as recorded by New York City: MINELLI CONSTRUCTION CO

Minelli Construction Co is the 774th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 112th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.2% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 98.9% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$79,495,743total received
997payments
5agencies
Jan 6, 2010May 30, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Minelli Construction Co. No spam.

Payments by fiscal year

FY 2025$2,370
FY 2024$216,481
FY 2023$165,666
FY 2022$821,582
FY 2021$309,789
FY 2020$467,500
FY 2019$3,159,395
FY 2018$1,660,860
FY 2017$2,323,482
FY 2016$4,892,792
FY 2015$10,502,855
FY 2014$18,964,685
FY 2013$9,243,831
FY 2012$14,780,878
FY 2011$8,216,193
FY 2010$3,767,385

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Health and Mental Hygiene1$2,370
FY 2024Department of Health and Mental Hygiene61$216,492
FY 2024Department of Design and Construction2-$11
FY 2023Department of Health and Mental Hygiene28$165,694
FY 2023Department of Design and Construction4-$28
FY 2022Department of Health and Mental Hygiene29$821,613
FY 2022Department of Design and Construction3-$32
FY 2021Department of Health and Mental Hygiene16$299,140
FY 2021School Construction Authority3$10,670
FY 2021Department of Design and Construction2-$21
FY 2020Department of Health and Mental Hygiene43$309,662
FY 2020School Construction Authority8$157,795
FY 2020Department of Design and Construction3$44
FY 2019School Construction Authority18$2,384,077
FY 2019Department of Health and Mental Hygiene25$775,346
FY 2019Department of Design and Construction3-$28
FY 2018Department of Health and Mental Hygiene19$1,576,926
FY 2018School Construction Authority4$82,793
FY 2018Department of Design and Construction2$1,141
FY 2017Department of Health and Mental Hygiene10$1,433,516
FY 2017School Construction Authority36$881,752
FY 2017City University of New York4$8,215
FY 2016School Construction Authority74$4,075,168
FY 2016Department of Health and Mental Hygiene5$817,624
FY 2015School Construction Authority106$9,636,012
FY 2015Department of Health and Mental Hygiene7$866,843
FY 2014School Construction Authority161$18,964,685
FY 2013School Construction Authority112$9,243,831
FY 2012School Construction Authority118$14,710,637
FY 2012Department of Parks and Recreation1$70,241
FY 2011School Construction Authority75$8,193,773
FY 2011Department of Parks and Recreation1$22,420
FY 2010School Construction Authority10$3,476,703
FY 2010Department of Parks and Recreation3$290,682
Total997$79,495,743

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
OTHR SERV AND CHRGS-GENERAL4$8,215Feb 6, 2017 Feb 6, 2017
CONSTRUCTION-BUILDINGS962$79,091,834Jan 6, 2010 May 30, 2025
IOTB CONSTRUCTION12$394,628Jan 15, 2010 May 23, 2024
SUPPLIES + MATERIALS - GENERAL2$1,570Jun 18, 2018 Nov 29, 2019
<Non-Applicable Expenditure Object>17-$504May 3, 2018 May 21, 2024

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 1 of 1 payments$2,370
DateAgencyAmountCategoryPurchase order
May 30, 2025Department of Health and Mental Hygiene$2,370.17CONSTRUCTION-BUILDINGS
FY 2024top 20 of 63 payments$216,481
DateAgencyAmountCategoryPurchase order
Jul 5, 2023Department of Health and Mental Hygiene$26,818.77CONSTRUCTION-BUILDINGS
May 21, 2024Department of Health and Mental Hygiene$21,488.76CONSTRUCTION-BUILDINGS
Jul 5, 2023Department of Health and Mental Hygiene$16,520.85CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$14,185.00CONSTRUCTION-BUILDINGS
