Ta Ahern Contractors Corp: New York City Government Payments

as recorded by New York City: TA AHERN CONTRACTORS CORP

Ta Ahern Contractors Corp is the 215th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 36th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.7% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 50.5% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$301,143,039total received
707payments
1agency
Jan 21, 2010 – May 20, 2025first / last payment
Find this supplier’s buyersCompare with other suppliers

Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.

Follow this vendorGet an email when the recorded payment summary for Ta Ahern Contractors Corp in New York City changes. Confirm by email to start. Self-service follows are free.

Payments by fiscal year

The payment history

Select a column to see the agencies behind that fiscal year.

16 fiscal years on record. The incoming flows below combine all recorded years.

Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.

Who pays this supplier?

Select a paying agency to inspect the relationship, then open its profile.

Jan 21, 2010 to May 20, 2025 · All recorded fiscal years

Showing 1 of 1 positive agencies in these records.

Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $301,143,039.48. Zero and net-negative relationships are excluded from positive flows.

The relationships at a glance

Total shown
$301,143,039.48
Payments represented
707
Paying agencies shown
1
Largest share of supplier total
100.0%

Largest displayed relationship: School Construction Authority. Select a flow to explore its details.

Jan 21, 2010 to May 20, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.

Receiving supplier

Ta Ahern Contractors Corp

$301,143,039from the agencies shown

Ta Ahern Contractors Corp
$301,143,039 from the agencies shown

  1. $301,143,039100.0% of supplier total

This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority54$6,510,368
FY 2024School Construction Authority90$13,145,198
FY 2023School Construction Authority77$18,804,089
FY 2022School Construction Authority38$2,774,726
FY 2021School Construction Authority8$471,729
FY 2020School Construction Authority12$1,654,704
FY 2019School Construction Authority17$2,884,426
FY 2018School Construction Authority19$7,991,159
FY 2017School Construction Authority65$27,361,891
FY 2016School Construction Authority66$73,668,179
FY 2015School Construction Authority31$22,229,013
FY 2014School Construction Authority14$13,044,939
FY 2013School Construction Authority23$23,860,189
FY 2012School Construction Authority60$15,327,115
FY 2011School Construction Authority90$28,416,846
FY 2010School Construction Authority43$42,998,469
Total707$301,143,039

