Stantec Architecture Inc: New York City Government Payments

as recorded by New York City: STANTEC ARCHITECTURE INC

Stantec Architecture Inc is the 1,264th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 185th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 13.5% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$39,367,349total received
2,101payments
2agencies
Jan 21, 2010Jun 23, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Stantec Architecture Inc. No spam.

Payments by fiscal year

FY 2025$5,389,328
FY 2024$4,748,541
FY 2023$4,227,985
FY 2022$2,544,826
FY 2021$1,486,965
FY 2020$5,402,703
FY 2019$4,219,625
FY 2018$5,165,433
FY 2017$2,045,622
FY 2016$125,665
FY 2015$235,352
FY 2014$413,896
FY 2013$1,851,413
FY 2012$712,427
FY 2011$643,463
FY 2010$154,105

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority506$4,925,217
FY 2025Department of Citywide Administrative Services1$464,111
FY 2024School Construction Authority291$3,874,634
FY 2024Department of Citywide Administrative Services3$873,907
FY 2023School Construction Authority329$2,962,612
FY 2023Department of Citywide Administrative Services2$1,265,373
FY 2022School Construction Authority214$2,525,365
FY 2022Department of Citywide Administrative Services3$19,461
FY 2021School Construction Authority60$1,100,894
FY 2021Department of Citywide Administrative Services3$386,071
FY 2020School Construction Authority279$4,208,876
FY 2020Department of Citywide Administrative Services6$1,193,827
FY 2019School Construction Authority134$2,563,185
FY 2019Department of Citywide Administrative Services9$1,656,440
FY 2018Department of Citywide Administrative Services12$3,911,793
FY 2018School Construction Authority52$1,253,640
FY 2017School Construction Authority27$1,027,972
FY 2017Department of Citywide Administrative Services11$1,017,650
FY 2016Department of Citywide Administrative Services7$125,665
FY 2015Department of Citywide Administrative Services17$235,352
FY 2014Department of Citywide Administrative Services22$413,896
FY 2013Department of Citywide Administrative Services46$1,851,413
FY 2012Department of Citywide Administrative Services29$712,427
FY 2011Department of Citywide Administrative Services30$643,463
FY 2010Department of Citywide Administrative Services8$154,105
Total2,101$39,367,349

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROF SERV OTHER1$84,827Mar 25, 2013 Mar 25, 2013
MAINT & REP GENERAL37$844,485Jan 21, 2010 Apr 9, 2018
PROF SERV ENGINEER & ARCHITECT10$702,271Jan 4, 2011 Jul 14, 2014
CONSTRUCTION-BUILDINGS1,892$24,442,395Sep 7, 2016 Jun 23, 2025
DESIGN-CONSULTANT-BUILDINGS153$13,164,581Mar 1, 2010 Dec 24, 2024
CONTRACTUAL SERVICES GENERAL7$129,140Feb 22, 2011 Oct 20, 2014
<Non-Applicable Expenditure Object>1-$350Aug 16, 2011 Aug 16, 2011

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 507 payments$5,389,328
DateAgencyAmountCategoryPurchase order
Jul 25, 2024School Construction Authority$542,321.72CONSTRUCTION-BUILDINGS
Jul 25, 2024School Construction Authority$542,321.72CONSTRUCTION-BUILDINGS
Dec 24, 2024Department of Citywide Administrative Services$464,110.67DESIGN-CONSULTANT-BUILDINGS
Apr 23, 2025School Construction Authority$343,695.10CONSTRUCTION-BUILDINGS
Mar 3, 2025School Construction Authority$237,204.23CONSTRUCTION-BUILDINGS
May 22, 2025School Construction Authority$136,439.75CONSTRUCTION-BUILDINGS
Oct 7, 2024School Construction Authority$115,968.60CONSTRUCTION-BUILDINGS
Mar 7, 2025School Construction Authority$111,149.25CONSTRUCTION-BUILDINGS
Apr 23, 2025School Construction Authority$109,407.50CONSTRUCTION-BUILDINGS
Jun 6, 2025School Construction Authority$80,715.09CONSTRUCTION-BUILDINGS
Mar 3, 2025School Construction Authority$79,068.07CONSTRUCTION-BUILDINGS
Nov 18, 2024School Construction Authority$73,533.96CONSTRUCTION-BUILDINGS
