Department of Environmental Protection 14 $19,556,249 FY 2014 Department of Environmental Protection 12 $15,628,747 FY 2013 Department of Environmental Protection 16 $21,372,056 FY 2012 Department of Environmental Protection 12 $24,903,762 FY 2011 Department of Environmental Protection 12 $22,522,953 FY 2010 Department of Environmental Protection 8 $11,504,320 Total 146 $155,919,031
What the payments were for Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
Category Payments Total First / last PROMPT PAYMENT INTEREST 1 $525 Jan 29, 2010 – Jan 29, 2010 CONTRACTUAL SERVICES GENERAL 2 $228,205 Jul 30, 2019 – May 24, 2021 DESIGN-CONSULTANT-IOTB 106 $143,436,475 Jan 8, 2010 – Mar 19, 2018 IOTB CONSTRUCTION 37 $12,253,827 Jan 16, 2018 – Oct 19, 2022
Largest payments by fiscal year The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2023 top 1 of 1 payments $12,693 FY 2021 top 10 of 10 payments $970,770 Date Agency Amount Category Purchase order Jul 20, 2020 Department of Environmental Protection $129,223.48 IOTB CONSTRUCTION – Dec 2, 2020 Department of Environmental Protection $114,153.05 IOTB CONSTRUCTION – Jul 22, 2020 Department of Environmental Protection $110,896.50 IOTB CONSTRUCTION – May 24, 2021 Department of Environmental Protection $108,958.16 CONTRACTUAL SERVICES GENERAL – Oct 20, 2020 Department of Environmental Protection $100,010.25 IOTB CONSTRUCTION – Nov 9, 2020 Department of Environmental Protection $94,085.01 IOTB CONSTRUCTION – Sep 15, 2020 Department of Environmental Protection $92,058.60 IOTB CONSTRUCTION – Oct 13, 2020 Department of Environmental Protection $91,678.72 IOTB CONSTRUCTION – Dec 29, 2020 Department of Environmental Protection $90,561.35 IOTB CONSTRUCTION – Jan 19, 2021 Department of Environmental Protection $39,145.28 IOTB CONSTRUCTION –
FY 2020 top 12 of 12 payments $2,311,337 Date Agency Amount Category Purchase order Nov 13, 2019 Department of Environmental Protection $1,257,804.99 IOTB CONSTRUCTION – Dec 13, 2019 Department of Environmental Protection $185,208.55 IOTB CONSTRUCTION – Feb 18, 2020 Department of Environmental Protection $169,455.95 IOTB CONSTRUCTION – Mar 10, 2020 Department of Environmental Protection $156,360.22 IOTB CONSTRUCTION – Apr 23, 2020 Department of Environmental Protection $139,486.04 IOTB CONSTRUCTION – Jul 30, 2019 Department of Environmental Protection $119,247.01 CONTRACTUAL SERVICES GENERAL – Jan 31, 2020 Department of Environmental Protection $80,306.09 IOTB CONSTRUCTION – Jan 31, 2020 Department of Environmental Protection $74,112.39 IOTB CONSTRUCTION – Sep 5, 2019 Department of Environmental Protection $40,365.78 IOTB CONSTRUCTION – Sep 3, 2019 Department of Environmental Protection $31,877.78 IOTB CONSTRUCTION – Sep 26, 2019 Department of Environmental Protection $31,566.82 IOTB CONSTRUCTION – Oct 23, 2019 Department of Environmental Protection $25,545.71 IOTB CONSTRUCTION –
FY 2019 top 11 of 11 payments $3,664,675 Date Agency Amount Category Purchase order Nov 13, 2018 Department of Environmental Protection $565,432.22 IOTB CONSTRUCTION – Sep 14, 2018 Department of Environmental Protection $494,078.83 IOTB CONSTRUCTION – Feb 13, 2019 Department of Environmental Protection $437,768.10 IOTB CONSTRUCTION – Jul 18, 2018 Department of Environmental Protection $392,163.47 IOTB CONSTRUCTION – Jul 18, 2018 Department of Environmental Protection $379,059.41 IOTB CONSTRUCTION – Dec 31, 2018 Department of Environmental Protection $366,815.41 IOTB CONSTRUCTION – Oct 12, 2018 Department of Environmental Protection $324,365.33 IOTB CONSTRUCTION – Mar 12, 2019 Department of Environmental Protection $301,789.22 IOTB CONSTRUCTION – Mar 29, 2019 Department of Environmental Protection $295,656.86 IOTB CONSTRUCTION – May 10, 2019 Department of Environmental Protection $75,079.90 IOTB CONSTRUCTION – Jun 3, 2019 Department of Environmental Protection $32,466.35 IOTB CONSTRUCTION –
