Tarasis Electric Corp: New York City Government Payments

as recorded by New York City: TARASIS ELECTRIC CORP

Tarasis Electric Corp is the 1,019th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 147th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span.

Primary spending category: CONSTRUCTION-BUILDINGS

$55,433,043total received
550payments
1agency
Feb 4, 2010Mar 24, 2023first / last payment
Follow this vendorGet an email when New York City publishes new payments to Tarasis Electric Corp. No spam.

Payments by fiscal year

FY 2023$218,334
FY 2022$1,104,646
FY 2021$1,084,694
FY 2020$2,032,335
FY 2019$3,766,362
FY 2018$1,508,461
FY 2017$7,116,978
FY 2016$7,327,817
FY 2015$9,491,917
FY 2014$6,498,001
FY 2013$2,336,940
FY 2012$4,988,237
FY 2011$4,493,555
FY 2010$3,464,767

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2023School Construction Authority8$218,334
FY 2022School Construction Authority26$1,104,646
FY 2021School Construction Authority15$1,084,694
FY 2020School Construction Authority25$2,032,335
FY 2019School Construction Authority34$3,766,362
FY 2018School Construction Authority17$1,508,461
FY 2017School Construction Authority37$7,116,978
FY 2016School Construction Authority50$7,327,817
FY 2015School Construction Authority48$9,491,917
FY 2014School Construction Authority39$6,498,001
FY 2013School Construction Authority30$2,336,940
FY 2012School Construction Authority133$4,988,237
FY 2011School Construction Authority68$4,493,555
FY 2010School Construction Authority20$3,464,767
Total550$55,433,043

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS550$55,433,043Feb 4, 2010 Mar 24, 2023

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2023top 8 of 8 payments$218,334
DateAgencyAmountCategoryPurchase order
Oct 11, 2022School Construction Authority$68,609.00CONSTRUCTION-BUILDINGS
Mar 24, 2023School Construction Authority$53,091.93CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$33,055.38CONSTRUCTION-BUILDINGS
Jul 6, 2022School Construction Authority$23,498.25CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$16,312.00CONSTRUCTION-BUILDINGS
Mar 24, 2023School Construction Authority$11,865.39CONSTRUCTION-BUILDINGS
Mar 24, 2023School Construction Authority$6,124.41CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$5,777.28CONSTRUCTION-BUILDINGS
FY 2022top 20 of 26 payments$1,104,646
DateAgencyAmountCategoryPurchase order
Jul 19, 2021School Construction Authority$217,208.00CONSTRUCTION-BUILDINGS
Jul 20, 2021School Construction Authority$137,968.60CONSTRUCTION-BUILDINGS
Oct 22, 2021School Construction Authority$126,807.36CONSTRUCTION-BUILDINGS
Jul 12, 2021School Construction Authority$106,204.56CONSTRUCTION-BUILDINGS
Nov 1, 2021School Construction Authority$81,576.50CONSTRUCTION-BUILDINGS
Jul 6, 2021School Construction Authority$54,020.94CONSTRUCTION-BUILDINGS
Jan 25, 2022School Construction Authority$52,663.25CONSTRUCTION-BUILDINGS
Oct 25, 2021School Construction Authority$49,314.50CONSTRUCTION-BUILDINGS
Jun 9, 2022School Construction Authority$40,249.60CONSTRUCTION-BUILDINGS
