Nehal Contracting Inc: New York City Government Payments
as recorded by New York City: NEHAL CONTRACTING INC
Nehal Contracting Inc is the 314th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 48th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.5% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 8.4% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OTHR SERV AND CHRGS-GENERAL | 10 | $929,820 | Aug 15, 2011 – Dec 26, 2014 |
| CAPITAL PURCHASED EQUIPMENT | 4 | $90,000 | Feb 3, 2014 – Nov 26, 2014 |
| PROF SERV OTHER | 1 | $76,701 | Aug 26, 2013 – Aug 26, 2013 |
| MAINT & REP GENERAL | 2 | $62,031 | Jun 27, 2013 – Jul 3, 2017 |
| SUPPLIES + MATERIALS - GENERAL | 1 | $4,905 | Mar 27, 2013 – Mar 27, 2013 |
| PROMPT PAYMENT INTEREST | 3 | $379 | Jan 7, 2016 – Oct 20, 2016 |
| IOTB CONSTRUCTION | 35 | $2,328,678 | Oct 17, 2016 – Jul 9, 2018 |
| CONSTRUCTION-BUILDINGS | 858 | $214,898,408 | Jan 6, 2010 – Jun 23, 2025 |
| CONTRACTUAL SERVICES GENERAL | 2 | $186,505 | Aug 6, 2012 – Dec 26, 2014 |
| PROF SERV ENGINEER & ARCHITECT | 1 | $14,910 | Jun 24, 2016 – Jun 24, 2016 |
| DESIGN-CONSULTANT-IOTB | 18 | $11,148 | Oct 17, 2016 – Jul 9, 2018 |
| <Non-Applicable Expenditure Object> | 25 | -$1,162 | Aug 15, 2011 – Apr 21, 2022 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 84 payments$22,348,994
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 12, 2025 | School Construction Authority | $1,781,835.30 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2025 | School Construction Authority | $1,765,321.92 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2025 | School Construction Authority | $1,597,206.50 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2024 | School Construction Authority | $1,369,487.51 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2025 | School Construction Authority | $1,093,957.01 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2025 | School Construction Authority | $1,073,177.29 | CONSTRUCTION-BUILDINGS | – |
| Feb 7, 2025 | School Construction Authority | $1,019,529.02 | CONSTRUCTION-BUILDINGS | – |
| Nov 6, 2024 | School Construction Authority | $910,764.62 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2024 | School Construction Authority | $910,347.77 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2024 | School Construction Authority | $794,681.75 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2024 | School Construction Authority | $788,196.33 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2024 | School Construction Authority | $779,054.86 | CONSTRUCTION-BUILDINGS | – |
| Sep 27, 2024 | School Construction Authority | $557,340.30 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2024 | School Construction Authority | $498,070.67 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2024 | School Construction Authority | $466,363.27 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2024 | School Construction Authority | $461,172.64 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2024 | School Construction Authority | $458,032.52 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2024 | School Construction Authority | $403,028.66 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2025 | School Construction Authority | $388,885.44 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2024 | School Construction Authority | $350,550.93 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 85 payments$20,620,418
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 15, 2023 | School Construction Authority | $2,922,381.97 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2023 | School Construction Authority | $2,221,247.40 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2023 | School Construction Authority | $1,576,426.95 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | School Construction Authority | $1,095,730.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 18, 2023 | School Construction Authority | $900,835.13 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | School Construction Authority | $679,392.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 11, 2023 | School Construction Authority | $521,469.25 | CONSTRUCTION-BUILDINGS | – |
| Jan 18, 2024 | School Construction Authority | $495,662.50 | CONSTRUCTION-BUILDINGS | – |
| May 16, 2024 | School Construction Authority | $494,505.40 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2023 | School Construction Authority | $494,505.40 | CONSTRUCTION-BUILDINGS | – |
| Jun 3, 2024 | School Construction Authority | $478,321.01 | CONSTRUCTION-BUILDINGS | – |
| Dec 1, 2023 | School Construction Authority | $451,549.25 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2023 | School Construction Authority | $449,952.78 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2024 | School Construction Authority | $448,566.53 | CONSTRUCTION-BUILDINGS | – |
| Jan 18, 2024 | School Construction Authority | $406,096.50 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2023 | School Construction Authority | $396,228.42 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2024 | School Construction Authority | $388,906.72 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2023 | School Construction Authority | $383,230.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2024 | School Construction Authority | $377,616.80 | CONSTRUCTION-BUILDINGS | – |
| Jan 5, 2024 | School Construction Authority | $342,000.00 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 93 payments$38,982,569
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 2, 2022 | School Construction Authority | $3,321,817.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 26, 2022 | School Construction Authority | $3,210,819.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 5, 2023 | School Construction Authority | $2,923,500.12 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2023 | School Construction Authority | $1,979,415.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2023 | School Construction Authority | $1,673,163.04 | CONSTRUCTION-BUILDINGS | – |