Dec 24, 2024School Construction Authority$66,534.82CONSTRUCTION-BUILDINGS
Dec 24, 2024School Construction Authority$65,170.68CONSTRUCTION-BUILDINGS
Dec 20, 2024School Construction Authority$64,267.90CONSTRUCTION-BUILDINGS
Nov 18, 2024School Construction Authority$60,257.97CONSTRUCTION-BUILDINGS
Nov 18, 2024School Construction Authority$60,257.97CONSTRUCTION-BUILDINGS
Feb 7, 2025School Construction Authority$57,155.28CONSTRUCTION-BUILDINGS
Dec 24, 2024School Construction Authority$56,542.83CONSTRUCTION-BUILDINGS
Sep 25, 2024School Construction Authority$56,055.38CONSTRUCTION-BUILDINGS
FY 2024top 20 of 294 payments$4,748,541
DateAgencyAmountCategoryPurchase order
Dec 18, 2023Department of Citywide Administrative Services$491,362.75DESIGN-CONSULTANT-BUILDINGS
Apr 5, 2024School Construction Authority$301,546.00CONSTRUCTION-BUILDINGS
Jul 21, 2023School Construction Authority$236,636.38CONSTRUCTION-BUILDINGS
Jul 21, 2023School Construction Authority$222,767.81CONSTRUCTION-BUILDINGS
Sep 5, 2023Department of Citywide Administrative Services$191,347.98DESIGN-CONSULTANT-BUILDINGS
Mar 27, 2024Department of Citywide Administrative Services$191,196.60DESIGN-CONSULTANT-BUILDINGS
Jun 12, 2024School Construction Authority$190,703.48CONSTRUCTION-BUILDINGS
Jan 26, 2024School Construction Authority$189,309.10CONSTRUCTION-BUILDINGS
Jun 12, 2024School Construction Authority$181,200.00CONSTRUCTION-BUILDINGS
Jul 21, 2023School Construction Authority$138,946.22CONSTRUCTION-BUILDINGS
Apr 2, 2024School Construction Authority$134,682.42CONSTRUCTION-BUILDINGS
Jun 12, 2024School Construction Authority$107,745.93CONSTRUCTION-BUILDINGS
Feb 15, 2024School Construction Authority$91,917.46CONSTRUCTION-BUILDINGS
Sep 26, 2023School Construction Authority$89,784.00CONSTRUCTION-BUILDINGS
Apr 2, 2024School Construction Authority$83,620.62CONSTRUCTION-BUILDINGS
Jun 12, 2024School Construction Authority$72,967.17CONSTRUCTION-BUILDINGS
Apr 5, 2024School Construction Authority$72,865.73CONSTRUCTION-BUILDINGS
Oct 3, 2023School Construction Authority$71,834.79CONSTRUCTION-BUILDINGS
Jun 5, 2024School Construction Authority$66,896.50CONSTRUCTION-BUILDINGS
Jun 10, 2024School Construction Authority$66,829.95CONSTRUCTION-BUILDINGS
FY 2023top 20 of 331 payments$4,227,985
DateAgencyAmountCategoryPurchase order
Dec 12, 2022Department of Citywide Administrative Services$852,989.26DESIGN-CONSULTANT-BUILDINGS
Sep 19, 2022School Construction Authority$448,919.00CONSTRUCTION-BUILDINGS
May 10, 2023Department of Citywide Administrative Services$412,384.21DESIGN-CONSULTANT-BUILDINGS
Sep 2, 2022School Construction Authority$224,459.00CONSTRUCTION-BUILDINGS
Apr 18, 2023School Construction Authority$166,866.41CONSTRUCTION-BUILDINGS
Aug 17, 2022School Construction Authority$147,330.28CONSTRUCTION-BUILDINGS
Oct 20, 2022School Construction Authority$145,971.83CONSTRUCTION-BUILDINGS
Apr 18, 2023School Construction Authority$130,217.01CONSTRUCTION-BUILDINGS
Apr 18, 2023School Construction Authority$99,993.17CONSTRUCTION-BUILDINGS
Jan 25, 2023School Construction Authority$89,784.00CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$69,294.78CONSTRUCTION-BUILDINGS
May 30, 2023School Construction Authority$56,700.00CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$53,912.04CONSTRUCTION-BUILDINGS
Oct 31, 2022School Construction Authority$52,764.31CONSTRUCTION-BUILDINGS
Jan 25, 2023School Construction Authority$44,892.00CONSTRUCTION-BUILDINGS
Oct 31, 2022School Construction Authority$41,014.43CONSTRUCTION-BUILDINGS
Oct 31, 2022School Construction Authority$36,492.96CONSTRUCTION-BUILDINGS
Oct 26, 2022School Construction Authority$36,331.51CONSTRUCTION-BUILDINGS
Dec 14, 2022School Construction Authority$33,714.59CONSTRUCTION-BUILDINGS
Feb 23, 2023School Construction Authority$32,125.34CONSTRUCTION-BUILDINGS
