Rocon Plumbing & Heating Inc Corporation: New York City Government Payments

as recorded by New York City: ROCON PLUMBING & HEATING INC CORPORATION

Rocon Plumbing & Heating Inc Corporation is the 566th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 87th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.3% of everything the School Construction Authority has paid vendors in that span.

Primary spending category: CONSTRUCTION-BUILDINGS

$117,224,503total received
1,195payments
3agencies
Jan 4, 2010Dec 18, 2018first / last payment
Follow this vendorGet an email when New York City publishes new payments to Rocon Plumbing & Heating Inc Corporation. No spam.

Payments by fiscal year

FY 2019$10,308,335
FY 2018$17,457,247
FY 2017$23,050,954
FY 2016$26,292,205
FY 2015$11,124,565
FY 2014$6,468,335
FY 2013$7,228,611
FY 2012$7,143,514
FY 2011$3,914,935
FY 2010$4,235,800

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2019School Construction Authority103$10,308,335
FY 2018School Construction Authority171$17,425,929
FY 2018Department of Health and Mental Hygiene13$31,318
FY 2017School Construction Authority205$23,050,954
FY 2016School Construction Authority288$26,186,177
FY 2016Department of Design and Construction18$65,214
FY 2016Department of Health and Mental Hygiene5$40,813
FY 2015School Construction Authority119$11,124,565
FY 2014School Construction Authority54$6,088,158
FY 2014Department of Health and Mental Hygiene14$380,178
FY 2013School Construction Authority66$6,550,728
FY 2013Department of Health and Mental Hygiene9$677,884
FY 2012School Construction Authority40$6,827,564
FY 2012Department of Health and Mental Hygiene7$315,950
FY 2011School Construction Authority49$3,864,685
FY 2011Department of Health and Mental Hygiene3$50,250
FY 2010School Construction Authority31$4,235,800
Total1,195$117,224,503

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL2$35,254Jul 29, 2015 Jul 29, 2015
PROF SERV OTHER1$30,065Jun 13, 2016 Jun 13, 2016
CONSTRUCTION-BUILDINGS1,177$117,159,289Jan 4, 2010 Dec 18, 2018
<Non-Applicable Expenditure Object>15-$105Jul 29, 2015 Jun 13, 2016

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2019top 20 of 103 payments$10,308,335
DateAgencyAmountCategoryPurchase order
Nov 21, 2018School Construction Authority$1,133,723.83CONSTRUCTION-BUILDINGS
Dec 18, 2018School Construction Authority$610,935.50CONSTRUCTION-BUILDINGS
Oct 18, 2018School Construction Authority$496,042.98CONSTRUCTION-BUILDINGS
Oct 16, 2018School Construction Authority$462,967.30CONSTRUCTION-BUILDINGS
Aug 1, 2018School Construction Authority$452,105.00CONSTRUCTION-BUILDINGS
Aug 1, 2018School Construction Authority$434,162.98CONSTRUCTION-BUILDINGS
Nov 27, 2018School Construction Authority$407,103.50CONSTRUCTION-BUILDINGS
Sep 13, 2018School Construction Authority$370,614.95CONSTRUCTION-BUILDINGS
Aug 31, 2018School Construction Authority$346,308.25CONSTRUCTION-BUILDINGS
Jul 5, 2018School Construction Authority$336,801.55CONSTRUCTION-BUILDINGS
Aug 15, 2018School Construction Authority$323,598.50CONSTRUCTION-BUILDINGS
Jul 3, 2018School Construction Authority$302,537.00CONSTRUCTION-BUILDINGS
Oct 23, 2018School Construction Authority$270,048.90CONSTRUCTION-BUILDINGS
Aug 1, 2018School Construction Authority$245,632.43CONSTRUCTION-BUILDINGS
Jul 3, 2018School Construction Authority$240,445.00CONSTRUCTION-BUILDINGS
