Mott Macdonald Ny Inc: New York City Government Payments
as recorded by New York City: MOTT MACDONALD NY INC
Mott Macdonald Ny Inc is the 845th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 24th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 18.7% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| DESIGN-CONSULTANT-BUILDINGS | 194 | $7,913,775 | Sep 6, 2016 – Jun 23, 2025 |
| OTHR SERV AND CHRGS-GENERAL | 27 | $762,290 | Feb 2, 2023 – Jun 25, 2025 |
| MAINT & REP GENERAL | 10 | $443,122 | Dec 23, 2020 – Jun 18, 2024 |
| DESIGN-CONSULTANT-IOTB | 366 | $35,929,069 | Oct 3, 2016 – Jun 30, 2025 |
| PROF SERV OTHER | 8 | $269,544 | Jun 7, 2017 – Apr 11, 2025 |
| PROMPT PAYMENT INTEREST | 24 | $2,618 | Oct 9, 2018 – Jun 30, 2025 |
| IOTB CONSTRUCTION | 83 | $2,314,774 | Dec 12, 2016 – May 30, 2025 |
| CONTRACTUAL SERVICES GENERAL | 51 | $2,112,722 | Oct 3, 2019 – Mar 18, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 464 | $21,073,111 | Sep 6, 2016 – Jun 10, 2025 |
| <Non-Applicable Expenditure Object> | 1 | -$350 | Jun 7, 2017 – Jun 7, 2017 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 189 payments$6,409,760
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 15, 2024 | Mayoralty | $519,744.60 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 15, 2024 | Water Supply | $246,311.77 | DESIGN-CONSULTANT-IOTB | – |
| Jul 24, 2024 | Mayoralty | $240,608.70 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 27, 2025 | Water Supply | $166,953.14 | DESIGN-CONSULTANT-IOTB | – |
| Jul 15, 2024 | Mayoralty | $161,830.80 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 23, 2025 | Department of Citywide Administrative Services | $155,081.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Mar 13, 2025 | Water Supply | $125,297.67 | DESIGN-CONSULTANT-IOTB | – |
| Sep 3, 2024 | Water Supply | $116,118.63 | DESIGN-CONSULTANT-IOTB | – |
| Oct 7, 2024 | Water Supply | $112,220.22 | DESIGN-CONSULTANT-IOTB | – |
| Mar 24, 2025 | Water Supply | $111,106.02 | DESIGN-CONSULTANT-IOTB | – |
| Aug 23, 2024 | Water Supply | $110,666.12 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2025 | Water Supply | $108,101.14 | DESIGN-CONSULTANT-IOTB | – |
| Aug 5, 2024 | Mayoralty | $97,462.90 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 28, 2024 | Department of Environmental Protection | $96,619.72 | IOTB CONSTRUCTION | – |
| Feb 21, 2025 | Department of Citywide Administrative Services | $96,379.46 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 10, 2025 | Water Supply | $95,621.53 | DESIGN-CONSULTANT-IOTB | – |
| Dec 10, 2024 | Department of Environmental Protection | $85,646.52 | DESIGN-CONSULTANT-IOTB | – |
| Jan 2, 2025 | Department of Environmental Protection | $84,779.18 | DESIGN-CONSULTANT-IOTB | – |
| Jun 12, 2025 | Water Supply | $82,738.93 | DESIGN-CONSULTANT-IOTB | – |
| Jun 30, 2025 | Department of Environmental Protection | $78,001.92 | DESIGN-CONSULTANT-IOTB | – |
FY 2024top 20 of 117 payments$7,885,374
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 16, 2024 | Mayoralty | $877,166.10 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 16, 2024 | Department of Citywide Administrative Services | $600,480.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 18, 2023 | Mayoralty | $373,141.80 | PROF SERV ENGINEER & ARCHITECT | – |
| Jul 12, 2023 | Mayoralty | $353,613.24 | PROF SERV ENGINEER & ARCHITECT | – |
| May 28, 2024 | Mayoralty | $278,829.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 17, 2024 | Department of Citywide Administrative Services | $244,200.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 23, 2024 | Department of Citywide Administrative Services | $237,751.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jan 16, 2024 | Mayoralty | $178,764.30 | PROF SERV ENGINEER & ARCHITECT | – |
| Aug 28, 2023 | Department of Citywide Administrative Services | $166,800.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 21, 2024 | Department of Citywide Administrative Services | $162,800.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 18, 2023 | Mayoralty | $162,157.50 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 18, 2023 | Mayoralty | $161,830.80 | PROF SERV ENGINEER & ARCHITECT | – |
| May 8, 2024 | Department of Environmental Protection | $154,241.93 | DESIGN-CONSULTANT-IOTB | – |
| Mar 11, 2024 | Department of Environmental Protection | $137,549.41 | DESIGN-CONSULTANT-IOTB | – |
