Nehal Contracting Inc: New York City Government Payments

as recorded by New York City: NEHAL CONTRACTING INC

Nehal Contracting Inc is the 314th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 48th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.5% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 8.4% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$218,602,325total received
960payments
10agencies
Jan 6, 2010 – Jun 23, 2025first / last payment
Find this supplier’s buyersCompare with other suppliers

Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.

Follow this vendorGet an email when the recorded payment summary for Nehal Contracting Inc in New York City changes. Confirm by email to start. Self-service follows are free.

Payments by fiscal year

The payment history

Select a column to see the agencies behind that fiscal year.

16 fiscal years on record. The incoming flows below combine all recorded years.

Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.

Who pays this supplier?

Select a paying agency to inspect the relationship, then open its profile.

Jan 6, 2010 to Jun 23, 2025 · All recorded fiscal years

Showing 5 of 10 positive agencies in these records.

Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $218,602,324.76. Zero and net-negative relationships are excluded from positive flows.

The relationships at a glance

Total shown
$217,196,857.54
Payments represented
946
Paying agencies shown
5
Largest share of supplier total
92.7%

Largest displayed relationship: School Construction Authority. Select a flow to explore its details.

Jan 6, 2010 to Jun 23, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.

Receiving supplier

Nehal Contracting Inc

$217,196,858from the agencies shown

Nehal Contracting Inc
$217,196,858 from the agencies shown

  1. $202,590,30792.7% of supplier total
  2. $7,307,3213.3% of supplier total
  3. $3,194,7651.5% of supplier total
  4. $2,835,2801.3% of supplier total
  5. $1,269,1850.6% of supplier total

This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority84$22,348,994
FY 2024School Construction Authority85$20,620,418
FY 2023School Construction Authority93$38,982,569
FY 2022School Construction Authority80$27,153,621
FY 2022Department of Health and Mental Hygiene11$162,477
FY 2022Department of Environmental Protection2$482
FY 2022Department of Design and Construction1-$7
FY 2021School Construction Authority35$6,288,104
FY 2020School Construction Authority46$21,476,592
FY 2019School Construction Authority29$12,102,812
FY 2019Police Department39$611,953
FY 2019Department of Cultural Affairs9$78,696
FY 2019Department of Design and Construction4-$46
FY 2018School Construction Authority38$9,712,424
FY 2018Police Department19$407,096
FY 2018Department of Design and Construction2$57,069
FY 2018Department of Cultural Affairs3$17,582
FY 2017School Construction Authority46$13,813,822
FY 2017Police Department19$1,812,178
FY 2017Department of Cultural Affairs13$405,711
FY 2017Department of Correction2$126,757
FY 2017Department of Health and Mental Hygiene10$48,824
FY 2017Department of Design and Construction2$153
FY 2016School Construction Authority42$10,547,918
FY 2016Police Department8$807,184
FY 2016Department of Cultural Affairs7$319,364
FY 2016Administration for Children's Services1$50,346
FY 2016Department of Design and Construction5$15,059
FY 2015School Construction Authority13$6,511,459
FY 2015Department of Cultural Affairs8$1,245,700
FY 2015Department of Correction2$1,140,809
FY 2015Department of Health and Mental Hygiene11$733,327
FY 2015Police Department8$211,341
FY 2015Department of Design and Construction8$3,624
FY 2014School Construction Authority22$5,174,586
FY 2014Department of Cultural Affairs7$1,127,711
FY 2014Department of Design and Construction6$728,983
FY 2014Police Department10$726,457
FY 2014Department of Environmental Protection2$46,885
FY 2014Fire Department1$353
FY 2013School Construction Authority9$1,925,099
FY 2013Police Department8$1,428,047
FY 2013Department of Health and Mental Hygiene4$917,585
FY 2013Department of Design and Construction7$203,380
FY 2013Department of Emergency Management1$4,905
FY 2013Fire Department2$3,087
FY 2012School Construction Authority20$2,187,299
FY 2012Police Department14$1,303,064
FY 2012Department of Health and Mental Hygiene2$973,067
FY 2012Department of Design and Construction9$260,968
FY 2012Fire Department1$31,843
FY 2011School Construction Authority40$3,052,741
FY 2010School Construction Authority10$691,847
Total960$218,602,325

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
OTHR SERV AND CHRGS-GENERAL10$929,820Aug 15, 2011 – Dec 26, 2014
CAPITAL PURCHASED EQUIPMENT4$90,000Feb 3, 2014 – Nov 26, 2014
PROF SERV OTHER1$76,701Aug 26, 2013 – Aug 26, 2013
MAINT & REP GENERAL2$62,031Jun 27, 2013 – Jul 3, 2017
SUPPLIES + MATERIALS - GENERAL1$4,905Mar 27, 2013 – Mar 27, 2013
PROMPT PAYMENT INTEREST3$379Jan 7, 2016 – Oct 20, 2016
IOTB CONSTRUCTION35$2,328,678Oct 17, 2016 – Jul 9, 2018
CONSTRUCTION-BUILDINGS858$214,898,408Jan 6, 2010 – Jun 23, 2025
CONTRACTUAL SERVICES GENERAL2$186,505Aug 6, 2012 – Dec 26, 2014
PROF SERV ENGINEER & ARCHITECT1$14,910Jun 24, 2016 – Jun 24, 2016
DESIGN-CONSULTANT-IOTB18$11,148Oct 17, 2016 – Jul 9, 2018
<Non-Applicable Expenditure Object>25-$1,162Aug 15, 2011 – Apr 21, 2022

