Malcolm Pirnie Inc/Hazen and Sawyer PC JV: New York City Government Payments

as recorded by New York City: MALCOLM PIRNIE INC/HAZEN AND SAWYER PC JV

Malcolm Pirnie Inc/Hazen and Sawyer PC JV is the 1,243rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 44th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: DESIGN-CONSULTANT-IOTB

$40,830,559total received
196payments
1agency
May 17, 2010 – Mar 8, 2022first / last payment
Find this supplier’s buyersCompare with other suppliers

Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.

Follow this vendorGet an email when the recorded payment summary for Malcolm Pirnie Inc/Hazen and Sawyer PC JV in New York City changes. Confirm by email to start. Self-service follows are free.

Payments by fiscal year

The payment history

Select a column to see the agencies behind that fiscal year.

13 fiscal years on record. The incoming flows below combine all recorded years.

Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.

Who pays this supplier?

Select a paying agency to inspect the relationship, then open its profile.

May 17, 2010 to Mar 8, 2022 · All recorded fiscal years

Showing 1 of 1 positive agencies in these records.

Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $40,830,558.50. Zero and net-negative relationships are excluded from positive flows.

The relationships at a glance

Total shown
$40,830,558.50
Payments represented
196
Paying agencies shown
1
Largest share of supplier total
100.0%

Largest displayed relationship: Department of Environmental Protection. Select a flow to explore its details.

May 17, 2010 to Mar 8, 2022 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.

Receiving supplier

Malcolm Pirnie Inc/Hazen and Sawyer PC JV

$40,830,559from the agencies shown

Malcolm Pirnie Inc/Hazen and Sawyer PC JV
$40,830,559 from the agencies shown

  1. $40,830,559100.0% of supplier total

This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2022Department of Environmental Protection1$57,237
FY 2021Department of Environmental Protection1$75,142
FY 2020Department of Environmental Protection5$457,488
FY 2019Department of Environmental Protection10$1,246,947
FY 2018Department of Environmental Protection19$2,406,661
FY 2017Department of Environmental Protection14$2,165,990
FY 2016Department of Environmental Protection25$2,753,712
FY 2015Department of Environmental Protection23$2,873,245
FY 2014Department of Environmental Protection29$4,392,539
FY 2013Department of Environmental Protection26$6,295,389
FY 2012Department of Environmental Protection23$7,575,865
FY 2011Department of Environmental Protection13$7,050,572
FY 2010Department of Environmental Protection7$3,479,772
Total196$40,830,559

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
DESIGN-CONSULTANT-IOTB196$40,830,559May 17, 2010 – Mar 8, 2022

