Picone-Wdf JV: New York City Government Payments

as recorded by New York City: PICONE-WDF JV

Picone-Wdf JV is the 1,016th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 127th in IOTB CONSTRUCTION spending. Its payments amount to 0.2% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$56,017,817total received
478payments
1agency
Jan 15, 2010Feb 20, 2019first / last payment
Follow this vendorGet an email when New York City publishes new payments to Picone-Wdf JV. No spam.

Payments by fiscal year

FY 2019$26,589
FY 2018$139,601
FY 2017$720,737
FY 2016$1,334,456
FY 2015$1,278,880
FY 2014$4,359,738
FY 2013$4,442,972
FY 2012$6,526,069
FY 2011$25,459,465
FY 2010$11,729,312

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2019Department of Environmental Protection2$26,589
FY 2018Department of Environmental Protection12$139,601
FY 2017Department of Environmental Protection18$720,737
FY 2016Department of Environmental Protection38$1,334,456
FY 2015Department of Environmental Protection55$1,278,880
FY 2014Department of Environmental Protection126$4,359,738
FY 2013Department of Environmental Protection57$4,442,972
FY 2012Department of Environmental Protection82$6,526,069
FY 2011Department of Environmental Protection84$25,459,465
FY 2010Department of Environmental Protection4$11,729,312
Total478$56,017,817

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
IOTB CONSTRUCTION478$56,017,817Jan 15, 2010 Feb 20, 2019

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2019top 2 of 2 payments$26,589
DateAgencyAmountCategoryPurchase order
Feb 20, 2019Department of Environmental Protection$26,381.95IOTB CONSTRUCTION
Feb 20, 2019Department of Environmental Protection$207.12IOTB CONSTRUCTION
FY 2018top 12 of 12 payments$139,601
DateAgencyAmountCategoryPurchase order
Jul 10, 2017Department of Environmental Protection$33,352.51IOTB CONSTRUCTION
Jul 5, 2017Department of Environmental Protection$28,599.71IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$23,464.71IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$16,229.38IOTB CONSTRUCTION
Jul 5, 2017Department of Environmental Protection$10,056.12IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$6,860.48IOTB CONSTRUCTION
Jul 5, 2017Department of Environmental Protection$5,287.75IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$4,839.63IOTB CONSTRUCTION
Jul 5, 2017Department of Environmental Protection$3,774.44IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$3,130.47IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$2,499.99IOTB CONSTRUCTION
Jul 10, 2017Department of Environmental Protection$1,505.62IOTB CONSTRUCTION
FY 2017top 18 of 18 payments$720,737
DateAgencyAmountCategoryPurchase order
Aug 8, 2016Department of Environmental Protection$243,200.00IOTB CONSTRUCTION
Nov 25, 2016Department of Environmental Protection$111,380.86IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$74,471.00IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$52,139.36IOTB CONSTRUCTION
Dec 12, 2016Department of Environmental Protection$48,549.60IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$43,975.00IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$39,957.73IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$33,113.34IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$27,150.81IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$17,810.77IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$8,952.48IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$7,645.88IOTB CONSTRUCTION
Dec 14, 2016Department of Environmental Protection$7,485.63IOTB CONSTRUCTION
Nov 7, 2016Department of Environmental Protection$1,739.05IOTB CONSTRUCTION
Dec 14, 2016Department of Environmental Protection$1,672.12IOTB CONSTRUCTION
Dec 14, 2016Department of Environmental Protection$630.48IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$578.69IOTB CONSTRUCTION
Feb 16, 2017Department of Environmental Protection$284.18IOTB CONSTRUCTION
FY 2016top 20 of 38 payments$1,334,456
DateAgencyAmountCategoryPurchase order
May 11, 2016Department of Environmental Protection$216,934.67IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$197,314.17IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$135,421.58IOTB CONSTRUCTION
Dec 28, 2015Department of Environmental Protection$72,957.96IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$54,965.91IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$47,914.11IOTB CONSTRUCTION
Aug 14, 2015Department of Environmental Protection$45,495.25IOTB CONSTRUCTION
Aug 14, 2015Department of Environmental Protection$39,639.45IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$39,251.42IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$36,664.27IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$36,361.32IOTB CONSTRUCTION
Aug 14, 2015Department of Environmental Protection$33,863.46IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$31,725.13IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$31,450.01IOTB CONSTRUCTION
Mar 16, 2016Department of Environmental Protection$27,162.17IOTB CONSTRUCTION
Aug 14, 2015Department of Environmental Protection$26,629.64IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$23,940.75IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$21,774.61IOTB CONSTRUCTION
May 17, 2016Department of Environmental Protection$21,112.04IOTB CONSTRUCTION
Dec 29, 2015Department of Environmental Protection$20,580.91IOTB CONSTRUCTION
FY 2015top 20 of 55 payments$1,278,880
DateAgencyAmountCategoryPurchase order
Aug 4, 2014Department of Environmental Protection$132,352.07IOTB CONSTRUCTION
May 20, 2015Department of Environmental Protection$128,642.09IOTB CONSTRUCTION
Dec 15, 2014Department of Environmental Protection$112,127.33IOTB CONSTRUCTION
Oct 30, 2014Department of Environmental Protection$93,559.43IOTB CONSTRUCTION
May 20, 2015Department of Environmental Protection$92,664.19IOTB CONSTRUCTION
Oct 6, 2014Department of Environmental Protection$84,270.29IOTB CONSTRUCTION
Aug 25, 2014Department of Environmental Protection$79,004.74IOTB CONSTRUCTION
Mar 30, 2015Department of Environmental Protection$54,699.75IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$38,757.45IOTB CONSTRUCTION
Feb 4, 2015Department of Environmental Protection$38,202.59IOTB CONSTRUCTION
Aug 25, 2014Department of Environmental Protection$36,368.42IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$35,852.60IOTB CONSTRUCTION
Oct 6, 2014Department of Environmental Protection$30,145.55IOTB CONSTRUCTION
Mar 16, 2015Department of Environmental Protection$22,671.81IOTB CONSTRUCTION
Mar 16, 2015Department of Environmental Protection$21,000.00IOTB CONSTRUCTION
Feb 4, 2015Department of Environmental Protection$19,609.89IOTB CONSTRUCTION
Mar 17, 2015Department of Environmental Protection$18,215.50IOTB CONSTRUCTION
Aug 18, 2014Department of Environmental Protection$17,448.11IOTB CONSTRUCTION
May 20, 2015Department of Environmental Protection$16,570.92IOTB CONSTRUCTION
Mar 30, 2015Department of Environmental Protection$15,674.93IOTB CONSTRUCTION
FY 2014top 20 of 126 payments$4,359,738
DateAgencyAmountCategoryPurchase order
Dec 26, 2013Department of Environmental Protection$733,404.09IOTB CONSTRUCTION
Aug 5, 2013Department of Environmental Protection$681,199.40IOTB CONSTRUCTION
Apr 7, 2014Department of Environmental Protection$482,978.56IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$170,849.68IOTB CONSTRUCTION
Sep 6, 2013Department of Environmental Protection$160,034.59IOTB CONSTRUCTION
Dec 6, 2013Department of Environmental Protection$124,912.73IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$104,904.20IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$81,863.56IOTB CONSTRUCTION
Apr 9, 2014Department of Environmental Protection$73,825.96IOTB CONSTRUCTION
May 19, 2014Department of Environmental Protection$73,103.07IOTB CONSTRUCTION
Dec 6, 2013Department of Environmental Protection$69,273.66IOTB CONSTRUCTION
Apr 9, 2014Department of Environmental Protection$60,850.20IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$52,758.83IOTB CONSTRUCTION
Mar 17, 2014Department of Environmental Protection$48,926.21IOTB CONSTRUCTION
Dec 6, 2013Department of Environmental Protection$47,615.09IOTB CONSTRUCTION
Apr 9, 2014Department of Environmental Protection$47,582.85IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$47,558.70IOTB CONSTRUCTION
Jun 18, 2014Department of Environmental Protection$43,296.73IOTB CONSTRUCTION
Apr 9, 2014Department of Environmental Protection$41,424.66IOTB CONSTRUCTION
Jul 2, 2013Department of Environmental Protection$39,366.87IOTB CONSTRUCTION
FY 2013top 20 of 57 payments$4,442,972
DateAgencyAmountCategoryPurchase order
Jul 26, 2012Department of Environmental Protection$612,551.07IOTB CONSTRUCTION
Mar 25, 2013Department of Environmental Protection$510,247.65IOTB CONSTRUCTION
Jan 10, 2013Department of Environmental Protection$442,918.36IOTB CONSTRUCTION
Dec 24, 2012Department of Environmental Protection$391,037.31IOTB CONSTRUCTION
Nov 5, 2012Department of Environmental Protection$254,318.40IOTB CONSTRUCTION
Jan 24, 2013Department of Environmental Protection$253,245.88IOTB CONSTRUCTION
Mar 5, 2013Department of Environmental Protection$244,876.85IOTB CONSTRUCTION
Sep 10, 2012Department of Environmental Protection$196,318.65IOTB CONSTRUCTION
Dec 17, 2012Department of Environmental Protection$143,412.26IOTB CONSTRUCTION
Jan 24, 2013Department of Environmental Protection$138,905.40IOTB CONSTRUCTION
Dec 17, 2012Department of Environmental Protection$132,210.19IOTB CONSTRUCTION
Jan 24, 2013Department of Environmental Protection$120,950.19IOTB CONSTRUCTION
Jan 24, 2013Department of Environmental Protection$101,148.16IOTB CONSTRUCTION
Mar 22, 2013Department of Environmental Protection$99,091.47IOTB CONSTRUCTION
Sep 10, 2012Department of Environmental Protection$83,085.45IOTB CONSTRUCTION
Mar 22, 2013Department of Environmental Protection$70,029.52IOTB CONSTRUCTION
Sep 10, 2012Department of Environmental Protection$69,000.00IOTB CONSTRUCTION
Mar 22, 2013Department of Environmental Protection$59,172.66IOTB CONSTRUCTION
Sep 10, 2012Department of Environmental Protection$56,578.26IOTB CONSTRUCTION
Apr 23, 2013Department of Environmental Protection$56,065.67IOTB CONSTRUCTION
FY 2012top 20 of 82 payments$6,526,069
DateAgencyAmountCategoryPurchase order
Mar 5, 2012Department of Environmental Protection$822,637.73IOTB CONSTRUCTION
Aug 22, 2011Department of Environmental Protection$787,068.48IOTB CONSTRUCTION
Sep 19, 2011Department of Environmental Protection$683,570.86IOTB CONSTRUCTION
Jul 7, 2011Department of Environmental Protection$598,206.80IOTB CONSTRUCTION
Jun 1, 2012Department of Environmental Protection$428,761.99IOTB CONSTRUCTION
Jan 12, 2012Department of Environmental Protection$413,072.76IOTB CONSTRUCTION
May 7, 2012Department of Environmental Protection$351,065.67IOTB CONSTRUCTION
Oct 20, 2011Department of Environmental Protection$279,103.97IOTB CONSTRUCTION
Jul 7, 2011Department of Environmental Protection$166,077.46IOTB CONSTRUCTION
Feb 21, 2012Department of Environmental Protection$156,636.71IOTB CONSTRUCTION
Dec 19, 2011Department of Environmental Protection$136,003.79IOTB CONSTRUCTION
Aug 31, 2011Department of Environmental Protection$96,693.83IOTB CONSTRUCTION
Jun 1, 2012Department of Environmental Protection$95,614.08IOTB CONSTRUCTION
Apr 23, 2012Department of Environmental Protection$85,324.24IOTB CONSTRUCTION
Jul 7, 2011Department of Environmental Protection$83,416.78IOTB CONSTRUCTION
Sep 19, 2011Department of Environmental Protection$75,924.70IOTB CONSTRUCTION
Aug 31, 2011Department of Environmental Protection$68,548.92IOTB CONSTRUCTION
Sep 19, 2011Department of Environmental Protection$67,305.27IOTB CONSTRUCTION
Apr 23, 2012Department of Environmental Protection$65,000.00IOTB CONSTRUCTION
Feb 21, 2012Department of Environmental Protection$61,954.73IOTB CONSTRUCTION
FY 2011top 20 of 84 payments$25,459,465
DateAgencyAmountCategoryPurchase order
Sep 3, 2010Department of Environmental Protection$4,256,767.33IOTB CONSTRUCTION
Apr 4, 2011Department of Environmental Protection$2,176,320.28IOTB CONSTRUCTION
Aug 27, 2010Department of Environmental Protection$2,136,434.55IOTB CONSTRUCTION
Oct 25, 2010Department of Environmental Protection$1,673,034.51IOTB CONSTRUCTION
Oct 4, 2010Department of Environmental Protection$1,557,604.75IOTB CONSTRUCTION
Jan 18, 2011Department of Environmental Protection$1,384,504.87IOTB CONSTRUCTION
Feb 14, 2011Department of Environmental Protection$1,302,429.50IOTB CONSTRUCTION
Dec 1, 2010Department of Environmental Protection$910,556.71IOTB CONSTRUCTION
Apr 25, 2011Department of Environmental Protection$904,074.27IOTB CONSTRUCTION
Apr 13, 2011Department of Environmental Protection$878,761.93IOTB CONSTRUCTION
May 31, 2011Department of Environmental Protection$652,082.54IOTB CONSTRUCTION
Nov 26, 2010Department of Environmental Protection$613,918.08IOTB CONSTRUCTION
Sep 3, 2010Department of Environmental Protection$531,878.83IOTB CONSTRUCTION
May 17, 2011Department of Environmental Protection$397,450.30IOTB CONSTRUCTION
Jan 24, 2011Department of Environmental Protection$325,591.04IOTB CONSTRUCTION
Feb 17, 2011Department of Environmental Protection$284,781.07IOTB CONSTRUCTION
May 17, 2011Department of Environmental Protection$275,048.90IOTB CONSTRUCTION
Mar 15, 2011Department of Environmental Protection$259,878.63IOTB CONSTRUCTION
Mar 15, 2011Department of Environmental Protection$252,034.01IOTB CONSTRUCTION
Apr 13, 2011Department of Environmental Protection$226,848.27IOTB CONSTRUCTION
FY 2010top 4 of 4 payments$11,729,312
DateAgencyAmountCategoryPurchase order
Apr 26, 2010Department of Environmental Protection$5,273,818.11IOTB CONSTRUCTION
Jan 15, 2010Department of Environmental Protection$3,792,891.15IOTB CONSTRUCTION
Jun 10, 2010Department of Environmental Protection$2,473,179.74IOTB CONSTRUCTION
May 21, 2010Department of Environmental Protection$189,423.13IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Feb 20, 2019Department of Environmental Protection$207.12IOTB CONSTRUCTIONCapital Contracts
Feb 20, 2019Department of Environmental Protection$26,381.95IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$4,839.63IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$1,505.62IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$2,499.99IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$16,229.38IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$33,352.51IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$3,130.47IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$23,464.71IOTB CONSTRUCTIONCapital Contracts
Jul 10, 2017Department of Environmental Protection$6,860.48IOTB CONSTRUCTIONCapital Contracts
Jul 5, 2017Department of Environmental Protection$5,287.75IOTB CONSTRUCTIONCapital Contracts
Jul 5, 2017Department of Environmental Protection$28,599.71IOTB CONSTRUCTIONCapital Contracts
Jul 5, 2017Department of Environmental Protection$10,056.12IOTB CONSTRUCTIONCapital Contracts
Jul 5, 2017Department of Environmental Protection$3,774.44IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$578.69IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$43,975.00IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$284.18IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$52,139.36IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$74,471.00IOTB CONSTRUCTIONCapital Contracts
Feb 16, 2017Department of Environmental Protection$27,150.81IOTB CONSTRUCTIONCapital Contracts
Dec 14, 2016Department of Environmental Protection$1,672.12IOTB CONSTRUCTIONCapital Contracts
Dec 14, 2016Department of Environmental Protection$630.48IOTB CONSTRUCTIONCapital Contracts
Dec 14, 2016Department of Environmental Protection$7,485.63IOTB CONSTRUCTIONCapital Contracts
Dec 12, 2016Department of Environmental Protection$48,549.60IOTB CONSTRUCTIONCapital Contracts
Nov 25, 2016Department of Environmental Protection$111,380.86IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data