M&J Engineering PC: New York City Government Payments

as recorded by New York City: M&J ENGINEERING PC

M&J Engineering PC is the 1,252nd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 159th in IOTB CONSTRUCTION spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 89.6% year over year.

Primary spending category: IOTB CONSTRUCTION

$40,464,680total received
507payments
5agencies
Oct 8, 2014Aug 21, 2024first / last payment
Follow this vendorGet an email when New York City publishes new payments to M&J Engineering PC. No spam.

Payments by fiscal year

FY 2025$1,059,933
FY 2024$10,213,692
FY 2023$9,606,083
FY 2022$7,808,452
FY 2021$4,867,374
FY 2020$3,477,926
FY 2019$1,993,244
FY 2018$902,017
FY 2017$18,817
FY 2016$296,137
FY 2015$221,005

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Transportation2$633,222
FY 2025Department of Environmental Protection6$374,051
FY 2025Department of Small Business Services4$52,660
FY 2024Department of Environmental Protection64$4,143,586
FY 2024Department of Transportation25$3,833,627
FY 2024Department of Citywide Administrative Services4$1,394,652
FY 2024Department of Design and Construction10$629,537
FY 2024Department of Small Business Services11$212,290
FY 2023Department of Transportation31$5,117,220
FY 2023Department of Environmental Protection64$4,299,427
FY 2023Department of Design and Construction8$189,436
FY 2022Department of Environmental Protection62$5,729,363
FY 2022Department of Transportation15$1,783,161
FY 2022Department of Design and Construction7$295,928
FY 2021Department of Transportation26$2,459,717
FY 2021Department of Environmental Protection29$2,407,656
FY 2020Department of Transportation30$2,516,941
FY 2020Department of Environmental Protection27$960,985
FY 2019Department of Environmental Protection18$1,155,008
FY 2019Department of Transportation7$774,203
FY 2019Department of Design and Construction1$64,033
FY 2018Department of Environmental Protection23$773,811
FY 2018Department of Design and Construction4$128,207
FY 2017Department of Environmental Protection1$18,817
FY 2016Department of Environmental Protection15$296,137
FY 2015Department of Environmental Protection13$221,005
Total507$40,464,680