Jul 5, 2023Department of Health and Mental Hygiene$10,266.56CONSTRUCTION-BUILDINGS
May 21, 2024Department of Health and Mental Hygiene$10,083.57CONSTRUCTION-BUILDINGS
Jul 5, 2023Department of Health and Mental Hygiene$7,971.90CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$7,113.48CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$6,739.05CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$6,630.84CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$5,563.95CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$5,387.50CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$5,187.50CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$4,660.59CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$4,575.45CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$4,345.00CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$4,055.74CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$3,750.00CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$3,717.76CONSTRUCTION-BUILDINGS
May 23, 2024Department of Health and Mental Hygiene$3,673.03CONSTRUCTION-BUILDINGS
FY 2023top 20 of 32 payments$165,666
DateAgencyAmountCategoryPurchase order
Mar 29, 2023Department of Health and Mental Hygiene$30,142.66CONSTRUCTION-BUILDINGS
Aug 29, 2022Department of Health and Mental Hygiene$23,797.50CONSTRUCTION-BUILDINGS
Mar 29, 2023Department of Health and Mental Hygiene$16,277.05CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$14,803.07CONSTRUCTION-BUILDINGS
Mar 29, 2023Department of Health and Mental Hygiene$8,769.82CONSTRUCTION-BUILDINGS
Jul 25, 2022Department of Health and Mental Hygiene$8,721.50CONSTRUCTION-BUILDINGS
May 22, 2023Department of Health and Mental Hygiene$6,762.82CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$6,324.63CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$6,310.87CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$5,530.47CONSTRUCTION-BUILDINGS
Mar 29, 2023Department of Health and Mental Hygiene$4,550.03CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$4,284.00CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$4,159.45CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$3,822.60CONSTRUCTION-BUILDINGS
May 22, 2023Department of Health and Mental Hygiene$3,752.91CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$3,156.00CONSTRUCTION-BUILDINGS
May 22, 2023Department of Health and Mental Hygiene$3,019.83CONSTRUCTION-BUILDINGS
Mar 29, 2023Department of Health and Mental Hygiene$2,440.79CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$1,861.00CONSTRUCTION-BUILDINGS
Nov 28, 2022Department of Health and Mental Hygiene$1,505.10CONSTRUCTION-BUILDINGS
FY 2022top 20 of 32 payments$821,582
DateAgencyAmountCategoryPurchase order
Feb 18, 2022Department of Health and Mental Hygiene$105,362.50CONSTRUCTION-BUILDINGS
May 2, 2022Department of Health and Mental Hygiene$104,270.05CONSTRUCTION-BUILDINGS
Nov 23, 2021Department of Health and Mental Hygiene$100,207.46CONSTRUCTION-BUILDINGS
Oct 7, 2021Department of Health and Mental Hygiene$74,252.26CONSTRUCTION-BUILDINGS
Nov 9, 2021Department of Health and Mental Hygiene$74,252.26CONSTRUCTION-BUILDINGS
Jul 12, 2021Department of Health and Mental Hygiene$71,787.57CONSTRUCTION-BUILDINGS
Sep 29, 2021Department of Health and Mental Hygiene$71,787.57CONSTRUCTION-BUILDINGS
Oct 29, 2021Department of Health and Mental Hygiene$70,421.55CONSTRUCTION-BUILDINGS
May 27, 2022Department of Health and Mental Hygiene$58,491.00CONSTRUCTION-BUILDINGS
Nov 9, 2021Department of Health and Mental Hygiene$52,731.74CONSTRUCTION-BUILDINGS