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2022top 1 of 1 payments$57,237
DateAgencyAmountCategoryPurchase order
Mar 8, 2022Department of Environmental Protection$57,237.31DESIGN-CONSULTANT-IOTB–
FY 2021top 1 of 1 payments$75,142
DateAgencyAmountCategoryPurchase order
Sep 11, 2020Department of Environmental Protection$75,142.14DESIGN-CONSULTANT-IOTB–
FY 2020top 5 of 5 payments$457,488
DateAgencyAmountCategoryPurchase order
Jul 17, 2019Department of Environmental Protection$183,592.27DESIGN-CONSULTANT-IOTB–
Aug 9, 2019Department of Environmental Protection$125,985.51DESIGN-CONSULTANT-IOTB–
Sep 5, 2019Department of Environmental Protection$87,461.61DESIGN-CONSULTANT-IOTB–
Nov 15, 2019Department of Environmental Protection$36,867.04DESIGN-CONSULTANT-IOTB–
Oct 23, 2019Department of Environmental Protection$23,581.21DESIGN-CONSULTANT-IOTB–
FY 2019top 10 of 10 payments$1,246,947
DateAgencyAmountCategoryPurchase order
Sep 24, 2018Department of Environmental Protection$257,555.44DESIGN-CONSULTANT-IOTB–
Nov 2, 2018Department of Environmental Protection$133,645.96DESIGN-CONSULTANT-IOTB–
Mar 18, 2019Department of Environmental Protection$132,107.21DESIGN-CONSULTANT-IOTB–
Dec 19, 2018Department of Environmental Protection$120,978.31DESIGN-CONSULTANT-IOTB–
Mar 18, 2019Department of Environmental Protection$118,590.01DESIGN-CONSULTANT-IOTB–
Aug 22, 2018Department of Environmental Protection$112,665.85DESIGN-CONSULTANT-IOTB–
Mar 22, 2019Department of Environmental Protection$100,115.61DESIGN-CONSULTANT-IOTB–
May 16, 2019Department of Environmental Protection$90,719.32DESIGN-CONSULTANT-IOTB–
Apr 17, 2019Department of Environmental Protection$90,689.64DESIGN-CONSULTANT-IOTB–
Jun 28, 2019Department of Environmental Protection$89,879.21DESIGN-CONSULTANT-IOTB–
FY 2018top 19 of 19 payments$2,406,661
DateAgencyAmountCategoryPurchase order
Sep 25, 2017Department of Environmental Protection$353,714.43DESIGN-CONSULTANT-IOTB–
Nov 30, 2017Department of Environmental Protection$347,539.99DESIGN-CONSULTANT-IOTB–
Nov 3, 2017Department of Environmental Protection$346,178.00DESIGN-CONSULTANT-IOTB–
Jul 13, 2017Department of Environmental Protection$254,844.24DESIGN-CONSULTANT-IOTB–
Jun 28, 2018Department of Environmental Protection$222,622.39DESIGN-CONSULTANT-IOTB–
May 2, 2018Department of Environmental Protection$178,730.91DESIGN-CONSULTANT-IOTB–
Aug 21, 2017Department of Environmental Protection$154,864.71DESIGN-CONSULTANT-IOTB–
Feb 2, 2018Department of Environmental Protection$139,640.08DESIGN-CONSULTANT-IOTB–
Dec 26, 2017Department of Environmental Protection$130,590.16DESIGN-CONSULTANT-IOTB–
May 30, 2018Department of Environmental Protection$83,934.72DESIGN-CONSULTANT-IOTB–
Oct 30, 2017Department of Environmental Protection$44,076.35DESIGN-CONSULTANT-IOTB–
Sep 18, 2017Department of Environmental Protection$30,439.15DESIGN-CONSULTANT-IOTB–
Aug 14, 2017Department of Environmental Protection$25,560.61DESIGN-CONSULTANT-IOTB–
Jul 5, 2017Department of Environmental Protection$23,198.92DESIGN-CONSULTANT-IOTB–
Jan 10, 2018Department of Environmental Protection$22,330.70DESIGN-CONSULTANT-IOTB–
Dec 6, 2017Department of Environmental Protection$18,679.77DESIGN-CONSULTANT-IOTB–
Jan 30, 2018Department of Environmental Protection$14,203.36DESIGN-CONSULTANT-IOTB–
Apr 2, 2018Department of Environmental Protection$13,261.63DESIGN-CONSULTANT-IOTB–
Jun 4, 2018Department of Environmental Protection$2,250.79DESIGN-CONSULTANT-IOTB–
FY 2017top 14 of 14 payments$2,165,990
DateAgencyAmountCategoryPurchase order
Oct 5, 2016Department of Environmental Protection$478,821.06DESIGN-CONSULTANT-IOTB–
Dec 27, 2016Department of Environmental Protection$441,565.60DESIGN-CONSULTANT-IOTB–
Apr 27, 2017Department of Environmental Protection$425,826.84DESIGN-CONSULTANT-IOTB–
Aug 25, 2016Department of Environmental Protection$213,691.00DESIGN-CONSULTANT-IOTB–