FY 2018 top 13 of 13 payments $6,629,594 Date Agency Amount Category Purchase order Jan 16, 2018 Department of Environmental Protection $3,806,431.76 IOTB CONSTRUCTION – Jul 3, 2017 Department of Environmental Protection $739,316.27 DESIGN-CONSULTANT-IOTB – Mar 8, 2018 Department of Environmental Protection $552,414.42 IOTB CONSTRUCTION – Apr 26, 2018 Department of Environmental Protection $433,056.65 IOTB CONSTRUCTION – Apr 26, 2018 Department of Environmental Protection $404,151.82 IOTB CONSTRUCTION – Mar 19, 2018 Department of Environmental Protection $326,501.11 IOTB CONSTRUCTION – Mar 19, 2018 Department of Environmental Protection $229,529.38 DESIGN-CONSULTANT-IOTB – Aug 16, 2017 Department of Environmental Protection $95,934.89 DESIGN-CONSULTANT-IOTB – Sep 8, 2017 Department of Environmental Protection $20,275.79 DESIGN-CONSULTANT-IOTB – Oct 17, 2017 Department of Environmental Protection $9,172.26 DESIGN-CONSULTANT-IOTB – Nov 20, 2017 Department of Environmental Protection $5,498.61 DESIGN-CONSULTANT-IOTB – Sep 27, 2017 Department of Environmental Protection $4,832.45 DESIGN-CONSULTANT-IOTB – Dec 7, 2017 Department of Environmental Protection $2,479.05 DESIGN-CONSULTANT-IOTB –
FY 2017 top 12 of 12 payments $13,730,354 Date Agency Amount Category Purchase order Dec 20, 2016 Department of Environmental Protection $9,249,447.87 DESIGN-CONSULTANT-IOTB – Mar 15, 2017 Department of Environmental Protection $1,600,140.18 DESIGN-CONSULTANT-IOTB – May 1, 2017 Department of Environmental Protection $740,075.07 DESIGN-CONSULTANT-IOTB – May 15, 2017 Department of Environmental Protection $725,783.59 DESIGN-CONSULTANT-IOTB – Jan 26, 2017 Department of Environmental Protection $722,789.05 DESIGN-CONSULTANT-IOTB – Apr 3, 2017 Department of Environmental Protection $645,287.94 DESIGN-CONSULTANT-IOTB – Aug 10, 2016 Department of Environmental Protection $15,980.25 DESIGN-CONSULTANT-IOTB – Aug 1, 2016 Department of Environmental Protection $15,483.00 DESIGN-CONSULTANT-IOTB – May 1, 2017 Department of Environmental Protection $6,398.39 DESIGN-CONSULTANT-IOTB – Sep 6, 2016 Department of Environmental Protection $5,425.99 DESIGN-CONSULTANT-IOTB – Sep 19, 2016 Department of Environmental Protection $3,330.79 DESIGN-CONSULTANT-IOTB – Oct 26, 2016 Department of Environmental Protection $211.93 DESIGN-CONSULTANT-IOTB –
FY 2016 top 13 of 13 payments $13,111,520 Date Agency Amount Category Purchase order Aug 21, 2015 Department of Environmental Protection $3,015,906.31 DESIGN-CONSULTANT-IOTB – Sep 15, 2015 Department of Environmental Protection $1,514,362.16 DESIGN-CONSULTANT-IOTB – Nov 9, 2015 Department of Environmental Protection $1,503,426.58 DESIGN-CONSULTANT-IOTB – Oct 26, 2015 Department of Environmental Protection $1,422,549.63 DESIGN-CONSULTANT-IOTB – Nov 27, 2015 Department of Environmental Protection $1,379,634.97 DESIGN-CONSULTANT-IOTB – Jan 14, 2016 Department of Environmental Protection $1,377,409.68 DESIGN-CONSULTANT-IOTB – Feb 29, 2016 Department of Environmental Protection $1,366,492.35 DESIGN-CONSULTANT-IOTB – Mar 15, 2016 Department of Environmental Protection $1,314,819.91 DESIGN-CONSULTANT-IOTB – Apr 11, 2016 Department of Environmental Protection $97,597.59 DESIGN-CONSULTANT-IOTB – Aug 21, 2015 Department of Environmental Protection $50,600.40 DESIGN-CONSULTANT-IOTB – Jul 2, 2015 Department of Environmental Protection $36,660.53 DESIGN-CONSULTANT-IOTB – May 16, 2016 Department of Environmental Protection $25,931.60 DESIGN-CONSULTANT-IOTB – Jul 30, 2015 Department of Environmental Protection $6,128.46 DESIGN-CONSULTANT-IOTB –