Sep 11, 2018School Construction Authority$237,954.10CONSTRUCTION-BUILDINGS
Oct 15, 2018School Construction Authority$227,342.88CONSTRUCTION-BUILDINGS
Dec 13, 2018School Construction Authority$213,075.41CONSTRUCTION-BUILDINGS
Aug 9, 2018School Construction Authority$202,421.25CONSTRUCTION-BUILDINGS
Aug 15, 2018School Construction Authority$190,332.50CONSTRUCTION-BUILDINGS
FY 2018top 20 of 184 payments$17,457,247
DateAgencyAmountCategoryPurchase order
Aug 8, 2017School Construction Authority$850,585.35CONSTRUCTION-BUILDINGS
May 10, 2018School Construction Authority$597,309.17CONSTRUCTION-BUILDINGS
Jul 26, 2017School Construction Authority$526,843.97CONSTRUCTION-BUILDINGS
Sep 5, 2017School Construction Authority$515,223.47CONSTRUCTION-BUILDINGS
Aug 31, 2017School Construction Authority$513,156.96CONSTRUCTION-BUILDINGS
May 30, 2018School Construction Authority$456,587.69CONSTRUCTION-BUILDINGS
Feb 16, 2018School Construction Authority$443,063.85CONSTRUCTION-BUILDINGS
Aug 15, 2017School Construction Authority$402,823.75CONSTRUCTION-BUILDINGS
Jan 29, 2018School Construction Authority$392,402.91CONSTRUCTION-BUILDINGS
May 31, 2018School Construction Authority$386,063.85CONSTRUCTION-BUILDINGS
Sep 29, 2017School Construction Authority$366,400.75CONSTRUCTION-BUILDINGS
Oct 4, 2017School Construction Authority$364,184.88CONSTRUCTION-BUILDINGS
Sep 22, 2017School Construction Authority$359,693.75CONSTRUCTION-BUILDINGS
Nov 8, 2017School Construction Authority$352,385.87CONSTRUCTION-BUILDINGS
Jan 18, 2018School Construction Authority$351,319.50CONSTRUCTION-BUILDINGS
Jan 26, 2018School Construction Authority$316,739.50CONSTRUCTION-BUILDINGS
Feb 5, 2018School Construction Authority$303,998.10CONSTRUCTION-BUILDINGS
Dec 22, 2017School Construction Authority$303,531.23CONSTRUCTION-BUILDINGS
Oct 18, 2017School Construction Authority$275,517.48CONSTRUCTION-BUILDINGS
Aug 22, 2017School Construction Authority$268,992.50CONSTRUCTION-BUILDINGS
FY 2017top 20 of 205 payments$23,050,954
DateAgencyAmountCategoryPurchase order
Sep 15, 2016School Construction Authority$858,928.62CONSTRUCTION-BUILDINGS
Mar 8, 2017School Construction Authority$849,128.06CONSTRUCTION-BUILDINGS
Aug 5, 2016School Construction Authority$630,527.50CONSTRUCTION-BUILDINGS
Nov 22, 2016School Construction Authority$582,515.99CONSTRUCTION-BUILDINGS
Jun 14, 2017School Construction Authority$571,467.75CONSTRUCTION-BUILDINGS
Oct 20, 2016School Construction Authority$571,239.13CONSTRUCTION-BUILDINGS
May 31, 2017School Construction Authority$553,530.23CONSTRUCTION-BUILDINGS
Mar 30, 2017School Construction Authority$545,067.25CONSTRUCTION-BUILDINGS
Nov 22, 2016School Construction Authority$515,216.26CONSTRUCTION-BUILDINGS
Mar 6, 2017School Construction Authority$511,703.25CONSTRUCTION-BUILDINGS
Mar 6, 2017School Construction Authority$411,188.50CONSTRUCTION-BUILDINGS
Aug 5, 2016School Construction Authority$375,813.90CONSTRUCTION-BUILDINGS
Aug 2, 2016School Construction Authority$371,941.31CONSTRUCTION-BUILDINGS
Feb 15, 2017School Construction Authority$359,017.07CONSTRUCTION-BUILDINGS
May 12, 2017School Construction Authority$350,209.18CONSTRUCTION-BUILDINGS
Feb 27, 2017School Construction Authority$345,230.00CONSTRUCTION-BUILDINGS
Nov 17, 2016School Construction Authority$342,783.75CONSTRUCTION-BUILDINGS