| May 9, 2024 | Mayoralty | $135,793.80 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 4, 2023 | Mayoralty | $128,871.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 19, 2023 | Department of Environmental Protection | $126,046.79 | DESIGN-CONSULTANT-IOTB | – |
| Sep 29, 2023 | Water Supply | $120,589.57 | DESIGN-CONSULTANT-IOTB | – |
| Jul 3, 2023 | Department of Citywide Administrative Services | $117,408.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 25, 2023 | Department of Environmental Protection | $117,313.35 | CONTRACTUAL SERVICES GENERAL | – |
FY 2023top 20 of 160 payments$7,764,437
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 17, 2023 | Department of Citywide Administrative Services | $333,600.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 20, 2022 | Mayoralty | $315,986.40 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 12, 2023 | Department of Environmental Protection | $274,889.61 | DESIGN-CONSULTANT-IOTB | – |
| May 8, 2023 | Department of Environmental Protection | $262,323.78 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 22, 2022 | Department of Environmental Protection | $258,427.97 | DESIGN-CONSULTANT-IOTB | – |
| Feb 16, 2023 | Department of Environmental Protection | $226,180.09 | DESIGN-CONSULTANT-IOTB | – |
| Jul 26, 2022 | Department of Citywide Administrative Services | $210,775.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 11, 2023 | Department of Environmental Protection | $167,313.59 | CONTRACTUAL SERVICES GENERAL | – |
| Mar 1, 2023 | Department of Environmental Protection | $153,874.44 | DESIGN-CONSULTANT-IOTB | – |
| Apr 26, 2023 | Department of Environmental Protection | $149,410.02 | DESIGN-CONSULTANT-IOTB | – |
| Nov 16, 2022 | Department of Environmental Protection | $132,759.45 | DESIGN-CONSULTANT-IOTB | – |
| Dec 5, 2022 | Department of Citywide Administrative Services | $126,775.00 | MAINT & REP GENERAL | – |
| Oct 11, 2022 | Department of Homeless Services | $123,728.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 24, 2023 | Department of Homeless Services | $120,000.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 11, 2023 | Department of Environmental Protection | $111,165.12 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 29, 2022 | Department of Environmental Protection | $109,287.63 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2023 | Department of Environmental Protection | $109,169.82 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2023 | Department of Environmental Protection | $106,228.11 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2022 | Department of Environmental Protection | $99,992.05 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2023 | Department of Environmental Protection | $95,828.85 | DESIGN-CONSULTANT-IOTB | – |
FY 2022top 20 of 151 payments$6,966,159
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 21, 2021 | Department of Environmental Protection | $303,895.88 | DESIGN-CONSULTANT-IOTB | – |
| Jul 6, 2021 | Department of Homeless Services | $211,200.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 2, 2021 | Department of Environmental Protection | $191,166.85 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2022 | Department of Environmental Protection | $176,597.80 | DESIGN-CONSULTANT-IOTB | – |
| Jan 18, 2022 | Department of Environmental Protection | $162,353.60 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2022 | Department of Environmental Protection | $155,013.51 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2022 | Department of Environmental Protection | $151,732.30 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 19, 2021 | Department of Environmental Protection | $148,077.42 | DESIGN-CONSULTANT-IOTB | – |
| Dec 6, 2021 | Department of Citywide Administrative Services | $147,165.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 16, 2021 | Department of Citywide Administrative Services | $141,500.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 17, 2021 | Department of Environmental Protection | $140,787.92 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 14, 2021 | Department of Environmental Protection | $138,456.52 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2021 | Department of Homeless Services | $128,844.20 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 24, 2021 | Department of Environmental Protection | $128,575.15 | DESIGN-CONSULTANT-IOTB | – |