FY 2022top 20 of 217 payments$2,544,826
DateAgencyAmountCategoryPurchase order
Apr 1, 2022School Construction Authority$299,279.00CONSTRUCTION-BUILDINGS
Jun 13, 2022School Construction Authority$224,459.00CONSTRUCTION-BUILDINGS
May 10, 2022School Construction Authority$184,162.85CONSTRUCTION-BUILDINGS
Sep 3, 2021School Construction Authority$182,464.80CONSTRUCTION-BUILDINGS
Nov 10, 2021School Construction Authority$149,640.00CONSTRUCTION-BUILDINGS
Nov 10, 2021School Construction Authority$149,640.00CONSTRUCTION-BUILDINGS
Oct 14, 2021School Construction Authority$73,195.99CONSTRUCTION-BUILDINGS
Jul 19, 2021School Construction Authority$69,760.00CONSTRUCTION-BUILDINGS
Jan 12, 2022School Construction Authority$65,574.40CONSTRUCTION-BUILDINGS
Feb 17, 2022School Construction Authority$58,556.79CONSTRUCTION-BUILDINGS
Nov 24, 2021School Construction Authority$47,654.37CONSTRUCTION-BUILDINGS
Nov 24, 2021School Construction Authority$46,677.31CONSTRUCTION-BUILDINGS
May 10, 2022School Construction Authority$40,021.48CONSTRUCTION-BUILDINGS
Feb 9, 2022School Construction Authority$34,531.38CONSTRUCTION-BUILDINGS
Jul 19, 2021School Construction Authority$28,099.46CONSTRUCTION-BUILDINGS
Nov 24, 2021School Construction Authority$25,814.34CONSTRUCTION-BUILDINGS
Jun 27, 2022School Construction Authority$25,545.07CONSTRUCTION-BUILDINGS
Jul 19, 2021School Construction Authority$25,445.97CONSTRUCTION-BUILDINGS
Nov 24, 2021School Construction Authority$25,441.32CONSTRUCTION-BUILDINGS
Oct 1, 2021School Construction Authority$25,401.01CONSTRUCTION-BUILDINGS
FY 2021top 20 of 63 payments$1,486,965
DateAgencyAmountCategoryPurchase order
Jun 17, 2021Department of Citywide Administrative Services$186,350.62DESIGN-CONSULTANT-BUILDINGS
Jan 6, 2021School Construction Authority$145,405.57CONSTRUCTION-BUILDINGS
Sep 11, 2020School Construction Authority$120,993.15CONSTRUCTION-BUILDINGS
Sep 29, 2020Department of Citywide Administrative Services$99,900.00DESIGN-CONSULTANT-BUILDINGS
Jul 14, 2020Department of Citywide Administrative Services$99,820.60DESIGN-CONSULTANT-BUILDINGS
Sep 11, 2020School Construction Authority$82,854.74CONSTRUCTION-BUILDINGS
Jan 4, 2021School Construction Authority$72,872.86CONSTRUCTION-BUILDINGS
Oct 16, 2020School Construction Authority$58,747.73CONSTRUCTION-BUILDINGS
Sep 11, 2020School Construction Authority$56,615.79CONSTRUCTION-BUILDINGS
Jun 14, 2021School Construction Authority$47,284.00CONSTRUCTION-BUILDINGS
Sep 11, 2020School Construction Authority$46,506.67CONSTRUCTION-BUILDINGS
Jan 6, 2021School Construction Authority$36,000.00CONSTRUCTION-BUILDINGS
Jan 6, 2021School Construction Authority$33,876.38CONSTRUCTION-BUILDINGS
Sep 11, 2020School Construction Authority$31,511.74CONSTRUCTION-BUILDINGS
Jan 6, 2021School Construction Authority$22,280.30CONSTRUCTION-BUILDINGS
Nov 12, 2020School Construction Authority$20,415.69CONSTRUCTION-BUILDINGS
Nov 12, 2020School Construction Authority$20,408.49CONSTRUCTION-BUILDINGS
Nov 12, 2020School Construction Authority$18,698.64CONSTRUCTION-BUILDINGS
Jan 4, 2021School Construction Authority$18,224.11CONSTRUCTION-BUILDINGS
Oct 16, 2020School Construction Authority$17,721.82CONSTRUCTION-BUILDINGS
FY 2020top 20 of 285 payments$5,402,703
DateAgencyAmountCategoryPurchase order
Feb 12, 2020Department of Citywide Administrative Services$592,021.36DESIGN-CONSULTANT-BUILDINGS
Sep 17, 2019Department of Citywide Administrative Services$480,046.73DESIGN-CONSULTANT-BUILDINGS
Dec 3, 2019School Construction Authority$336,799.00CONSTRUCTION-BUILDINGS
Oct 9, 2019School Construction Authority$213,306.00CONSTRUCTION-BUILDINGS
Dec 3, 2019School Construction Authority$160,956.00CONSTRUCTION-BUILDINGS
Feb 24, 2020School Construction Authority$148,033.85CONSTRUCTION-BUILDINGS