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 84 payments$22,348,994
DateAgencyAmountCategoryPurchase order
Mar 12, 2025School Construction Authority$1,781,835.30CONSTRUCTION-BUILDINGS–
May 13, 2025School Construction Authority$1,765,321.92CONSTRUCTION-BUILDINGS–
Feb 25, 2025School Construction Authority$1,597,206.50CONSTRUCTION-BUILDINGS–
Dec 10, 2024School Construction Authority$1,369,487.51CONSTRUCTION-BUILDINGS–
Apr 21, 2025School Construction Authority$1,093,957.01CONSTRUCTION-BUILDINGS–
Jun 20, 2025School Construction Authority$1,073,177.29CONSTRUCTION-BUILDINGS–
Feb 7, 2025School Construction Authority$1,019,529.02CONSTRUCTION-BUILDINGS–
Nov 6, 2024School Construction Authority$910,764.62CONSTRUCTION-BUILDINGS–
Dec 19, 2024School Construction Authority$910,347.77CONSTRUCTION-BUILDINGS–
Oct 28, 2024School Construction Authority$794,681.75CONSTRUCTION-BUILDINGS–
Dec 19, 2024School Construction Authority$788,196.33CONSTRUCTION-BUILDINGS–
Oct 29, 2024School Construction Authority$779,054.86CONSTRUCTION-BUILDINGS–
Sep 27, 2024School Construction Authority$557,340.30CONSTRUCTION-BUILDINGS–
Oct 8, 2024School Construction Authority$498,070.67CONSTRUCTION-BUILDINGS–
Nov 15, 2024School Construction Authority$466,363.27CONSTRUCTION-BUILDINGS–
Aug 27, 2024School Construction Authority$461,172.64CONSTRUCTION-BUILDINGS–
Nov 15, 2024School Construction Authority$458,032.52CONSTRUCTION-BUILDINGS–
Aug 6, 2024School Construction Authority$403,028.66CONSTRUCTION-BUILDINGS–
Jan 10, 2025School Construction Authority$388,885.44CONSTRUCTION-BUILDINGS–
Aug 27, 2024School Construction Authority$350,550.93CONSTRUCTION-BUILDINGS–
FY 2024top 20 of 85 payments$20,620,418
DateAgencyAmountCategoryPurchase order
Aug 15, 2023School Construction Authority$2,922,381.97CONSTRUCTION-BUILDINGS–
Jul 26, 2023School Construction Authority$2,221,247.40CONSTRUCTION-BUILDINGS–
Jul 28, 2023School Construction Authority$1,576,426.95CONSTRUCTION-BUILDINGS–
Sep 6, 2023School Construction Authority$1,095,730.00CONSTRUCTION-BUILDINGS–
Sep 18, 2023School Construction Authority$900,835.13CONSTRUCTION-BUILDINGS–
Sep 6, 2023School Construction Authority$679,392.50CONSTRUCTION-BUILDINGS–
Aug 11, 2023School Construction Authority$521,469.25CONSTRUCTION-BUILDINGS–
Jan 18, 2024School Construction Authority$495,662.50CONSTRUCTION-BUILDINGS–
May 16, 2024School Construction Authority$494,505.40CONSTRUCTION-BUILDINGS–
Dec 13, 2023School Construction Authority$494,505.40CONSTRUCTION-BUILDINGS–
Jun 3, 2024School Construction Authority$478,321.01CONSTRUCTION-BUILDINGS–
Dec 1, 2023School Construction Authority$451,549.25CONSTRUCTION-BUILDINGS–
Nov 3, 2023School Construction Authority$449,952.78CONSTRUCTION-BUILDINGS–
Feb 1, 2024School Construction Authority$448,566.53CONSTRUCTION-BUILDINGS–
Jan 18, 2024School Construction Authority$406,096.50CONSTRUCTION-BUILDINGS–
Nov 28, 2023School Construction Authority$396,228.42CONSTRUCTION-BUILDINGS–
Apr 24, 2024School Construction Authority$388,906.72CONSTRUCTION-BUILDINGS–
Nov 28, 2023School Construction Authority$383,230.00CONSTRUCTION-BUILDINGS–
Feb 1, 2024School Construction Authority$377,616.80CONSTRUCTION-BUILDINGS–
Jan 5, 2024School Construction Authority$342,000.00CONSTRUCTION-BUILDINGS–
FY 2023top 20 of 93 payments$38,982,569
DateAgencyAmountCategoryPurchase order
Nov 2, 2022School Construction Authority$3,321,817.60CONSTRUCTION-BUILDINGS–
Oct 26, 2022School Construction Authority$3,210,819.50CONSTRUCTION-BUILDINGS–
Jan 5, 2023School Construction Authority$2,923,500.12CONSTRUCTION-BUILDINGS–
Mar 20, 2023School Construction Authority$1,979,415.25CONSTRUCTION-BUILDINGS–
Apr 4, 2023School Construction Authority$1,673,163.04CONSTRUCTION-BUILDINGS–
Oct 27, 2022School Construction Authority$1,628,813.95CONSTRUCTION-BUILDINGS–
May 25, 2023School Construction Authority$1,451,880.68CONSTRUCTION-BUILDINGS–
Oct 11, 2022School Construction Authority$1,370,612.50CONSTRUCTION-BUILDINGS–
May 15, 2023School Construction Authority$1,284,848.15CONSTRUCTION-BUILDINGS–
May 25, 2023School Construction Authority$1,279,032.50CONSTRUCTION-BUILDINGS–