Oct 7, 2021Department of Health and Mental Hygiene$52,731.74CONSTRUCTION-BUILDINGS
Jul 2, 2021Department of Health and Mental Hygiene$40,778.82CONSTRUCTION-BUILDINGS
Mar 18, 2022Department of Health and Mental Hygiene$26,438.53CONSTRUCTION-BUILDINGS
Jul 2, 2021Department of Health and Mental Hygiene$23,000.00CONSTRUCTION-BUILDINGS
Jul 2, 2021Department of Health and Mental Hygiene$16,894.71CONSTRUCTION-BUILDINGS
Nov 4, 2021Department of Health and Mental Hygiene$14,962.50CONSTRUCTION-BUILDINGS
Mar 18, 2022Department of Health and Mental Hygiene$11,400.00CONSTRUCTION-BUILDINGS
Sep 29, 2021Department of Health and Mental Hygiene$8,256.00CONSTRUCTION-BUILDINGS
May 25, 2022Department of Health and Mental Hygiene$8,256.00CONSTRUCTION-BUILDINGS
Nov 23, 2021Department of Health and Mental Hygiene$8,013.49CONSTRUCTION-BUILDINGS
FY 2021top 20 of 21 payments$309,789
DateAgencyAmountCategoryPurchase order
Aug 13, 2020Department of Health and Mental Hygiene$60,674.16CONSTRUCTION-BUILDINGS
Jun 3, 2021Department of Health and Mental Hygiene$52,131.25CONSTRUCTION-BUILDINGS
Feb 23, 2021Department of Health and Mental Hygiene$49,149.90CONSTRUCTION-BUILDINGS
Dec 11, 2020Department of Health and Mental Hygiene$42,702.50CONSTRUCTION-BUILDINGS
Dec 21, 2020Department of Health and Mental Hygiene$19,000.00CONSTRUCTION-BUILDINGS
Oct 27, 2020Department of Health and Mental Hygiene$18,449.00CONSTRUCTION-BUILDINGS
Dec 21, 2020Department of Health and Mental Hygiene$16,435.28CONSTRUCTION-BUILDINGS
Dec 21, 2020Department of Health and Mental Hygiene$9,024.56CONSTRUCTION-BUILDINGS
Jul 9, 2020Department of Health and Mental Hygiene$8,148.75CONSTRUCTION-BUILDINGS
Jul 9, 2020Department of Health and Mental Hygiene$7,473.00CONSTRUCTION-BUILDINGS
Oct 27, 2020Department of Health and Mental Hygiene$6,881.34CONSTRUCTION-BUILDINGS
May 12, 2021School Construction Authority$5,621.25CONSTRUCTION-BUILDINGS
Jul 9, 2020Department of Health and Mental Hygiene$5,317.66CONSTRUCTION-BUILDINGS
Jul 9, 2020Department of Health and Mental Hygiene$3,495.00CONSTRUCTION-BUILDINGS
Mar 10, 2021School Construction Authority$2,910.00CONSTRUCTION-BUILDINGS
Mar 10, 2021School Construction Authority$2,138.75CONSTRUCTION-BUILDINGS
Oct 27, 2020Department of Health and Mental Hygiene$125.73CONSTRUCTION-BUILDINGS
Dec 21, 2020Department of Health and Mental Hygiene$105.44CONSTRUCTION-BUILDINGS
Jul 9, 2020Department of Health and Mental Hygiene$26.25CONSTRUCTION-BUILDINGS
Aug 13, 2020Department of Design and Construction-$3.50<Non-Applicable Expenditure Object>
FY 2020top 20 of 54 payments$467,500
DateAgencyAmountCategoryPurchase order
Aug 2, 2019School Construction Authority$97,189.39CONSTRUCTION-BUILDINGS
Jun 29, 2020Department of Health and Mental Hygiene$51,668.34CONSTRUCTION-BUILDINGS
Aug 2, 2019School Construction Authority$39,026.64CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$21,443.00CONSTRUCTION-BUILDINGS
Aug 8, 2019Department of Health and Mental Hygiene$21,019.70CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$17,286.62CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$16,844.49CONSTRUCTION-BUILDINGS
Nov 27, 2019Department of Health and Mental Hygiene$16,443.00CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$16,060.25CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$13,440.00CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$12,130.44CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$11,043.80CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$10,935.00CONSTRUCTION-BUILDINGS