Mar 27, 2020School Construction Authority$111,000.00CONSTRUCTION-BUILDINGS
Dec 3, 2019School Construction Authority$109,568.16CONSTRUCTION-BUILDINGS
Dec 30, 2019School Construction Authority$108,884.00CONSTRUCTION-BUILDINGS
Dec 3, 2019School Construction Authority$108,882.00CONSTRUCTION-BUILDINGS
Nov 27, 2019School Construction Authority$104,618.91CONSTRUCTION-BUILDINGS
Jun 17, 2020School Construction Authority$95,308.73CONSTRUCTION-BUILDINGS
Jun 17, 2020School Construction Authority$93,354.62CONSTRUCTION-BUILDINGS
Mar 17, 2020School Construction Authority$87,970.68CONSTRUCTION-BUILDINGS
Nov 20, 2019School Construction Authority$86,059.85CONSTRUCTION-BUILDINGS
Oct 15, 2019School Construction Authority$76,481.87CONSTRUCTION-BUILDINGS
Jun 8, 2020Department of Citywide Administrative Services$75,706.47DESIGN-CONSULTANT-BUILDINGS
Mar 12, 2020School Construction Authority$69,100.90CONSTRUCTION-BUILDINGS
Mar 27, 2020School Construction Authority$62,448.19CONSTRUCTION-BUILDINGS
Nov 27, 2019School Construction Authority$61,313.53CONSTRUCTION-BUILDINGS
FY 2019top 20 of 143 payments$4,219,625
DateAgencyAmountCategoryPurchase order
Jun 19, 2019Department of Citywide Administrative Services$1,214,450.13DESIGN-CONSULTANT-BUILDINGS
Jul 24, 2018School Construction Authority$409,592.20CONSTRUCTION-BUILDINGS
Jun 20, 2019School Construction Authority$235,684.00CONSTRUCTION-BUILDINGS
Mar 13, 2019School Construction Authority$168,400.00CONSTRUCTION-BUILDINGS
Sep 10, 2018Department of Citywide Administrative Services$154,490.86DESIGN-CONSULTANT-BUILDINGS
Jul 24, 2018School Construction Authority$153,324.31CONSTRUCTION-BUILDINGS
Jun 19, 2019Department of Citywide Administrative Services$142,214.47DESIGN-CONSULTANT-BUILDINGS
Mar 18, 2019School Construction Authority$134,720.00CONSTRUCTION-BUILDINGS
Jul 24, 2018School Construction Authority$121,445.20CONSTRUCTION-BUILDINGS
Jun 20, 2019School Construction Authority$119,413.60CONSTRUCTION-BUILDINGS
Jun 20, 2019School Construction Authority$117,842.00CONSTRUCTION-BUILDINGS
Jan 23, 2019School Construction Authority$110,445.25CONSTRUCTION-BUILDINGS
Jun 20, 2019School Construction Authority$94,274.00CONSTRUCTION-BUILDINGS
Oct 26, 2018School Construction Authority$74,324.39CONSTRUCTION-BUILDINGS
Dec 4, 2018School Construction Authority$57,448.45CONSTRUCTION-BUILDINGS
Jul 24, 2018School Construction Authority$48,250.50CONSTRUCTION-BUILDINGS
Mar 18, 2019School Construction Authority$46,806.66CONSTRUCTION-BUILDINGS
Oct 3, 2018Department of Citywide Administrative Services$43,608.78DESIGN-CONSULTANT-BUILDINGS
Jan 23, 2019School Construction Authority$40,347.54CONSTRUCTION-BUILDINGS
Feb 26, 2019Department of Citywide Administrative Services$37,828.93DESIGN-CONSULTANT-BUILDINGS
FY 2018top 20 of 64 payments$5,165,433
DateAgencyAmountCategoryPurchase order
Sep 5, 2017Department of Citywide Administrative Services$896,336.75DESIGN-CONSULTANT-BUILDINGS
Jan 29, 2018Department of Citywide Administrative Services$834,408.96DESIGN-CONSULTANT-BUILDINGS
Nov 6, 2017Department of Citywide Administrative Services$733,367.25DESIGN-CONSULTANT-BUILDINGS
Jan 8, 2018Department of Citywide Administrative Services$469,355.04DESIGN-CONSULTANT-BUILDINGS
Aug 15, 2017Department of Citywide Administrative Services$335,981.00DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2018Department of Citywide Administrative Services$260,752.80DESIGN-CONSULTANT-BUILDINGS
Nov 15, 2017School Construction Authority$182,167.80CONSTRUCTION-BUILDINGS
May 1, 2018Department of Citywide Administrative Services$156,451.69DESIGN-CONSULTANT-BUILDINGS
Nov 15, 2017School Construction Authority$121,445.20CONSTRUCTION-BUILDINGS
Apr 6, 2018School Construction Authority$121,445.20CONSTRUCTION-BUILDINGS
Apr 6, 2018School Construction Authority$114,277.50CONSTRUCTION-BUILDINGS
Jan 31, 2018Department of Citywide Administrative Services$112,226.68MAINT & REP GENERAL
Aug 21, 2017School Construction Authority$107,191.65CONSTRUCTION-BUILDINGS
Oct 11, 2017School Construction Authority$78,238.24CONSTRUCTION-BUILDINGS
May 14, 2018School Construction Authority$70,986.05CONSTRUCTION-BUILDINGS
May 18, 2018School Construction Authority$62,590.58CONSTRUCTION-BUILDINGS
Jun 22, 2018School Construction Authority$60,391.66CONSTRUCTION-BUILDINGS
May 16, 2018Department of Citywide Administrative Services$53,410.55DESIGN-CONSULTANT-BUILDINGS
Apr 9, 2018Department of Citywide Administrative Services$47,500.00MAINT & REP GENERAL
Sep 25, 2017School Construction Authority$47,145.00CONSTRUCTION-BUILDINGS
FY 2017top 20 of 38 payments$2,045,622
DateAgencyAmountCategoryPurchase order
Feb 7, 2017Department of Citywide Administrative Services$315,900.00DESIGN-CONSULTANT-BUILDINGS
Nov 25, 2016Department of Citywide Administrative Services$190,698.54MAINT & REP GENERAL
Aug 22, 2016Department of Citywide Administrative Services$145,001.68MAINT & REP GENERAL
Mar 15, 2017School Construction Authority$135,400.00CONSTRUCTION-BUILDINGS
Mar 15, 2017School Construction Authority$135,400.00CONSTRUCTION-BUILDINGS
Mar 15, 2017School Construction Authority$135,400.00CONSTRUCTION-BUILDINGS
Apr 27, 2017School Construction Authority$126,975.00CONSTRUCTION-BUILDINGS
Mar 15, 2017School Construction Authority$108,320.00CONSTRUCTION-BUILDINGS
Aug 23, 2016Department of Citywide Administrative Services$101,720.05MAINT & REP GENERAL
Oct 18, 2016Department of Citywide Administrative Services$100,755.18DESIGN-CONSULTANT-BUILDINGS
Apr 27, 2017School Construction Authority$84,650.00CONSTRUCTION-BUILDINGS
Jan 23, 2017Department of Citywide Administrative Services$84,375.00MAINT & REP GENERAL
Jul 25, 2016Department of Citywide Administrative Services$51,593.95DESIGN-CONSULTANT-BUILDINGS
Apr 27, 2017School Construction Authority$41,727.06CONSTRUCTION-BUILDINGS
Mar 15, 2017School Construction Authority$37,904.38CONSTRUCTION-BUILDINGS
Nov 28, 2016School Construction Authority$36,428.39CONSTRUCTION-BUILDINGS
Jun 9, 2017School Construction Authority$27,080.00CONSTRUCTION-BUILDINGS
Mar 15, 2017School Construction Authority$25,269.58CONSTRUCTION-BUILDINGS
Nov 9, 2016School Construction Authority$17,634.75CONSTRUCTION-BUILDINGS
Jun 8, 2017School Construction Authority$17,100.00CONSTRUCTION-BUILDINGS
FY 2016top 7 of 7 payments$125,665
DateAgencyAmountCategoryPurchase order
Aug 31, 2015Department of Citywide Administrative Services$62,654.80DESIGN-CONSULTANT-BUILDINGS
Feb 10, 2016Department of Citywide Administrative Services$23,939.37DESIGN-CONSULTANT-BUILDINGS
Nov 19, 2015Department of Citywide Administrative Services$18,444.86MAINT & REP GENERAL
Mar 21, 2016Department of Citywide Administrative Services$13,591.88DESIGN-CONSULTANT-BUILDINGS
Mar 21, 2016Department of Citywide Administrative Services$3,483.12DESIGN-CONSULTANT-BUILDINGS
Dec 28, 2015Department of Citywide Administrative Services$2,298.28MAINT & REP GENERAL
Dec 28, 2015Department of Citywide Administrative Services$1,252.86MAINT & REP GENERAL
FY 2015top 17 of 17 payments$235,352
DateAgencyAmountCategoryPurchase order
Jul 21, 2014Department of Citywide Administrative Services$80,300.00DESIGN-CONSULTANT-BUILDINGS
May 11, 2015Department of Citywide Administrative Services$38,722.97DESIGN-CONSULTANT-BUILDINGS
Jan 13, 2015Department of Citywide Administrative Services$31,092.18DESIGN-CONSULTANT-BUILDINGS
Jul 21, 2014Department of Citywide Administrative Services$22,051.86DESIGN-CONSULTANT-BUILDINGS
Oct 20, 2014Department of Citywide Administrative Services$13,039.40DESIGN-CONSULTANT-BUILDINGS
Jul 8, 2014Department of Citywide Administrative Services$10,596.53DESIGN-CONSULTANT-BUILDINGS
Oct 6, 2014Department of Citywide Administrative Services$7,126.35DESIGN-CONSULTANT-BUILDINGS