Feb 9, 2017Department of Environmental Protection$204,859.11DESIGN-CONSULTANT-IOTB–
Jun 19, 2017Department of Environmental Protection$191,203.39DESIGN-CONSULTANT-IOTB–
Feb 1, 2017Department of Environmental Protection$62,190.12DESIGN-CONSULTANT-IOTB–
Jul 18, 2016Department of Environmental Protection$45,070.61DESIGN-CONSULTANT-IOTB–
Oct 17, 2016Department of Environmental Protection$29,767.55DESIGN-CONSULTANT-IOTB–
Jul 5, 2016Department of Environmental Protection$28,716.05DESIGN-CONSULTANT-IOTB–
Jun 19, 2017Department of Environmental Protection$15,273.78DESIGN-CONSULTANT-IOTB–
Jan 23, 2017Department of Environmental Protection$13,658.02DESIGN-CONSULTANT-IOTB–
Mar 22, 2017Department of Environmental Protection$10,758.77DESIGN-CONSULTANT-IOTB–
Nov 28, 2016Department of Environmental Protection$4,587.70DESIGN-CONSULTANT-IOTB–
FY 2016top 20 of 25 payments$2,753,712
DateAgencyAmountCategoryPurchase order
Jan 25, 2016Department of Environmental Protection$257,475.84DESIGN-CONSULTANT-IOTB–
Dec 2, 2015Department of Environmental Protection$234,003.88DESIGN-CONSULTANT-IOTB–
Mar 28, 2016Department of Environmental Protection$213,171.80DESIGN-CONSULTANT-IOTB–
Feb 3, 2016Department of Environmental Protection$208,353.69DESIGN-CONSULTANT-IOTB–
Jun 27, 2016Department of Environmental Protection$203,593.15DESIGN-CONSULTANT-IOTB–
Oct 30, 2015Department of Environmental Protection$201,449.08DESIGN-CONSULTANT-IOTB–
May 2, 2016Department of Environmental Protection$195,569.08DESIGN-CONSULTANT-IOTB–
Mar 3, 2016Department of Environmental Protection$195,549.72DESIGN-CONSULTANT-IOTB–
Sep 1, 2015Department of Environmental Protection$191,526.36DESIGN-CONSULTANT-IOTB–
Oct 13, 2015Department of Environmental Protection$184,055.38DESIGN-CONSULTANT-IOTB–
May 27, 2016Department of Environmental Protection$181,637.97DESIGN-CONSULTANT-IOTB–
Jul 29, 2015Department of Environmental Protection$174,594.49DESIGN-CONSULTANT-IOTB–
Jul 7, 2015Department of Environmental Protection$162,101.94DESIGN-CONSULTANT-IOTB–
May 2, 2016Department of Environmental Protection$31,409.38DESIGN-CONSULTANT-IOTB–
Oct 13, 2015Department of Environmental Protection$15,699.15DESIGN-CONSULTANT-IOTB–
Mar 21, 2016Department of Environmental Protection$15,110.77DESIGN-CONSULTANT-IOTB–
May 24, 2016Department of Environmental Protection$13,396.67DESIGN-CONSULTANT-IOTB–
Feb 22, 2016Department of Environmental Protection$12,907.28DESIGN-CONSULTANT-IOTB–
Jul 1, 2015Department of Environmental Protection$10,473.37DESIGN-CONSULTANT-IOTB–
Aug 24, 2015Department of Environmental Protection$9,967.69DESIGN-CONSULTANT-IOTB–
FY 2015top 20 of 23 payments$2,873,245
DateAgencyAmountCategoryPurchase order
May 13, 2015Department of Environmental Protection$319,832.34DESIGN-CONSULTANT-IOTB–
Oct 22, 2014Department of Environmental Protection$301,856.36DESIGN-CONSULTANT-IOTB–
Jul 31, 2014Department of Environmental Protection$298,642.11DESIGN-CONSULTANT-IOTB–
Aug 25, 2014Department of Environmental Protection$252,929.10DESIGN-CONSULTANT-IOTB–
Sep 12, 2014Department of Environmental Protection$243,639.31DESIGN-CONSULTANT-IOTB–
Mar 20, 2015Department of Environmental Protection$219,619.51DESIGN-CONSULTANT-IOTB–
Feb 25, 2015Department of Environmental Protection$191,949.13DESIGN-CONSULTANT-IOTB–
Jan 14, 2015Department of Environmental Protection$191,381.46DESIGN-CONSULTANT-IOTB–
Apr 24, 2015Department of Environmental Protection$182,315.04DESIGN-CONSULTANT-IOTB–
Dec 18, 2014Department of Environmental Protection$177,494.08DESIGN-CONSULTANT-IOTB–
Jun 10, 2015Department of Environmental Protection$164,300.98DESIGN-CONSULTANT-IOTB–
Nov 17, 2014Department of Environmental Protection$159,239.19DESIGN-CONSULTANT-IOTB–
Mar 2, 2015Department of Environmental Protection$25,141.30DESIGN-CONSULTANT-IOTB–
Dec 8, 2014Department of Environmental Protection$25,022.72DESIGN-CONSULTANT-IOTB–