Nov 27, 2019Department of Health and Mental Hygiene$10,454.55CONSTRUCTION-BUILDINGS
Jul 15, 2019School Construction Authority$9,991.29CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$9,445.00CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$8,738.21CONSTRUCTION-BUILDINGS
Dec 19, 2019Department of Health and Mental Hygiene$7,500.00CONSTRUCTION-BUILDINGS
Nov 29, 2019Department of Health and Mental Hygiene$7,250.90CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Health and Mental Hygiene$6,749.59CONSTRUCTION-BUILDINGS
FY 2019top 20 of 46 payments$3,159,395
DateAgencyAmountCategoryPurchase order
Dec 24, 2018School Construction Authority$1,174,097.19CONSTRUCTION-BUILDINGS
Dec 24, 2018School Construction Authority$634,595.77CONSTRUCTION-BUILDINGS
Dec 24, 2018School Construction Authority$409,878.58CONSTRUCTION-BUILDINGS
Sep 20, 2018Department of Health and Mental Hygiene$115,056.12CONSTRUCTION-BUILDINGS
Dec 19, 2018Department of Health and Mental Hygiene$101,055.00CONSTRUCTION-BUILDINGS
Oct 5, 2018Department of Health and Mental Hygiene$80,312.50CONSTRUCTION-BUILDINGS
Nov 19, 2018Department of Health and Mental Hygiene$75,465.00CONSTRUCTION-BUILDINGS
Dec 19, 2018Department of Health and Mental Hygiene$71,250.00CONSTRUCTION-BUILDINGS
Mar 27, 2019Department of Health and Mental Hygiene$70,637.59CONSTRUCTION-BUILDINGS
Jul 31, 2018Department of Health and Mental Hygiene$61,763.53CONSTRUCTION-BUILDINGS
Jul 23, 2018Department of Health and Mental Hygiene$61,763.53CONSTRUCTION-BUILDINGS
Feb 7, 2019School Construction Authority$58,999.35CONSTRUCTION-BUILDINGS
Mar 18, 2019School Construction Authority$58,999.35CONSTRUCTION-BUILDINGS
Mar 4, 2019School Construction Authority$58,999.35CONSTRUCTION-BUILDINGS
Dec 24, 2018School Construction Authority$39,522.67CONSTRUCTION-BUILDINGS
Mar 27, 2019Department of Health and Mental Hygiene$36,052.33CONSTRUCTION-BUILDINGS
Feb 8, 2019Department of Health and Mental Hygiene$35,473.00CONSTRUCTION-BUILDINGS
Jan 17, 2019Department of Health and Mental Hygiene$32,305.00CONSTRUCTION-BUILDINGS
Jun 19, 2019School Construction Authority$30,187.50CONSTRUCTION-BUILDINGS
Apr 22, 2019Department of Health and Mental Hygiene$23,275.00CONSTRUCTION-BUILDINGS
FY 2018top 20 of 25 payments$1,660,860
DateAgencyAmountCategoryPurchase order
May 3, 2018Department of Health and Mental Hygiene$353,215.00CONSTRUCTION-BUILDINGS
Apr 11, 2018Department of Health and Mental Hygiene$177,654.00CONSTRUCTION-BUILDINGS
May 16, 2018Department of Health and Mental Hygiene$153,927.63CONSTRUCTION-BUILDINGS
Dec 11, 2017Department of Health and Mental Hygiene$153,709.73CONSTRUCTION-BUILDINGS
Dec 11, 2017Department of Health and Mental Hygiene$108,767.10CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$89,680.00CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$87,241.95CONSTRUCTION-BUILDINGS
Dec 11, 2017Department of Health and Mental Hygiene$78,639.00CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$67,324.17CONSTRUCTION-BUILDINGS
Oct 5, 2017Department of Health and Mental Hygiene$63,905.00CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$58,477.98CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$56,280.33CONSTRUCTION-BUILDINGS
Apr 11, 2018Department of Health and Mental Hygiene$46,193.87CONSTRUCTION-BUILDINGS
Aug 16, 2017School Construction Authority$45,884.26CONSTRUCTION-BUILDINGS
Dec 11, 2017Department of Health and Mental Hygiene$29,246.80CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$27,500.00CONSTRUCTION-BUILDINGS