Jun 21, 2017School Construction Authority$331,003.75CONSTRUCTION-BUILDINGS
Apr 28, 2017School Construction Authority$315,176.75CONSTRUCTION-BUILDINGS
Mar 30, 2017School Construction Authority$310,016.58CONSTRUCTION-BUILDINGS
FY 2016top 20 of 311 payments$26,292,205
DateAgencyAmountCategoryPurchase order
May 23, 2016School Construction Authority$1,132,081.75CONSTRUCTION-BUILDINGS
Jun 15, 2016School Construction Authority$1,045,788.50CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$883,031.19CONSTRUCTION-BUILDINGS
Oct 22, 2015School Construction Authority$770,706.50CONSTRUCTION-BUILDINGS
Sep 15, 2015School Construction Authority$753,777.50CONSTRUCTION-BUILDINGS
Oct 22, 2015School Construction Authority$753,777.50CONSTRUCTION-BUILDINGS
Sep 2, 2015School Construction Authority$579,927.50CONSTRUCTION-BUILDINGS
Apr 6, 2016School Construction Authority$579,078.14CONSTRUCTION-BUILDINGS
Jan 5, 2016School Construction Authority$482,547.96CONSTRUCTION-BUILDINGS
Nov 2, 2015School Construction Authority$450,685.99CONSTRUCTION-BUILDINGS
Aug 25, 2015School Construction Authority$398,442.50CONSTRUCTION-BUILDINGS
Oct 1, 2015School Construction Authority$364,743.00CONSTRUCTION-BUILDINGS
Feb 23, 2016School Construction Authority$364,477.00CONSTRUCTION-BUILDINGS
Jan 13, 2016School Construction Authority$333,904.06CONSTRUCTION-BUILDINGS
May 2, 2016School Construction Authority$323,368.20CONSTRUCTION-BUILDINGS
Sep 18, 2015School Construction Authority$318,577.75CONSTRUCTION-BUILDINGS
Jan 4, 2016School Construction Authority$317,703.75CONSTRUCTION-BUILDINGS
Dec 14, 2015School Construction Authority$316,207.50CONSTRUCTION-BUILDINGS
Nov 2, 2015School Construction Authority$314,064.85CONSTRUCTION-BUILDINGS
Apr 6, 2016School Construction Authority$309,168.00CONSTRUCTION-BUILDINGS
FY 2015top 20 of 119 payments$11,124,565
DateAgencyAmountCategoryPurchase order
Mar 24, 2015School Construction Authority$608,190.00CONSTRUCTION-BUILDINGS
Apr 29, 2015School Construction Authority$563,426.42CONSTRUCTION-BUILDINGS
Aug 5, 2014School Construction Authority$516,573.71CONSTRUCTION-BUILDINGS
Sep 5, 2014School Construction Authority$514,021.82CONSTRUCTION-BUILDINGS
Jun 1, 2015School Construction Authority$405,032.50CONSTRUCTION-BUILDINGS
Aug 5, 2014School Construction Authority$363,221.10CONSTRUCTION-BUILDINGS
Sep 29, 2014School Construction Authority$338,547.70CONSTRUCTION-BUILDINGS
Jun 1, 2015School Construction Authority$328,723.75CONSTRUCTION-BUILDINGS
Apr 29, 2015School Construction Authority$325,375.00CONSTRUCTION-BUILDINGS
May 26, 2015School Construction Authority$325,368.92CONSTRUCTION-BUILDINGS
Jan 8, 2015School Construction Authority$311,505.00CONSTRUCTION-BUILDINGS
Mar 2, 2015School Construction Authority$308,968.88CONSTRUCTION-BUILDINGS
Apr 16, 2015School Construction Authority$307,177.75CONSTRUCTION-BUILDINGS
Jun 22, 2015School Construction Authority$306,346.50CONSTRUCTION-BUILDINGS
Jun 23, 2015School Construction Authority$246,715.00CONSTRUCTION-BUILDINGS
Jan 28, 2015School Construction Authority$245,807.75CONSTRUCTION-BUILDINGS
May 6, 2015School Construction Authority$231,948.67CONSTRUCTION-BUILDINGS
Jan 12, 2015School Construction Authority$230,598.25CONSTRUCTION-BUILDINGS
Aug 1, 2014School Construction Authority$207,006.80CONSTRUCTION-BUILDINGS
Nov 13, 2014School Construction Authority$204,540.70CONSTRUCTION-BUILDINGS