FY 2015 top 14 of 14 payments $19,556,249 Date Agency Amount Category Purchase order Oct 6, 2014 Department of Environmental Protection $5,268,362.42 DESIGN-CONSULTANT-IOTB – Nov 5, 2014 Department of Environmental Protection $2,892,866.38 DESIGN-CONSULTANT-IOTB – Jun 4, 2015 Department of Environmental Protection $1,573,904.32 DESIGN-CONSULTANT-IOTB – Jan 9, 2015 Department of Environmental Protection $1,568,736.02 DESIGN-CONSULTANT-IOTB – Nov 21, 2014 Department of Environmental Protection $1,517,261.31 DESIGN-CONSULTANT-IOTB – Apr 17, 2015 Department of Environmental Protection $1,405,743.72 DESIGN-CONSULTANT-IOTB – May 1, 2015 Department of Environmental Protection $1,338,265.87 DESIGN-CONSULTANT-IOTB – Dec 16, 2014 Department of Environmental Protection $1,330,850.95 DESIGN-CONSULTANT-IOTB – Feb 23, 2015 Department of Environmental Protection $1,309,374.94 DESIGN-CONSULTANT-IOTB – Feb 2, 2015 Department of Environmental Protection $1,243,037.39 DESIGN-CONSULTANT-IOTB – Feb 2, 2015 Department of Environmental Protection $58,003.21 DESIGN-CONSULTANT-IOTB – Aug 11, 2014 Department of Environmental Protection $28,684.62 DESIGN-CONSULTANT-IOTB – Feb 2, 2015 Department of Environmental Protection $12,212.56 DESIGN-CONSULTANT-IOTB – Aug 25, 2014 Department of Environmental Protection $8,945.52 DESIGN-CONSULTANT-IOTB –
FY 2014 top 12 of 12 payments $15,628,747 Date Agency Amount Category Purchase order Sep 18, 2013 Department of Environmental Protection $1,680,342.24 DESIGN-CONSULTANT-IOTB – Aug 14, 2013 Department of Environmental Protection $1,670,986.30 DESIGN-CONSULTANT-IOTB – Jul 8, 2013 Department of Environmental Protection $1,660,029.36 DESIGN-CONSULTANT-IOTB – Jan 13, 2014 Department of Environmental Protection $1,505,058.01 DESIGN-CONSULTANT-IOTB – Apr 25, 2014 Department of Environmental Protection $1,479,209.96 DESIGN-CONSULTANT-IOTB – Feb 28, 2014 Department of Environmental Protection $1,464,293.04 DESIGN-CONSULTANT-IOTB – Jan 30, 2014 Department of Environmental Protection $1,447,114.26 DESIGN-CONSULTANT-IOTB – Mar 31, 2014 Department of Environmental Protection $1,428,465.54 DESIGN-CONSULTANT-IOTB – Dec 5, 2013 Department of Environmental Protection $1,410,720.95 DESIGN-CONSULTANT-IOTB – Oct 31, 2013 Department of Environmental Protection $1,342,582.67 DESIGN-CONSULTANT-IOTB – May 27, 2014 Department of Environmental Protection $503,072.44 DESIGN-CONSULTANT-IOTB – Jun 23, 2014 Department of Environmental Protection $36,871.95 DESIGN-CONSULTANT-IOTB –
FY 2013 top 16 of 16 payments $21,372,056 Date Agency Amount Category Purchase order Jul 5, 2012 Department of Environmental Protection $1,987,602.22 DESIGN-CONSULTANT-IOTB – Jan 4, 2013 Department of Environmental Protection $1,926,296.06 DESIGN-CONSULTANT-IOTB – Jun 3, 2013 Department of Environmental Protection $1,859,771.97 DESIGN-CONSULTANT-IOTB – Oct 22, 2012 Department of Environmental Protection $1,854,180.11 DESIGN-CONSULTANT-IOTB – Sep 12, 2012 Department of Environmental Protection $1,829,946.48 DESIGN-CONSULTANT-IOTB – Feb 6, 2013 Department of Environmental Protection $1,797,806.30 DESIGN-CONSULTANT-IOTB – Nov 13, 2012 Department of Environmental Protection $1,770,220.33 DESIGN-CONSULTANT-IOTB – Mar 27, 2013 Department of Environmental Protection $1,739,360.05 DESIGN-CONSULTANT-IOTB – May 13, 2013 Department of Environmental Protection $1,633,562.53 DESIGN-CONSULTANT-IOTB – Apr 9, 2013 Department of Environmental Protection $1,594,121.12 DESIGN-CONSULTANT-IOTB – Mar 4, 2013 Department of Environmental Protection $1,592,231.09 DESIGN-CONSULTANT-IOTB – Aug 16, 2012 Department of Environmental Protection $1,119,666.09 DESIGN-CONSULTANT-IOTB – Aug 16, 2012 Department of Environmental Protection $354,952.00 DESIGN-CONSULTANT-IOTB – Aug 16, 2012 Department of Environmental Protection $185,792.56 DESIGN-CONSULTANT-IOTB – Aug 16, 2012 Department of Environmental Protection $88,126.80 DESIGN-CONSULTANT-IOTB – Aug 16, 2012 Department of Environmental Protection $38,420.52 DESIGN-CONSULTANT-IOTB –
FY 2012 top 12 of 12 payments $24,903,762 Date Agency Amount Category Purchase order Nov 15, 2011 Department of Environmental Protection $2,374,989.60 DESIGN-CONSULTANT-IOTB – Aug 15, 2011 Department of Environmental Protection $2,262,257.30 DESIGN-CONSULTANT-IOTB – Jul 27, 2011 Department of Environmental Protection $2,261,303.28 DESIGN-CONSULTANT-IOTB – Sep 12, 2011 Department of Environmental Protection $2,140,563.43 DESIGN-CONSULTANT-IOTB – Jan 17, 2012 Department of Environmental Protection $2,123,913.64 DESIGN-CONSULTANT-IOTB – Dec 5, 2011 Department of Environmental Protection $2,090,129.23 DESIGN-CONSULTANT-IOTB – Feb 22, 2012 Department of Environmental Protection $2,050,603.15 DESIGN-CONSULTANT-IOTB – Oct 20, 2011 Department of Environmental Protection $2,043,065.39 DESIGN-CONSULTANT-IOTB – May 7, 2012 Department of Environmental Protection $2,039,253.10 DESIGN-CONSULTANT-IOTB – Apr 6, 2012 Department of Environmental Protection $1,902,311.76 DESIGN-CONSULTANT-IOTB – May 23, 2012 Department of Environmental Protection $1,873,874.10 DESIGN-CONSULTANT-IOTB – Jun 14, 2012 Department of Environmental Protection $1,741,497.92 DESIGN-CONSULTANT-IOTB –
FY 2011 top 12 of 12 payments $22,522,953 Date Agency Amount Category Purchase order Jan 27, 2011 Department of Environmental Protection $2,273,544.75 DESIGN-CONSULTANT-IOTB – Jul 26, 2010 Department of Environmental Protection $2,195,856.15 DESIGN-CONSULTANT-IOTB – Jun 16, 2011 Department of Environmental Protection $2,165,462.87 DESIGN-CONSULTANT-IOTB – Nov 8, 2010 Department of Environmental Protection $2,121,347.05 DESIGN-CONSULTANT-IOTB – Apr 13, 2011 Department of Environmental Protection $2,059,935.98 DESIGN-CONSULTANT-IOTB – Dec 15, 2010 Department of Environmental Protection $2,021,384.39 DESIGN-CONSULTANT-IOTB – Oct 7, 2010 Department of Environmental Protection $1,974,787.15 DESIGN-CONSULTANT-IOTB – Jan 19, 2011 Department of Environmental Protection $1,938,537.29 DESIGN-CONSULTANT-IOTB – Mar 14, 2011 Department of Environmental Protection $1,883,336.05 DESIGN-CONSULTANT-IOTB – Sep 9, 2010 Department of Environmental Protection $1,838,343.07 DESIGN-CONSULTANT-IOTB – May 31, 2011 Department of Environmental Protection $1,179,628.90 DESIGN-CONSULTANT-IOTB – May 31, 2011 Department of Environmental Protection $870,789.15 DESIGN-CONSULTANT-IOTB –