Aug 16, 2017School Construction Authority$22,340.58CONSTRUCTION-BUILDINGS
Aug 16, 2017School Construction Authority$12,329.45CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$8,118.70CONSTRUCTION-BUILDINGS
Jun 18, 2018Department of Health and Mental Hygiene$7,680.75CONSTRUCTION-BUILDINGS
FY 2017top 20 of 50 payments$2,323,482
DateAgencyAmountCategoryPurchase order
Jan 3, 2017Department of Health and Mental Hygiene$358,860.00CONSTRUCTION-BUILDINGS
Mar 6, 2017Department of Health and Mental Hygiene$316,144.75CONSTRUCTION-BUILDINGS
Jul 20, 2016Department of Health and Mental Hygiene$242,517.00CONSTRUCTION-BUILDINGS
Apr 6, 2017Department of Health and Mental Hygiene$229,304.71CONSTRUCTION-BUILDINGS
Apr 24, 2017Department of Health and Mental Hygiene$179,455.00CONSTRUCTION-BUILDINGS
Aug 9, 2016School Construction Authority$156,241.86CONSTRUCTION-BUILDINGS
Jul 13, 2016School Construction Authority$85,605.00CONSTRUCTION-BUILDINGS
Jun 12, 2017Department of Health and Mental Hygiene$65,218.90CONSTRUCTION-BUILDINGS
Jul 13, 2016School Construction Authority$64,127.02CONSTRUCTION-BUILDINGS
Jan 25, 2017School Construction Authority$61,647.19CONSTRUCTION-BUILDINGS
Mar 3, 2017School Construction Authority$48,221.03CONSTRUCTION-BUILDINGS
Mar 3, 2017School Construction Authority$39,543.94CONSTRUCTION-BUILDINGS
Jan 25, 2017School Construction Authority$39,387.00CONSTRUCTION-BUILDINGS
Dec 29, 2016School Construction Authority$36,870.29CONSTRUCTION-BUILDINGS
Mar 16, 2017School Construction Authority$29,325.11CONSTRUCTION-BUILDINGS
Jan 25, 2017School Construction Authority$27,493.93CONSTRUCTION-BUILDINGS
Mar 3, 2017School Construction Authority$24,707.50CONSTRUCTION-BUILDINGS
Jun 27, 2017School Construction Authority$24,097.38CONSTRUCTION-BUILDINGS
Dec 30, 2016School Construction Authority$22,684.29CONSTRUCTION-BUILDINGS
Mar 16, 2017School Construction Authority$22,528.85CONSTRUCTION-BUILDINGS
FY 2016top 20 of 79 payments$4,892,792
DateAgencyAmountCategoryPurchase order
May 31, 2016Department of Health and Mental Hygiene$374,342.00CONSTRUCTION-BUILDINGS
Jul 29, 2015School Construction Authority$294,428.48CONSTRUCTION-BUILDINGS
Sep 21, 2015School Construction Authority$251,892.50CONSTRUCTION-BUILDINGS
Apr 7, 2016Department of Health and Mental Hygiene$230,478.31CONSTRUCTION-BUILDINGS
Sep 1, 2015School Construction Authority$200,319.30CONSTRUCTION-BUILDINGS
Sep 21, 2015School Construction Authority$191,857.80CONSTRUCTION-BUILDINGS
Jan 25, 2016School Construction Authority$182,114.91CONSTRUCTION-BUILDINGS
Oct 29, 2015School Construction Authority$167,677.53CONSTRUCTION-BUILDINGS
Sep 1, 2015School Construction Authority$160,195.82CONSTRUCTION-BUILDINGS
Dec 30, 2015School Construction Authority$153,092.50CONSTRUCTION-BUILDINGS
Oct 19, 2015Department of Health and Mental Hygiene$132,765.00CONSTRUCTION-BUILDINGS
Oct 15, 2015School Construction Authority$125,303.84CONSTRUCTION-BUILDINGS
Dec 2, 2015School Construction Authority$113,632.11CONSTRUCTION-BUILDINGS
Dec 23, 2015School Construction Authority$109,700.05CONSTRUCTION-BUILDINGS
Sep 1, 2015School Construction Authority$108,540.98CONSTRUCTION-BUILDINGS
Jan 25, 2016School Construction Authority$101,863.03CONSTRUCTION-BUILDINGS
Jan 25, 2016School Construction Authority$101,460.00CONSTRUCTION-BUILDINGS
Jun 9, 2016School Construction Authority$97,626.53CONSTRUCTION-BUILDINGS
Oct 15, 2015School Construction Authority$92,230.54CONSTRUCTION-BUILDINGS
Dec 2, 2015School Construction Authority$84,161.83CONSTRUCTION-BUILDINGS