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS707$301,143,039Jan 21, 2010 – May 20, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 54 payments$6,510,368
DateAgencyAmountCategoryPurchase order
Oct 3, 2024School Construction Authority$811,853.10CONSTRUCTION-BUILDINGS–
Aug 28, 2024School Construction Authority$752,808.50CONSTRUCTION-BUILDINGS–
Nov 14, 2024School Construction Authority$658,443.98CONSTRUCTION-BUILDINGS–
Oct 24, 2024School Construction Authority$404,662.00CONSTRUCTION-BUILDINGS–
Dec 24, 2024School Construction Authority$403,816.79CONSTRUCTION-BUILDINGS–
Jul 24, 2024School Construction Authority$403,730.97CONSTRUCTION-BUILDINGS–
Nov 29, 2024School Construction Authority$400,000.00CONSTRUCTION-BUILDINGS–
May 20, 2025School Construction Authority$391,543.09CONSTRUCTION-BUILDINGS–
Dec 11, 2024School Construction Authority$217,095.18CONSTRUCTION-BUILDINGS–
Mar 17, 2025School Construction Authority$164,283.72CONSTRUCTION-BUILDINGS–
Nov 14, 2024School Construction Authority$160,825.19CONSTRUCTION-BUILDINGS–
Jul 1, 2024School Construction Authority$132,508.29CONSTRUCTION-BUILDINGS–
Nov 6, 2024School Construction Authority$121,450.56CONSTRUCTION-BUILDINGS–
Dec 11, 2024School Construction Authority$120,006.85CONSTRUCTION-BUILDINGS–
Jul 24, 2024School Construction Authority$111,221.25CONSTRUCTION-BUILDINGS–
Apr 14, 2025School Construction Authority$100,292.07CONSTRUCTION-BUILDINGS–
Mar 17, 2025School Construction Authority$93,098.00CONSTRUCTION-BUILDINGS–
Nov 4, 2024School Construction Authority$88,034.40CONSTRUCTION-BUILDINGS–
Jul 9, 2024School Construction Authority$84,087.05CONSTRUCTION-BUILDINGS–
Mar 17, 2025School Construction Authority$83,687.21CONSTRUCTION-BUILDINGS–
FY 2024top 20 of 90 payments$13,145,198
DateAgencyAmountCategoryPurchase order
Apr 15, 2024School Construction Authority$838,839.07CONSTRUCTION-BUILDINGS–
May 7, 2024School Construction Authority$803,524.41CONSTRUCTION-BUILDINGS–
Mar 19, 2024School Construction Authority$605,530.00CONSTRUCTION-BUILDINGS–
May 7, 2024School Construction Authority$428,038.37CONSTRUCTION-BUILDINGS–
Oct 23, 2023School Construction Authority$403,170.60CONSTRUCTION-BUILDINGS–
Oct 23, 2023School Construction Authority$330,353.00CONSTRUCTION-BUILDINGS–
Apr 15, 2024School Construction Authority$326,135.00CONSTRUCTION-BUILDINGS–
Sep 21, 2023School Construction Authority$325,500.46CONSTRUCTION-BUILDINGS–
Oct 30, 2023School Construction Authority$307,852.79CONSTRUCTION-BUILDINGS–
Jul 11, 2023School Construction Authority$307,022.90CONSTRUCTION-BUILDINGS–
Jan 4, 2024School Construction Authority$302,908.31CONSTRUCTION-BUILDINGS–
Jul 21, 2023School Construction Authority$290,950.94CONSTRUCTION-BUILDINGS–
Jun 13, 2024School Construction Authority$286,641.60CONSTRUCTION-BUILDINGS–
Jul 7, 2023School Construction Authority$284,850.18CONSTRUCTION-BUILDINGS–
Jul 21, 2023School Construction Authority$284,762.50CONSTRUCTION-BUILDINGS–
Aug 22, 2023School Construction Authority$281,808.34CONSTRUCTION-BUILDINGS–
Sep 21, 2023School Construction Authority$271,759.38CONSTRUCTION-BUILDINGS–
Jan 18, 2024School Construction Authority$270,427.00CONSTRUCTION-BUILDINGS–
Jul 20, 2023School Construction Authority$243,249.54CONSTRUCTION-BUILDINGS–
Jan 2, 2024School Construction Authority$237,040.24CONSTRUCTION-BUILDINGS–
FY 2023top 20 of 77 payments$18,804,089
DateAgencyAmountCategoryPurchase order
Nov 21, 2022School Construction Authority$1,366,871.49CONSTRUCTION-BUILDINGS–
Nov 21, 2022School Construction Authority$1,085,090.00CONSTRUCTION-BUILDINGS–
Aug 5, 2022School Construction Authority$966,549.47CONSTRUCTION-BUILDINGS–
Oct 19, 2022School Construction Authority$892,569.84CONSTRUCTION-BUILDINGS–
Dec 16, 2022School Construction Authority$891,621.55CONSTRUCTION-BUILDINGS–
Aug 30, 2022School Construction Authority$860,532.90CONSTRUCTION-BUILDINGS–
Dec 16, 2022School Construction Authority$771,970.00CONSTRUCTION-BUILDINGS–