FY 2014top 20 of 68 payments$6,468,335
DateAgencyAmountCategoryPurchase order
Jun 12, 2014School Construction Authority$577,250.40CONSTRUCTION-BUILDINGS
Jan 6, 2014School Construction Authority$472,007.50CONSTRUCTION-BUILDINGS
Jul 11, 2013School Construction Authority$435,188.35CONSTRUCTION-BUILDINGS
Jun 4, 2014School Construction Authority$324,527.98CONSTRUCTION-BUILDINGS
Sep 16, 2013School Construction Authority$244,914.75CONSTRUCTION-BUILDINGS
Jul 18, 2013School Construction Authority$232,303.50CONSTRUCTION-BUILDINGS
Jun 12, 2014School Construction Authority$217,217.50CONSTRUCTION-BUILDINGS
Aug 21, 2013School Construction Authority$215,381.15CONSTRUCTION-BUILDINGS
Feb 6, 2014School Construction Authority$205,380.59CONSTRUCTION-BUILDINGS
Aug 28, 2013School Construction Authority$186,868.32CONSTRUCTION-BUILDINGS
Mar 19, 2014School Construction Authority$173,113.75CONSTRUCTION-BUILDINGS
Nov 7, 2013School Construction Authority$172,926.13CONSTRUCTION-BUILDINGS
Sep 23, 2013School Construction Authority$172,880.05CONSTRUCTION-BUILDINGS
Nov 6, 2013School Construction Authority$155,158.75CONSTRUCTION-BUILDINGS
Apr 8, 2014School Construction Authority$151,287.50CONSTRUCTION-BUILDINGS
Apr 21, 2014School Construction Authority$150,788.75CONSTRUCTION-BUILDINGS
Apr 8, 2014School Construction Authority$134,805.00CONSTRUCTION-BUILDINGS
Feb 3, 2014School Construction Authority$122,407.50CONSTRUCTION-BUILDINGS
Dec 5, 2013School Construction Authority$113,848.95CONSTRUCTION-BUILDINGS
Feb 3, 2014School Construction Authority$113,430.00CONSTRUCTION-BUILDINGS
FY 2013top 20 of 75 payments$7,228,611
DateAgencyAmountCategoryPurchase order
Jun 17, 2013School Construction Authority$548,469.20CONSTRUCTION-BUILDINGS
Aug 21, 2012School Construction Authority$375,986.25CONSTRUCTION-BUILDINGS
Oct 2, 2012School Construction Authority$359,826.75CONSTRUCTION-BUILDINGS
Jan 22, 2013School Construction Authority$331,341.00CONSTRUCTION-BUILDINGS
Apr 16, 2013School Construction Authority$289,474.50CONSTRUCTION-BUILDINGS
May 21, 2013School Construction Authority$275,108.13CONSTRUCTION-BUILDINGS
May 23, 2013School Construction Authority$253,438.88CONSTRUCTION-BUILDINGS
Jul 17, 2012School Construction Authority$251,664.50CONSTRUCTION-BUILDINGS
Mar 22, 2013School Construction Authority$230,529.37CONSTRUCTION-BUILDINGS
Jun 17, 2013School Construction Authority$222,227.72CONSTRUCTION-BUILDINGS
Apr 26, 2013School Construction Authority$219,497.50CONSTRUCTION-BUILDINGS
Jun 21, 2013School Construction Authority$216,362.50CONSTRUCTION-BUILDINGS
Oct 22, 2012School Construction Authority$191,045.96CONSTRUCTION-BUILDINGS
May 23, 2013School Construction Authority$188,892.41CONSTRUCTION-BUILDINGS
Oct 17, 2012Department of Health and Mental Hygiene$153,284.40CONSTRUCTION-BUILDINGS
Jan 3, 2013School Construction Authority$147,957.75CONSTRUCTION-BUILDINGS
Nov 28, 2012School Construction Authority$140,823.25CONSTRUCTION-BUILDINGS
Sep 10, 2012School Construction Authority$138,818.75CONSTRUCTION-BUILDINGS
Jul 25, 2012School Construction Authority$129,789.00CONSTRUCTION-BUILDINGS
Aug 27, 2012School Construction Authority$112,921.26CONSTRUCTION-BUILDINGS
FY 2012top 20 of 47 payments$7,143,514
DateAgencyAmountCategoryPurchase order
Oct 13, 2011School Construction Authority$501,590.50CONSTRUCTION-BUILDINGS
Oct 27, 2011School Construction Authority$499,856.75CONSTRUCTION-BUILDINGS
Sep 7, 2011School Construction Authority$493,544.00CONSTRUCTION-BUILDINGS
Jul 11, 2011School Construction Authority$440,296.50CONSTRUCTION-BUILDINGS
Oct 12, 2011School Construction Authority$420,617.25CONSTRUCTION-BUILDINGS
Jul 14, 2011School Construction Authority$348,531.25CONSTRUCTION-BUILDINGS
May 7, 2012School Construction Authority$329,982.50CONSTRUCTION-BUILDINGS
Jul 20, 2011School Construction Authority$294,666.25CONSTRUCTION-BUILDINGS
Nov 21, 2011School Construction Authority$231,790.50CONSTRUCTION-BUILDINGS
Jul 20, 2011School Construction Authority$231,420.00CONSTRUCTION-BUILDINGS
Mar 14, 2012School Construction Authority$204,076.77CONSTRUCTION-BUILDINGS
Jun 4, 2012School Construction Authority$198,103.50CONSTRUCTION-BUILDINGS
Jun 4, 2012School Construction Authority$187,781.75CONSTRUCTION-BUILDINGS
Nov 23, 2011School Construction Authority$168,648.75CONSTRUCTION-BUILDINGS
Oct 27, 2011School Construction Authority$158,578.75CONSTRUCTION-BUILDINGS
Jan 12, 2012School Construction Authority$155,999.50CONSTRUCTION-BUILDINGS
Mar 14, 2012School Construction Authority$143,925.00CONSTRUCTION-BUILDINGS
Jun 11, 2012School Construction Authority$138,839.48CONSTRUCTION-BUILDINGS
Jul 11, 2011School Construction Authority$136,847.50CONSTRUCTION-BUILDINGS
May 7, 2012School Construction Authority$130,245.00CONSTRUCTION-BUILDINGS
FY 2011top 20 of 52 payments$3,914,935
DateAgencyAmountCategoryPurchase order
Jul 7, 2010School Construction Authority$513,266.00CONSTRUCTION-BUILDINGS
Jun 15, 2011School Construction Authority$323,142.50CONSTRUCTION-BUILDINGS
Aug 12, 2010School Construction Authority$311,543.00CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$232,583.75CONSTRUCTION-BUILDINGS
Jul 7, 2010School Construction Authority$203,043.50CONSTRUCTION-BUILDINGS
Apr 28, 2011School Construction Authority$189,204.85CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$168,981.25CONSTRUCTION-BUILDINGS
Jan 4, 2011School Construction Authority$167,821.30CONSTRUCTION-BUILDINGS
Jul 7, 2010School Construction Authority$154,462.40CONSTRUCTION-BUILDINGS
Oct 19, 2010School Construction Authority$144,991.85CONSTRUCTION-BUILDINGS
Mar 30, 2011School Construction Authority$138,272.50CONSTRUCTION-BUILDINGS
Apr 28, 2011School Construction Authority$126,132.45CONSTRUCTION-BUILDINGS
Jul 7, 2010School Construction Authority$113,275.15CONSTRUCTION-BUILDINGS
Jun 15, 2011School Construction Authority$109,791.50CONSTRUCTION-BUILDINGS
Aug 6, 2010School Construction Authority$109,595.80CONSTRUCTION-BUILDINGS
Sep 10, 2010School Construction Authority$103,784.65CONSTRUCTION-BUILDINGS
Oct 19, 2010School Construction Authority$92,727.60CONSTRUCTION-BUILDINGS
Mar 30, 2011School Construction Authority$70,775.00CONSTRUCTION-BUILDINGS
Aug 12, 2010School Construction Authority$68,877.85CONSTRUCTION-BUILDINGS
Jan 4, 2011School Construction Authority$67,875.60CONSTRUCTION-BUILDINGS
FY 2010top 20 of 31 payments$4,235,800
DateAgencyAmountCategoryPurchase order
Jun 7, 2010School Construction Authority$541,452.50CONSTRUCTION-BUILDINGS
Mar 8, 2010School Construction Authority$524,827.50CONSTRUCTION-BUILDINGS
Jan 29, 2010School Construction Authority$372,604.25CONSTRUCTION-BUILDINGS
Feb 11, 2010School Construction Authority$269,610.00CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$265,002.50CONSTRUCTION-BUILDINGS