Feb 2, 2015Department of Environmental Protection$22,790.19DESIGN-CONSULTANT-IOTB–
Mar 30, 2015Department of Environmental Protection$20,804.27DESIGN-CONSULTANT-IOTB–
Dec 29, 2014Department of Environmental Protection$14,711.90DESIGN-CONSULTANT-IOTB–
Jul 28, 2014Department of Environmental Protection$12,164.53DESIGN-CONSULTANT-IOTB–
Oct 28, 2014Department of Environmental Protection$11,842.37DESIGN-CONSULTANT-IOTB–
Apr 20, 2015Department of Environmental Protection$10,707.47DESIGN-CONSULTANT-IOTB–
FY 2014top 20 of 29 payments$4,392,539
DateAgencyAmountCategoryPurchase order
Nov 6, 2013Department of Environmental Protection$404,197.41DESIGN-CONSULTANT-IOTB–
Jul 18, 2013Department of Environmental Protection$381,697.49DESIGN-CONSULTANT-IOTB–
Oct 2, 2013Department of Environmental Protection$363,826.26DESIGN-CONSULTANT-IOTB–
Oct 8, 2013Department of Environmental Protection$351,007.69DESIGN-CONSULTANT-IOTB–
Feb 26, 2014Department of Environmental Protection$340,391.62DESIGN-CONSULTANT-IOTB–
Dec 26, 2013Department of Environmental Protection$330,520.50DESIGN-CONSULTANT-IOTB–
Dec 26, 2013Department of Environmental Protection$328,070.74DESIGN-CONSULTANT-IOTB–
Aug 12, 2013Department of Environmental Protection$319,843.71DESIGN-CONSULTANT-IOTB–
Mar 13, 2014Department of Environmental Protection$294,095.08DESIGN-CONSULTANT-IOTB–
Jun 16, 2014Department of Environmental Protection$277,411.39DESIGN-CONSULTANT-IOTB–
Apr 11, 2014Department of Environmental Protection$256,002.08DESIGN-CONSULTANT-IOTB–
May 22, 2014Department of Environmental Protection$241,449.68DESIGN-CONSULTANT-IOTB–
Feb 5, 2014Department of Environmental Protection$77,454.03DESIGN-CONSULTANT-IOTB–
Dec 16, 2013Department of Environmental Protection$61,300.22DESIGN-CONSULTANT-IOTB–
Sep 9, 2013Department of Environmental Protection$46,142.28DESIGN-CONSULTANT-IOTB–
Jul 3, 2013Department of Environmental Protection$40,687.55DESIGN-CONSULTANT-IOTB–
Aug 2, 2013Department of Environmental Protection$38,146.95DESIGN-CONSULTANT-IOTB–
Apr 22, 2014Department of Environmental Protection$32,028.14DESIGN-CONSULTANT-IOTB–
Apr 7, 2014Department of Environmental Protection$31,597.90DESIGN-CONSULTANT-IOTB–
Feb 12, 2014Department of Environmental Protection$29,260.78DESIGN-CONSULTANT-IOTB–
FY 2013top 20 of 26 payments$6,295,389
DateAgencyAmountCategoryPurchase order
Nov 19, 2012Department of Environmental Protection$540,416.22DESIGN-CONSULTANT-IOTB–
Jul 27, 2012Department of Environmental Protection$524,918.20DESIGN-CONSULTANT-IOTB–
Oct 11, 2012Department of Environmental Protection$501,899.88DESIGN-CONSULTANT-IOTB–
Sep 10, 2012Department of Environmental Protection$469,025.18DESIGN-CONSULTANT-IOTB–
Feb 1, 2013Department of Environmental Protection$461,715.36DESIGN-CONSULTANT-IOTB–
Dec 14, 2012Department of Environmental Protection$457,338.44DESIGN-CONSULTANT-IOTB–
Jan 4, 2013Department of Environmental Protection$442,486.55DESIGN-CONSULTANT-IOTB–
Feb 28, 2013Department of Environmental Protection$425,921.78DESIGN-CONSULTANT-IOTB–
May 28, 2013Department of Environmental Protection$385,200.28DESIGN-CONSULTANT-IOTB–
Apr 29, 2013Department of Environmental Protection$377,309.33DESIGN-CONSULTANT-IOTB–
Jun 20, 2013Department of Environmental Protection$373,004.94DESIGN-CONSULTANT-IOTB–
Apr 3, 2013Department of Environmental Protection$370,717.37DESIGN-CONSULTANT-IOTB–
Sep 17, 2012Department of Environmental Protection$231,473.93DESIGN-CONSULTANT-IOTB–
Jul 9, 2012Department of Environmental Protection$100,759.72DESIGN-CONSULTANT-IOTB–
Apr 29, 2013Department of Environmental Protection$83,915.27DESIGN-CONSULTANT-IOTB–
Aug 23, 2012Department of Environmental Protection$78,117.68DESIGN-CONSULTANT-IOTB–
Sep 17, 2012Department of Environmental Protection$71,851.05DESIGN-CONSULTANT-IOTB–