FY 2015top 20 of 113 payments$10,502,855
DateAgencyAmountCategoryPurchase order
Aug 20, 2014School Construction Authority$832,985.38CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$442,338.68CONSTRUCTION-BUILDINGS
Oct 23, 2014School Construction Authority$441,726.68CONSTRUCTION-BUILDINGS
Feb 9, 2015Department of Health and Mental Hygiene$390,377.18CONSTRUCTION-BUILDINGS
Aug 20, 2014School Construction Authority$344,945.00CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$329,412.50CONSTRUCTION-BUILDINGS
Aug 20, 2014School Construction Authority$321,518.00CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$303,055.51CONSTRUCTION-BUILDINGS
Aug 20, 2014School Construction Authority$294,951.25CONSTRUCTION-BUILDINGS
Oct 23, 2014School Construction Authority$263,299.62CONSTRUCTION-BUILDINGS
Dec 3, 2014School Construction Authority$256,308.97CONSTRUCTION-BUILDINGS
Jul 29, 2014School Construction Authority$255,407.50CONSTRUCTION-BUILDINGS
Aug 20, 2014School Construction Authority$246,451.45CONSTRUCTION-BUILDINGS
Jul 17, 2014School Construction Authority$238,890.56CONSTRUCTION-BUILDINGS
Nov 24, 2014School Construction Authority$195,712.26CONSTRUCTION-BUILDINGS
Dec 17, 2014School Construction Authority$190,019.00CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$188,417.87CONSTRUCTION-BUILDINGS
Aug 14, 2014School Construction Authority$181,512.92CONSTRUCTION-BUILDINGS
Dec 3, 2014School Construction Authority$176,647.75CONSTRUCTION-BUILDINGS
Aug 26, 2014School Construction Authority$172,090.13CONSTRUCTION-BUILDINGS
FY 2014top 20 of 161 payments$18,964,685
DateAgencyAmountCategoryPurchase order
Aug 26, 2013School Construction Authority$860,182.06CONSTRUCTION-BUILDINGS
Dec 27, 2013School Construction Authority$853,592.25CONSTRUCTION-BUILDINGS
Jun 19, 2014School Construction Authority$634,020.25CONSTRUCTION-BUILDINGS
Nov 25, 2013School Construction Authority$605,945.10CONSTRUCTION-BUILDINGS
Apr 30, 2014School Construction Authority$588,524.36CONSTRUCTION-BUILDINGS
Oct 18, 2013School Construction Authority$568,243.75CONSTRUCTION-BUILDINGS
Apr 4, 2014School Construction Authority$548,082.90CONSTRUCTION-BUILDINGS
Jun 17, 2014School Construction Authority$473,270.38CONSTRUCTION-BUILDINGS
May 23, 2014School Construction Authority$441,179.42CONSTRUCTION-BUILDINGS
Oct 4, 2013School Construction Authority$440,528.80CONSTRUCTION-BUILDINGS
Jun 3, 2014School Construction Authority$431,562.39CONSTRUCTION-BUILDINGS
Nov 21, 2013School Construction Authority$429,696.66CONSTRUCTION-BUILDINGS
May 27, 2014School Construction Authority$406,552.50CONSTRUCTION-BUILDINGS
Jul 17, 2013School Construction Authority$348,043.28CONSTRUCTION-BUILDINGS
Nov 20, 2013School Construction Authority$336,452.00CONSTRUCTION-BUILDINGS
Oct 18, 2013School Construction Authority$335,944.05CONSTRUCTION-BUILDINGS
Nov 4, 2013School Construction Authority$318,796.85CONSTRUCTION-BUILDINGS
Jan 23, 2014School Construction Authority$309,158.74CONSTRUCTION-BUILDINGS
Aug 29, 2013School Construction Authority$297,878.20CONSTRUCTION-BUILDINGS
Dec 17, 2013School Construction Authority$276,212.50CONSTRUCTION-BUILDINGS
FY 2013top 20 of 112 payments$9,243,831
DateAgencyAmountCategoryPurchase order
Aug 1, 2012School Construction Authority$432,878.90CONSTRUCTION-BUILDINGS
Sep 19, 2012School Construction Authority$426,617.68CONSTRUCTION-BUILDINGS
Dec 18, 2012School Construction Authority$347,475.80CONSTRUCTION-BUILDINGS
Aug 10, 2012School Construction Authority$344,410.53CONSTRUCTION-BUILDINGS