Dec 29, 2014Department of Citywide Administrative Services$4,950.00DESIGN-CONSULTANT-BUILDINGS
Jul 21, 2014Department of Citywide Administrative Services$4,897.09DESIGN-CONSULTANT-BUILDINGS
Apr 8, 2015Department of Citywide Administrative Services$4,402.63DESIGN-CONSULTANT-BUILDINGS
Oct 15, 2014Department of Citywide Administrative Services$3,378.82DESIGN-CONSULTANT-BUILDINGS
Jul 30, 2014Department of Citywide Administrative Services$3,224.94DESIGN-CONSULTANT-BUILDINGS
Dec 15, 2014Department of Citywide Administrative Services$2,876.10DESIGN-CONSULTANT-BUILDINGS
Oct 20, 2014Department of Citywide Administrative Services$2,762.98CONTRACTUAL SERVICES GENERAL
Sep 2, 2014Department of Citywide Administrative Services$2,699.39DESIGN-CONSULTANT-BUILDINGS
Apr 8, 2015Department of Citywide Administrative Services$2,303.27DESIGN-CONSULTANT-BUILDINGS
Jul 14, 2014Department of Citywide Administrative Services$927.71PROF SERV ENGINEER & ARCHITECT
FY 2014top 20 of 22 payments$413,896
DateAgencyAmountCategoryPurchase order
May 12, 2014Department of Citywide Administrative Services$60,836.78DESIGN-CONSULTANT-BUILDINGS
Jul 29, 2013Department of Citywide Administrative Services$58,718.45DESIGN-CONSULTANT-BUILDINGS
Nov 4, 2013Department of Citywide Administrative Services$52,921.00CONTRACTUAL SERVICES GENERAL
Aug 19, 2013Department of Citywide Administrative Services$50,790.84DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2014Department of Citywide Administrative Services$40,931.64DESIGN-CONSULTANT-BUILDINGS
Apr 1, 2014Department of Citywide Administrative Services$35,022.21DESIGN-CONSULTANT-BUILDINGS
Dec 18, 2013Department of Citywide Administrative Services$32,062.50DESIGN-CONSULTANT-BUILDINGS
May 6, 2014Department of Citywide Administrative Services$29,463.83DESIGN-CONSULTANT-BUILDINGS
Aug 13, 2013Department of Citywide Administrative Services$11,250.00MAINT & REP GENERAL
Mar 19, 2014Department of Citywide Administrative Services$7,920.00DESIGN-CONSULTANT-BUILDINGS
Dec 23, 2013Department of Citywide Administrative Services$7,028.83DESIGN-CONSULTANT-BUILDINGS
Oct 8, 2013Department of Citywide Administrative Services$6,115.04DESIGN-CONSULTANT-BUILDINGS
Jan 21, 2014Department of Citywide Administrative Services$5,546.53DESIGN-CONSULTANT-BUILDINGS
Nov 15, 2013Department of Citywide Administrative Services$4,017.90MAINT & REP GENERAL
May 5, 2014Department of Citywide Administrative Services$3,219.65DESIGN-CONSULTANT-BUILDINGS
Nov 12, 2013Department of Citywide Administrative Services$2,836.62DESIGN-CONSULTANT-BUILDINGS
Feb 25, 2014Department of Citywide Administrative Services$1,875.00MAINT & REP GENERAL
Nov 15, 2013Department of Citywide Administrative Services$1,607.10MAINT & REP GENERAL
Oct 23, 2013Department of Citywide Administrative Services$832.93PROF SERV ENGINEER & ARCHITECT
Oct 7, 2013Department of Citywide Administrative Services$420.00DESIGN-CONSULTANT-BUILDINGS
FY 2013top 20 of 46 payments$1,851,413
DateAgencyAmountCategoryPurchase order
Jul 11, 2012Department of Citywide Administrative Services$269,619.05PROF SERV ENGINEER & ARCHITECT
Jun 24, 2013Department of Citywide Administrative Services$151,024.95DESIGN-CONSULTANT-BUILDINGS
Apr 3, 2013Department of Citywide Administrative Services$127,866.68DESIGN-CONSULTANT-BUILDINGS
Jan 9, 2013Department of Citywide Administrative Services$111,639.33DESIGN-CONSULTANT-BUILDINGS
Apr 1, 2013Department of Citywide Administrative Services$100,993.44DESIGN-CONSULTANT-BUILDINGS
Aug 27, 2012Department of Citywide Administrative Services$100,616.25DESIGN-CONSULTANT-BUILDINGS
Jul 11, 2012Department of Citywide Administrative Services$97,001.81PROF SERV ENGINEER & ARCHITECT
Mar 25, 2013Department of Citywide Administrative Services$84,826.68PROF SERV OTHER
Oct 9, 2012Department of Citywide Administrative Services$83,973.62PROF SERV ENGINEER & ARCHITECT
Mar 4, 2013Department of Citywide Administrative Services$83,356.75PROF SERV ENGINEER & ARCHITECT
Feb 4, 2013Department of Citywide Administrative Services$61,488.80DESIGN-CONSULTANT-BUILDINGS
Apr 3, 2013Department of Citywide Administrative Services$57,379.92DESIGN-CONSULTANT-BUILDINGS
Dec 12, 2012Department of Citywide Administrative Services$55,819.67DESIGN-CONSULTANT-BUILDINGS
Mar 4, 2013Department of Citywide Administrative Services$42,750.00DESIGN-CONSULTANT-BUILDINGS
Nov 20, 2012Department of Citywide Administrative Services$39,600.00DESIGN-CONSULTANT-BUILDINGS
Sep 24, 2012Department of Citywide Administrative Services$36,868.00DESIGN-CONSULTANT-BUILDINGS
Dec 4, 2012Department of Citywide Administrative Services$36,225.00DESIGN-CONSULTANT-BUILDINGS
Oct 22, 2012Department of Citywide Administrative Services$35,200.00DESIGN-CONSULTANT-BUILDINGS
Apr 8, 2013Department of Citywide Administrative Services$31,680.00DESIGN-CONSULTANT-BUILDINGS
Apr 3, 2013Department of Citywide Administrative Services$31,594.44DESIGN-CONSULTANT-BUILDINGS
FY 2012top 20 of 29 payments$712,427
DateAgencyAmountCategoryPurchase order
Aug 8, 2011Department of Citywide Administrative Services$123,750.00DESIGN-CONSULTANT-BUILDINGS
Apr 2, 2012Department of Citywide Administrative Services$87,735.33PROF SERV ENGINEER & ARCHITECT
Mar 21, 2012Department of Citywide Administrative Services$80,682.83DESIGN-CONSULTANT-BUILDINGS
May 21, 2012Department of Citywide Administrative Services$78,750.00DESIGN-CONSULTANT-BUILDINGS
Dec 19, 2011Department of Citywide Administrative Services$77,962.50DESIGN-CONSULTANT-BUILDINGS
May 29, 2012Department of Citywide Administrative Services$56,275.02DESIGN-CONSULTANT-BUILDINGS
Jul 25, 2011Department of Citywide Administrative Services$51,030.00DESIGN-CONSULTANT-BUILDINGS
Apr 2, 2012Department of Citywide Administrative Services$38,045.42PROF SERV ENGINEER & ARCHITECT
Mar 7, 2012Department of Citywide Administrative Services$24,817.50MAINT & REP GENERAL
Dec 27, 2011Department of Citywide Administrative Services$23,360.62DESIGN-CONSULTANT-BUILDINGS
Aug 8, 2011Department of Citywide Administrative Services$23,306.65DESIGN-CONSULTANT-BUILDINGS
Dec 13, 2011Department of Citywide Administrative Services$10,211.84DESIGN-CONSULTANT-BUILDINGS
Sep 19, 2011Department of Citywide Administrative Services$6,127.00DESIGN-CONSULTANT-BUILDINGS
Nov 14, 2011Department of Citywide Administrative Services$5,673.35DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2012Department of Citywide Administrative Services$4,929.91DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2012Department of Citywide Administrative Services$4,247.94DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2012Department of Citywide Administrative Services$2,698.48DESIGN-CONSULTANT-BUILDINGS
Apr 9, 2012Department of Citywide Administrative Services$2,552.96DESIGN-CONSULTANT-BUILDINGS
Mar 19, 2012Department of Citywide Administrative Services$2,361.92DESIGN-CONSULTANT-BUILDINGS
Apr 4, 2012Department of Citywide Administrative Services$2,270.00DESIGN-CONSULTANT-BUILDINGS
FY 2011top 20 of 30 payments$643,463
DateAgencyAmountCategoryPurchase order
Jun 8, 2011Department of Citywide Administrative Services$110,000.00DESIGN-CONSULTANT-BUILDINGS
May 2, 2011Department of Citywide Administrative Services$55,000.00DESIGN-CONSULTANT-BUILDINGS
Feb 22, 2011Department of Citywide Administrative Services$46,657.76DESIGN-CONSULTANT-BUILDINGS
Sep 22, 2010Department of Citywide Administrative Services$45,440.00DESIGN-CONSULTANT-BUILDINGS
Feb 7, 2011Department of Citywide Administrative Services$44,819.30DESIGN-CONSULTANT-BUILDINGS
Oct 25, 2010Department of Citywide Administrative Services$38,997.63DESIGN-CONSULTANT-BUILDINGS