May 2, 2023School Construction Authority$1,159,005.46CONSTRUCTION-BUILDINGS–
Mar 16, 2023School Construction Authority$1,153,196.92CONSTRUCTION-BUILDINGS–
Jul 21, 2022School Construction Authority$929,891.68CONSTRUCTION-BUILDINGS–
Oct 11, 2022School Construction Authority$875,995.00CONSTRUCTION-BUILDINGS–
Jan 3, 2023School Construction Authority$827,569.09CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$621,204.70CONSTRUCTION-BUILDINGS–
Jun 26, 2023School Construction Authority$601,967.23CONSTRUCTION-BUILDINGS–
Dec 19, 2022School Construction Authority$581,829.05CONSTRUCTION-BUILDINGS–
Aug 3, 2022School Construction Authority$553,707.50CONSTRUCTION-BUILDINGS–
Oct 20, 2022School Construction Authority$535,241.63CONSTRUCTION-BUILDINGS–
FY 2022top 20 of 94 payments$27,316,574
DateAgencyAmountCategoryPurchase order
May 11, 2022School Construction Authority$2,372,682.00CONSTRUCTION-BUILDINGS–
Jul 7, 2021School Construction Authority$1,814,548.45CONSTRUCTION-BUILDINGS–
Dec 9, 2021School Construction Authority$1,719,642.50CONSTRUCTION-BUILDINGS–
Sep 29, 2021School Construction Authority$1,364,793.75CONSTRUCTION-BUILDINGS–
Jun 6, 2022School Construction Authority$1,152,199.90CONSTRUCTION-BUILDINGS–
Jul 6, 2021School Construction Authority$1,108,555.00CONSTRUCTION-BUILDINGS–
Aug 4, 2021School Construction Authority$999,725.27CONSTRUCTION-BUILDINGS–
Sep 29, 2021School Construction Authority$951,575.35CONSTRUCTION-BUILDINGS–
Jul 6, 2021School Construction Authority$786,640.23CONSTRUCTION-BUILDINGS–
Dec 14, 2021School Construction Authority$782,097.00CONSTRUCTION-BUILDINGS–
Aug 4, 2021School Construction Authority$716,062.50CONSTRUCTION-BUILDINGS–
Aug 4, 2021School Construction Authority$671,697.50CONSTRUCTION-BUILDINGS–
Jul 7, 2021School Construction Authority$566,846.00CONSTRUCTION-BUILDINGS–
Oct 27, 2021School Construction Authority$559,137.13CONSTRUCTION-BUILDINGS–
Jun 16, 2022School Construction Authority$553,707.50CONSTRUCTION-BUILDINGS–
Sep 29, 2021School Construction Authority$521,265.00CONSTRUCTION-BUILDINGS–
Apr 20, 2022School Construction Authority$512,494.89CONSTRUCTION-BUILDINGS–
Feb 9, 2022School Construction Authority$510,297.25CONSTRUCTION-BUILDINGS–
Aug 18, 2021School Construction Authority$510,292.50CONSTRUCTION-BUILDINGS–
Jun 16, 2022School Construction Authority$491,444.59CONSTRUCTION-BUILDINGS–
FY 2021top 20 of 35 payments$6,288,104
DateAgencyAmountCategoryPurchase order
Feb 22, 2021School Construction Authority$951,659.84CONSTRUCTION-BUILDINGS–
Apr 8, 2021School Construction Authority$676,048.50CONSTRUCTION-BUILDINGS–
Jun 8, 2021School Construction Authority$517,310.91CONSTRUCTION-BUILDINGS–
Jan 22, 2021School Construction Authority$496,308.50CONSTRUCTION-BUILDINGS–
Feb 11, 2021School Construction Authority$470,148.58CONSTRUCTION-BUILDINGS–
Jan 8, 2021School Construction Authority$411,941.09CONSTRUCTION-BUILDINGS–
May 3, 2021School Construction Authority$374,357.00CONSTRUCTION-BUILDINGS–
Jan 19, 2021School Construction Authority$290,795.00CONSTRUCTION-BUILDINGS–
Jun 8, 2021School Construction Authority$241,226.37CONSTRUCTION-BUILDINGS–
Oct 5, 2020School Construction Authority$211,466.20CONSTRUCTION-BUILDINGS–
May 5, 2021School Construction Authority$208,469.25CONSTRUCTION-BUILDINGS–
Jan 8, 2021School Construction Authority$187,845.88CONSTRUCTION-BUILDINGS–
Jan 8, 2021School Construction Authority$156,791.80CONSTRUCTION-BUILDINGS–
Oct 14, 2020School Construction Authority$149,074.00CONSTRUCTION-BUILDINGS–
Oct 2, 2020School Construction Authority$138,409.35CONSTRUCTION-BUILDINGS–
Jun 1, 2021School Construction Authority$126,953.14CONSTRUCTION-BUILDINGS–
Dec 7, 2020School Construction Authority$109,131.12CONSTRUCTION-BUILDINGS–
Oct 23, 2020School Construction Authority$83,007.43CONSTRUCTION-BUILDINGS–
Jan 8, 2021School Construction Authority$81,676.25CONSTRUCTION-BUILDINGS–
Oct 28, 2020School Construction Authority$67,717.63CONSTRUCTION-BUILDINGS–
FY 2020top 20 of 46 payments$21,476,592
DateAgencyAmountCategoryPurchase order
Aug 21, 2019School Construction Authority$3,881,149.95CONSTRUCTION-BUILDINGS–
Feb 4, 2020School Construction Authority$1,696,857.04CONSTRUCTION-BUILDINGS–