Mar 20, 2013School Construction Authority$328,156.50CONSTRUCTION-BUILDINGS
May 21, 2013School Construction Authority$317,588.04CONSTRUCTION-BUILDINGS
Oct 23, 2012School Construction Authority$310,036.06CONSTRUCTION-BUILDINGS
Sep 6, 2012School Construction Authority$294,917.53CONSTRUCTION-BUILDINGS
May 13, 2013School Construction Authority$282,691.17CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$270,826.00CONSTRUCTION-BUILDINGS
Jun 20, 2013School Construction Authority$260,894.70CONSTRUCTION-BUILDINGS
Mar 22, 2013School Construction Authority$213,809.66CONSTRUCTION-BUILDINGS
Apr 17, 2013School Construction Authority$202,644.76CONSTRUCTION-BUILDINGS
May 13, 2013School Construction Authority$197,815.55CONSTRUCTION-BUILDINGS
Jan 30, 2013School Construction Authority$194,318.94CONSTRUCTION-BUILDINGS
Mar 20, 2013School Construction Authority$191,072.27CONSTRUCTION-BUILDINGS
Feb 21, 2013School Construction Authority$190,893.06CONSTRUCTION-BUILDINGS
Sep 24, 2012School Construction Authority$185,250.00CONSTRUCTION-BUILDINGS
Dec 5, 2012School Construction Authority$173,175.22CONSTRUCTION-BUILDINGS
May 16, 2013School Construction Authority$172,177.65CONSTRUCTION-BUILDINGS
FY 2012top 20 of 119 payments$14,780,878
DateAgencyAmountCategoryPurchase order
Sep 9, 2011School Construction Authority$766,099.45CONSTRUCTION-BUILDINGS
Jan 9, 2012School Construction Authority$617,907.80CONSTRUCTION-BUILDINGS
Aug 11, 2011School Construction Authority$491,735.06CONSTRUCTION-BUILDINGS
Oct 4, 2011School Construction Authority$475,016.63CONSTRUCTION-BUILDINGS
Aug 22, 2011School Construction Authority$448,330.13CONSTRUCTION-BUILDINGS
Apr 9, 2012School Construction Authority$416,476.39CONSTRUCTION-BUILDINGS
Aug 10, 2011School Construction Authority$385,009.00CONSTRUCTION-BUILDINGS
Jul 11, 2011School Construction Authority$370,118.43CONSTRUCTION-BUILDINGS
Dec 21, 2011School Construction Authority$359,586.45CONSTRUCTION-BUILDINGS
Dec 13, 2011School Construction Authority$340,652.19CONSTRUCTION-BUILDINGS
Jun 20, 2012School Construction Authority$329,289.80CONSTRUCTION-BUILDINGS
Aug 24, 2011School Construction Authority$316,497.73CONSTRUCTION-BUILDINGS
Nov 15, 2011School Construction Authority$308,351.88CONSTRUCTION-BUILDINGS
Aug 22, 2011School Construction Authority$301,018.29CONSTRUCTION-BUILDINGS
Sep 9, 2011School Construction Authority$295,117.47CONSTRUCTION-BUILDINGS
Nov 10, 2011School Construction Authority$294,543.70CONSTRUCTION-BUILDINGS
Dec 16, 2011School Construction Authority$269,281.06CONSTRUCTION-BUILDINGS
Jun 18, 2012School Construction Authority$247,739.58CONSTRUCTION-BUILDINGS
Jan 23, 2012School Construction Authority$221,844.00CONSTRUCTION-BUILDINGS
Jul 19, 2011School Construction Authority$214,185.10CONSTRUCTION-BUILDINGS
FY 2011top 20 of 76 payments$8,216,193
DateAgencyAmountCategoryPurchase order
Aug 6, 2010School Construction Authority$703,760.57CONSTRUCTION-BUILDINGS
Sep 8, 2010School Construction Authority$636,735.76CONSTRUCTION-BUILDINGS
Jul 9, 2010School Construction Authority$575,580.06CONSTRUCTION-BUILDINGS
Nov 22, 2010School Construction Authority$572,330.31CONSTRUCTION-BUILDINGS
Jun 20, 2011School Construction Authority$410,901.36CONSTRUCTION-BUILDINGS
Jun 6, 2011School Construction Authority$344,478.98CONSTRUCTION-BUILDINGS
May 17, 2011School Construction Authority$285,315.89CONSTRUCTION-BUILDINGS
Jun 20, 2011School Construction Authority$264,945.84CONSTRUCTION-BUILDINGS
May 12, 2011School Construction Authority$244,141.13CONSTRUCTION-BUILDINGS