| Oct 27, 2022 | School Construction Authority | $1,628,813.95 | CONSTRUCTION-BUILDINGS | – |
| May 25, 2023 | School Construction Authority | $1,451,880.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2022 | School Construction Authority | $1,370,612.50 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2023 | School Construction Authority | $1,284,848.15 | CONSTRUCTION-BUILDINGS | – |
| May 25, 2023 | School Construction Authority | $1,279,032.50 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2023 | School Construction Authority | $1,159,005.46 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2023 | School Construction Authority | $1,153,196.92 | CONSTRUCTION-BUILDINGS | – |
| Jul 21, 2022 | School Construction Authority | $929,891.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2022 | School Construction Authority | $875,995.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2023 | School Construction Authority | $827,569.09 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2023 | School Construction Authority | $621,204.70 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2023 | School Construction Authority | $601,967.23 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2022 | School Construction Authority | $581,829.05 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2022 | School Construction Authority | $553,707.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 20, 2022 | School Construction Authority | $535,241.63 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 94 payments$27,316,574
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 11, 2022 | School Construction Authority | $2,372,682.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 7, 2021 | School Construction Authority | $1,814,548.45 | CONSTRUCTION-BUILDINGS | – |
| Dec 9, 2021 | School Construction Authority | $1,719,642.50 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2021 | School Construction Authority | $1,364,793.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2022 | School Construction Authority | $1,152,199.90 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2021 | School Construction Authority | $1,108,555.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2021 | School Construction Authority | $999,725.27 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2021 | School Construction Authority | $951,575.35 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2021 | School Construction Authority | $786,640.23 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2021 | School Construction Authority | $782,097.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2021 | School Construction Authority | $716,062.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2021 | School Construction Authority | $671,697.50 | CONSTRUCTION-BUILDINGS | – |
| Jul 7, 2021 | School Construction Authority | $566,846.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 27, 2021 | School Construction Authority | $559,137.13 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2022 | School Construction Authority | $553,707.50 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2021 | School Construction Authority | $521,265.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2022 | School Construction Authority | $512,494.89 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2022 | School Construction Authority | $510,297.25 | CONSTRUCTION-BUILDINGS | – |
| Aug 18, 2021 | School Construction Authority | $510,292.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2022 | School Construction Authority | $491,444.59 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 35 payments$6,288,104
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 22, 2021 | School Construction Authority | $951,659.84 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2021 | School Construction Authority | $676,048.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2021 | School Construction Authority | $517,310.91 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2021 | School Construction Authority | $496,308.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2021 | School Construction Authority | $470,148.58 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2021 | School Construction Authority | $411,941.09 | CONSTRUCTION-BUILDINGS | – |
| May 3, 2021 | School Construction Authority | $374,357.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2021 | School Construction Authority | $290,795.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2021 | School Construction Authority | $241,226.37 | CONSTRUCTION-BUILDINGS | – |
| Oct 5, 2020 | School Construction Authority | $211,466.20 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2021 | School Construction Authority | $208,469.25 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2021 | School Construction Authority | $187,845.88 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2021 | School Construction Authority | $156,791.80 | CONSTRUCTION-BUILDINGS | – |
| Oct 14, 2020 | School Construction Authority | $149,074.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 2, 2020 | School Construction Authority | $138,409.35 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2021 | School Construction Authority | $126,953.14 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2020 | School Construction Authority | $109,131.12 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2020 | School Construction Authority | $83,007.43 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2021 | School Construction Authority | $81,676.25 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2020 | School Construction Authority | $67,717.63 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 46 payments$21,476,592
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 21, 2019 | School Construction Authority | $3,881,149.95 | CONSTRUCTION-BUILDINGS | – |
| Feb 4, 2020 | School Construction Authority | $1,696,857.04 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2020 | School Construction Authority | $1,267,983.05 | CONSTRUCTION-BUILDINGS | – |
| Jul 30, 2019 | School Construction Authority | $1,112,810.71 | CONSTRUCTION-BUILDINGS | – |
| Mar 26, 2020 | School Construction Authority | $986,686.62 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2020 | School Construction Authority | $928,079.70 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2019 | School Construction Authority | $922,900.95 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2020 | School Construction Authority | $895,704.17 | CONSTRUCTION-BUILDINGS | – |
| Feb 4, 2020 | School Construction Authority | $894,650.63 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2020 | School Construction Authority | $836,789.36 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2020 | School Construction Authority | $732,352.90 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2019 | School Construction Authority | $688,137.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2020 | School Construction Authority | $594,144.44 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2019 | School Construction Authority | $544,557.67 | CONSTRUCTION-BUILDINGS | – |
| Feb 18, 2020 | School Construction Authority | $525,008.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2020 | School Construction Authority | $504,916.54 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2019 | School Construction Authority | $438,092.50 | CONSTRUCTION-BUILDINGS | – |
| Dec 11, 2019 | School Construction Authority | $430,057.40 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2020 | School Construction Authority | $415,815.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 7, 2020 | School Construction Authority | $382,289.50 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 81 payments$12,793,415
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 26, 2019 | School Construction Authority | $1,516,279.99 | CONSTRUCTION-BUILDINGS | – |
| Feb 15, 2019 | School Construction Authority | $1,486,343.97 | CONSTRUCTION-BUILDINGS | – |
| Oct 16, 2018 | School Construction Authority | $1,341,863.32 | CONSTRUCTION-BUILDINGS | – |
| Aug 17, 2018 | School Construction Authority | $1,007,880.31 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2019 | School Construction Authority | $783,465.95 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2019 | School Construction Authority | $758,290.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2018 | School Construction Authority | $577,742.50 | CONSTRUCTION-BUILDINGS | – |
| May 1, 2019 | School Construction Authority | $558,030.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 27, 2019 | School Construction Authority | $476,238.04 | CONSTRUCTION-BUILDINGS | – |
| Mar 15, 2019 | School Construction Authority | $427,562.23 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2018 | School Construction Authority | $419,246.87 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | School Construction Authority | $416,741.25 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2019 | School Construction Authority | $347,510.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | School Construction Authority | $294,452.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 20, 2019 | School Construction Authority | $250,000.00 | CONSTRUCTION-BUILDINGS | – |
| May 29, 2019 | School Construction Authority | $227,477.58 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | School Construction Authority | $206,340.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 24, 2018 | School Construction Authority | $167,313.46 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | School Construction Authority | $150,052.50 | CONSTRUCTION-BUILDINGS | – |
| May 31, 2019 | School Construction Authority | $129,006.23 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 62 payments$10,194,171
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 1, 2018 | School Construction Authority | $1,344,902.32 | CONSTRUCTION-BUILDINGS | – |
| Nov 30, 2017 | School Construction Authority | $892,848.03 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2018 | School Construction Authority | $892,848.03 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2018 | School Construction Authority | $753,036.93 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2018 | School Construction Authority | $667,833.80 | CONSTRUCTION-BUILDINGS | – |
| May 21, 2018 | School Construction Authority | $604,580.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2017 | School Construction Authority | $521,436.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2018 | School Construction Authority | $478,798.09 | CONSTRUCTION-BUILDINGS | – |
| Feb 12, 2018 | School Construction Authority | $462,574.00 | CONSTRUCTION-BUILDINGS | – |
| May 21, 2018 | School Construction Authority | $452,627.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2018 | School Construction Authority | $452,039.08 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2018 | School Construction Authority | $426,839.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2018 | School Construction Authority | $421,464.56 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2018 | School Construction Authority | $345,752.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2018 | School Construction Authority | $322,861.30 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2018 | School Construction Authority | $310,331.75 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2018 | School Construction Authority | $239,991.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2017 | School Construction Authority | $164,765.12 | CONSTRUCTION-BUILDINGS | – |
| Aug 25, 2017 | Police Department | $138,338.01 | IOTB CONSTRUCTION | – |
| Feb 12, 2018 | School Construction Authority | $137,960.52 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 92 payments$16,207,446
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 23, 2017 | School Construction Authority | $1,275,527.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 20, 2017 | School Construction Authority | $1,262,240.78 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2017 | School Construction Authority | $1,097,596.75 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2017 | School Construction Authority | $1,023,648.75 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2017 | School Construction Authority | $1,007,343.90 | CONSTRUCTION-BUILDINGS | – |
| May 22, 2017 | School Construction Authority | $953,724.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 1, 2017 | School Construction Authority | $884,188.27 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2016 | School Construction Authority | $667,361.94 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2016 | School Construction Authority | $615,487.52 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2016 | School Construction Authority | $508,223.78 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $505,763.47 | CONSTRUCTION-BUILDINGS | – |
| Jun 23, 2017 | School Construction Authority | $431,186.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2016 | School Construction Authority | $371,891.75 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2016 | School Construction Authority | $306,482.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2017 | School Construction Authority | $300,485.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2017 | School Construction Authority | $289,303.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 17, 2016 | School Construction Authority | $268,173.64 | CONSTRUCTION-BUILDINGS | – |
| Jun 2, 2017 | School Construction Authority | $249,422.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 24, 2016 | School Construction Authority | $247,168.62 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2017 | Police Department | $246,869.02 | IOTB CONSTRUCTION | – |
FY 2016top 20 of 63 payments$11,739,871
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 12, 2015 | School Construction Authority | $1,552,885.20 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2016 | School Construction Authority | $1,155,613.25 | CONSTRUCTION-BUILDINGS | – |
| Apr 29, 2016 | School Construction Authority | $794,847.05 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2016 | School Construction Authority | $601,301.45 | CONSTRUCTION-BUILDINGS | – |
| May 26, 2016 | School Construction Authority | $439,299.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2016 | School Construction Authority | $422,512.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 22, 2016 | School Construction Authority | $403,891.45 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $395,375.75 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2015 | School Construction Authority | $386,488.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2016 | School Construction Authority | $370,690.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 18, 2015 | School Construction Authority | $370,690.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2015 | School Construction Authority | $347,915.65 | CONSTRUCTION-BUILDINGS | – |
| Mar 28, 2016 | Police Department | $330,342.76 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2016 | School Construction Authority | $323,314.93 | CONSTRUCTION-BUILDINGS | – |
| Aug 21, 2015 | School Construction Authority | $312,431.25 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2016 | School Construction Authority | $295,450.00 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2016 | School Construction Authority | $291,862.42 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2016 | School Construction Authority | $248,975.81 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2016 | School Construction Authority | $238,014.61 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2016 | School Construction Authority | $231,640.97 | CONSTRUCTION-BUILDINGS | – |
FY 2015top 20 of 50 payments$9,846,261
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 29, 2015 | School Construction Authority | $1,736,072.15 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2015 | School Construction Authority | $1,323,478.82 | CONSTRUCTION-BUILDINGS | – |
| Apr 30, 2015 | Department of Correction | $905,009.08 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2014 | School Construction Authority | $838,025.40 | CONSTRUCTION-BUILDINGS | – |
| Sep 5, 2014 | Department of Cultural Affairs | $564,192.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 22, 2015 | School Construction Authority | $526,860.88 | CONSTRUCTION-BUILDINGS | – |
| Dec 23, 2014 | School Construction Authority | $434,055.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 22, 2014 | School Construction Authority | $413,812.64 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2015 | School Construction Authority | $367,779.58 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2014 | School Construction Authority | $357,057.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 17, 2015 | Department of Correction | $235,800.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 24, 2014 | Department of Cultural Affairs | $208,440.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 23, 2014 | School Construction Authority | $154,856.13 | CONSTRUCTION-BUILDINGS | – |
| Jun 10, 2015 | School Construction Authority | $141,254.55 | CONSTRUCTION-BUILDINGS | – |
| Jan 2, 2015 | Department of Cultural Affairs | $131,418.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 2, 2015 | Department of Cultural Affairs | $130,595.40 | CONSTRUCTION-BUILDINGS | – |
| Aug 21, 2014 | School Construction Authority | $126,776.69 | CONSTRUCTION-BUILDINGS | – |