Oct 9, 2012Department of Environmental Protection$59,925.42DESIGN-CONSULTANT-IOTB–
Sep 11, 2012Department of Environmental Protection$57,478.29DESIGN-CONSULTANT-IOTB–
Oct 30, 2012Department of Environmental Protection$51,889.30DESIGN-CONSULTANT-IOTB–
FY 2012top 20 of 23 payments$7,575,865
DateAgencyAmountCategoryPurchase order
Oct 20, 2011Department of Environmental Protection$1,111,748.94DESIGN-CONSULTANT-IOTB–
Aug 15, 2011Department of Environmental Protection$687,832.41DESIGN-CONSULTANT-IOTB–
Aug 26, 2011Department of Environmental Protection$561,816.18DESIGN-CONSULTANT-IOTB–
Apr 12, 2012Department of Environmental Protection$534,125.48DESIGN-CONSULTANT-IOTB–
Feb 16, 2012Department of Environmental Protection$503,594.37DESIGN-CONSULTANT-IOTB–
Mar 7, 2012Department of Environmental Protection$497,463.72DESIGN-CONSULTANT-IOTB–
Jan 17, 2012Department of Environmental Protection$496,759.38DESIGN-CONSULTANT-IOTB–
Jan 4, 2012Department of Environmental Protection$485,575.83DESIGN-CONSULTANT-IOTB–
May 9, 2012Department of Environmental Protection$440,232.49DESIGN-CONSULTANT-IOTB–
Sep 16, 2011Department of Environmental Protection$415,040.15DESIGN-CONSULTANT-IOTB–
Jun 27, 2012Department of Environmental Protection$404,001.26DESIGN-CONSULTANT-IOTB–
Jun 11, 2012Department of Environmental Protection$343,690.05DESIGN-CONSULTANT-IOTB–
Jan 3, 2012Department of Environmental Protection$163,459.05DESIGN-CONSULTANT-IOTB–
Sep 16, 2011Department of Environmental Protection$138,346.72DESIGN-CONSULTANT-IOTB–
Feb 22, 2012Department of Environmental Protection$113,819.26DESIGN-CONSULTANT-IOTB–
Jun 4, 2012Department of Environmental Protection$113,008.57DESIGN-CONSULTANT-IOTB–
Mar 30, 2012Department of Environmental Protection$112,983.23DESIGN-CONSULTANT-IOTB–
Feb 14, 2012Department of Environmental Protection$107,176.34DESIGN-CONSULTANT-IOTB–
May 18, 2012Department of Environmental Protection$107,127.04DESIGN-CONSULTANT-IOTB–
Apr 25, 2012Department of Environmental Protection$106,326.10DESIGN-CONSULTANT-IOTB–
FY 2011top 13 of 13 payments$7,050,572
DateAgencyAmountCategoryPurchase order
Jan 18, 2011Department of Environmental Protection$624,968.49DESIGN-CONSULTANT-IOTB–
Jul 19, 2010Department of Environmental Protection$609,222.35DESIGN-CONSULTANT-IOTB–
Dec 8, 2010Department of Environmental Protection$581,534.95DESIGN-CONSULTANT-IOTB–
Sep 20, 2010Department of Environmental Protection$570,167.13DESIGN-CONSULTANT-IOTB–
Jun 23, 2011Department of Environmental Protection$565,551.86DESIGN-CONSULTANT-IOTB–
Aug 19, 2010Department of Environmental Protection$560,743.44DESIGN-CONSULTANT-IOTB–
Dec 27, 2010Department of Environmental Protection$549,888.23DESIGN-CONSULTANT-IOTB–
May 23, 2011Department of Environmental Protection$536,591.02DESIGN-CONSULTANT-IOTB–
May 5, 2011Department of Environmental Protection$531,494.68DESIGN-CONSULTANT-IOTB–
Aug 9, 2010Department of Environmental Protection$520,813.79DESIGN-CONSULTANT-IOTB–
Feb 14, 2011Department of Environmental Protection$515,914.04DESIGN-CONSULTANT-IOTB–
Nov 12, 2010Department of Environmental Protection$514,720.75DESIGN-CONSULTANT-IOTB–
Jul 14, 2010Department of Environmental Protection$368,961.41DESIGN-CONSULTANT-IOTB–
FY 2010top 7 of 7 payments$3,479,772
DateAgencyAmountCategoryPurchase order
May 17, 2010Department of Environmental Protection$1,159,781.82DESIGN-CONSULTANT-IOTB–
May 21, 2010Department of Environmental Protection$695,451.02DESIGN-CONSULTANT-IOTB–
Jun 21, 2010Department of Environmental Protection$557,582.33DESIGN-CONSULTANT-IOTB–
May 28, 2010Department of Environmental Protection$543,673.08DESIGN-CONSULTANT-IOTB–
Jun 14, 2010Department of Environmental Protection$494,967.41DESIGN-CONSULTANT-IOTB–
Jun 7, 2010Department of Environmental Protection$20,875.39DESIGN-CONSULTANT-IOTB–
Jun 7, 2010Department of Environmental Protection$7,440.84DESIGN-CONSULTANT-IOTB–