FY 2010 top 8 of 8 payments $11,504,320 Date Agency Amount Category Purchase order Jun 21, 2010 Department of Environmental Protection $1,975,454.28 DESIGN-CONSULTANT-IOTB – Apr 23, 2010 Department of Environmental Protection $1,793,326.93 DESIGN-CONSULTANT-IOTB – Jan 29, 2010 Department of Environmental Protection $1,750,010.18 DESIGN-CONSULTANT-IOTB – Apr 14, 2010 Department of Environmental Protection $1,529,441.27 DESIGN-CONSULTANT-IOTB – May 26, 2010 Department of Environmental Protection $1,518,609.15 DESIGN-CONSULTANT-IOTB – Jan 8, 2010 Department of Environmental Protection $1,474,052.27 DESIGN-CONSULTANT-IOTB – Mar 11, 2010 Department of Environmental Protection $1,462,900.76 DESIGN-CONSULTANT-IOTB – Jan 29, 2010 Department of Environmental Protection $525.00 PROMPT PAYMENT INTEREST –
Recent payments Date Agency Amount Category Method Oct 19, 2022 Department of Environmental Protection $12,693.17 IOTB CONSTRUCTION Capital Contracts May 24, 2021 Department of Environmental Protection $108,958.16 CONTRACTUAL SERVICES GENERAL Contracts Jan 19, 2021 Department of Environmental Protection $39,145.28 IOTB CONSTRUCTION Capital Contracts Dec 29, 2020 Department of Environmental Protection $90,561.35 IOTB CONSTRUCTION Capital Contracts Dec 2, 2020 Department of Environmental Protection $114,153.05 IOTB CONSTRUCTION Capital Contracts Nov 9, 2020 Department of Environmental Protection $94,085.01 IOTB CONSTRUCTION Capital Contracts Oct 20, 2020 Department of Environmental Protection $100,010.25 IOTB CONSTRUCTION Capital Contracts Oct 13, 2020 Department of Environmental Protection $91,678.72 IOTB CONSTRUCTION Capital Contracts Sep 15, 2020 Department of Environmental Protection $92,058.60 IOTB CONSTRUCTION Capital Contracts Jul 22, 2020 Department of Environmental Protection $110,896.50 IOTB CONSTRUCTION Capital Contracts Jul 20, 2020 Department of Environmental Protection $129,223.48 IOTB CONSTRUCTION Capital Contracts Apr 23, 2020 Department of Environmental Protection $139,486.04 IOTB CONSTRUCTION Capital Contracts Mar 10, 2020 Department of Environmental Protection $156,360.22 IOTB CONSTRUCTION Capital Contracts Feb 18, 2020 Department of Environmental Protection $169,455.95 IOTB CONSTRUCTION Capital Contracts Jan 31, 2020 Department of Environmental Protection $74,112.39 IOTB CONSTRUCTION Capital Contracts Jan 31, 2020 Department of Environmental Protection $80,306.09 IOTB CONSTRUCTION Capital Contracts Dec 13, 2019 Department of Environmental Protection $185,208.55 IOTB CONSTRUCTION Capital Contracts Nov 13, 2019 Department of Environmental Protection $1,257,804.99 IOTB CONSTRUCTION Capital Contracts Oct 23, 2019 Department of Environmental Protection $25,545.71 IOTB CONSTRUCTION Capital Contracts Sep 26, 2019 Department of Environmental Protection $31,566.82 IOTB CONSTRUCTION Capital Contracts Sep 5, 2019 Department of Environmental Protection $40,365.78 IOTB CONSTRUCTION Capital Contracts Sep 3, 2019 Department of Environmental Protection $31,877.78 IOTB CONSTRUCTION Capital Contracts Jul 30, 2019 Department of Environmental Protection $119,247.01 CONTRACTUAL SERVICES GENERAL Contracts Jun 3, 2019 Department of Environmental Protection $32,466.35 IOTB CONSTRUCTION Capital Contracts May 10, 2019 Department of Environmental Protection $75,079.90 IOTB CONSTRUCTION Capital Contracts
Other vendors serving Department of Environmental Protection Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292 New York City Economic Development Corporation $727,117,935 Cac Industries Inc $720,373,938 Sew Construction - JV $687,835,200 WDF Inc $617,437,825 Maspeth Supply Co LLC $515,469,345 Jett Industries Inc $475,916,558 John Picone Inc $459,591,951 Hazen & Sawyer $455,192,970 New York Power Authority $434,611,466 Verified Data refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data