| Dec 29, 2014 | Department of Health and Mental Hygiene | $126,185.69 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2015 | Department of Health and Mental Hygiene | $82,225.35 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2015 | Department of Health and Mental Hygiene | $72,270.30 | CONSTRUCTION-BUILDINGS | – |
FY 2014top 20 of 48 payments$7,804,975
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 6, 2013 | School Construction Authority | $570,183.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2014 | Department of Design and Construction | $540,819.02 | OTHR SERV AND CHRGS-GENERAL | – |
| Nov 12, 2013 | Department of Cultural Affairs | $518,587.18 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2014 | School Construction Authority | $487,654.24 | CONSTRUCTION-BUILDINGS | – |
| May 27, 2014 | School Construction Authority | $401,987.57 | CONSTRUCTION-BUILDINGS | – |
| Sep 30, 2013 | School Construction Authority | $359,524.36 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2014 | School Construction Authority | $325,090.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 26, 2014 | School Construction Authority | $306,324.17 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2014 | Department of Cultural Affairs | $283,727.07 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2013 | School Construction Authority | $270,465.34 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2014 | School Construction Authority | $250,101.70 | CONSTRUCTION-BUILDINGS | – |
| Jul 25, 2013 | Police Department | $246,260.62 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2014 | School Construction Authority | $235,842.25 | CONSTRUCTION-BUILDINGS | – |
| Mar 19, 2014 | Police Department | $232,129.25 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2013 | School Construction Authority | $227,034.32 | CONSTRUCTION-BUILDINGS | – |
| Apr 7, 2014 | School Construction Authority | $210,620.08 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2014 | Department of Cultural Affairs | $196,200.01 | CONSTRUCTION-BUILDINGS | – |
| Sep 27, 2013 | School Construction Authority | $192,262.66 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2013 | School Construction Authority | $190,595.65 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2013 | School Construction Authority | $177,237.51 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 31 payments$4,482,104
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 28, 2012 | Police Department | $403,773.57 | CONSTRUCTION-BUILDINGS | – |
| Dec 12, 2012 | Department of Health and Mental Hygiene | $401,735.81 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2012 | School Construction Authority | $361,794.42 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $350,821.83 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2012 | School Construction Authority | $322,610.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 24, 2012 | School Construction Authority | $277,793.30 | CONSTRUCTION-BUILDINGS | – |
| Dec 31, 2012 | School Construction Authority | $273,509.43 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $239,918.56 | CONSTRUCTION-BUILDINGS | – |
| Apr 9, 2013 | School Construction Authority | $217,135.72 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2013 | School Construction Authority | $203,338.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $186,582.48 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2012 | Department of Design and Construction | $184,639.89 | CONTRACTUAL SERVICES GENERAL | – |
| May 15, 2013 | Department of Health and Mental Hygiene | $176,119.67 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2013 | Department of Health and Mental Hygiene | $170,598.03 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2012 | Department of Health and Mental Hygiene | $169,131.07 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2013 | School Construction Authority | $168,265.98 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $98,564.97 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $71,696.88 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2012 | Police Department | $61,488.79 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2013 | School Construction Authority | $53,801.91 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 46 payments$4,756,242
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 23, 2012 | Department of Health and Mental Hygiene | $592,559.60 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | Police Department | $381,220.55 | CONSTRUCTION-BUILDINGS | – |
| Mar 26, 2012 | Department of Health and Mental Hygiene | $380,507.63 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | School Construction Authority | $296,922.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 12, 2011 | School Construction Authority | $261,107.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2012 | School Construction Authority | $228,870.58 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2012 | School Construction Authority | $211,509.90 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2012 | Police Department | $202,676.58 | CONSTRUCTION-BUILDINGS | – |
| Jun 27, 2012 | Department of Design and Construction | $180,759.87 | OTHR SERV AND CHRGS-GENERAL | – |
| Dec 19, 2011 | Police Department | $176,561.41 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2012 | School Construction Authority | $169,810.60 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2012 | School Construction Authority | $145,520.33 | CONSTRUCTION-BUILDINGS | – |
| Feb 6, 2012 | School Construction Authority | $142,536.25 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2011 | School Construction Authority | $138,533.75 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | Police Department | $109,646.96 | CONSTRUCTION-BUILDINGS | – |