Jun 14, 2011School Construction Authority$243,906.92CONSTRUCTION-BUILDINGS
Jun 20, 2011School Construction Authority$209,790.26CONSTRUCTION-BUILDINGS
Jan 19, 2011School Construction Authority$209,570.00CONSTRUCTION-BUILDINGS
Dec 14, 2010School Construction Authority$199,414.50CONSTRUCTION-BUILDINGS
May 13, 2011School Construction Authority$196,760.44CONSTRUCTION-BUILDINGS
Mar 15, 2011School Construction Authority$185,911.83CONSTRUCTION-BUILDINGS
Jun 20, 2011School Construction Authority$183,621.03CONSTRUCTION-BUILDINGS
Dec 22, 2010School Construction Authority$181,495.86CONSTRUCTION-BUILDINGS
Oct 25, 2010School Construction Authority$164,818.79CONSTRUCTION-BUILDINGS
Apr 26, 2011School Construction Authority$128,927.95CONSTRUCTION-BUILDINGS
May 13, 2011School Construction Authority$126,255.02CONSTRUCTION-BUILDINGS
FY 2010top 13 of 13 payments$3,767,385
DateAgencyAmountCategoryPurchase order
Apr 26, 2010School Construction Authority$986,354.03CONSTRUCTION-BUILDINGS
Jan 6, 2010School Construction Authority$897,107.49CONSTRUCTION-BUILDINGS
Mar 30, 2010School Construction Authority$768,036.31CONSTRUCTION-BUILDINGS
Mar 9, 2010School Construction Authority$590,626.92CONSTRUCTION-BUILDINGS
Apr 28, 2010Department of Parks and Recreation$165,376.71IOTB CONSTRUCTION
Jun 11, 2010School Construction Authority$140,756.90CONSTRUCTION-BUILDINGS
May 19, 2010Department of Parks and Recreation$111,055.00IOTB CONSTRUCTION
Mar 30, 2010School Construction Authority$31,825.00CONSTRUCTION-BUILDINGS
Apr 26, 2010School Construction Authority$25,650.00CONSTRUCTION-BUILDINGS
Mar 9, 2010School Construction Authority$20,875.41CONSTRUCTION-BUILDINGS
Jan 6, 2010School Construction Authority$14,250.00CONSTRUCTION-BUILDINGS
Jan 15, 2010Department of Parks and Recreation$14,250.00IOTB CONSTRUCTION
Mar 30, 2010School Construction Authority$1,220.78CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
May 30, 2025Department of Health and Mental Hygiene$2,370.17CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$42.41CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$250.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$5,187.50CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$2,692.10CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$884.79CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$5,387.50CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$14,185.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$4,660.59CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$1,252.50CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$600.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$1,000.97CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$2,880.26CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$245.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$971.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$7,113.48CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$147.73CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$308.50CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$2,743.75CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$892.76CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$2,247.50CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$1,867.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$1,000.00CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$6,739.05CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2024Department of Health and Mental Hygiene$6,630.84CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority