Malcolm Pirnie Inc/Hazen and Sawyer PC JV is the 1,243rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 44th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span.
Primary spending category: DESIGN-CONSULTANT-IOTB
Confirm your email to activate this follow.
Check your inbox and click the confirmation link to activate this follow and open your watchlist. The link expires in 20 minutes.
A link was requested recently. Check your inbox, or wait one minute and submit this follow again. This request has not added a follow.
We couldn't send the confirmation. Check the email address and try again. This follow is not active until you confirm it.
Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.
Payments by fiscal year
The payment history
Select a column to see the agencies behind that fiscal year.
13 fiscal years on record. The incoming flows below combine all recorded years.
Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.
Who pays this supplier?
Select a paying agency to inspect the relationship, then open its profile.
May 17, 2010 to Mar 8, 2022 · All recorded fiscal years
Showing 1 of 1 positive agencies in these records.
Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $40,830,558.50. Zero and net-negative relationships are excluded from positive flows.
The relationships at a glance
- Total shown
- $40,830,558.50
- Payments represented
- 196
- Paying agencies shown
- 1
- Largest share of supplier total
- 100.0%
Largest displayed relationship: Department of Environmental Protection. Select a flow to explore its details.
May 17, 2010 to Mar 8, 2022 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.
Malcolm Pirnie Inc/Hazen and Sawyer PC JV
$40,830,559from the agencies shownMalcolm Pirnie Inc/Hazen and Sawyer PC JV
$40,830,559 from the agencies shown
- $40,830,559100.0% of supplier total
This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2022 | Department of Environmental Protection | 1 | $57,237 |
| FY 2021 | Department of Environmental Protection | 1 | $75,142 |
| FY 2020 | Department of Environmental Protection | 5 | $457,488 |
| FY 2019 | Department of Environmental Protection | 10 | $1,246,947 |
| FY 2018 | Department of Environmental Protection | 19 | $2,406,661 |
| FY 2017 | Department of Environmental Protection | 14 | $2,165,990 |
| FY 2016 | Department of Environmental Protection | 25 | $2,753,712 |
| FY 2015 | Department of Environmental Protection | 23 | $2,873,245 |
| FY 2014 | Department of Environmental Protection | 29 | $4,392,539 |
| FY 2013 | Department of Environmental Protection | 26 | $6,295,389 |
| FY 2012 | Department of Environmental Protection | 23 | $7,575,865 |
| FY 2011 | Department of Environmental Protection | 13 | $7,050,572 |
| FY 2010 | Department of Environmental Protection | 7 | $3,479,772 |
| Total | 196 | $40,830,559 |
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| DESIGN-CONSULTANT-IOTB | 196 | $40,830,559 | May 17, 2010 – Mar 8, 2022 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2022top 1 of 1 payments$57,237
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 8, 2022 | Department of Environmental Protection | $57,237.31 | DESIGN-CONSULTANT-IOTB | – |
FY 2021top 1 of 1 payments$75,142
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 11, 2020 | Department of Environmental Protection | $75,142.14 | DESIGN-CONSULTANT-IOTB | – |
FY 2020top 5 of 5 payments$457,488
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 17, 2019 | Department of Environmental Protection | $183,592.27 | DESIGN-CONSULTANT-IOTB | – |
| Aug 9, 2019 | Department of Environmental Protection | $125,985.51 | DESIGN-CONSULTANT-IOTB | – |
| Sep 5, 2019 | Department of Environmental Protection | $87,461.61 | DESIGN-CONSULTANT-IOTB | – |
| Nov 15, 2019 | Department of Environmental Protection | $36,867.04 | DESIGN-CONSULTANT-IOTB | – |
| Oct 23, 2019 | Department of Environmental Protection | $23,581.21 | DESIGN-CONSULTANT-IOTB | – |
FY 2019top 10 of 10 payments$1,246,947
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 24, 2018 | Department of Environmental Protection | $257,555.44 | DESIGN-CONSULTANT-IOTB | – |
| Nov 2, 2018 | Department of Environmental Protection | $133,645.96 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2019 | Department of Environmental Protection | $132,107.21 | DESIGN-CONSULTANT-IOTB | – |
| Dec 19, 2018 | Department of Environmental Protection | $120,978.31 | DESIGN-CONSULTANT-IOTB | – |
| Mar 18, 2019 | Department of Environmental Protection | $118,590.01 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2018 | Department of Environmental Protection | $112,665.85 | DESIGN-CONSULTANT-IOTB | – |
| Mar 22, 2019 | Department of Environmental Protection | $100,115.61 | DESIGN-CONSULTANT-IOTB | – |
| May 16, 2019 | Department of Environmental Protection | $90,719.32 | DESIGN-CONSULTANT-IOTB | – |
| Apr 17, 2019 | Department of Environmental Protection | $90,689.64 | DESIGN-CONSULTANT-IOTB | – |
| Jun 28, 2019 | Department of Environmental Protection | $89,879.21 | DESIGN-CONSULTANT-IOTB | – |
FY 2018top 19 of 19 payments$2,406,661
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 25, 2017 | Department of Environmental Protection | $353,714.43 | DESIGN-CONSULTANT-IOTB | – |
| Nov 30, 2017 | Department of Environmental Protection | $347,539.99 | DESIGN-CONSULTANT-IOTB | – |
| Nov 3, 2017 | Department of Environmental Protection | $346,178.00 | DESIGN-CONSULTANT-IOTB | – |
| Jul 13, 2017 | Department of Environmental Protection | $254,844.24 | DESIGN-CONSULTANT-IOTB | – |
| Jun 28, 2018 | Department of Environmental Protection | $222,622.39 | DESIGN-CONSULTANT-IOTB | – |
| May 2, 2018 | Department of Environmental Protection | $178,730.91 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2017 | Department of Environmental Protection | $154,864.71 | DESIGN-CONSULTANT-IOTB | – |
| Feb 2, 2018 | Department of Environmental Protection | $139,640.08 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2017 | Department of Environmental Protection | $130,590.16 | DESIGN-CONSULTANT-IOTB | – |
| May 30, 2018 | Department of Environmental Protection | $83,934.72 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2017 | Department of Environmental Protection | $44,076.35 | DESIGN-CONSULTANT-IOTB | – |
| Sep 18, 2017 | Department of Environmental Protection | $30,439.15 | DESIGN-CONSULTANT-IOTB | – |
| Aug 14, 2017 | Department of Environmental Protection | $25,560.61 | DESIGN-CONSULTANT-IOTB | – |
| Jul 5, 2017 | Department of Environmental Protection | $23,198.92 | DESIGN-CONSULTANT-IOTB | – |
| Jan 10, 2018 | Department of Environmental Protection | $22,330.70 | DESIGN-CONSULTANT-IOTB | – |
| Dec 6, 2017 | Department of Environmental Protection | $18,679.77 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2018 | Department of Environmental Protection | $14,203.36 | DESIGN-CONSULTANT-IOTB | – |
| Apr 2, 2018 | Department of Environmental Protection | $13,261.63 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2018 | Department of Environmental Protection | $2,250.79 | DESIGN-CONSULTANT-IOTB | – |
FY 2017top 14 of 14 payments$2,165,990
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 5, 2016 | Department of Environmental Protection | $478,821.06 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2016 | Department of Environmental Protection | $441,565.60 | DESIGN-CONSULTANT-IOTB | – |
| Apr 27, 2017 | Department of Environmental Protection | $425,826.84 | DESIGN-CONSULTANT-IOTB | – |
| Aug 25, 2016 | Department of Environmental Protection | $213,691.00 | DESIGN-CONSULTANT-IOTB | – |
| Feb 9, 2017 | Department of Environmental Protection | $204,859.11 | DESIGN-CONSULTANT-IOTB | – |
| Jun 19, 2017 | Department of Environmental Protection | $191,203.39 | DESIGN-CONSULTANT-IOTB | – |
| Feb 1, 2017 | Department of Environmental Protection | $62,190.12 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2016 | Department of Environmental Protection | $45,070.61 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2016 | Department of Environmental Protection | $29,767.55 | DESIGN-CONSULTANT-IOTB | – |
| Jul 5, 2016 | Department of Environmental Protection | $28,716.05 | DESIGN-CONSULTANT-IOTB | – |
| Jun 19, 2017 | Department of Environmental Protection | $15,273.78 | DESIGN-CONSULTANT-IOTB | – |
| Jan 23, 2017 | Department of Environmental Protection | $13,658.02 | DESIGN-CONSULTANT-IOTB | – |
| Mar 22, 2017 | Department of Environmental Protection | $10,758.77 | DESIGN-CONSULTANT-IOTB | – |
| Nov 28, 2016 | Department of Environmental Protection | $4,587.70 | DESIGN-CONSULTANT-IOTB | – |
FY 2016top 20 of 25 payments$2,753,712
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 25, 2016 | Department of Environmental Protection | $257,475.84 | DESIGN-CONSULTANT-IOTB | – |
| Dec 2, 2015 | Department of Environmental Protection | $234,003.88 | DESIGN-CONSULTANT-IOTB | – |
| Mar 28, 2016 | Department of Environmental Protection | $213,171.80 | DESIGN-CONSULTANT-IOTB | – |
| Feb 3, 2016 | Department of Environmental Protection | $208,353.69 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2016 | Department of Environmental Protection | $203,593.15 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2015 | Department of Environmental Protection | $201,449.08 | DESIGN-CONSULTANT-IOTB | – |
| May 2, 2016 | Department of Environmental Protection | $195,569.08 | DESIGN-CONSULTANT-IOTB | – |
| Mar 3, 2016 | Department of Environmental Protection | $195,549.72 | DESIGN-CONSULTANT-IOTB | – |
| Sep 1, 2015 | Department of Environmental Protection | $191,526.36 | DESIGN-CONSULTANT-IOTB | – |
| Oct 13, 2015 | Department of Environmental Protection | $184,055.38 | DESIGN-CONSULTANT-IOTB | – |
| May 27, 2016 | Department of Environmental Protection | $181,637.97 | DESIGN-CONSULTANT-IOTB | – |
| Jul 29, 2015 | Department of Environmental Protection | $174,594.49 | DESIGN-CONSULTANT-IOTB | – |
| Jul 7, 2015 | Department of Environmental Protection | $162,101.94 | DESIGN-CONSULTANT-IOTB | – |
| May 2, 2016 | Department of Environmental Protection | $31,409.38 | DESIGN-CONSULTANT-IOTB | – |
| Oct 13, 2015 | Department of Environmental Protection | $15,699.15 | DESIGN-CONSULTANT-IOTB | – |
| Mar 21, 2016 | Department of Environmental Protection | $15,110.77 | DESIGN-CONSULTANT-IOTB | – |
| May 24, 2016 | Department of Environmental Protection | $13,396.67 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2016 | Department of Environmental Protection | $12,907.28 | DESIGN-CONSULTANT-IOTB | – |
| Jul 1, 2015 | Department of Environmental Protection | $10,473.37 | DESIGN-CONSULTANT-IOTB | – |
| Aug 24, 2015 | Department of Environmental Protection | $9,967.69 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 23 payments$2,873,245
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 13, 2015 | Department of Environmental Protection | $319,832.34 | DESIGN-CONSULTANT-IOTB | – |
| Oct 22, 2014 | Department of Environmental Protection | $301,856.36 | DESIGN-CONSULTANT-IOTB | – |
| Jul 31, 2014 | Department of Environmental Protection | $298,642.11 | DESIGN-CONSULTANT-IOTB | – |
| Aug 25, 2014 | Department of Environmental Protection | $252,929.10 | DESIGN-CONSULTANT-IOTB | – |
| Sep 12, 2014 | Department of Environmental Protection | $243,639.31 | DESIGN-CONSULTANT-IOTB | – |
| Mar 20, 2015 | Department of Environmental Protection | $219,619.51 | DESIGN-CONSULTANT-IOTB | – |
| Feb 25, 2015 | Department of Environmental Protection | $191,949.13 | DESIGN-CONSULTANT-IOTB | – |
| Jan 14, 2015 | Department of Environmental Protection | $191,381.46 | DESIGN-CONSULTANT-IOTB | – |
| Apr 24, 2015 | Department of Environmental Protection | $182,315.04 | DESIGN-CONSULTANT-IOTB | – |
| Dec 18, 2014 | Department of Environmental Protection | $177,494.08 | DESIGN-CONSULTANT-IOTB | – |
| Jun 10, 2015 | Department of Environmental Protection | $164,300.98 | DESIGN-CONSULTANT-IOTB | – |
| Nov 17, 2014 | Department of Environmental Protection | $159,239.19 | DESIGN-CONSULTANT-IOTB | – |
| Mar 2, 2015 | Department of Environmental Protection | $25,141.30 | DESIGN-CONSULTANT-IOTB | – |
| Dec 8, 2014 | Department of Environmental Protection | $25,022.72 | DESIGN-CONSULTANT-IOTB | – |
| Feb 2, 2015 | Department of Environmental Protection | $22,790.19 | DESIGN-CONSULTANT-IOTB | – |
| Mar 30, 2015 | Department of Environmental Protection | $20,804.27 | DESIGN-CONSULTANT-IOTB | – |
| Dec 29, 2014 | Department of Environmental Protection | $14,711.90 | DESIGN-CONSULTANT-IOTB | – |
| Jul 28, 2014 | Department of Environmental Protection | $12,164.53 | DESIGN-CONSULTANT-IOTB | – |
| Oct 28, 2014 | Department of Environmental Protection | $11,842.37 | DESIGN-CONSULTANT-IOTB | – |
| Apr 20, 2015 | Department of Environmental Protection | $10,707.47 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 29 payments$4,392,539
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 6, 2013 | Department of Environmental Protection | $404,197.41 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2013 | Department of Environmental Protection | $381,697.49 | DESIGN-CONSULTANT-IOTB | – |
| Oct 2, 2013 | Department of Environmental Protection | $363,826.26 | DESIGN-CONSULTANT-IOTB | – |
| Oct 8, 2013 | Department of Environmental Protection | $351,007.69 | DESIGN-CONSULTANT-IOTB | – |
| Feb 26, 2014 | Department of Environmental Protection | $340,391.62 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2013 | Department of Environmental Protection | $330,520.50 | DESIGN-CONSULTANT-IOTB | – |
| Dec 26, 2013 | Department of Environmental Protection | $328,070.74 | DESIGN-CONSULTANT-IOTB | – |
| Aug 12, 2013 | Department of Environmental Protection | $319,843.71 | DESIGN-CONSULTANT-IOTB | – |
| Mar 13, 2014 | Department of Environmental Protection | $294,095.08 | DESIGN-CONSULTANT-IOTB | – |
| Jun 16, 2014 | Department of Environmental Protection | $277,411.39 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2014 | Department of Environmental Protection | $256,002.08 | DESIGN-CONSULTANT-IOTB | – |
| May 22, 2014 | Department of Environmental Protection | $241,449.68 | DESIGN-CONSULTANT-IOTB | – |
| Feb 5, 2014 | Department of Environmental Protection | $77,454.03 | DESIGN-CONSULTANT-IOTB | – |
| Dec 16, 2013 | Department of Environmental Protection | $61,300.22 | DESIGN-CONSULTANT-IOTB | – |
| Sep 9, 2013 | Department of Environmental Protection | $46,142.28 | DESIGN-CONSULTANT-IOTB | – |
| Jul 3, 2013 | Department of Environmental Protection | $40,687.55 | DESIGN-CONSULTANT-IOTB | – |
| Aug 2, 2013 | Department of Environmental Protection | $38,146.95 | DESIGN-CONSULTANT-IOTB | – |
| Apr 22, 2014 | Department of Environmental Protection | $32,028.14 | DESIGN-CONSULTANT-IOTB | – |
| Apr 7, 2014 | Department of Environmental Protection | $31,597.90 | DESIGN-CONSULTANT-IOTB | – |
| Feb 12, 2014 | Department of Environmental Protection | $29,260.78 | DESIGN-CONSULTANT-IOTB | – |
FY 2013top 20 of 26 payments$6,295,389
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 19, 2012 | Department of Environmental Protection | $540,416.22 | DESIGN-CONSULTANT-IOTB | – |
| Jul 27, 2012 | Department of Environmental Protection | $524,918.20 | DESIGN-CONSULTANT-IOTB | – |
| Oct 11, 2012 | Department of Environmental Protection | $501,899.88 | DESIGN-CONSULTANT-IOTB | – |
| Sep 10, 2012 | Department of Environmental Protection | $469,025.18 | DESIGN-CONSULTANT-IOTB | – |
| Feb 1, 2013 | Department of Environmental Protection | $461,715.36 | DESIGN-CONSULTANT-IOTB | – |
| Dec 14, 2012 | Department of Environmental Protection | $457,338.44 | DESIGN-CONSULTANT-IOTB | – |
| Jan 4, 2013 | Department of Environmental Protection | $442,486.55 | DESIGN-CONSULTANT-IOTB | – |
| Feb 28, 2013 | Department of Environmental Protection | $425,921.78 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2013 | Department of Environmental Protection | $385,200.28 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2013 | Department of Environmental Protection | $377,309.33 | DESIGN-CONSULTANT-IOTB | – |
| Jun 20, 2013 | Department of Environmental Protection | $373,004.94 | DESIGN-CONSULTANT-IOTB | – |
| Apr 3, 2013 | Department of Environmental Protection | $370,717.37 | DESIGN-CONSULTANT-IOTB | – |
| Sep 17, 2012 | Department of Environmental Protection | $231,473.93 | DESIGN-CONSULTANT-IOTB | – |
| Jul 9, 2012 | Department of Environmental Protection | $100,759.72 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2013 | Department of Environmental Protection | $83,915.27 | DESIGN-CONSULTANT-IOTB | – |
| Aug 23, 2012 | Department of Environmental Protection | $78,117.68 | DESIGN-CONSULTANT-IOTB | – |
| Sep 17, 2012 | Department of Environmental Protection | $71,851.05 | DESIGN-CONSULTANT-IOTB | – |
| Oct 9, 2012 | Department of Environmental Protection | $59,925.42 | DESIGN-CONSULTANT-IOTB | – |
| Sep 11, 2012 | Department of Environmental Protection | $57,478.29 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2012 | Department of Environmental Protection | $51,889.30 | DESIGN-CONSULTANT-IOTB | – |
FY 2012top 20 of 23 payments$7,575,865
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 20, 2011 | Department of Environmental Protection | $1,111,748.94 | DESIGN-CONSULTANT-IOTB | – |
| Aug 15, 2011 | Department of Environmental Protection | $687,832.41 | DESIGN-CONSULTANT-IOTB | – |
| Aug 26, 2011 | Department of Environmental Protection | $561,816.18 | DESIGN-CONSULTANT-IOTB | – |
| Apr 12, 2012 | Department of Environmental Protection | $534,125.48 | DESIGN-CONSULTANT-IOTB | – |
| Feb 16, 2012 | Department of Environmental Protection | $503,594.37 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2012 | Department of Environmental Protection | $497,463.72 | DESIGN-CONSULTANT-IOTB | – |
| Jan 17, 2012 | Department of Environmental Protection | $496,759.38 | DESIGN-CONSULTANT-IOTB | – |
| Jan 4, 2012 | Department of Environmental Protection | $485,575.83 | DESIGN-CONSULTANT-IOTB | – |
| May 9, 2012 | Department of Environmental Protection | $440,232.49 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2011 | Department of Environmental Protection | $415,040.15 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2012 | Department of Environmental Protection | $404,001.26 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2012 | Department of Environmental Protection | $343,690.05 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2012 | Department of Environmental Protection | $163,459.05 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2011 | Department of Environmental Protection | $138,346.72 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2012 | Department of Environmental Protection | $113,819.26 | DESIGN-CONSULTANT-IOTB | – |
| Jun 4, 2012 | Department of Environmental Protection | $113,008.57 | DESIGN-CONSULTANT-IOTB | – |
| Mar 30, 2012 | Department of Environmental Protection | $112,983.23 | DESIGN-CONSULTANT-IOTB | – |
| Feb 14, 2012 | Department of Environmental Protection | $107,176.34 | DESIGN-CONSULTANT-IOTB | – |
| May 18, 2012 | Department of Environmental Protection | $107,127.04 | DESIGN-CONSULTANT-IOTB | – |
| Apr 25, 2012 | Department of Environmental Protection | $106,326.10 | DESIGN-CONSULTANT-IOTB | – |
FY 2011top 13 of 13 payments$7,050,572
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 18, 2011 | Department of Environmental Protection | $624,968.49 | DESIGN-CONSULTANT-IOTB | – |
| Jul 19, 2010 | Department of Environmental Protection | $609,222.35 | DESIGN-CONSULTANT-IOTB | – |
| Dec 8, 2010 | Department of Environmental Protection | $581,534.95 | DESIGN-CONSULTANT-IOTB | – |
| Sep 20, 2010 | Department of Environmental Protection | $570,167.13 | DESIGN-CONSULTANT-IOTB | – |
| Jun 23, 2011 | Department of Environmental Protection | $565,551.86 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2010 | Department of Environmental Protection | $560,743.44 | DESIGN-CONSULTANT-IOTB | – |
| Dec 27, 2010 | Department of Environmental Protection | $549,888.23 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2011 | Department of Environmental Protection | $536,591.02 | DESIGN-CONSULTANT-IOTB | – |
| May 5, 2011 | Department of Environmental Protection | $531,494.68 | DESIGN-CONSULTANT-IOTB | – |
| Aug 9, 2010 | Department of Environmental Protection | $520,813.79 | DESIGN-CONSULTANT-IOTB | – |
| Feb 14, 2011 | Department of Environmental Protection | $515,914.04 | DESIGN-CONSULTANT-IOTB | – |
| Nov 12, 2010 | Department of Environmental Protection | $514,720.75 | DESIGN-CONSULTANT-IOTB | – |
| Jul 14, 2010 | Department of Environmental Protection | $368,961.41 | DESIGN-CONSULTANT-IOTB | – |
FY 2010top 7 of 7 payments$3,479,772
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 17, 2010 | Department of Environmental Protection | $1,159,781.82 | DESIGN-CONSULTANT-IOTB | – |
| May 21, 2010 | Department of Environmental Protection | $695,451.02 | DESIGN-CONSULTANT-IOTB | – |
| Jun 21, 2010 | Department of Environmental Protection | $557,582.33 | DESIGN-CONSULTANT-IOTB | – |
| May 28, 2010 | Department of Environmental Protection | $543,673.08 | DESIGN-CONSULTANT-IOTB | – |
| Jun 14, 2010 | Department of Environmental Protection | $494,967.41 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2010 | Department of Environmental Protection | $20,875.39 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2010 | Department of Environmental Protection | $7,440.84 | DESIGN-CONSULTANT-IOTB | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Mar 8, 2022 | Department of Environmental Protection | $57,237.31 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Sep 11, 2020 | Department of Environmental Protection | $75,142.14 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Nov 15, 2019 | Department of Environmental Protection | $36,867.04 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Oct 23, 2019 | Department of Environmental Protection | $23,581.21 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Sep 5, 2019 | Department of Environmental Protection | $87,461.61 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Aug 9, 2019 | Department of Environmental Protection | $125,985.51 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jul 17, 2019 | Department of Environmental Protection | $183,592.27 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 28, 2019 | Department of Environmental Protection | $89,879.21 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 16, 2019 | Department of Environmental Protection | $90,719.32 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 17, 2019 | Department of Environmental Protection | $90,689.64 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Mar 22, 2019 | Department of Environmental Protection | $100,115.61 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Mar 18, 2019 | Department of Environmental Protection | $118,590.01 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Mar 18, 2019 | Department of Environmental Protection | $132,107.21 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Dec 19, 2018 | Department of Environmental Protection | $120,978.31 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Nov 2, 2018 | Department of Environmental Protection | $133,645.96 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Sep 24, 2018 | Department of Environmental Protection | $257,555.44 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Aug 22, 2018 | Department of Environmental Protection | $112,665.85 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 28, 2018 | Department of Environmental Protection | $222,622.39 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 4, 2018 | Department of Environmental Protection | $2,250.79 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 30, 2018 | Department of Environmental Protection | $83,934.72 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| May 2, 2018 | Department of Environmental Protection | $178,730.91 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Apr 2, 2018 | Department of Environmental Protection | $13,261.63 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Feb 2, 2018 | Department of Environmental Protection | $139,640.08 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jan 30, 2018 | Department of Environmental Protection | $14,203.36 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jan 10, 2018 | Department of Environmental Protection | $22,330.70 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data