Jan 7, 2010School Construction Authority$256,688.10CONSTRUCTION-BUILDINGS
Apr 15, 2010School Construction Authority$252,753.20CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$227,984.80CONSTRUCTION-BUILDINGS
Feb 11, 2010School Construction Authority$222,062.50CONSTRUCTION-BUILDINGS
Mar 9, 2010School Construction Authority$160,763.75CONSTRUCTION-BUILDINGS
Jun 14, 2010School Construction Authority$148,612.30CONSTRUCTION-BUILDINGS
Jan 29, 2010School Construction Authority$139,167.40CONSTRUCTION-BUILDINGS
Mar 16, 2010School Construction Authority$111,150.00CONSTRUCTION-BUILDINGS
Mar 16, 2010School Construction Authority$104,490.50CONSTRUCTION-BUILDINGS
Jan 29, 2010School Construction Authority$102,125.00CONSTRUCTION-BUILDINGS
Apr 13, 2010School Construction Authority$84,501.55CONSTRUCTION-BUILDINGS
Mar 8, 2010School Construction Authority$79,330.70CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$71,288.27CONSTRUCTION-BUILDINGS
Jun 7, 2010School Construction Authority$52,172.10CONSTRUCTION-BUILDINGS
Jan 7, 2010School Construction Authority$48,592.50CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Dec 18, 2018School Construction Authority$49,222.74CONSTRUCTION-BUILDINGSCapital Contracts
Dec 18, 2018School Construction Authority$26,053.25CONSTRUCTION-BUILDINGSCapital Contracts
Dec 18, 2018School Construction Authority$5,255.22CONSTRUCTION-BUILDINGSCapital Contracts
Dec 18, 2018School Construction Authority$83,932.15CONSTRUCTION-BUILDINGSCapital Contracts
Dec 18, 2018School Construction Authority$610,935.50CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$1,160.00CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$44,067.43CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$28,589.56CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$1,662.22CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$3,561.79CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$2,904.80CONSTRUCTION-BUILDINGSCapital Contracts
Dec 14, 2018School Construction Authority$9,429.19CONSTRUCTION-BUILDINGSCapital Contracts
Dec 13, 2018School Construction Authority$186,983.75CONSTRUCTION-BUILDINGSCapital Contracts
Dec 13, 2018School Construction Authority$213,075.41CONSTRUCTION-BUILDINGSCapital Contracts
Nov 27, 2018School Construction Authority$50,587.50CONSTRUCTION-BUILDINGSCapital Contracts
Nov 27, 2018School Construction Authority$407,103.50CONSTRUCTION-BUILDINGSCapital Contracts
Nov 21, 2018School Construction Authority$1,133,723.83CONSTRUCTION-BUILDINGSCapital Contracts
Nov 21, 2018School Construction Authority$67,022.50CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2018School Construction Authority$43,370.82CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2018School Construction Authority$26,263.70CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2018School Construction Authority$11,281.25CONSTRUCTION-BUILDINGSCapital Contracts
Nov 19, 2018School Construction Authority$139,255.04CONSTRUCTION-BUILDINGSCapital Contracts
Oct 23, 2018School Construction Authority$270,048.90CONSTRUCTION-BUILDINGSCapital Contracts
Oct 18, 2018School Construction Authority$496,042.98CONSTRUCTION-BUILDINGSCapital Contracts
Oct 18, 2018School Construction Authority$110,746.24CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data