Superstructures Engineering Architecture, PLLC is the 771st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 111th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 13.6% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OTHR SERV AND CHRGS-GENERAL | 13 | $99,069 | Jun 21, 2010 – Feb 7, 2020 |
| PROF SERV OTHER | 41 | $5,769,968 | Jul 13, 2017 – Jun 27, 2025 |
| CONSTRUCTION-BUILDINGS | 7,599 | $54,863,805 | Jan 22, 2010 – Jun 17, 2025 |
| MAINT & REP GENERAL | 29 | $2,635,066 | May 27, 2014 – Apr 21, 2025 |
| OTHER EXPENDITURES-GENERAL | 11 | $25,223 | Feb 26, 2013 – Jan 22, 2014 |
| CLEANING SERVICES | 3 | $235,026 | Dec 28, 2020 – Sep 13, 2021 |
| CONTRACTUAL SERVICES GENERAL | 24 | $1,674,194 | Apr 16, 2018 – Apr 21, 2025 |
| DESIGN-CONSULTANT-IOTB | 4 | $129,134 | May 15, 2017 – Mar 25, 2024 |
| DESIGN-CONSULTANT-BUILDINGS | 566 | $11,681,642 | Jan 14, 2010 – Jun 9, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 33 | $1,091,934 | Feb 15, 2011 – Mar 17, 2021 |
| OTHER EXPENDITURES-REPORTABLE | 93 | $1,084,770 | Feb 18, 2014 – Jun 7, 2022 |
| N/A | 24 | $1,027,002 | Jan 21, 2014 – Sep 27, 2019 |
| <Non-Applicable Expenditure Object> | 1 | -$175 | Apr 17, 2017 – Apr 17, 2017 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 842 payments$7,488,986
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 27, 2025 | Department of Citywide Administrative Services | $621,600.00 | PROF SERV OTHER | – |
| Aug 7, 2024 | Department of Citywide Administrative Services | $499,410.91 | PROF SERV OTHER | – |
| Jan 17, 2025 | Department of Citywide Administrative Services | $215,325.00 | PROF SERV OTHER | – |
| Jan 8, 2025 | Department of Citywide Administrative Services | $193,000.00 | PROF SERV OTHER | – |
| Jan 14, 2025 | School Construction Authority | $163,661.88 | CONSTRUCTION-BUILDINGS | – |
| Jul 3, 2024 | School Construction Authority | $145,241.23 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2025 | Health and Hospitals Corporation | $139,587.67 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 17, 2025 | Department of Citywide Administrative Services | $133,122.00 | MAINT & REP GENERAL | – |
| Jan 15, 2025 | Department of Citywide Administrative Services | $132,919.00 | PROF SERV OTHER | – |
| Jun 12, 2025 | School Construction Authority | $130,929.50 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2024 | School Construction Authority | $130,088.65 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2025 | Department of Citywide Administrative Services | $127,245.87 | PROF SERV OTHER | – |
| Jan 8, 2025 | Department of Citywide Administrative Services | $115,573.45 | PROF SERV OTHER | – |
| Jan 14, 2025 | School Construction Authority | $109,107.92 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2025 | School Construction Authority | $104,912.57 | CONSTRUCTION-BUILDINGS | – |
| Jan 14, 2025 | Health and Hospitals Corporation | $94,050.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2024 | School Construction Authority | $93,948.18 | CONSTRUCTION-BUILDINGS | – |
| Feb 14, 2025 | Department of Citywide Administrative Services | $79,555.70 | PROF SERV OTHER | – |
| Jul 3, 2024 | School Construction Authority | $65,514.78 | CONSTRUCTION-BUILDINGS | – |
| Mar 5, 2025 | School Construction Authority | $64,000.00 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 628 payments$6,595,190
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 31, 2023 | Department of Citywide Administrative Services | $426,667.25 | PROF SERV OTHER | – |
| Mar 13, 2024 | School Construction Authority | $207,478.83 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2023 | School Construction Authority | $167,539.92 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2023 | School Construction Authority | $166,779.01 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2023 | School Construction Authority | $164,465.93 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2023 | School Construction Authority | $148,403.28 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2023 | School Construction Authority | $134,031.94 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2023 | School Construction Authority | $133,423.21 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2023 | School Construction Authority | $131,572.74 | CONSTRUCTION-BUILDINGS | – |
| Sep 12, 2023 | School Construction Authority | $120,748.85 | CONSTRUCTION-BUILDINGS | – |
| Sep 12, 2023 | School Construction Authority | $117,435.22 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2023 | School Construction Authority | $116,512.17 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2023 | School Construction Authority | $115,859.02 | CONSTRUCTION-BUILDINGS | – |
| Jul 14, 2023 | School Construction Authority | $111,054.85 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2023 | School Construction Authority | $104,811.90 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2024 | Health and Hospitals Corporation | $104,500.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2023 | School Construction Authority | $102,242.05 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2023 | School Construction Authority | $98,935.52 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2024 | School Construction Authority | $92,687.22 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2024 | School Construction Authority | $81,893.48 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 405 payments$6,593,517