May 13, 2020School Construction Authority$1,267,983.05CONSTRUCTION-BUILDINGS–
Jul 30, 2019School Construction Authority$1,112,810.71CONSTRUCTION-BUILDINGS–
Mar 26, 2020School Construction Authority$986,686.62CONSTRUCTION-BUILDINGS–
Jan 29, 2020School Construction Authority$928,079.70CONSTRUCTION-BUILDINGS–
Dec 3, 2019School Construction Authority$922,900.95CONSTRUCTION-BUILDINGS–
Apr 2, 2020School Construction Authority$895,704.17CONSTRUCTION-BUILDINGS–
Feb 4, 2020School Construction Authority$894,650.63CONSTRUCTION-BUILDINGS–
May 19, 2020School Construction Authority$836,789.36CONSTRUCTION-BUILDINGS–
Mar 31, 2020School Construction Authority$732,352.90CONSTRUCTION-BUILDINGS–
Oct 15, 2019School Construction Authority$688,137.25CONSTRUCTION-BUILDINGS–
Apr 21, 2020School Construction Authority$594,144.44CONSTRUCTION-BUILDINGS–
Dec 6, 2019School Construction Authority$544,557.67CONSTRUCTION-BUILDINGS–
Feb 18, 2020School Construction Authority$525,008.00CONSTRUCTION-BUILDINGS–
Mar 31, 2020School Construction Authority$504,916.54CONSTRUCTION-BUILDINGS–
Sep 6, 2019School Construction Authority$438,092.50CONSTRUCTION-BUILDINGS–
Dec 11, 2019School Construction Authority$430,057.40CONSTRUCTION-BUILDINGS–
Mar 30, 2020School Construction Authority$415,815.00CONSTRUCTION-BUILDINGS–
Apr 7, 2020School Construction Authority$382,289.50CONSTRUCTION-BUILDINGS–
FY 2019top 20 of 81 payments$12,793,415
DateAgencyAmountCategoryPurchase order
Feb 26, 2019School Construction Authority$1,516,279.99CONSTRUCTION-BUILDINGS–
Feb 15, 2019School Construction Authority$1,486,343.97CONSTRUCTION-BUILDINGS–
Oct 16, 2018School Construction Authority$1,341,863.32CONSTRUCTION-BUILDINGS–
Aug 17, 2018School Construction Authority$1,007,880.31CONSTRUCTION-BUILDINGS–
Feb 27, 2019School Construction Authority$783,465.95CONSTRUCTION-BUILDINGS–
Jun 13, 2019School Construction Authority$758,290.00CONSTRUCTION-BUILDINGS–
Jul 17, 2018School Construction Authority$577,742.50CONSTRUCTION-BUILDINGS–
May 1, 2019School Construction Authority$558,030.00CONSTRUCTION-BUILDINGS–
Feb 27, 2019School Construction Authority$476,238.04CONSTRUCTION-BUILDINGS–
Mar 15, 2019School Construction Authority$427,562.23CONSTRUCTION-BUILDINGS–
Jul 17, 2018School Construction Authority$419,246.87CONSTRUCTION-BUILDINGS–
Sep 17, 2018School Construction Authority$416,741.25CONSTRUCTION-BUILDINGS–
Feb 25, 2019School Construction Authority$347,510.00CONSTRUCTION-BUILDINGS–
Sep 17, 2018School Construction Authority$294,452.50CONSTRUCTION-BUILDINGS–
Feb 20, 2019School Construction Authority$250,000.00CONSTRUCTION-BUILDINGS–
May 29, 2019School Construction Authority$227,477.58CONSTRUCTION-BUILDINGS–
Sep 17, 2018School Construction Authority$206,340.00CONSTRUCTION-BUILDINGS–
Aug 24, 2018School Construction Authority$167,313.46CONSTRUCTION-BUILDINGS–
Sep 17, 2018School Construction Authority$150,052.50CONSTRUCTION-BUILDINGS–
May 31, 2019School Construction Authority$129,006.23CONSTRUCTION-BUILDINGS–
FY 2018top 20 of 62 payments$10,194,171
DateAgencyAmountCategoryPurchase order
Jun 1, 2018School Construction Authority$1,344,902.32CONSTRUCTION-BUILDINGS–
Nov 30, 2017School Construction Authority$892,848.03CONSTRUCTION-BUILDINGS–
Jan 23, 2018School Construction Authority$892,848.03CONSTRUCTION-BUILDINGS–
Jun 8, 2018School Construction Authority$753,036.93CONSTRUCTION-BUILDINGS–
Feb 1, 2018School Construction Authority$667,833.80CONSTRUCTION-BUILDINGS–
May 21, 2018School Construction Authority$604,580.00CONSTRUCTION-BUILDINGS–
Aug 31, 2017School Construction Authority$521,436.00CONSTRUCTION-BUILDINGS–
Jan 19, 2018School Construction Authority$478,798.09CONSTRUCTION-BUILDINGS–
Feb 12, 2018School Construction Authority$462,574.00CONSTRUCTION-BUILDINGS–
May 21, 2018School Construction Authority$452,627.50CONSTRUCTION-BUILDINGS–
Mar 21, 2018School Construction Authority$452,039.08CONSTRUCTION-BUILDINGS–
May 23, 2018School Construction Authority$426,839.75CONSTRUCTION-BUILDINGS–
Mar 21, 2018School Construction Authority$421,464.56CONSTRUCTION-BUILDINGS–
Mar 21, 2018School Construction Authority$345,752.50CONSTRUCTION-BUILDINGS–