Oct 18, 2022School Construction Authority$712,118.95CONSTRUCTION-BUILDINGS–
Apr 26, 2023School Construction Authority$649,536.38CONSTRUCTION-BUILDINGS–
Jan 9, 2023School Construction Authority$641,250.00CONSTRUCTION-BUILDINGS–
Mar 3, 2023School Construction Authority$634,505.00CONSTRUCTION-BUILDINGS–
Sep 28, 2022School Construction Authority$591,850.00CONSTRUCTION-BUILDINGS–
Mar 3, 2023School Construction Authority$562,570.24CONSTRUCTION-BUILDINGS–
Dec 5, 2022School Construction Authority$519,755.63CONSTRUCTION-BUILDINGS–
May 30, 2023School Construction Authority$519,706.81CONSTRUCTION-BUILDINGS–
Nov 21, 2022School Construction Authority$500,687.53CONSTRUCTION-BUILDINGS–
Jan 9, 2023School Construction Authority$447,962.05CONSTRUCTION-BUILDINGS–
Apr 26, 2023School Construction Authority$429,969.71CONSTRUCTION-BUILDINGS–
Oct 19, 2022School Construction Authority$346,560.00CONSTRUCTION-BUILDINGS–
Apr 21, 2023School Construction Authority$311,695.00CONSTRUCTION-BUILDINGS–
FY 2022top 20 of 38 payments$2,774,726
DateAgencyAmountCategoryPurchase order
Jan 18, 2022School Construction Authority$861,920.79CONSTRUCTION-BUILDINGS–
Jul 22, 2021School Construction Authority$467,467.05CONSTRUCTION-BUILDINGS–
Jun 1, 2022School Construction Authority$314,936.81CONSTRUCTION-BUILDINGS–
Dec 16, 2021School Construction Authority$208,606.52CONSTRUCTION-BUILDINGS–
May 16, 2022School Construction Authority$150,895.50CONSTRUCTION-BUILDINGS–
Dec 28, 2021School Construction Authority$144,088.23CONSTRUCTION-BUILDINGS–
Jul 22, 2021School Construction Authority$140,224.99CONSTRUCTION-BUILDINGS–
Mar 16, 2022School Construction Authority$126,559.00CONSTRUCTION-BUILDINGS–
Oct 5, 2021School Construction Authority$124,892.54CONSTRUCTION-BUILDINGS–
Sep 23, 2021School Construction Authority$122,680.52CONSTRUCTION-BUILDINGS–
Feb 9, 2022School Construction Authority$121,152.74CONSTRUCTION-BUILDINGS–
Jun 7, 2022School Construction Authority$111,264.00CONSTRUCTION-BUILDINGS–
Jan 18, 2022School Construction Authority$83,372.06CONSTRUCTION-BUILDINGS–
Feb 10, 2022School Construction Authority$81,792.37CONSTRUCTION-BUILDINGS–
Jan 11, 2022School Construction Authority$79,073.36CONSTRUCTION-BUILDINGS–
Jan 6, 2022School Construction Authority$74,765.29CONSTRUCTION-BUILDINGS–
Jul 23, 2021School Construction Authority$63,794.87CONSTRUCTION-BUILDINGS–
Dec 16, 2021School Construction Authority$57,924.36CONSTRUCTION-BUILDINGS–
Sep 23, 2021School Construction Authority$54,466.50CONSTRUCTION-BUILDINGS–
May 16, 2022School Construction Authority$48,149.46CONSTRUCTION-BUILDINGS–
FY 2021top 8 of 8 payments$471,729
DateAgencyAmountCategoryPurchase order
Oct 26, 2020School Construction Authority$163,683.23CONSTRUCTION-BUILDINGS–
Jan 5, 2021School Construction Authority$92,725.29CONSTRUCTION-BUILDINGS–
Mar 17, 2021School Construction Authority$80,658.68CONSTRUCTION-BUILDINGS–
Apr 9, 2021School Construction Authority$50,858.13CONSTRUCTION-BUILDINGS–
Apr 9, 2021School Construction Authority$36,955.35CONSTRUCTION-BUILDINGS–
Oct 26, 2020School Construction Authority$22,023.63CONSTRUCTION-BUILDINGS–
Apr 9, 2021School Construction Authority$14,921.61CONSTRUCTION-BUILDINGS–
Mar 17, 2021School Construction Authority$9,903.00CONSTRUCTION-BUILDINGS–
FY 2020top 12 of 12 payments$1,654,704
DateAgencyAmountCategoryPurchase order
Nov 20, 2019School Construction Authority$438,092.36CONSTRUCTION-BUILDINGS–
Dec 6, 2019School Construction Authority$309,802.48CONSTRUCTION-BUILDINGS–
Dec 11, 2019School Construction Authority$206,515.32CONSTRUCTION-BUILDINGS–
Nov 20, 2019School Construction Authority$202,496.98CONSTRUCTION-BUILDINGS–
May 7, 2020School Construction Authority$177,733.24CONSTRUCTION-BUILDINGS–
Sep 27, 2019School Construction Authority$135,563.07CONSTRUCTION-BUILDINGS–
Nov 20, 2019School Construction Authority$97,909.94CONSTRUCTION-BUILDINGS–
Sep 27, 2019School Construction Authority$48,565.58CONSTRUCTION-BUILDINGS–