Jul 12, 2010Department of Citywide Administrative Services$38,231.47DESIGN-CONSULTANT-BUILDINGS
Jun 6, 2011Department of Citywide Administrative Services$34,720.25DESIGN-CONSULTANT-BUILDINGS
Jan 4, 2011Department of Citywide Administrative Services$29,825.91PROF SERV ENGINEER & ARCHITECT
Oct 25, 2010Department of Citywide Administrative Services$24,000.00DESIGN-CONSULTANT-BUILDINGS
Dec 6, 2010Department of Citywide Administrative Services$21,000.00DESIGN-CONSULTANT-BUILDINGS
Jul 19, 2010Department of Citywide Administrative Services$20,430.00DESIGN-CONSULTANT-BUILDINGS
Jan 7, 2011Department of Citywide Administrative Services$20,356.90DESIGN-CONSULTANT-BUILDINGS
Apr 25, 2011Department of Citywide Administrative Services$14,592.97DESIGN-CONSULTANT-BUILDINGS
Feb 22, 2011Department of Citywide Administrative Services$14,187.15DESIGN-CONSULTANT-BUILDINGS
May 16, 2011Department of Citywide Administrative Services$13,385.29DESIGN-CONSULTANT-BUILDINGS
Aug 30, 2010Department of Citywide Administrative Services$11,340.00DESIGN-CONSULTANT-BUILDINGS
Jun 22, 2011Department of Citywide Administrative Services$10,952.86PROF SERV ENGINEER & ARCHITECT
Jan 25, 2011Department of Citywide Administrative Services$7,087.20MAINT & REP GENERAL
Dec 6, 2010Department of Citywide Administrative Services$6,319.30DESIGN-CONSULTANT-BUILDINGS
FY 2010top 8 of 8 payments$154,105
DateAgencyAmountCategoryPurchase order
Mar 1, 2010Department of Citywide Administrative Services$45,360.00DESIGN-CONSULTANT-BUILDINGS
May 11, 2010Department of Citywide Administrative Services$34,020.00DESIGN-CONSULTANT-BUILDINGS
Mar 30, 2010Department of Citywide Administrative Services$23,534.19DESIGN-CONSULTANT-BUILDINGS
May 10, 2010Department of Citywide Administrative Services$21,257.28DESIGN-CONSULTANT-BUILDINGS
Mar 1, 2010Department of Citywide Administrative Services$15,309.36MAINT & REP GENERAL
Jan 21, 2010Department of Citywide Administrative Services$6,379.20MAINT & REP GENERAL
Mar 29, 2010Department of Citywide Administrative Services$6,374.52DESIGN-CONSULTANT-BUILDINGS
Apr 5, 2010Department of Citywide Administrative Services$1,870.58MAINT & REP GENERAL

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025School Construction Authority$2,303.55CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$588.73CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$400.73CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$248.13CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$2,933.52CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$195.95CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$3.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$3,598.49CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$1,066.95CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$1,541.03CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$215.68CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$12,965.61CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$529.56CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$452.99CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$590.87CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$1,774.54CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$9,564.76CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$909.64CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$2,845.05CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$3,524.70CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$9,564.75CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$27,461.41CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$473.13CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$3,058.08CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$2,148.31CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data