Jan 19, 2018School Construction Authority$322,861.30CONSTRUCTION-BUILDINGS–
Apr 2, 2018School Construction Authority$310,331.75CONSTRUCTION-BUILDINGS–
Jan 19, 2018School Construction Authority$239,991.00CONSTRUCTION-BUILDINGS–
Jul 6, 2017School Construction Authority$164,765.12CONSTRUCTION-BUILDINGS–
Aug 25, 2017Police Department$138,338.01IOTB CONSTRUCTION–
Feb 12, 2018School Construction Authority$137,960.52CONSTRUCTION-BUILDINGS–
FY 2017top 20 of 92 payments$16,207,446
DateAgencyAmountCategoryPurchase order
Mar 23, 2017School Construction Authority$1,275,527.00CONSTRUCTION-BUILDINGS–
Jan 20, 2017School Construction Authority$1,262,240.78CONSTRUCTION-BUILDINGS–
Jun 16, 2017School Construction Authority$1,097,596.75CONSTRUCTION-BUILDINGS–
Apr 18, 2017School Construction Authority$1,023,648.75CONSTRUCTION-BUILDINGS–
Feb 22, 2017School Construction Authority$1,007,343.90CONSTRUCTION-BUILDINGS–
May 22, 2017School Construction Authority$953,724.00CONSTRUCTION-BUILDINGS–
Mar 1, 2017School Construction Authority$884,188.27CONSTRUCTION-BUILDINGS–
Nov 3, 2016School Construction Authority$667,361.94CONSTRUCTION-BUILDINGS–
Dec 6, 2016School Construction Authority$615,487.52CONSTRUCTION-BUILDINGS–
Sep 19, 2016School Construction Authority$508,223.78CONSTRUCTION-BUILDINGS–
Nov 9, 2016School Construction Authority$505,763.47CONSTRUCTION-BUILDINGS–
Jun 23, 2017School Construction Authority$431,186.00CONSTRUCTION-BUILDINGS–
Aug 26, 2016School Construction Authority$371,891.75CONSTRUCTION-BUILDINGS–
Aug 23, 2016School Construction Authority$306,482.25CONSTRUCTION-BUILDINGS–
Apr 19, 2017School Construction Authority$300,485.00CONSTRUCTION-BUILDINGS–
Apr 19, 2017School Construction Authority$289,303.50CONSTRUCTION-BUILDINGS–
Aug 17, 2016School Construction Authority$268,173.64CONSTRUCTION-BUILDINGS–
Jun 2, 2017School Construction Authority$249,422.50CONSTRUCTION-BUILDINGS–
Aug 24, 2016School Construction Authority$247,168.62CONSTRUCTION-BUILDINGS–
Jun 14, 2017Police Department$246,869.02IOTB CONSTRUCTION–
FY 2016top 20 of 63 payments$11,739,871
DateAgencyAmountCategoryPurchase order
Aug 12, 2015School Construction Authority$1,552,885.20CONSTRUCTION-BUILDINGS–
Jun 21, 2016School Construction Authority$1,155,613.25CONSTRUCTION-BUILDINGS–
Apr 29, 2016School Construction Authority$794,847.05CONSTRUCTION-BUILDINGS–
Mar 31, 2016School Construction Authority$601,301.45CONSTRUCTION-BUILDINGS–
May 26, 2016School Construction Authority$439,299.00CONSTRUCTION-BUILDINGS–
Feb 16, 2016School Construction Authority$422,512.50CONSTRUCTION-BUILDINGS–
Jun 22, 2016School Construction Authority$403,891.45CONSTRUCTION-BUILDINGS–
Oct 9, 2015School Construction Authority$395,375.75CONSTRUCTION-BUILDINGS–
Dec 21, 2015School Construction Authority$386,488.50CONSTRUCTION-BUILDINGS–
Jan 19, 2016School Construction Authority$370,690.00CONSTRUCTION-BUILDINGS–
Nov 18, 2015School Construction Authority$370,690.00CONSTRUCTION-BUILDINGS–
Jul 8, 2015School Construction Authority$347,915.65CONSTRUCTION-BUILDINGS–
Mar 28, 2016Police Department$330,342.76CONSTRUCTION-BUILDINGS–
May 5, 2016School Construction Authority$323,314.93CONSTRUCTION-BUILDINGS–
Aug 21, 2015School Construction Authority$312,431.25CONSTRUCTION-BUILDINGS–
Mar 23, 2016School Construction Authority$295,450.00CONSTRUCTION-BUILDINGS–
May 5, 2016School Construction Authority$291,862.42CONSTRUCTION-BUILDINGS–
Feb 16, 2016School Construction Authority$248,975.81CONSTRUCTION-BUILDINGS–
May 5, 2016School Construction Authority$238,014.61CONSTRUCTION-BUILDINGS–
Mar 23, 2016School Construction Authority$231,640.97CONSTRUCTION-BUILDINGS–
FY 2015top 20 of 50 payments$9,846,261
DateAgencyAmountCategoryPurchase order
May 29, 2015School Construction Authority$1,736,072.15CONSTRUCTION-BUILDINGS–
Mar 31, 2015School Construction Authority$1,323,478.82CONSTRUCTION-BUILDINGS–
Apr 30, 2015Department of Correction$905,009.08CONSTRUCTION-BUILDINGS–
Aug 20, 2014School Construction Authority$838,025.40CONSTRUCTION-BUILDINGS–
Sep 5, 2014Department of Cultural Affairs$564,192.00CONSTRUCTION-BUILDINGS–
Jun 22, 2015School Construction Authority$526,860.88CONSTRUCTION-BUILDINGS–
Dec 23, 2014School Construction Authority$434,055.00CONSTRUCTION-BUILDINGS–
Sep 22, 2014School Construction Authority$413,812.64CONSTRUCTION-BUILDINGS–
Mar 9, 2015School Construction Authority$367,779.58CONSTRUCTION-BUILDINGS–
Aug 20, 2014School Construction Authority$357,057.50CONSTRUCTION-BUILDINGS–
Feb 17, 2015Department of Correction$235,800.00CONSTRUCTION-BUILDINGS–
Oct 24, 2014Department of Cultural Affairs$208,440.00CONSTRUCTION-BUILDINGS–
Dec 23, 2014School Construction Authority$154,856.13CONSTRUCTION-BUILDINGS–
Jun 10, 2015School Construction Authority$141,254.55CONSTRUCTION-BUILDINGS–
Jan 2, 2015Department of Cultural Affairs$131,418.00CONSTRUCTION-BUILDINGS–
Jan 2, 2015Department of Cultural Affairs$130,595.40CONSTRUCTION-BUILDINGS–
Aug 21, 2014School Construction Authority$126,776.69CONSTRUCTION-BUILDINGS–
Dec 29, 2014Department of Health and Mental Hygiene$126,185.69CONSTRUCTION-BUILDINGS–
Jun 26, 2015Department of Health and Mental Hygiene$82,225.35CONSTRUCTION-BUILDINGS–
Jun 26, 2015Department of Health and Mental Hygiene$72,270.30CONSTRUCTION-BUILDINGS–
FY 2014top 20 of 48 payments$7,804,975
DateAgencyAmountCategoryPurchase order
Nov 6, 2013School Construction Authority$570,183.54CONSTRUCTION-BUILDINGS–
Feb 10, 2014Department of Design and Construction$540,819.02OTHR SERV AND CHRGS-GENERAL–
Nov 12, 2013Department of Cultural Affairs$518,587.18CONSTRUCTION-BUILDINGS–
Apr 8, 2014School Construction Authority$487,654.24CONSTRUCTION-BUILDINGS–
May 27, 2014School Construction Authority$401,987.57CONSTRUCTION-BUILDINGS–
Sep 30, 2013School Construction Authority$359,524.36CONSTRUCTION-BUILDINGS–
Apr 4, 2014School Construction Authority$325,090.00CONSTRUCTION-BUILDINGS–
Feb 26, 2014School Construction Authority$306,324.17CONSTRUCTION-BUILDINGS–
Jan 17, 2014Department of Cultural Affairs$283,727.07CONSTRUCTION-BUILDINGS–
Dec 30, 2013School Construction Authority$270,465.34CONSTRUCTION-BUILDINGS–
Jun 9, 2014School Construction Authority$250,101.70CONSTRUCTION-BUILDINGS–
Jul 25, 2013Police Department$246,260.62CONSTRUCTION-BUILDINGS–
Apr 4, 2014School Construction Authority$235,842.25CONSTRUCTION-BUILDINGS–
Mar 19, 2014Police Department$232,129.25CONSTRUCTION-BUILDINGS–
Dec 10, 2013School Construction Authority$227,034.32CONSTRUCTION-BUILDINGS–
Apr 7, 2014School Construction Authority$210,620.08CONSTRUCTION-BUILDINGS–
Jan 27, 2014Department of Cultural Affairs$196,200.01CONSTRUCTION-BUILDINGS–
Sep 27, 2013School Construction Authority$192,262.66CONSTRUCTION-BUILDINGS–
Dec 13, 2013School Construction Authority$190,595.65CONSTRUCTION-BUILDINGS–
Oct 23, 2013School Construction Authority$177,237.51CONSTRUCTION-BUILDINGS–
FY 2013top 20 of 31 payments$4,482,104
DateAgencyAmountCategoryPurchase order
Nov 28, 2012Police Department$403,773.57CONSTRUCTION-BUILDINGS–
Dec 12, 2012Department of Health and Mental Hygiene$401,735.81CONSTRUCTION-BUILDINGS–
Oct 4, 2012School Construction Authority$361,794.42CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$350,821.83CONSTRUCTION-BUILDINGS–
Oct 9, 2012School Construction Authority$322,610.50CONSTRUCTION-BUILDINGS–
Oct 24, 2012School Construction Authority$277,793.30CONSTRUCTION-BUILDINGS–
Dec 31, 2012School Construction Authority$273,509.43CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$239,918.56CONSTRUCTION-BUILDINGS–
Apr 9, 2013School Construction Authority$217,135.72CONSTRUCTION-BUILDINGS–
Jan 3, 2013School Construction Authority$203,338.00CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$186,582.48CONSTRUCTION-BUILDINGS–
Aug 6, 2012Department of Design and Construction$184,639.89CONTRACTUAL SERVICES GENERAL–
May 15, 2013Department of Health and Mental Hygiene$176,119.67CONSTRUCTION-BUILDINGS–
Jan 22, 2013Department of Health and Mental Hygiene$170,598.03CONSTRUCTION-BUILDINGS–
Aug 6, 2012Department of Health and Mental Hygiene$169,131.07CONSTRUCTION-BUILDINGS–
Jan 11, 2013School Construction Authority$168,265.98CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$98,564.97CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$71,696.88CONSTRUCTION-BUILDINGS–
Nov 28, 2012Police Department$61,488.79CONSTRUCTION-BUILDINGS–
Jan 3, 2013School Construction Authority$53,801.91CONSTRUCTION-BUILDINGS–
FY 2012top 20 of 46 payments$4,756,242
DateAgencyAmountCategoryPurchase order
May 23, 2012Department of Health and Mental Hygiene$592,559.60CONSTRUCTION-BUILDINGS–
Dec 19, 2011Police Department$381,220.55CONSTRUCTION-BUILDINGS–
Mar 26, 2012Department of Health and Mental Hygiene$380,507.63CONSTRUCTION-BUILDINGS–
Dec 19, 2011School Construction Authority$296,922.50CONSTRUCTION-BUILDINGS–
Oct 12, 2011School Construction Authority$261,107.50CONSTRUCTION-BUILDINGS–
Jan 9, 2012School Construction Authority$228,870.58CONSTRUCTION-BUILDINGS–
Feb 8, 2012School Construction Authority$211,509.90CONSTRUCTION-BUILDINGS–
Feb 21, 2012Police Department$202,676.58CONSTRUCTION-BUILDINGS–
Jun 27, 2012Department of Design and Construction$180,759.87OTHR SERV AND CHRGS-GENERAL–
Dec 19, 2011Police Department$176,561.41CONSTRUCTION-BUILDINGS–
Feb 9, 2012School Construction Authority$169,810.60CONSTRUCTION-BUILDINGS–
May 2, 2012School Construction Authority$145,520.33CONSTRUCTION-BUILDINGS–
Feb 6, 2012School Construction Authority$142,536.25CONSTRUCTION-BUILDINGS–
Jul 8, 2011School Construction Authority$138,533.75CONSTRUCTION-BUILDINGS–
Dec 19, 2011Police Department$109,646.96CONSTRUCTION-BUILDINGS–
May 16, 2012School Construction Authority$108,960.44CONSTRUCTION-BUILDINGS–
Feb 16, 2012School Construction Authority$102,072.94CONSTRUCTION-BUILDINGS–
Aug 23, 2011School Construction Authority$100,121.46CONSTRUCTION-BUILDINGS–
Oct 12, 2011School Construction Authority$89,129.00CONSTRUCTION-BUILDINGS–
Dec 19, 2011Police Department$87,166.49CONSTRUCTION-BUILDINGS–
FY 2011top 20 of 40 payments$3,052,741
DateAgencyAmountCategoryPurchase order
Oct 6, 2010School Construction Authority$616,348.60CONSTRUCTION-BUILDINGS–
Oct 14, 2010School Construction Authority$537,545.15CONSTRUCTION-BUILDINGS–
Oct 8, 2010School Construction Authority$291,223.83CONSTRUCTION-BUILDINGS–
Oct 12, 2010School Construction Authority$289,667.35CONSTRUCTION-BUILDINGS–
Mar 30, 2011School Construction Authority$282,564.20CONSTRUCTION-BUILDINGS–
Dec 15, 2010School Construction Authority$188,443.90CONSTRUCTION-BUILDINGS–
Jun 28, 2011School Construction Authority$137,163.00CONSTRUCTION-BUILDINGS–
Jun 1, 2011School Construction Authority$126,682.50CONSTRUCTION-BUILDINGS–
Feb 9, 2011School Construction Authority$95,117.80CONSTRUCTION-BUILDINGS–
Mar 8, 2011School Construction Authority$79,500.00CONSTRUCTION-BUILDINGS–
Jun 14, 2011School Construction Authority$74,907.50CONSTRUCTION-BUILDINGS–
Oct 8, 2010School Construction Authority$52,356.73CONSTRUCTION-BUILDINGS–
Dec 15, 2010School Construction Authority$37,512.65CONSTRUCTION-BUILDINGS–
Dec 9, 2010School Construction Authority$30,438.00CONSTRUCTION-BUILDINGS–
Jun 24, 2011School Construction Authority$25,297.00CONSTRUCTION-BUILDINGS–
Dec 15, 2010School Construction Authority$21,231.17CONSTRUCTION-BUILDINGS–
Jun 24, 2011School Construction Authority$20,308.90CONSTRUCTION-BUILDINGS–
Mar 8, 2011School Construction Authority$16,617.00CONSTRUCTION-BUILDINGS–
Jul 7, 2010School Construction Authority$15,500.00CONSTRUCTION-BUILDINGS–
Jun 28, 2011School Construction Authority$14,231.85CONSTRUCTION-BUILDINGS–
FY 2010top 10 of 10 payments$691,847
DateAgencyAmountCategoryPurchase order
Jan 6, 2010School Construction Authority$244,625.00CONSTRUCTION-BUILDINGS–
Feb 22, 2010School Construction Authority$177,578.75CONSTRUCTION-BUILDINGS–
Jun 25, 2010School Construction Authority$102,504.75CONSTRUCTION-BUILDINGS–
May 19, 2010School Construction Authority$65,945.06CONSTRUCTION-BUILDINGS–
Jun 1, 2010School Construction Authority$24,795.00CONSTRUCTION-BUILDINGS–
Jan 6, 2010School Construction Authority$24,581.25CONSTRUCTION-BUILDINGS–
Feb 11, 2010School Construction Authority$23,501.06CONSTRUCTION-BUILDINGS–
Jan 21, 2010School Construction Authority$15,689.25CONSTRUCTION-BUILDINGS–
Jun 25, 2010School Construction Authority$11,914.44CONSTRUCTION-BUILDINGS–
Feb 11, 2010School Construction Authority$712.50CONSTRUCTION-BUILDINGS–

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025School Construction Authority$60,701.87CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$1,520.01CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$7,745.08CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$17,643.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$1,073,177.29CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$24,458.76CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$49,156.25CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$144,940.69CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$20,498.85CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$7,736.00CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$25,759.25CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$72,845.21CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$1,765,321.92CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$68,841.28CONSTRUCTION-BUILDINGSCapital Contracts
May 7, 2025School Construction Authority$58,520.95CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025School Construction Authority$1,093,957.01CONSTRUCTION-BUILDINGSCapital Contracts
Apr 8, 2025School Construction Authority$69,396.48CONSTRUCTION-BUILDINGSCapital Contracts
Apr 8, 2025School Construction Authority$199.50CONSTRUCTION-BUILDINGSCapital Contracts
Mar 26, 2025School Construction Authority$203,643.80CONSTRUCTION-BUILDINGSCapital Contracts
Mar 26, 2025School Construction Authority$1,884.27CONSTRUCTION-BUILDINGSCapital Contracts
Mar 17, 2025School Construction Authority$33,060.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 12, 2025School Construction Authority$152,879.98CONSTRUCTION-BUILDINGSCapital Contracts
Mar 12, 2025School Construction Authority$1,781,835.30CONSTRUCTION-BUILDINGSCapital Contracts
Feb 25, 2025School Construction Authority$1,597,206.50CONSTRUCTION-BUILDINGSCapital Contracts
Feb 20, 2025School Construction Authority$677.20CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data