Jan 13, 2020School Construction Authority$10,785.00CONSTRUCTION-BUILDINGS–
Dec 13, 2019School Construction Authority$10,785.00CONSTRUCTION-BUILDINGS–
Jan 13, 2020School Construction Authority$10,785.00CONSTRUCTION-BUILDINGS–
Jan 24, 2020School Construction Authority$5,670.50CONSTRUCTION-BUILDINGS–
FY 2019top 17 of 17 payments$2,884,426
DateAgencyAmountCategoryPurchase order
Aug 1, 2018School Construction Authority$1,122,032.53CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority$568,525.31CONSTRUCTION-BUILDINGS–
Apr 22, 2019School Construction Authority$543,435.31CONSTRUCTION-BUILDINGS–
Feb 19, 2019School Construction Authority$339,256.59CONSTRUCTION-BUILDINGS–
Jun 7, 2019School Construction Authority$300,987.90CONSTRUCTION-BUILDINGS–
Apr 22, 2019School Construction Authority$158,993.26CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority$158,993.25CONSTRUCTION-BUILDINGS–
Jan 10, 2019School Construction Authority$128,909.78CONSTRUCTION-BUILDINGS–
Jan 10, 2019School Construction Authority$105,500.64CONSTRUCTION-BUILDINGS–
Jun 19, 2019School Construction Authority$86,117.85CONSTRUCTION-BUILDINGS–
Apr 22, 2019School Construction Authority$72,947.98CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority$72,947.98CONSTRUCTION-BUILDINGS–
Jan 10, 2019School Construction Authority$23,837.05CONSTRUCTION-BUILDINGS–
Jan 8, 2019School Construction Authority$2,406.77CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority-$72,947.98CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority-$158,993.25CONSTRUCTION-BUILDINGS–
Mar 25, 2019School Construction Authority-$568,525.31CONSTRUCTION-BUILDINGS–
FY 2018top 19 of 19 payments$7,991,159
DateAgencyAmountCategoryPurchase order
Sep 22, 2017School Construction Authority$1,644,797.67CONSTRUCTION-BUILDINGS–
Aug 18, 2017School Construction Authority$1,516,005.44CONSTRUCTION-BUILDINGS–
Jul 6, 2017School Construction Authority$1,131,316.50CONSTRUCTION-BUILDINGS–
Oct 4, 2017School Construction Authority$793,497.00CONSTRUCTION-BUILDINGS–
Aug 15, 2017School Construction Authority$772,675.47CONSTRUCTION-BUILDINGS–
May 3, 2018School Construction Authority$510,054.05CONSTRUCTION-BUILDINGS–
Jun 22, 2018School Construction Authority$323,698.05CONSTRUCTION-BUILDINGS–
Feb 5, 2018School Construction Authority$274,074.92CONSTRUCTION-BUILDINGS–
May 3, 2018School Construction Authority$214,016.63CONSTRUCTION-BUILDINGS–
May 10, 2018School Construction Authority$172,166.86CONSTRUCTION-BUILDINGS–
Aug 15, 2017School Construction Authority$169,340.55CONSTRUCTION-BUILDINGS–
Oct 4, 2017School Construction Authority$159,219.40CONSTRUCTION-BUILDINGS–
Oct 11, 2017School Construction Authority$109,111.10CONSTRUCTION-BUILDINGS–
Oct 4, 2017School Construction Authority$93,959.80CONSTRUCTION-BUILDINGS–
Oct 10, 2017School Construction Authority$36,690.37CONSTRUCTION-BUILDINGS–
Oct 10, 2017School Construction Authority$26,848.10CONSTRUCTION-BUILDINGS–
Mar 14, 2018School Construction Authority$25,398.48CONSTRUCTION-BUILDINGS–
Oct 10, 2017School Construction Authority$16,449.90CONSTRUCTION-BUILDINGS–
Aug 15, 2017School Construction Authority$1,839.00CONSTRUCTION-BUILDINGS–
FY 2017top 20 of 65 payments$27,361,891
DateAgencyAmountCategoryPurchase order
Aug 9, 2016School Construction Authority$3,076,682.66CONSTRUCTION-BUILDINGS–
Jul 22, 2016School Construction Authority$2,682,439.59CONSTRUCTION-BUILDINGS–
Aug 25, 2016School Construction Authority$2,278,368.75CONSTRUCTION-BUILDINGS–
Sep 12, 2016School Construction Authority$2,260,247.87CONSTRUCTION-BUILDINGS–
Jul 25, 2016School Construction Authority$2,135,780.53CONSTRUCTION-BUILDINGS–
Sep 23, 2016School Construction Authority$1,724,192.48CONSTRUCTION-BUILDINGS–
Sep 23, 2016School Construction Authority$1,634,788.50CONSTRUCTION-BUILDINGS–
Sep 8, 2016School Construction Authority$1,303,862.56CONSTRUCTION-BUILDINGS–