Jan 24, 2022School Construction Authority$38,145.78CONSTRUCTION-BUILDINGS
Jul 20, 2021School Construction Authority$33,487.22CONSTRUCTION-BUILDINGS
Jul 6, 2021School Construction Authority$30,996.37CONSTRUCTION-BUILDINGS
Apr 11, 2022School Construction Authority$28,420.00CONSTRUCTION-BUILDINGS
Nov 26, 2021School Construction Authority$25,463.41CONSTRUCTION-BUILDINGS
Jul 6, 2021School Construction Authority$16,294.22CONSTRUCTION-BUILDINGS
Mar 10, 2022School Construction Authority$15,115.39CONSTRUCTION-BUILDINGS
Feb 8, 2022School Construction Authority$12,685.01CONSTRUCTION-BUILDINGS
Apr 7, 2022School Construction Authority$11,382.50CONSTRUCTION-BUILDINGS
Oct 25, 2021School Construction Authority$8,388.50CONSTRUCTION-BUILDINGS
Feb 8, 2022School Construction Authority$3,904.34CONSTRUCTION-BUILDINGS
FY 2021top 15 of 15 payments$1,084,694
DateAgencyAmountCategoryPurchase order
Jun 14, 2021School Construction Authority$214,529.17CONSTRUCTION-BUILDINGS
May 19, 2021School Construction Authority$204,222.09CONSTRUCTION-BUILDINGS
Nov 19, 2020School Construction Authority$152,091.04CONSTRUCTION-BUILDINGS
Mar 26, 2021School Construction Authority$134,478.49CONSTRUCTION-BUILDINGS
Dec 22, 2020School Construction Authority$109,621.52CONSTRUCTION-BUILDINGS
Oct 23, 2020School Construction Authority$91,247.50CONSTRUCTION-BUILDINGS
Jan 22, 2021School Construction Authority$53,361.50CONSTRUCTION-BUILDINGS
Aug 26, 2020School Construction Authority$34,592.99CONSTRUCTION-BUILDINGS
Aug 26, 2020School Construction Authority$23,207.10CONSTRUCTION-BUILDINGS
May 19, 2021School Construction Authority$20,016.91CONSTRUCTION-BUILDINGS
Oct 23, 2020School Construction Authority$17,254.05CONSTRUCTION-BUILDINGS
Dec 22, 2020School Construction Authority$15,216.76CONSTRUCTION-BUILDINGS
May 19, 2021School Construction Authority$13,770.22CONSTRUCTION-BUILDINGS
Mar 26, 2021School Construction Authority$747.66CONSTRUCTION-BUILDINGS
Jan 22, 2021School Construction Authority$337.25CONSTRUCTION-BUILDINGS
FY 2020top 20 of 25 payments$2,032,335
DateAgencyAmountCategoryPurchase order
Feb 18, 2020School Construction Authority$279,775.00CONSTRUCTION-BUILDINGS
Sep 24, 2019School Construction Authority$238,996.25CONSTRUCTION-BUILDINGS
Jul 12, 2019School Construction Authority$231,284.34CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$200,521.25CONSTRUCTION-BUILDINGS
Dec 12, 2019School Construction Authority$161,566.50CONSTRUCTION-BUILDINGS
Aug 23, 2019School Construction Authority$153,401.25CONSTRUCTION-BUILDINGS
May 19, 2020School Construction Authority$145,687.25CONSTRUCTION-BUILDINGS
Mar 17, 2020School Construction Authority$106,300.00CONSTRUCTION-BUILDINGS
Nov 21, 2019School Construction Authority$94,240.00CONSTRUCTION-BUILDINGS
May 11, 2020School Construction Authority$77,269.13CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$52,209.21CONSTRUCTION-BUILDINGS
Jul 26, 2019School Construction Authority$48,063.35CONSTRUCTION-BUILDINGS
Jul 12, 2019School Construction Authority$38,095.00CONSTRUCTION-BUILDINGS
Sep 25, 2019School Construction Authority$31,340.50CONSTRUCTION-BUILDINGS
Mar 13, 2020School Construction Authority$30,974.25CONSTRUCTION-BUILDINGS
Jan 29, 2020School Construction Authority$30,476.00CONSTRUCTION-BUILDINGS
Mar 12, 2020School Construction Authority$24,795.00CONSTRUCTION-BUILDINGS
Mar 17, 2020School Construction Authority$22,615.00CONSTRUCTION-BUILDINGS
Apr 23, 2020School Construction Authority$22,524.16CONSTRUCTION-BUILDINGS
Dec 20, 2019School Construction Authority$18,947.67CONSTRUCTION-BUILDINGS
FY 2019top 20 of 34 payments$3,766,362
DateAgencyAmountCategoryPurchase order
Oct 2, 2018School Construction Authority$598,946.50CONSTRUCTION-BUILDINGS
Sep 24, 2018School Construction Authority$387,904.95CONSTRUCTION-BUILDINGS
Feb 25, 2019School Construction Authority$273,172.50CONSTRUCTION-BUILDINGS
Dec 19, 2018School Construction Authority$263,967.00CONSTRUCTION-BUILDINGS
Aug 23, 2018School Construction Authority$206,577.50CONSTRUCTION-BUILDINGS
Apr 1, 2019School Construction Authority$203,832.00CONSTRUCTION-BUILDINGS
Jan 29, 2019School Construction Authority$187,416.00CONSTRUCTION-BUILDINGS
Apr 8, 2019School Construction Authority$186,455.56CONSTRUCTION-BUILDINGS
Nov 2, 2018School Construction Authority$164,825.00CONSTRUCTION-BUILDINGS
May 20, 2019School Construction Authority$130,745.27CONSTRUCTION-BUILDINGS
Nov 21, 2018School Construction Authority$129,008.51CONSTRUCTION-BUILDINGS
Aug 15, 2018School Construction Authority$115,757.50CONSTRUCTION-BUILDINGS
Jan 11, 2019School Construction Authority$100,082.50CONSTRUCTION-BUILDINGS
Nov 8, 2018School Construction Authority$100,000.00CONSTRUCTION-BUILDINGS
Mar 4, 2019School Construction Authority$98,315.50CONSTRUCTION-BUILDINGS
Sep 27, 2018School Construction Authority$70,185.00CONSTRUCTION-BUILDINGS
Jun 4, 2019School Construction Authority$59,088.18CONSTRUCTION-BUILDINGS
Nov 15, 2018School Construction Authority$58,434.50CONSTRUCTION-BUILDINGS
Nov 21, 2018School Construction Authority$56,174.99CONSTRUCTION-BUILDINGS
Feb 4, 2019School Construction Authority$55,254.34CONSTRUCTION-BUILDINGS
FY 2018top 17 of 17 payments$1,508,461
DateAgencyAmountCategoryPurchase order
Sep 22, 2017School Construction Authority$389,318.36CONSTRUCTION-BUILDINGS
May 25, 2018School Construction Authority$256,690.00CONSTRUCTION-BUILDINGS
Jun 13, 2018School Construction Authority$204,117.00CONSTRUCTION-BUILDINGS
Feb 14, 2018School Construction Authority$124,393.00CONSTRUCTION-BUILDINGS
Oct 30, 2017School Construction Authority$116,355.62CONSTRUCTION-BUILDINGS
Feb 28, 2018School Construction Authority$73,851.60CONSTRUCTION-BUILDINGS
Jun 12, 2018School Construction Authority$62,016.00CONSTRUCTION-BUILDINGS
Dec 27, 2017School Construction Authority$60,315.44CONSTRUCTION-BUILDINGS
Dec 11, 2017School Construction Authority$40,814.85CONSTRUCTION-BUILDINGS
Feb 16, 2018School Construction Authority$39,045.79CONSTRUCTION-BUILDINGS
Dec 11, 2017School Construction Authority$35,681.24CONSTRUCTION-BUILDINGS
Jul 13, 2017School Construction Authority$29,756.83CONSTRUCTION-BUILDINGS
Dec 11, 2017School Construction Authority$25,474.06CONSTRUCTION-BUILDINGS
Feb 28, 2018School Construction Authority$24,697.35CONSTRUCTION-BUILDINGS
Feb 21, 2018School Construction Authority$13,063.27CONSTRUCTION-BUILDINGS
Feb 16, 2018School Construction Authority$11,312.28CONSTRUCTION-BUILDINGS
Feb 16, 2018School Construction Authority$1,558.00CONSTRUCTION-BUILDINGS
FY 2017top 20 of 37 payments$7,116,978
DateAgencyAmountCategoryPurchase order
Nov 1, 2016School Construction Authority$951,203.92CONSTRUCTION-BUILDINGS
Aug 2, 2016School Construction Authority$859,007.81CONSTRUCTION-BUILDINGS
Mar 8, 2017School Construction Authority$736,425.75CONSTRUCTION-BUILDINGS
Nov 9, 2016School Construction Authority$393,395.00CONSTRUCTION-BUILDINGS
Dec 22, 2016School Construction Authority$392,426.00CONSTRUCTION-BUILDINGS
Sep 23, 2016School Construction Authority$376,299.63CONSTRUCTION-BUILDINGS
May 1, 2017School Construction Authority$368,655.19CONSTRUCTION-BUILDINGS
Jan 19, 2017School Construction Authority$332,654.66CONSTRUCTION-BUILDINGS
Mar 8, 2017School Construction Authority$312,113.00CONSTRUCTION-BUILDINGS
Mar 8, 2017School Construction Authority$295,291.35CONSTRUCTION-BUILDINGS
Mar 3, 2017School Construction Authority$279,356.66CONSTRUCTION-BUILDINGS
Jun 23, 2017School Construction Authority$208,128.17CONSTRUCTION-BUILDINGS
Jul 5, 2016School Construction Authority$200,057.18CONSTRUCTION-BUILDINGS
Aug 8, 2016School Construction Authority$174,382.66CONSTRUCTION-BUILDINGS
Dec 22, 2016School Construction Authority$162,592.50CONSTRUCTION-BUILDINGS
Mar 13, 2017School Construction Authority$137,826.17CONSTRUCTION-BUILDINGS
Jan 24, 2017School Construction Authority$126,388.00CONSTRUCTION-BUILDINGS
Jan 24, 2017School Construction Authority$113,545.52CONSTRUCTION-BUILDINGS
Oct 14, 2016School Construction Authority$101,180.22CONSTRUCTION-BUILDINGS
May 3, 2017School Construction Authority$85,255.28CONSTRUCTION-BUILDINGS
FY 2016top 20 of 50 payments$7,327,817
DateAgencyAmountCategoryPurchase order
Mar 25, 2016School Construction Authority$817,184.49CONSTRUCTION-BUILDINGS
Aug 5, 2015School Construction Authority$690,127.50CONSTRUCTION-BUILDINGS
Aug 17, 2015School Construction Authority$514,503.66CONSTRUCTION-BUILDINGS
Nov 18, 2015School Construction Authority$411,856.35CONSTRUCTION-BUILDINGS
Aug 19, 2015School Construction Authority$396,152.37CONSTRUCTION-BUILDINGS
Oct 9, 2015School Construction Authority$356,708.99CONSTRUCTION-BUILDINGS
Sep 16, 2015School Construction Authority$286,188.69CONSTRUCTION-BUILDINGS
Jul 14, 2015School Construction Authority$283,701.54CONSTRUCTION-BUILDINGS
Jun 13, 2016School Construction Authority$276,071.52CONSTRUCTION-BUILDINGS
May 4, 2016School Construction Authority$274,499.27CONSTRUCTION-BUILDINGS
Sep 16, 2015School Construction Authority$260,015.00CONSTRUCTION-BUILDINGS
Jul 24, 2015School Construction Authority$252,683.09CONSTRUCTION-BUILDINGS
Jun 20, 2016School Construction Authority$248,906.27CONSTRUCTION-BUILDINGS