| May 16, 2012 | School Construction Authority | $108,960.44 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2012 | School Construction Authority | $102,072.94 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2011 | School Construction Authority | $100,121.46 | CONSTRUCTION-BUILDINGS | – |
| Oct 12, 2011 | School Construction Authority | $89,129.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | Police Department | $87,166.49 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 40 payments$3,052,741
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 6, 2010 | School Construction Authority | $616,348.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 14, 2010 | School Construction Authority | $537,545.15 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2010 | School Construction Authority | $291,223.83 | CONSTRUCTION-BUILDINGS | – |
| Oct 12, 2010 | School Construction Authority | $289,667.35 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2011 | School Construction Authority | $282,564.20 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2010 | School Construction Authority | $188,443.90 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2011 | School Construction Authority | $137,163.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2011 | School Construction Authority | $126,682.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2011 | School Construction Authority | $95,117.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2011 | School Construction Authority | $79,500.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2011 | School Construction Authority | $74,907.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2010 | School Construction Authority | $52,356.73 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2010 | School Construction Authority | $37,512.65 | CONSTRUCTION-BUILDINGS | – |
| Dec 9, 2010 | School Construction Authority | $30,438.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2011 | School Construction Authority | $25,297.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2010 | School Construction Authority | $21,231.17 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2011 | School Construction Authority | $20,308.90 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2011 | School Construction Authority | $16,617.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 7, 2010 | School Construction Authority | $15,500.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2011 | School Construction Authority | $14,231.85 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 10 of 10 payments$691,847
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 6, 2010 | School Construction Authority | $244,625.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2010 | School Construction Authority | $177,578.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2010 | School Construction Authority | $102,504.75 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2010 | School Construction Authority | $65,945.06 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2010 | School Construction Authority | $24,795.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 6, 2010 | School Construction Authority | $24,581.25 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2010 | School Construction Authority | $23,501.06 | CONSTRUCTION-BUILDINGS | – |
| Jan 21, 2010 | School Construction Authority | $15,689.25 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2010 | School Construction Authority | $11,914.44 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2010 | School Construction Authority | $712.50 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 23, 2025 | School Construction Authority | $60,701.87 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,520.01 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $7,745.08 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $17,643.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $1,073,177.29 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $24,458.76 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $49,156.25 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 30, 2025 | School Construction Authority | $144,940.69 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 30, 2025 | School Construction Authority | $20,498.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 30, 2025 | School Construction Authority | $7,736.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 30, 2025 | School Construction Authority | $25,759.25 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 30, 2025 | School Construction Authority | $72,845.21 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 13, 2025 | School Construction Authority | $1,765,321.92 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 13, 2025 | School Construction Authority | $68,841.28 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 7, 2025 | School Construction Authority | $58,520.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 21, 2025 | School Construction Authority | $1,093,957.01 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 8, 2025 | School Construction Authority | $69,396.48 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 8, 2025 | School Construction Authority | $199.50 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 26, 2025 | School Construction Authority | $203,643.80 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 26, 2025 | School Construction Authority | $1,884.27 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 17, 2025 | School Construction Authority | $33,060.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 12, 2025 | School Construction Authority | $152,879.98 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 12, 2025 | School Construction Authority | $1,781,835.30 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Feb 25, 2025 | School Construction Authority | $1,597,206.50 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Feb 20, 2025 | School Construction Authority | $677.20 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data