Oct 14, 2016School Construction Authority$945,533.88CONSTRUCTION-BUILDINGS–
Apr 21, 2017School Construction Authority$661,425.21CONSTRUCTION-BUILDINGS–
Dec 9, 2016School Construction Authority$642,166.47CONSTRUCTION-BUILDINGS–
Oct 26, 2016School Construction Authority$525,348.25CONSTRUCTION-BUILDINGS–
Nov 15, 2016School Construction Authority$493,637.67CONSTRUCTION-BUILDINGS–
Feb 24, 2017School Construction Authority$477,394.00CONSTRUCTION-BUILDINGS–
Dec 2, 2016School Construction Authority$458,474.15CONSTRUCTION-BUILDINGS–
Jan 25, 2017School Construction Authority$415,564.01CONSTRUCTION-BUILDINGS–
Oct 24, 2016School Construction Authority$342,156.99CONSTRUCTION-BUILDINGS–
Dec 2, 2016School Construction Authority$336,777.25CONSTRUCTION-BUILDINGS–
Jan 25, 2017School Construction Authority$316,973.46CONSTRUCTION-BUILDINGS–
Sep 12, 2016School Construction Authority$274,833.00CONSTRUCTION-BUILDINGS–
FY 2016top 20 of 66 payments$73,668,179
DateAgencyAmountCategoryPurchase order
Apr 28, 2016School Construction Authority$4,274,876.40CONSTRUCTION-BUILDINGS–
May 24, 2016School Construction Authority$3,189,373.15CONSTRUCTION-BUILDINGS–
Mar 3, 2016School Construction Authority$3,019,805.99CONSTRUCTION-BUILDINGS–
Feb 29, 2016School Construction Authority$2,943,001.58CONSTRUCTION-BUILDINGS–
Dec 7, 2015School Construction Authority$2,693,117.95CONSTRUCTION-BUILDINGS–
Dec 24, 2015School Construction Authority$2,659,905.05CONSTRUCTION-BUILDINGS–
Apr 21, 2016School Construction Authority$2,627,191.99CONSTRUCTION-BUILDINGS–
Oct 28, 2015School Construction Authority$2,507,835.36CONSTRUCTION-BUILDINGS–
Jun 13, 2016School Construction Authority$2,504,617.80CONSTRUCTION-BUILDINGS–
Mar 24, 2016School Construction Authority$2,432,731.83CONSTRUCTION-BUILDINGS–
Dec 21, 2015School Construction Authority$2,358,590.32CONSTRUCTION-BUILDINGS–
Jun 21, 2016School Construction Authority$2,219,287.88CONSTRUCTION-BUILDINGS–
Dec 1, 2015School Construction Authority$2,131,600.39CONSTRUCTION-BUILDINGS–
Sep 18, 2015School Construction Authority$2,123,624.92CONSTRUCTION-BUILDINGS–
Oct 21, 2015School Construction Authority$1,964,080.58CONSTRUCTION-BUILDINGS–
Jul 23, 2015School Construction Authority$1,847,202.56CONSTRUCTION-BUILDINGS–
Jul 23, 2015School Construction Authority$1,819,772.12CONSTRUCTION-BUILDINGS–
Sep 25, 2015School Construction Authority$1,815,286.60CONSTRUCTION-BUILDINGS–
Aug 12, 2015School Construction Authority$1,807,506.88CONSTRUCTION-BUILDINGS–
Jun 16, 2016School Construction Authority$1,745,129.07CONSTRUCTION-BUILDINGS–
FY 2015top 20 of 31 payments$22,229,013
DateAgencyAmountCategoryPurchase order
Mar 3, 2015School Construction Authority$1,328,527.50CONSTRUCTION-BUILDINGS–
Jan 9, 2015School Construction Authority$1,289,001.04CONSTRUCTION-BUILDINGS–
Mar 19, 2015School Construction Authority$1,285,967.50CONSTRUCTION-BUILDINGS–
Aug 28, 2014School Construction Authority$1,192,695.57CONSTRUCTION-BUILDINGS–
Apr 16, 2015School Construction Authority$1,042,298.11CONSTRUCTION-BUILDINGS–
Feb 11, 2015School Construction Authority$1,005,886.01CONSTRUCTION-BUILDINGS–
Mar 17, 2015School Construction Authority$972,162.90CONSTRUCTION-BUILDINGS–
May 15, 2015School Construction Authority$969,376.15CONSTRUCTION-BUILDINGS–
Jun 12, 2015School Construction Authority$965,769.05CONSTRUCTION-BUILDINGS–
Dec 11, 2014School Construction Authority$934,427.22CONSTRUCTION-BUILDINGS–
Nov 18, 2014School Construction Authority$879,438.70CONSTRUCTION-BUILDINGS–
Dec 16, 2014School Construction Authority$852,779.43CONSTRUCTION-BUILDINGS–
Jun 22, 2015School Construction Authority$851,276.00CONSTRUCTION-BUILDINGS–
May 15, 2015School Construction Authority$809,956.99CONSTRUCTION-BUILDINGS–
Feb 20, 2015School Construction Authority$747,036.24CONSTRUCTION-BUILDINGS–
May 15, 2015School Construction Authority$715,426.00CONSTRUCTION-BUILDINGS–
Apr 20, 2015School Construction Authority$682,337.50CONSTRUCTION-BUILDINGS–