Nov 2, 2015School Construction Authority$218,388.47CONSTRUCTION-BUILDINGS
Jun 20, 2016School Construction Authority$180,606.87CONSTRUCTION-BUILDINGS
Nov 24, 2015School Construction Authority$175,636.00CONSTRUCTION-BUILDINGS
Jul 14, 2015School Construction Authority$160,350.50CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$145,821.00CONSTRUCTION-BUILDINGS
Jan 11, 2016School Construction Authority$141,792.00CONSTRUCTION-BUILDINGS
Aug 17, 2015School Construction Authority$116,449.67CONSTRUCTION-BUILDINGS
FY 2015top 20 of 48 payments$9,491,917
DateAgencyAmountCategoryPurchase order
Aug 5, 2014School Construction Authority$521,550.00CONSTRUCTION-BUILDINGS
May 15, 2015School Construction Authority$424,365.00CONSTRUCTION-BUILDINGS
Apr 30, 2015School Construction Authority$403,967.55CONSTRUCTION-BUILDINGS
Dec 1, 2014School Construction Authority$392,742.35CONSTRUCTION-BUILDINGS
Mar 5, 2015School Construction Authority$383,287.95CONSTRUCTION-BUILDINGS
Aug 21, 2014School Construction Authority$378,603.50CONSTRUCTION-BUILDINGS
Jul 16, 2014School Construction Authority$354,609.35CONSTRUCTION-BUILDINGS
May 1, 2015School Construction Authority$341,581.05CONSTRUCTION-BUILDINGS
Mar 3, 2015School Construction Authority$322,251.40CONSTRUCTION-BUILDINGS
Dec 9, 2014School Construction Authority$314,403.26CONSTRUCTION-BUILDINGS
Sep 10, 2014School Construction Authority$309,704.75CONSTRUCTION-BUILDINGS
Apr 29, 2015School Construction Authority$308,406.48CONSTRUCTION-BUILDINGS
Jul 16, 2014School Construction Authority$295,806.25CONSTRUCTION-BUILDINGS
Nov 26, 2014School Construction Authority$281,394.75CONSTRUCTION-BUILDINGS
Mar 3, 2015School Construction Authority$278,047.90CONSTRUCTION-BUILDINGS
Jan 15, 2015School Construction Authority$267,520.00CONSTRUCTION-BUILDINGS
Dec 1, 2014School Construction Authority$265,109.85CONSTRUCTION-BUILDINGS
Jun 23, 2015School Construction Authority$257,592.50CONSTRUCTION-BUILDINGS
Jan 15, 2015School Construction Authority$216,799.50CONSTRUCTION-BUILDINGS
Aug 1, 2014School Construction Authority$205,338.70CONSTRUCTION-BUILDINGS
FY 2014top 20 of 39 payments$6,498,001
DateAgencyAmountCategoryPurchase order
Aug 14, 2013School Construction Authority$972,296.50CONSTRUCTION-BUILDINGS
Aug 12, 2013School Construction Authority$719,530.00CONSTRUCTION-BUILDINGS
Jul 24, 2013School Construction Authority$669,731.00CONSTRUCTION-BUILDINGS
May 2, 2014School Construction Authority$665,688.75CONSTRUCTION-BUILDINGS
Mar 5, 2014School Construction Authority$599,483.25CONSTRUCTION-BUILDINGS
Apr 15, 2014School Construction Authority$488,846.25CONSTRUCTION-BUILDINGS
Jul 29, 2013School Construction Authority$483,217.50CONSTRUCTION-BUILDINGS
May 2, 2014School Construction Authority$400,709.05CONSTRUCTION-BUILDINGS
Sep 3, 2013School Construction Authority$399,475.00CONSTRUCTION-BUILDINGS
Aug 30, 2013School Construction Authority$317,300.00CONSTRUCTION-BUILDINGS
Oct 31, 2013School Construction Authority$235,248.50CONSTRUCTION-BUILDINGS
Oct 31, 2013School Construction Authority$200,877.50CONSTRUCTION-BUILDINGS
Jul 11, 2013School Construction Authority$110,088.10CONSTRUCTION-BUILDINGS
Jul 9, 2013School Construction Authority$68,723.00CONSTRUCTION-BUILDINGS
Apr 8, 2014School Construction Authority$30,344.40CONSTRUCTION-BUILDINGS
Feb 18, 2014School Construction Authority$25,202.61CONSTRUCTION-BUILDINGS
Feb 18, 2014School Construction Authority$21,964.96CONSTRUCTION-BUILDINGS
Mar 26, 2014School Construction Authority$14,810.00CONSTRUCTION-BUILDINGS
Jan 13, 2014School Construction Authority$13,722.15CONSTRUCTION-BUILDINGS
Jan 13, 2014School Construction Authority$12,043.96CONSTRUCTION-BUILDINGS
FY 2013top 20 of 30 payments$2,336,940
DateAgencyAmountCategoryPurchase order
Oct 31, 2012School Construction Authority$275,948.87CONSTRUCTION-BUILDINGS
Jan 29, 2013School Construction Authority$201,027.12CONSTRUCTION-BUILDINGS
May 20, 2013School Construction Authority$185,352.60CONSTRUCTION-BUILDINGS
Mar 28, 2013School Construction Authority$180,404.53CONSTRUCTION-BUILDINGS
Apr 16, 2013School Construction Authority$177,317.50CONSTRUCTION-BUILDINGS
Jan 18, 2013School Construction Authority$157,339.00CONSTRUCTION-BUILDINGS
Aug 27, 2012School Construction Authority$156,003.38CONSTRUCTION-BUILDINGS
Oct 9, 2012School Construction Authority$149,405.85CONSTRUCTION-BUILDINGS
Aug 27, 2012School Construction Authority$149,063.20CONSTRUCTION-BUILDINGS
Jun 18, 2013School Construction Authority$143,547.17CONSTRUCTION-BUILDINGS
Mar 4, 2013School Construction Authority$96,315.75CONSTRUCTION-BUILDINGS
Jun 18, 2013School Construction Authority$81,003.67CONSTRUCTION-BUILDINGS
May 20, 2013School Construction Authority$74,969.73CONSTRUCTION-BUILDINGS
Aug 27, 2012School Construction Authority$57,218.25CONSTRUCTION-BUILDINGS
Jul 5, 2012School Construction Authority$42,623.11CONSTRUCTION-BUILDINGS
Jun 18, 2013School Construction Authority$41,350.03CONSTRUCTION-BUILDINGS
Dec 19, 2012School Construction Authority$28,131.04CONSTRUCTION-BUILDINGS
Sep 24, 2012School Construction Authority$24,855.18CONSTRUCTION-BUILDINGS
Feb 12, 2013School Construction Authority$22,988.00CONSTRUCTION-BUILDINGS
Feb 12, 2013School Construction Authority$22,087.49CONSTRUCTION-BUILDINGS
FY 2012top 20 of 133 payments$4,988,237
DateAgencyAmountCategoryPurchase order
Feb 6, 2012School Construction Authority$694,022.50CONSTRUCTION-BUILDINGS
Sep 15, 2011School Construction Authority$530,052.50CONSTRUCTION-BUILDINGS
Mar 16, 2012School Construction Authority$450,179.35CONSTRUCTION-BUILDINGS
Jul 15, 2011School Construction Authority$414,203.42CONSTRUCTION-BUILDINGS
May 3, 2012School Construction Authority$278,552.35CONSTRUCTION-BUILDINGS
Feb 15, 2012School Construction Authority$256,982.60CONSTRUCTION-BUILDINGS
Jun 4, 2012School Construction Authority$229,466.80CONSTRUCTION-BUILDINGS
Jun 18, 2012School Construction Authority$167,200.00CONSTRUCTION-BUILDINGS
Dec 12, 2011School Construction Authority$161,606.40CONSTRUCTION-BUILDINGS
Dec 12, 2011School Construction Authority$103,590.32CONSTRUCTION-BUILDINGS
Nov 10, 2011School Construction Authority$97,294.87CONSTRUCTION-BUILDINGS
May 25, 2012School Construction Authority$74,528.61CONSTRUCTION-BUILDINGS
Jun 11, 2012School Construction Authority$69,732.00CONSTRUCTION-BUILDINGS
Jul 21, 2011School Construction Authority$67,150.00CONSTRUCTION-BUILDINGS
May 25, 2012School Construction Authority$63,776.40CONSTRUCTION-BUILDINGS
May 25, 2012School Construction Authority$62,912.37CONSTRUCTION-BUILDINGS
Dec 12, 2011School Construction Authority$61,973.43CONSTRUCTION-BUILDINGS
Jan 20, 2012School Construction Authority$61,104.00CONSTRUCTION-BUILDINGS
May 25, 2012School Construction Authority$58,230.50CONSTRUCTION-BUILDINGS
Aug 24, 2011School Construction Authority$57,116.50CONSTRUCTION-BUILDINGS
FY 2011top 20 of 68 payments$4,493,555
DateAgencyAmountCategoryPurchase order
Sep 22, 2010School Construction Authority$632,774.89CONSTRUCTION-BUILDINGS
Nov 4, 2010School Construction Authority$425,394.80CONSTRUCTION-BUILDINGS
Apr 6, 2011School Construction Authority$340,913.93CONSTRUCTION-BUILDINGS
Jun 22, 2011School Construction Authority$336,366.84CONSTRUCTION-BUILDINGS
Nov 4, 2010School Construction Authority$330,800.26CONSTRUCTION-BUILDINGS
Aug 12, 2010School Construction Authority$264,912.25CONSTRUCTION-BUILDINGS
Aug 31, 2010School Construction Authority$219,525.05CONSTRUCTION-BUILDINGS
Apr 6, 2011School Construction Authority$197,496.57CONSTRUCTION-BUILDINGS
Sep 22, 2010School Construction Authority$174,105.40CONSTRUCTION-BUILDINGS
Mar 10, 2011School Construction Authority$161,416.40CONSTRUCTION-BUILDINGS
May 24, 2011School Construction Authority$161,027.98CONSTRUCTION-BUILDINGS
Nov 29, 2010School Construction Authority$159,305.50CONSTRUCTION-BUILDINGS
Jul 20, 2010School Construction Authority$135,845.25CONSTRUCTION-BUILDINGS
Apr 6, 2011School Construction Authority$130,579.05CONSTRUCTION-BUILDINGS
Aug 31, 2010School Construction Authority$104,444.90CONSTRUCTION-BUILDINGS
Mar 7, 2011School Construction Authority$82,471.40CONSTRUCTION-BUILDINGS
Apr 6, 2011School Construction Authority$68,924.00CONSTRUCTION-BUILDINGS
Mar 7, 2011School Construction Authority$62,874.52CONSTRUCTION-BUILDINGS
Mar 7, 2011School Construction Authority$51,456.08CONSTRUCTION-BUILDINGS
Nov 29, 2010School Construction Authority$44,650.00CONSTRUCTION-BUILDINGS
FY 2010top 20 of 20 payments$3,464,767
DateAgencyAmountCategoryPurchase order
Feb 4, 2010School Construction Authority$815,860.00CONSTRUCTION-BUILDINGS
Feb 16, 2010School Construction Authority$581,789.50CONSTRUCTION-BUILDINGS
Feb 4, 2010School Construction Authority$331,393.25CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$254,291.25CONSTRUCTION-BUILDINGS
Feb 4, 2010School Construction Authority$250,847.50CONSTRUCTION-BUILDINGS
Jun 16, 2010School Construction Authority$219,058.60CONSTRUCTION-BUILDINGS
Jun 18, 2010School Construction Authority$212,863.34CONSTRUCTION-BUILDINGS
Jun 21, 2010School Construction Authority$210,345.00CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$194,607.50CONSTRUCTION-BUILDINGS
Jun 16, 2010School Construction Authority$140,590.11CONSTRUCTION-BUILDINGS
Feb 4, 2010School Construction Authority$84,320.10CONSTRUCTION-BUILDINGS
Jun 16, 2010School Construction Authority$51,161.68CONSTRUCTION-BUILDINGS
May 17, 2010School Construction Authority$48,269.50CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$24,810.02CONSTRUCTION-BUILDINGS
Jun 29, 2010School Construction Authority$17,056.66CONSTRUCTION-BUILDINGS
Jun 21, 2010School Construction Authority$16,219.15CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$4,393.75CONSTRUCTION-BUILDINGS
Jun 29, 2010School Construction Authority$3,192.50CONSTRUCTION-BUILDINGS
Jun 29, 2010School Construction Authority$1,897.67CONSTRUCTION-BUILDINGS
Jun 29, 2010School Construction Authority$1,799.65CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Mar 24, 2023School Construction Authority$11,865.39CONSTRUCTION-BUILDINGSCapital Contracts
Mar 24, 2023School Construction Authority$53,091.93CONSTRUCTION-BUILDINGSCapital Contracts
Mar 24, 2023School Construction Authority$6,124.41CONSTRUCTION-BUILDINGSCapital Contracts
Oct 26, 2022School Construction Authority$33,055.38CONSTRUCTION-BUILDINGSCapital Contracts
Oct 26, 2022School Construction Authority$16,312.00CONSTRUCTION-BUILDINGSCapital Contracts
Oct 26, 2022School Construction Authority$5,777.28CONSTRUCTION-BUILDINGSCapital Contracts
Oct 11, 2022School Construction Authority$68,609.00CONSTRUCTION-BUILDINGSCapital Contracts
Jul 6, 2022School Construction Authority$23,498.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 9, 2022School Construction Authority$40,249.60CONSTRUCTION-BUILDINGSCapital Contracts
Apr 11, 2022School Construction Authority$28,420.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 7, 2022School Construction Authority$1,015.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 7, 2022School Construction Authority$11,382.50CONSTRUCTION-BUILDINGSCapital Contracts
Mar 10, 2022School Construction Authority$3,605.90CONSTRUCTION-BUILDINGSCapital Contracts
Mar 10, 2022School Construction Authority$15,115.39CONSTRUCTION-BUILDINGSCapital Contracts
Feb 8, 2022School Construction Authority$3,858.00CONSTRUCTION-BUILDINGSCapital Contracts
Feb 8, 2022School Construction Authority$12,685.01CONSTRUCTION-BUILDINGSCapital Contracts
Feb 8, 2022School Construction Authority$2,167.44CONSTRUCTION-BUILDINGSCapital Contracts
Feb 8, 2022School Construction Authority$3,904.34CONSTRUCTION-BUILDINGSCapital Contracts
Jan 25, 2022School Construction Authority$52,663.25CONSTRUCTION-BUILDINGSCapital Contracts
Jan 24, 2022School Construction Authority$38,145.78CONSTRUCTION-BUILDINGSCapital Contracts
Jan 24, 2022School Construction Authority$3,493.17CONSTRUCTION-BUILDINGSCapital Contracts
Nov 26, 2021School Construction Authority$210.00CONSTRUCTION-BUILDINGSCapital Contracts
Nov 26, 2021School Construction Authority$25,463.41CONSTRUCTION-BUILDINGSCapital Contracts
Nov 1, 2021School Construction Authority$81,576.50CONSTRUCTION-BUILDINGSCapital Contracts
Oct 25, 2021School Construction Authority$8,388.50CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data