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 11, 2022 | Department of Citywide Administrative Services | $1,546,398.51 | PROF SERV OTHER | – |
| Mar 2, 2023 | School Construction Authority | $365,063.97 | CONSTRUCTION-BUILDINGS | – |
| Feb 15, 2023 | Department of Citywide Administrative Services | $276,268.17 | PROF SERV OTHER | – |
| Sep 30, 2022 | School Construction Authority | $143,922.23 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2023 | School Construction Authority | $124,716.54 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2022 | Department of Citywide Administrative Services | $124,650.00 | PROF SERV OTHER | – |
| Apr 17, 2023 | School Construction Authority | $121,697.40 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2022 | Health and Hospitals Corporation | $108,000.00 | CONSTRUCTION-BUILDINGS | – |
| May 1, 2023 | Health and Hospitals Corporation | $104,500.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 21, 2023 | School Construction Authority | $99,773.22 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2022 | School Construction Authority | $97,480.51 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2022 | School Construction Authority | $93,591.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2023 | School Construction Authority | $91,272.47 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2023 | School Construction Authority | $78,290.15 | CONSTRUCTION-BUILDINGS | – |
| May 4, 2023 | School Construction Authority | $77,983.55 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2023 | School Construction Authority | $72,366.22 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2023 | School Construction Authority | $67,100.55 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2022 | School Construction Authority | $66,394.97 | CONSTRUCTION-BUILDINGS | – |
| Sep 30, 2022 | School Construction Authority | $66,394.97 | CONSTRUCTION-BUILDINGS | – |
| Mar 13, 2023 | Health and Hospitals Corporation | $55,877.94 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 453 payments$5,917,802
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 31, 2021 | Department of Citywide Administrative Services | $1,042,750.00 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 28, 2022 | Department of Citywide Administrative Services | $521,916.75 | PROF SERV OTHER | – |
| Apr 13, 2022 | School Construction Authority | $179,902.78 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2022 | School Construction Authority | $119,935.19 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2022 | School Construction Authority | $116,989.74 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2021 | Department of Citywide Administrative Services | $113,348.75 | MAINT & REP GENERAL | – |
| Jan 31, 2022 | Department of Correction | $94,460.11 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 16, 2021 | School Construction Authority | $83,784.49 | CONSTRUCTION-BUILDINGS | – |
| Feb 14, 2022 | School Construction Authority | $82,087.08 | CONSTRUCTION-BUILDINGS | – |
| Aug 2, 2021 | Health and Hospitals Corporation | $80,776.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 6, 2021 | Health and Hospitals Corporation | $73,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 24, 2022 | School Construction Authority | $72,800.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 7, 2022 | School Construction Authority | $65,669.66 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2022 | School Construction Authority | $60,937.43 | CONSTRUCTION-BUILDINGS | – |
| May 27, 2022 | School Construction Authority | $59,532.54 | CONSTRUCTION-BUILDINGS | – |
| Aug 24, 2021 | Health and Hospitals Corporation | $56,543.55 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 16, 2022 | School Construction Authority | $55,686.96 | CONSTRUCTION-BUILDINGS | – |
| Feb 14, 2022 | School Construction Authority | $53,206.63 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2021 | Health and Hospitals Corporation | $52,898.84 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2022 | School Construction Authority | $52,305.29 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 321 payments$6,028,090
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 28, 2020 | Department of Citywide Administrative Services | $1,072,285.47 | MAINT & REP GENERAL | – |
| Aug 17, 2020 | Department of Design and Construction | $796,662.86 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 4, 2020 | School Construction Authority | $306,745.57 | CONSTRUCTION-BUILDINGS | – |
| Dec 28, 2020 | Department of Citywide Administrative Services | $175,409.00 | CLEANING SERVICES | – |
| May 25, 2021 | Department of Citywide Administrative Services | $109,074.10 | MAINT & REP GENERAL | – |
| Jul 2, 2020 | Department of Correction | $100,465.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 22, 2020 | Department of Correction | $88,665.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 25, 2021 | Health and Hospitals Corporation | $80,996.25 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 1, 2021 | Health and Hospitals Corporation | $80,776.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 16, 2020 | School Construction Authority | $78,704.89 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2020 | School Construction Authority | $76,691.83 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2020 | School Construction Authority | $71,630.41 | CONSTRUCTION-BUILDINGS | – |
| Dec 28, 2020 | Department of Citywide Administrative Services | $70,888.50 | MAINT & REP GENERAL | – |
| May 20, 2021 | School Construction Authority | $69,645.32 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2021 | School Construction Authority | $67,469.57 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2020 | Department of Citywide Administrative Services | $66,732.50 | MAINT & REP GENERAL | – |
| May 20, 2021 | School Construction Authority | $65,701.97 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2021 | School Construction Authority | $64,804.35 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2020 | School Construction Authority | $60,805.83 | CONSTRUCTION-BUILDINGS | – |
| Oct 26, 2020 | Health and Hospitals Corporation | $60,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2020top 20 of 618 payments$7,241,209
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 3, 2019 | Department of Correction | $522,637.49 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 18, 2019 | Department of Citywide Administrative Services | $287,356.30 | PROF SERV OTHER | – |
| Oct 11, 2019 | School Construction Authority | $266,681.53 | CONSTRUCTION-BUILDINGS | – |
| Jul 18, 2019 | Department of Citywide Administrative Services | $249,973.00 | MAINT & REP GENERAL | – |
| Sep 3, 2019 | Department of Design and Construction | $216,051.46 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 16, 2019 | School Construction Authority | $215,448.80 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2020 | Department of Design and Construction | $177,806.71 | PROF SERV ENGINEER & ARCHITECT | – |
| Feb 19, 2020 | School Construction Authority | $165,751.31 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2019 | Health and Hospitals Corporation | $136,859.18 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 17, 2020 | School Construction Authority | $132,601.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2019 | School Construction Authority | $129,475.09 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2020 | School Construction Authority | $115,541.58 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2019 | School Construction Authority | $111,554.34 | CONSTRUCTION-BUILDINGS | – |
| Jul 23, 2019 | Department of Correction | $110,829.60 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 8, 2019 | School Construction Authority | $107,169.92 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2020 | Department of Correction | $106,110.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 30, 2019 | Department of Correction | $104,037.12 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 29, 2019 | School Construction Authority | $100,615.07 | CONSTRUCTION-BUILDINGS | – |
| Feb 3, 2020 | Health and Hospitals Corporation | $79,830.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 26, 2019 | Department of Correction | $74,081.50 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2019top 20 of 505 payments$8,726,169
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 29, 2019 | Department of Correction | $594,221.14 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 29, 2019 | Department of Correction | $573,117.34 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 17, 2018 | School Construction Authority | $381,606.49 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2018 | Department of Correction | $336,858.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 17, 2018 | School Construction Authority | $326,737.54 | CONSTRUCTION-BUILDINGS | – |
| Aug 29, 2018 | Department of Correction | $304,965.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 11, 2019 | Department of Citywide Administrative Services | $239,000.00 | PROF SERV OTHER | – |
| Nov 5, 2018 | Department of Correction | $199,507.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 25, 2018 | Department of Citywide Administrative Services | $179,000.00 | MAINT & REP GENERAL | – |
| Jan 25, 2019 | School Construction Authority | $170,670.37 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2018 | Department of Citywide Administrative Services | $123,450.72 | MAINT & REP GENERAL | – |
| Sep 10, 2018 | School Construction Authority | $122,472.16 | CONSTRUCTION-BUILDINGS | – |
| Jan 16, 2019 | Health and Hospitals Corporation | $118,944.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 7, 2019 | School Construction Authority | $114,010.56 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2019 | School Construction Authority | $110,318.94 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2018 | School Construction Authority | $105,852.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2018 | City University Construction Fund | $103,949.06 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 12, 2019 | School Construction Authority | $100,386.94 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2019 | School Construction Authority | $88,255.15 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2019 | School Construction Authority | $84,148.41 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 528 payments$4,115,970
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 14, 2018 | Department of Correction | $269,210.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 7, 2018 | School Construction Authority | $241,825.02 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2018 | School Construction Authority | $211,132.18 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2018 | School Construction Authority | $167,095.49 | CONSTRUCTION-BUILDINGS | – |
| Mar 12, 2018 | School Construction Authority | $152,438.31 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2018 | School Construction Authority | $133,676.39 | CONSTRUCTION-BUILDINGS | – |
| Aug 1, 2017 | School Construction Authority | $132,955.24 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2018 | School Construction Authority | $121,950.65 | CONSTRUCTION-BUILDINGS | – |
| Apr 25, 2018 | School Construction Authority | $112,536.95 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2018 | Department of Citywide Administrative Services | $112,500.00 | MAINT & REP GENERAL | – |
| Dec 11, 2017 | School Construction Authority | $106,364.19 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2018 | School Construction Authority | $100,796.65 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2018 | School Construction Authority | $94,119.56 | CONSTRUCTION-BUILDINGS | – |
| Apr 16, 2018 | Department of Correction | $69,424.50 | CONTRACTUAL SERVICES GENERAL | – |
| Feb 7, 2018 | School Construction Authority | $57,603.55 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2018 | School Construction Authority | $51,000.14 | CONSTRUCTION-BUILDINGS | – |
| Sep 18, 2017 | City University Construction Fund | $46,705.00 | OTHER EXPENDITURES-REPORTABLE | – |
| Feb 26, 2018 | Health and Hospitals Corporation | $42,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 16, 2017 | Health and Hospitals Corporation | $42,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 20, 2018 | Department of Correction | $38,016.00 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2017top 20 of 829 payments$3,184,768
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 23, 2016 | School Construction Authority | $203,294.48 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2016 | School Construction Authority | $143,718.36 | CONSTRUCTION-BUILDINGS | – |
| Mar 1, 2017 | Department of Correction | $118,800.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 5, 2017 | School Construction Authority | $94,119.56 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2017 | Health and Hospitals Corporation | $56,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 17, 2016 | Department of Correction | $54,948.92 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 21, 2017 | School Construction Authority | $50,823.62 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2017 | Health and Hospitals Corporation | $49,500.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 15, 2017 | School Construction Authority | $47,259.94 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2017 | Department of Correction | $47,057.50 | DESIGN-CONSULTANT-IOTB | – |
| Oct 12, 2016 | Department of Correction | $43,602.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 23, 2017 | Department of Homeless Services | $43,368.79 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 20, 2017 | Department of Correction | $32,815.28 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 1, 2017 | School Construction Authority | $32,656.32 | CONSTRUCTION-BUILDINGS | – |
| Jul 1, 2016 | Department of Correction | $32,600.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 23, 2016 | School Construction Authority | $31,125.54 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2016 | Department of Correction | $30,834.24 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 28, 2017 | Health and Hospitals Corporation | $30,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 13, 2016 | Department of Homeless Services | $30,000.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 1, 2017 | School Construction Authority | $29,000.00 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 690 payments$6,266,592
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 3, 2016 | School Construction Authority | $254,118.11 | CONSTRUCTION-BUILDINGS | – |
| Nov 16, 2015 | Department of Correction | $170,638.75 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 13, 2015 | School Construction Authority | $169,664.65 | CONSTRUCTION-BUILDINGS | – |
| Nov 20, 2015 | School Construction Authority | $147,695.66 | CONSTRUCTION-BUILDINGS | – |
| Nov 20, 2015 | School Construction Authority | $122,672.57 | CONSTRUCTION-BUILDINGS | – |
| Mar 10, 2016 | School Construction Authority | $118,156.52 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2016 | School Construction Authority | $98,138.06 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2016 | Department of Correction | $95,272.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 6, 2015 | School Construction Authority | $92,711.30 | CONSTRUCTION-BUILDINGS | – |
| Nov 6, 2015 | School Construction Authority | $89,459.20 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2015 | School Construction Authority | $89,403.69 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2015 | Department of Correction | $84,742.78 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 16, 2016 | Department of Correction | $75,560.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 18, 2016 | School Construction Authority | $75,387.52 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2016 | School Construction Authority | $71,522.95 | CONSTRUCTION-BUILDINGS | – |
| Nov 6, 2015 | School Construction Authority | $66,860.77 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2016 | School Construction Authority | $60,310.01 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2015 | School Construction Authority | $59,613.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 22, 2015 | School Construction Authority | $56,947.69 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2015 | Department of Correction | $56,736.25 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2015top 20 of 454 payments$3,087,662
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 8, 2014 | School Construction Authority | $124,495.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 12, 2014 | School Construction Authority | $120,230.39 | CONSTRUCTION-BUILDINGS | – |
| Aug 21, 2014 | Mayoralty | $115,438.05 | N/A | – |
| Nov 26, 2014 | School Construction Authority | $99,596.14 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2015 | School Construction Authority | $85,426.98 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2014 | School Construction Authority | $71,300.85 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2015 | City University Construction Fund | $59,170.80 | OTHER EXPENDITURES-REPORTABLE | – |
| Nov 26, 2014 | School Construction Authority | $57,040.68 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2014 | School Construction Authority | $51,740.85 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2014 | School Construction Authority | $46,609.55 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2014 | School Construction Authority | $45,685.69 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2015 | School Construction Authority | $45,685.68 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2014 | School Construction Authority | $44,793.83 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2015 | City University Construction Fund | $39,447.20 | OTHER EXPENDITURES-REPORTABLE | – |
| Jun 5, 2015 | School Construction Authority | $38,725.10 | CONSTRUCTION-BUILDINGS | – |
| Feb 5, 2015 | School Construction Authority | $37,328.10 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2015 | School Construction Authority | $31,228.20 | CONSTRUCTION-BUILDINGS | – |
| Nov 25, 2014 | City University Construction Fund | $28,627.60 | OTHER EXPENDITURES-REPORTABLE | – |
| Jan 6, 2015 | School Construction Authority | $28,167.73 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2015 | City University Construction Fund | $27,806.19 | OTHER EXPENDITURES-REPORTABLE | – |
FY 2014top 20 of 508 payments$4,023,090
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 7, 2013 | School Construction Authority | $321,309.57 | CONSTRUCTION-BUILDINGS | – |
| Jan 21, 2014 | Mayoralty | $297,855.23 | N/A | – |
| Apr 24, 2014 | Mayoralty | $226,746.45 | N/A | – |
| Aug 7, 2013 | School Construction Authority | $196,797.13 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2014 | School Construction Authority | $150,287.99 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2014 | School Construction Authority | $91,178.28 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2014 | Mayoralty | $85,556.25 | N/A | – |
| May 28, 2014 | School Construction Authority | $58,261.95 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2014 | School Construction Authority | $56,911.23 | CONSTRUCTION-BUILDINGS | – |
| Nov 26, 2013 | School Construction Authority | $56,888.88 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2014 | School Construction Authority | $55,992.29 | CONSTRUCTION-BUILDINGS | – |
| Nov 26, 2013 | School Construction Authority | $49,020.27 | CONSTRUCTION-BUILDINGS | – |
| Mar 19, 2014 | School Construction Authority | $47,612.54 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2013 | School Construction Authority | $46,789.39 | CONSTRUCTION-BUILDINGS | – |
| Mar 19, 2014 | School Construction Authority | $45,511.10 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2014 | School Construction Authority | $45,304.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2014 | Mayoralty | $43,800.75 | N/A | – |
| Feb 24, 2014 | School Construction Authority | $41,512.49 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2014 | School Construction Authority | $41,304.76 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2014 | School Construction Authority | $41,077.54 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 559 payments$4,739,858
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 15, 2012 | School Construction Authority | $153,524.06 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2012 | School Construction Authority | $113,779.34 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2012 | School Construction Authority | $111,857.69 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2012 | School Construction Authority | $87,568.38 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2013 | School Construction Authority | $85,562.41 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2012 | School Construction Authority | $81,625.08 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2013 | School Construction Authority | $73,968.34 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2013 | School Construction Authority | $72,388.54 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2013 | School Construction Authority | $68,449.93 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2013 | School Construction Authority | $67,858.66 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2013 | School Construction Authority | $67,612.39 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2013 | School Construction Authority | $66,821.28 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2012 | School Construction Authority | $66,400.56 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2012 | School Construction Authority | $65,981.47 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2013 | School Construction Authority | $64,101.43 | CONSTRUCTION-BUILDINGS | – |
| Feb 4, 2013 | School Construction Authority | $61,327.08 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2012 | School Construction Authority | $58,170.42 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2013 | School Construction Authority | $57,910.83 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2013 | School Construction Authority | $55,641.33 | CONSTRUCTION-BUILDINGS | – |
| Feb 4, 2013 | School Construction Authority | $54,899.01 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 397 payments$2,205,939
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 4, 2012 | School Construction Authority | $232,799.98 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2012 | School Construction Authority | $160,944.83 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2012 | School Construction Authority | $113,163.28 | CONSTRUCTION-BUILDINGS | – |
| Jan 12, 2012 | School Construction Authority | $77,599.99 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2011 | Department of Correction | $75,395.07 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $48,214.42 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2012 | School Construction Authority | $43,676.73 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2012 | School Construction Authority | $43,204.37 | CONSTRUCTION-BUILDINGS | – |
| Feb 2, 2012 | School Construction Authority | $39,617.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2012 | School Construction Authority | $38,052.40 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $34,941.38 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2011 | School Construction Authority | $31,943.64 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $31,302.39 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $31,193.88 | CONSTRUCTION-BUILDINGS | – |
| Feb 29, 2012 | Department of Correction | $29,765.51 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 30, 2012 | School Construction Authority | $25,410.14 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $23,884.29 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2012 | School Construction Authority | $23,069.65 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2012 | School Construction Authority | $21,846.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2012 | School Construction Authority | $21,742.00 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 484 payments$2,455,164
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 19, 2011 | Department of Cultural Affairs | $115,411.18 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 10, 2011 | School Construction Authority | $74,611.83 | CONSTRUCTION-BUILDINGS | – |
| Jan 20, 2011 | School Construction Authority | $66,582.85 | CONSTRUCTION-BUILDINGS | – |
| Oct 14, 2010 | School Construction Authority | $59,609.20 | CONSTRUCTION-BUILDINGS | – |
| Jan 20, 2011 | School Construction Authority | $58,085.66 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2010 | Department of Homeless Services | $57,554.05 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 15, 2010 | Department of Cultural Affairs | $55,528.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 20, 2011 | School Construction Authority | $51,124.57 | CONSTRUCTION-BUILDINGS | – |
| Jul 30, 2010 | School Construction Authority | $41,196.57 | CONSTRUCTION-BUILDINGS | – |
| Oct 20, 2010 | School Construction Authority | $40,835.22 | CONSTRUCTION-BUILDINGS | – |
| Dec 2, 2010 | School Construction Authority | $38,724.77 | CONSTRUCTION-BUILDINGS | – |
| Aug 17, 2010 | School Construction Authority | $34,719.79 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2011 | Department of Correction | $33,452.61 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 20, 2011 | School Construction Authority | $33,046.20 | CONSTRUCTION-BUILDINGS | – |
| Feb 15, 2011 | School Construction Authority | $28,922.18 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2011 | School Construction Authority | $27,790.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2010 | Fire Department | $27,501.25 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jul 30, 2010 | School Construction Authority | $27,464.38 | CONSTRUCTION-BUILDINGS | – |
| Oct 20, 2010 | School Construction Authority | $27,301.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2011 | Department of Health and Mental Hygiene | $26,933.37 | DESIGN-CONSULTANT-BUILDINGS | – |
FY 2010top 20 of 220 payments$1,646,651
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 22, 2010 | School Construction Authority | $69,315.08 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2010 | School Construction Authority | $68,848.79 | CONSTRUCTION-BUILDINGS | – |
| May 10, 2010 | School Construction Authority | $65,156.17 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2010 | School Construction Authority | $64,717.86 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2010 | School Construction Authority | $64,077.48 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2010 | School Construction Authority | $59,076.70 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2010 | School Construction Authority | $53,189.34 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2010 | School Construction Authority | $49,997.98 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2010 | Department of Homeless Services | $45,605.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 9, 2010 | School Construction Authority | $44,132.73 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2010 | School Construction Authority | $42,527.26 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2010 | School Construction Authority | $38,537.83 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2010 | School Construction Authority | $36,639.20 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2010 | School Construction Authority | $33,299.42 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2010 | Department of Homeless Services | $33,083.50 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 22, 2010 | School Construction Authority | $32,353.77 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2010 | School Construction Authority | $31,535.89 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2010 | School Construction Authority | $30,668.32 | CONSTRUCTION-BUILDINGS | – |
| May 10, 2010 | School Construction Authority | $30,412.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2010 | School Construction Authority | $24,121.74 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 27, 2025 | Department of Citywide Administrative Services | $621,600.00 | PROF SERV OTHER | Contracts |
| Jun 25, 2025 | Department of Citywide Administrative Services | $127,245.87 | PROF SERV OTHER | Contracts |
| Jun 17, 2025 | School Construction Authority | $53,013.87 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $142.89 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $58,683.39 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $3,172.14 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $130,929.50 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $1,299.29 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $83.60 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 12, 2025 | School Construction Authority | $3,123.64 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $1,718.75 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $4,764.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $3,447.61 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $1,514.30 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $3,205.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $2,793.68 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $1,889.10 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $1,978.17 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $20,880.96 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $2,294.02 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $9,923.70 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $830.81 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $2,520.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $1,103.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 11, 2025 | School Construction Authority | $11,468.59 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data