| Dec 6, 2021 | Department of Environmental Protection | $126,311.08 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2022 | Department of Environmental Protection | $125,245.18 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2022 | Department of Environmental Protection | $123,532.62 | DESIGN-CONSULTANT-IOTB | – |
| Jan 7, 2022 | Department of Environmental Protection | $115,886.02 | DESIGN-CONSULTANT-IOTB | – |
| Oct 4, 2021 | Department of Environmental Protection | $115,711.35 | DESIGN-CONSULTANT-IOTB | – |
| Apr 19, 2022 | Department of Environmental Protection | $103,632.17 | DESIGN-CONSULTANT-IOTB | – |
FY 2021top 20 of 128 payments$7,732,966
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 20, 2020 | Department of Environmental Protection | $411,957.86 | DESIGN-CONSULTANT-IOTB | – |
| Oct 5, 2020 | Department of Environmental Protection | $379,790.50 | DESIGN-CONSULTANT-IOTB | – |
| Dec 29, 2020 | Department of Environmental Protection | $334,419.78 | DESIGN-CONSULTANT-IOTB | – |
| Jul 27, 2020 | Department of Environmental Protection | $284,134.35 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2020 | Mayoralty | $257,804.15 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 2, 2021 | Department of Environmental Protection | $254,478.16 | DESIGN-CONSULTANT-IOTB | – |
| May 24, 2021 | Water Supply | $232,475.61 | DESIGN-CONSULTANT-IOTB | – |
| Oct 22, 2020 | Department of Environmental Protection | $208,311.11 | DESIGN-CONSULTANT-IOTB | – |
| Nov 24, 2020 | Department of Environmental Protection | $192,589.92 | DESIGN-CONSULTANT-IOTB | – |
| Nov 16, 2020 | Department of Citywide Administrative Services | $175,500.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 1, 2021 | Department of Environmental Protection | $171,233.07 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2021 | Department of Environmental Protection | $163,057.28 | DESIGN-CONSULTANT-IOTB | – |
| Apr 1, 2021 | Department of Environmental Protection | $155,899.07 | DESIGN-CONSULTANT-IOTB | – |
| Feb 8, 2021 | Water Supply | $154,096.88 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2020 | Mayoralty | $141,920.95 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 19, 2021 | Department of Environmental Protection | $141,145.24 | DESIGN-CONSULTANT-IOTB | – |
| Feb 26, 2021 | Department of Environmental Protection | $138,061.96 | DESIGN-CONSULTANT-IOTB | – |
| Apr 28, 2021 | Department of Environmental Protection | $130,481.86 | DESIGN-CONSULTANT-IOTB | – |
| May 3, 2021 | Water Supply | $128,009.94 | DESIGN-CONSULTANT-IOTB | – |
| Aug 11, 2020 | Department of Homeless Services | $124,336.77 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2020top 20 of 161 payments$14,146,506
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 26, 2020 | Department of Environmental Protection | $998,276.94 | DESIGN-CONSULTANT-IOTB | – |
| Mar 16, 2020 | Department of Environmental Protection | $931,102.37 | DESIGN-CONSULTANT-IOTB | – |
| Mar 2, 2020 | Department of Environmental Protection | $593,009.96 | DESIGN-CONSULTANT-IOTB | – |
| Aug 9, 2019 | Department of Environmental Protection | $510,955.54 | DESIGN-CONSULTANT-IOTB | – |
| Feb 3, 2020 | Department of Environmental Protection | $405,794.76 | DESIGN-CONSULTANT-IOTB | – |
| Nov 27, 2019 | Department of Environmental Protection | $394,953.07 | DESIGN-CONSULTANT-IOTB | – |
| Jun 29, 2020 | Department of Environmental Protection | $391,036.44 | DESIGN-CONSULTANT-IOTB | – |
| Jan 27, 2020 | Department of Environmental Protection | $332,737.73 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2020 | Department of Environmental Protection | $328,972.28 | DESIGN-CONSULTANT-IOTB | – |
| Sep 12, 2019 | Department of Environmental Protection | $328,098.24 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2020 | Department of Environmental Protection | $317,522.62 | DESIGN-CONSULTANT-IOTB | – |
| May 6, 2020 | Department of Environmental Protection | $310,975.79 | DESIGN-CONSULTANT-IOTB | – |
| Sep 11, 2019 | Mayoralty | $303,916.50 | PROF SERV ENGINEER & ARCHITECT | – |
| Mar 18, 2020 | Mayoralty | $295,518.95 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 5, 2019 | Department of Environmental Protection | $271,065.06 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2019 | Department of Environmental Protection | $264,168.39 | DESIGN-CONSULTANT-IOTB | – |
| Jul 11, 2019 | Department of Environmental Protection | $263,851.88 | DESIGN-CONSULTANT-IOTB | – |