Nov 10, 2014School Construction Authority$630,382.00CONSTRUCTION-BUILDINGS–
Mar 11, 2015School Construction Authority$629,675.01CONSTRUCTION-BUILDINGS–
Jan 15, 2015School Construction Authority$583,251.49CONSTRUCTION-BUILDINGS–
FY 2014top 14 of 14 payments$13,044,939
DateAgencyAmountCategoryPurchase order
Jul 8, 2013School Construction Authority$3,274,273.63CONSTRUCTION-BUILDINGS–
Aug 1, 2013School Construction Authority$2,804,468.31CONSTRUCTION-BUILDINGS–
Sep 6, 2013School Construction Authority$1,821,692.55CONSTRUCTION-BUILDINGS–
May 22, 2014School Construction Authority$1,585,211.10CONSTRUCTION-BUILDINGS–
Oct 2, 2013School Construction Authority$853,836.35CONSTRUCTION-BUILDINGS–
Jan 9, 2014School Construction Authority$637,087.88CONSTRUCTION-BUILDINGS–
May 28, 2014School Construction Authority$500,743.10CONSTRUCTION-BUILDINGS–
May 1, 2014School Construction Authority$422,733.79CONSTRUCTION-BUILDINGS–
Feb 6, 2014School Construction Authority$347,868.15CONSTRUCTION-BUILDINGS–
Dec 23, 2013School Construction Authority$312,294.03CONSTRUCTION-BUILDINGS–
Jun 20, 2014School Construction Authority$278,041.20CONSTRUCTION-BUILDINGS–
Sep 5, 2013School Construction Authority$115,724.96CONSTRUCTION-BUILDINGS–
Mar 24, 2014School Construction Authority$75,970.22CONSTRUCTION-BUILDINGS–
May 14, 2014School Construction Authority$14,993.92CONSTRUCTION-BUILDINGS–
FY 2013top 20 of 23 payments$23,860,189
DateAgencyAmountCategoryPurchase order
Feb 19, 2013School Construction Authority$3,267,523.58CONSTRUCTION-BUILDINGS–
May 1, 2013School Construction Authority$2,722,893.52CONSTRUCTION-BUILDINGS–
Mar 22, 2013School Construction Authority$2,192,009.91CONSTRUCTION-BUILDINGS–
Jun 4, 2013School Construction Authority$2,085,420.41CONSTRUCTION-BUILDINGS–
May 22, 2013School Construction Authority$1,950,324.65CONSTRUCTION-BUILDINGS–
Jan 7, 2013School Construction Authority$1,916,817.85CONSTRUCTION-BUILDINGS–
Dec 13, 2012School Construction Authority$1,550,547.67CONSTRUCTION-BUILDINGS–
Oct 12, 2012School Construction Authority$1,330,694.18CONSTRUCTION-BUILDINGS–
Dec 17, 2012School Construction Authority$1,285,241.34CONSTRUCTION-BUILDINGS–
Nov 28, 2012School Construction Authority$1,163,516.81CONSTRUCTION-BUILDINGS–
Nov 19, 2012School Construction Authority$899,426.56CONSTRUCTION-BUILDINGS–
Aug 21, 2012School Construction Authority$693,970.15CONSTRUCTION-BUILDINGS–
Sep 11, 2012School Construction Authority$659,376.00CONSTRUCTION-BUILDINGS–
Jul 18, 2012School Construction Authority$614,146.48CONSTRUCTION-BUILDINGS–
Jul 10, 2012School Construction Authority$446,691.06CONSTRUCTION-BUILDINGS–
Nov 16, 2012School Construction Authority$219,000.00CONSTRUCTION-BUILDINGS–
Oct 23, 2012School Construction Authority$208,859.70CONSTRUCTION-BUILDINGS–
Nov 8, 2012School Construction Authority$205,861.09CONSTRUCTION-BUILDINGS–
Jan 17, 2013School Construction Authority$199,806.35CONSTRUCTION-BUILDINGS–
May 21, 2013School Construction Authority$180,144.28CONSTRUCTION-BUILDINGS–
FY 2012top 20 of 60 payments$15,327,115
DateAgencyAmountCategoryPurchase order
Mar 15, 2012School Construction Authority$2,330,308.54CONSTRUCTION-BUILDINGS–
Jan 12, 2012School Construction Authority$2,095,543.78CONSTRUCTION-BUILDINGS–
May 10, 2012School Construction Authority$1,068,000.00CONSTRUCTION-BUILDINGS–
Apr 10, 2012School Construction Authority$938,124.05CONSTRUCTION-BUILDINGS–
Jul 12, 2011School Construction Authority$850,666.36CONSTRUCTION-BUILDINGS–
Jun 21, 2012School Construction Authority$849,218.30CONSTRUCTION-BUILDINGS–
Mar 15, 2012School Construction Authority$791,732.03CONSTRUCTION-BUILDINGS–
Jul 15, 2011School Construction Authority$779,349.15CONSTRUCTION-BUILDINGS–
Feb 17, 2012School Construction Authority$550,145.00CONSTRUCTION-BUILDINGS–
May 8, 2012School Construction Authority$476,358.50CONSTRUCTION-BUILDINGS–
Jan 13, 2012School Construction Authority$438,024.66CONSTRUCTION-BUILDINGS–