Recent payments

DateAgencyAmountCategoryMethod
Mar 8, 2022Department of Environmental Protection$57,237.31DESIGN-CONSULTANT-IOTBCapital Contracts
Sep 11, 2020Department of Environmental Protection$75,142.14DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 15, 2019Department of Environmental Protection$36,867.04DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 23, 2019Department of Environmental Protection$23,581.21DESIGN-CONSULTANT-IOTBCapital Contracts
Sep 5, 2019Department of Environmental Protection$87,461.61DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 9, 2019Department of Environmental Protection$125,985.51DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 17, 2019Department of Environmental Protection$183,592.27DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 28, 2019Department of Environmental Protection$89,879.21DESIGN-CONSULTANT-IOTBCapital Contracts
May 16, 2019Department of Environmental Protection$90,719.32DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 17, 2019Department of Environmental Protection$90,689.64DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 22, 2019Department of Environmental Protection$100,115.61DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 18, 2019Department of Environmental Protection$118,590.01DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 18, 2019Department of Environmental Protection$132,107.21DESIGN-CONSULTANT-IOTBCapital Contracts
Dec 19, 2018Department of Environmental Protection$120,978.31DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 2, 2018Department of Environmental Protection$133,645.96DESIGN-CONSULTANT-IOTBCapital Contracts
Sep 24, 2018Department of Environmental Protection$257,555.44DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 22, 2018Department of Environmental Protection$112,665.85DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 28, 2018Department of Environmental Protection$222,622.39DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 4, 2018Department of Environmental Protection$2,250.79DESIGN-CONSULTANT-IOTBCapital Contracts
May 30, 2018Department of Environmental Protection$83,934.72DESIGN-CONSULTANT-IOTBCapital Contracts
May 2, 2018Department of Environmental Protection$178,730.91DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 2, 2018Department of Environmental Protection$13,261.63DESIGN-CONSULTANT-IOTBCapital Contracts
Feb 2, 2018Department of Environmental Protection$139,640.08DESIGN-CONSULTANT-IOTBCapital Contracts
Jan 30, 2018Department of Environmental Protection$14,203.36DESIGN-CONSULTANT-IOTBCapital Contracts
Jan 10, 2018Department of Environmental Protection$22,330.70DESIGN-CONSULTANT-IOTBCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data