| Jan 6, 2020 | Department of Environmental Protection | $251,774.77 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2019 | Department of Environmental Protection | $250,338.51 | DESIGN-CONSULTANT-IOTB | – |
| Sep 30, 2019 | Department of Environmental Protection | $245,746.14 | DESIGN-CONSULTANT-IOTB | – |
FY 2019top 20 of 158 payments$9,613,903
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 31, 2018 | Department of Environmental Protection | $620,099.53 | DESIGN-CONSULTANT-IOTB | – |
| Dec 5, 2018 | Department of Environmental Protection | $547,029.91 | DESIGN-CONSULTANT-IOTB | – |
| Oct 9, 2018 | Department of Environmental Protection | $433,697.46 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2019 | Department of Environmental Protection | $399,457.23 | DESIGN-CONSULTANT-IOTB | – |
| Apr 17, 2019 | Department of Environmental Protection | $378,884.05 | DESIGN-CONSULTANT-IOTB | – |
| Feb 27, 2019 | Department of Environmental Protection | $360,143.30 | DESIGN-CONSULTANT-IOTB | – |
| Apr 15, 2019 | Department of Environmental Protection | $354,541.46 | DESIGN-CONSULTANT-IOTB | – |
| Jul 23, 2018 | Department of Environmental Protection | $353,747.45 | DESIGN-CONSULTANT-IOTB | – |
| Aug 20, 2018 | Mayoralty | $325,793.47 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 24, 2018 | Department of Homeless Services | $270,351.20 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 24, 2018 | Department of Homeless Services | $270,351.20 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 9, 2018 | Department of Homeless Services | $210,078.18 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 28, 2018 | Mayoralty | $174,578.03 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 8, 2019 | Mayoralty | $167,376.19 | PROF SERV ENGINEER & ARCHITECT | – |
| May 8, 2019 | Department of Environmental Protection | $160,365.77 | DESIGN-CONSULTANT-IOTB | – |
| Oct 16, 2018 | Water Supply | $156,518.42 | DESIGN-CONSULTANT-IOTB | – |
| Nov 28, 2018 | Mayoralty | $156,006.37 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 24, 2019 | Department of Citywide Administrative Services | $155,974.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 25, 2018 | Department of Homeless Services | $106,753.72 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 25, 2018 | Department of Homeless Services | $106,753.72 | PROF SERV ENGINEER & ARCHITECT | – |
FY 2018top 20 of 91 payments$6,366,738
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 26, 2018 | Department of Environmental Protection | $520,659.33 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2018 | Department of Environmental Protection | $493,960.16 | DESIGN-CONSULTANT-IOTB | – |
| May 2, 2018 | Water Supply | $403,888.18 | DESIGN-CONSULTANT-IOTB | – |
| Feb 7, 2018 | Water Supply | $329,456.61 | DESIGN-CONSULTANT-IOTB | – |
| Oct 11, 2017 | Department of Homeless Services | $303,393.50 | PROF SERV ENGINEER & ARCHITECT | – |
| Mar 19, 2018 | Department of Environmental Protection | $290,356.59 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2018 | Department of Environmental Protection | $282,874.34 | DESIGN-CONSULTANT-IOTB | – |
| Oct 11, 2017 | Department of Homeless Services | $248,514.45 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 16, 2018 | Department of Environmental Protection | $176,243.16 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2017 | Department of Environmental Protection | $175,174.94 | DESIGN-CONSULTANT-IOTB | – |
| Feb 7, 2018 | Department of Environmental Protection | $165,841.22 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2018 | Mayoralty | $161,121.60 | PROF SERV ENGINEER & ARCHITECT | – |
| Aug 21, 2017 | Department of Environmental Protection | $140,668.35 | DESIGN-CONSULTANT-IOTB | – |
| Jul 3, 2017 | Department of Environmental Protection | $139,128.62 | DESIGN-CONSULTANT-IOTB | – |
| Oct 10, 2017 | Mayoralty | $132,165.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 5, 2018 | Water Supply | $130,868.91 | DESIGN-CONSULTANT-IOTB | – |
| Oct 11, 2017 | Department of Homeless Services | $123,901.20 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 6, 2017 | Mayoralty | $122,760.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 2, 2018 | Mayoralty | $120,474.48 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 2, 2017 | Water Supply | $109,474.65 | DESIGN-CONSULTANT-IOTB | – |
FY 2017top 20 of 73 payments$3,934,832