Mar 8, 2012School Construction Authority$415,435.00CONSTRUCTION-BUILDINGS–
Oct 17, 2011School Construction Authority$250,983.43CONSTRUCTION-BUILDINGS–
Jul 19, 2011School Construction Authority$229,928.55CONSTRUCTION-BUILDINGS–
Jul 15, 2011School Construction Authority$220,100.38CONSTRUCTION-BUILDINGS–
Oct 27, 2011School Construction Authority$208,499.74CONSTRUCTION-BUILDINGS–
Oct 17, 2011School Construction Authority$196,442.47CONSTRUCTION-BUILDINGS–
Jul 15, 2011School Construction Authority$176,294.73CONSTRUCTION-BUILDINGS–
May 9, 2012School Construction Authority$169,337.86CONSTRUCTION-BUILDINGS–
Jul 15, 2011School Construction Authority$167,239.34CONSTRUCTION-BUILDINGS–
FY 2011top 20 of 90 payments$28,416,846
DateAgencyAmountCategoryPurchase order
Jul 20, 2010School Construction Authority$4,109,915.70CONSTRUCTION-BUILDINGS–
Jul 14, 2010School Construction Authority$3,777,828.64CONSTRUCTION-BUILDINGS–
Aug 23, 2010School Construction Authority$3,732,406.93CONSTRUCTION-BUILDINGS–
Oct 18, 2010School Construction Authority$1,779,446.33CONSTRUCTION-BUILDINGS–
Dec 6, 2010School Construction Authority$1,358,969.82CONSTRUCTION-BUILDINGS–
Jan 10, 2011School Construction Authority$1,298,214.28CONSTRUCTION-BUILDINGS–
Oct 6, 2010School Construction Authority$970,189.30CONSTRUCTION-BUILDINGS–
Apr 1, 2011School Construction Authority$961,329.51CONSTRUCTION-BUILDINGS–
Sep 16, 2010School Construction Authority$811,161.05CONSTRUCTION-BUILDINGS–
Jan 4, 2011School Construction Authority$705,329.18CONSTRUCTION-BUILDINGS–
Apr 28, 2011School Construction Authority$512,867.55CONSTRUCTION-BUILDINGS–
Sep 28, 2010School Construction Authority$496,756.78CONSTRUCTION-BUILDINGS–
Feb 22, 2011School Construction Authority$470,637.58CONSTRUCTION-BUILDINGS–
Nov 9, 2010School Construction Authority$436,541.48CONSTRUCTION-BUILDINGS–
Apr 19, 2011School Construction Authority$416,632.02CONSTRUCTION-BUILDINGS–
Jul 7, 2010School Construction Authority$360,727.35CONSTRUCTION-BUILDINGS–
Apr 28, 2011School Construction Authority$346,922.42CONSTRUCTION-BUILDINGS–
Apr 1, 2011School Construction Authority$332,385.70CONSTRUCTION-BUILDINGS–
May 3, 2011School Construction Authority$307,028.59CONSTRUCTION-BUILDINGS–
Apr 28, 2011School Construction Authority$274,153.47CONSTRUCTION-BUILDINGS–
FY 2010top 20 of 43 payments$42,998,469
DateAgencyAmountCategoryPurchase order
May 18, 2010School Construction Authority$4,447,273.62CONSTRUCTION-BUILDINGS–
Jun 16, 2010School Construction Authority$4,368,642.50CONSTRUCTION-BUILDINGS–
Apr 6, 2010School Construction Authority$4,181,907.17CONSTRUCTION-BUILDINGS–
Mar 22, 2010School Construction Authority$3,482,449.39CONSTRUCTION-BUILDINGS–
Jun 14, 2010School Construction Authority$3,312,212.66CONSTRUCTION-BUILDINGS–
Jan 21, 2010School Construction Authority$3,243,618.25CONSTRUCTION-BUILDINGS–
Jan 22, 2010School Construction Authority$3,042,056.04CONSTRUCTION-BUILDINGS–
Feb 23, 2010School Construction Authority$3,028,719.42CONSTRUCTION-BUILDINGS–
May 13, 2010School Construction Authority$2,876,138.84CONSTRUCTION-BUILDINGS–
Apr 15, 2010School Construction Authority$2,652,970.66CONSTRUCTION-BUILDINGS–
Apr 28, 2010School Construction Authority$2,503,723.45CONSTRUCTION-BUILDINGS–
Feb 25, 2010School Construction Authority$2,479,779.54CONSTRUCTION-BUILDINGS–
May 14, 2010School Construction Authority$786,720.43CONSTRUCTION-BUILDINGS–
Mar 9, 2010School Construction Authority$559,383.66CONSTRUCTION-BUILDINGS–
Jun 25, 2010School Construction Authority$433,364.96CONSTRUCTION-BUILDINGS–
Jun 16, 2010School Construction Authority$230,539.02CONSTRUCTION-BUILDINGS–
Apr 7, 2010School Construction Authority$162,759.70CONSTRUCTION-BUILDINGS–
Jan 26, 2010School Construction Authority$142,408.39CONSTRUCTION-BUILDINGS–
Jun 16, 2010School Construction Authority$96,207.03CONSTRUCTION-BUILDINGS–
Jun 16, 2010School Construction Authority$92,262.50CONSTRUCTION-BUILDINGS–

Recent payments

DateAgencyAmountCategoryMethod
May 20, 2025School Construction Authority$391,543.09CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$28,085.82CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$40,129.39CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$4,750.11CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$25,724.02CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$43,904.24CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$100,292.07CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$164,283.72CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$93,098.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$4,632.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$83,687.21CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$55,661.77CONSTRUCTION-BUILDINGSCapital Contracts
Dec 24, 2024School Construction Authority$403,816.79CONSTRUCTION-BUILDINGSCapital Contracts
Dec 11, 2024School Construction Authority$8,360.00CONSTRUCTION-BUILDINGSCapital Contracts
Dec 11, 2024School Construction Authority$217,095.18CONSTRUCTION-BUILDINGSCapital Contracts
Dec 11, 2024School Construction Authority$120,006.85CONSTRUCTION-BUILDINGSCapital Contracts
Nov 29, 2024School Construction Authority$400,000.00CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2024School Construction Authority$2,910.45CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2024School Construction Authority$577.35CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2024School Construction Authority$334.03CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2024School Construction Authority$11,693.10CONSTRUCTION-BUILDINGSCapital Contracts
Nov 14, 2024School Construction Authority$658,443.98CONSTRUCTION-BUILDINGSCapital Contracts
Nov 14, 2024School Construction Authority$11,048.50CONSTRUCTION-BUILDINGSCapital Contracts
Nov 14, 2024School Construction Authority$160,825.19CONSTRUCTION-BUILDINGSCapital Contracts
Nov 14, 2024School Construction Authority$21,758.41CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data