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 3, 2017 | Mayoralty | $396,411.87 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 5, 2016 | Mayoralty | $292,318.30 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 3, 2017 | Department of Environmental Protection | $214,332.64 | DESIGN-CONSULTANT-IOTB | – |
| May 15, 2017 | Mayoralty | $195,837.82 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 24, 2017 | Mayoralty | $180,834.10 | PROF SERV ENGINEER & ARCHITECT | – |
| Mar 20, 2017 | Mayoralty | $176,509.80 | PROF SERV ENGINEER & ARCHITECT | – |
| Feb 21, 2017 | Department of Environmental Protection | $175,471.50 | IOTB CONSTRUCTION | – |
| Jun 26, 2017 | Mayoralty | $131,738.85 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 3, 2017 | Mayoralty | $123,633.90 | PROF SERV ENGINEER & ARCHITECT | – |
| Mar 28, 2017 | Department of Homeless Services | $111,600.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| May 1, 2017 | Department of Environmental Protection | $106,916.85 | DESIGN-CONSULTANT-IOTB | – |
| Dec 12, 2016 | Department of Environmental Protection | $103,359.00 | IOTB CONSTRUCTION | – |
| Oct 3, 2016 | Department of Environmental Protection | $102,204.20 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2017 | Department of Citywide Administrative Services | $95,423.16 | PROF SERV OTHER | – |
| Apr 24, 2017 | Mayoralty | $86,759.30 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 27, 2016 | Department of Environmental Protection | $83,014.83 | DESIGN-CONSULTANT-IOTB | – |
| Mar 27, 2017 | Department of Environmental Protection | $77,277.81 | IOTB CONSTRUCTION | – |
| Oct 31, 2016 | Department of Environmental Protection | $72,967.45 | DESIGN-CONSULTANT-IOTB | – |
| Nov 21, 2016 | Department of Environmental Protection | $72,507.65 | DESIGN-CONSULTANT-IOTB | – |
| Apr 10, 2017 | Department of Homeless Services | $69,671.76 | PROF SERV ENGINEER & ARCHITECT | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Department of Environmental Protection | $78,001.92 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Environmental Protection | $133.42 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $5,245.52 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $14,700.64 | OTHR SERV AND CHRGS-GENERAL | Contracts |
| Jun 23, 2025 | Department of Citywide Administrative Services | $155,081.00 | DESIGN-CONSULTANT-BUILDINGS | Capital Contracts |
| Jun 18, 2025 | Department of Environmental Protection | $48.23 | PROMPT PAYMENT INTEREST | Contracts |
| Jun 17, 2025 | Department of Environmental Protection | $9,914.04 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 12, 2025 | Water Supply | $82,738.93 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 10, 2025 | Water Supply | $95,621.53 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 10, 2025 | Mayoralty | $22,114.80 | PROF SERV ENGINEER & ARCHITECT | Contracts |
| Jun 9, 2025 | Department of Environmental Protection | $15,801.64 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 30, 2025 | Department of Environmental Protection | $35,591.77 | IOTB CONSTRUCTION | Capital Contracts |
| May 30, 2025 | Department of Environmental Protection | $35,591.77 | IOTB CONSTRUCTION | Capital Contracts |
| May 30, 2025 | Department of Environmental Protection | $35,591.77 | IOTB CONSTRUCTION | Capital Contracts |
| May 29, 2025 | Department of Environmental Protection | $29,248.58 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 21, 2025 | Department of Environmental Protection | $21,684.92 | OTHR SERV AND CHRGS-GENERAL | Contracts |
| May 20, 2025 | Department of Environmental Protection | $46,871.49 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 19, 2025 | Department of Environmental Protection | $18,079.74 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 15, 2025 | Department of Environmental Protection | $14,442.86 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 14, 2025 | Department of Environmental Protection | $8,131.25 | IOTB CONSTRUCTION | Capital Contracts |
| May 12, 2025 | Department of Environmental Protection | $5,897.64 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 12, 2025 | Department of Environmental Protection | $14,964.73 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 12, 2025 | Department of Environmental Protection | $22,691.68 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 6, 2025 | Department of Environmental Protection | $11,383.02 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 29, 2025 | Department of Environmental Protection | $56,959.38 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data