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
N/A162$7,720,057Oct 8, 2014 Aug 21, 2024
PROMPT PAYMENT INTEREST2$62Apr 26, 2023 Apr 26, 2023
OTHR SERV AND CHRGS-GENERAL1$39,000Nov 23, 2022 Nov 23, 2022
IOTB CONSTRUCTION336$31,194,916Oct 30, 2017 Jul 30, 2024
CONSTRUCTION-BUILDINGS4$1,394,652Sep 18, 2023 Jun 4, 2024
CONTRACTUAL SERVICES GENERAL1$116,000Nov 23, 2022 Nov 23, 2022
<Non-Applicable Expenditure Object>1-$7May 10, 2018 May 10, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 12 of 12 payments$1,059,933
DateAgencyAmountCategoryPurchase order
Jul 30, 2024Department of Transportation$482,086.21IOTB CONSTRUCTION
Jul 16, 2024Department of Environmental Protection$190,386.00IOTB CONSTRUCTION
Jul 17, 2024Department of Transportation$151,135.98IOTB CONSTRUCTION
Jul 15, 2024Department of Environmental Protection$60,893.20IOTB CONSTRUCTION
Aug 7, 2024Department of Environmental Protection$48,837.18N/A
Jul 12, 2024Department of Environmental Protection$48,774.92N/A
Aug 21, 2024Department of Environmental Protection$22,498.69N/A
Jul 1, 2024Department of Small Business Services$20,010.01IOTB CONSTRUCTION
Jul 22, 2024Department of Small Business Services$18,058.17IOTB CONSTRUCTION
Jul 1, 2024Department of Small Business Services$7,669.99IOTB CONSTRUCTION
Jul 22, 2024Department of Small Business Services$6,921.83IOTB CONSTRUCTION
Aug 21, 2024Department of Environmental Protection$2,661.28N/A
FY 2024top 20 of 114 payments$10,213,692
DateAgencyAmountCategoryPurchase order
Sep 11, 2023Department of Transportation$561,571.67IOTB CONSTRUCTION
Dec 5, 2023Department of Citywide Administrative Services$552,210.70CONSTRUCTION-BUILDINGS
Jun 17, 2024Department of Transportation$410,023.63IOTB CONSTRUCTION
Dec 12, 2023Department of Environmental Protection$319,412.00IOTB CONSTRUCTION
Feb 14, 2024Department of Citywide Administrative Services$311,526.25CONSTRUCTION-BUILDINGS
Sep 18, 2023Department of Citywide Administrative Services$285,184.76CONSTRUCTION-BUILDINGS
Aug 16, 2023Department of Transportation$280,054.67IOTB CONSTRUCTION
Feb 12, 2024Department of Transportation$266,720.36IOTB CONSTRUCTION
Jun 4, 2024Department of Citywide Administrative Services$245,730.59CONSTRUCTION-BUILDINGS
Sep 20, 2023Department of Environmental Protection$237,113.07IOTB CONSTRUCTION
Jul 19, 2023Department of Environmental Protection$213,472.90N/A
Nov 13, 2023Department of Transportation$201,932.26IOTB CONSTRUCTION
Sep 28, 2023Department of Environmental Protection$180,993.85IOTB CONSTRUCTION
Sep 20, 2023Department of Transportation$176,824.00IOTB CONSTRUCTION
Aug 24, 2023Department of Environmental Protection$172,037.16IOTB CONSTRUCTION
Nov 3, 2023Department of Transportation$162,185.52IOTB CONSTRUCTION
Dec 11, 2023Department of Transportation$156,817.52IOTB CONSTRUCTION
Mar 18, 2024Department of Transportation$155,211.66IOTB CONSTRUCTION
Jun 12, 2024Department of Transportation$151,365.78IOTB CONSTRUCTION
Jan 2, 2024Department of Design and Construction$150,961.29N/A
FY 2023top 20 of 103 payments$9,606,083
DateAgencyAmountCategoryPurchase order
Apr 6, 2023Department of Transportation$465,480.79IOTB CONSTRUCTION
Jan 5, 2023Department of Transportation$450,923.78IOTB CONSTRUCTION
May 25, 2023Department of Transportation$299,910.78IOTB CONSTRUCTION
Nov 7, 2022Department of Transportation$291,146.14IOTB CONSTRUCTION
Aug 18, 2022Department of Transportation$284,776.15IOTB CONSTRUCTION
Oct 31, 2022Department of Transportation$282,009.53IOTB CONSTRUCTION
Nov 23, 2022Department of Transportation$255,963.71IOTB CONSTRUCTION
Feb 16, 2023Department of Environmental Protection$242,021.93IOTB CONSTRUCTION
Jul 6, 2022Department of Environmental Protection$233,930.19N/A
Jul 15, 2022Department of Transportation$222,316.68IOTB CONSTRUCTION
Mar 13, 2023Department of Environmental Protection$200,000.00IOTB CONSTRUCTION
Oct 21, 2022Department of Environmental Protection$187,560.77N/A
May 15, 2023Department of Transportation$179,990.64IOTB CONSTRUCTION
Jun 23, 2023Department of Transportation$170,107.16IOTB CONSTRUCTION
Apr 24, 2023Department of Transportation$168,750.30IOTB CONSTRUCTION
Dec 21, 2022Department of Transportation$163,679.22IOTB CONSTRUCTION
Mar 16, 2023Department of Transportation$162,124.13IOTB CONSTRUCTION
Nov 18, 2022Department of Transportation$157,621.78IOTB CONSTRUCTION
Apr 24, 2023Department of Transportation$154,316.60IOTB CONSTRUCTION
Jun 7, 2023Department of Transportation$152,326.92IOTB CONSTRUCTION
FY 2022top 20 of 84 payments$7,808,452
DateAgencyAmountCategoryPurchase order
Dec 8, 2021Department of Environmental Protection$731,726.79IOTB CONSTRUCTION
Feb 10, 2022Department of Transportation$266,154.71IOTB CONSTRUCTION
Feb 17, 2022Department of Transportation$259,329.00IOTB CONSTRUCTION
May 18, 2022Department of Environmental Protection$190,960.75IOTB CONSTRUCTION
Oct 29, 2021Department of Environmental Protection$187,112.88IOTB CONSTRUCTION
Nov 24, 2021Department of Environmental Protection$171,435.37N/A
Oct 13, 2021Department of Environmental Protection$168,078.78N/A
Oct 29, 2021Department of Environmental Protection$165,728.95IOTB CONSTRUCTION
Jan 31, 2022Department of Environmental Protection$165,342.19IOTB CONSTRUCTION
May 16, 2022Department of Environmental Protection$155,927.17IOTB CONSTRUCTION
May 16, 2022Department of Transportation$155,173.44IOTB CONSTRUCTION
Jan 7, 2022Department of Environmental Protection$152,833.46N/A
Jan 5, 2022Department of Environmental Protection$139,432.70IOTB CONSTRUCTION
Apr 11, 2022Department of Transportation$136,326.72IOTB CONSTRUCTION
Mar 17, 2022Department of Transportation$135,209.95IOTB CONSTRUCTION
Feb 9, 2022Department of Environmental Protection$133,029.03IOTB CONSTRUCTION
May 18, 2022Department of Transportation$131,061.57IOTB CONSTRUCTION
Mar 14, 2022Department of Environmental Protection$128,894.91IOTB CONSTRUCTION
Jun 30, 2022Department of Transportation$128,204.93IOTB CONSTRUCTION
Nov 15, 2021Department of Environmental Protection$125,422.57IOTB CONSTRUCTION
FY 2021top 20 of 55 payments$4,867,374
DateAgencyAmountCategoryPurchase order
Jun 1, 2021Department of Transportation$267,215.97IOTB CONSTRUCTION
Nov 12, 2020Department of Environmental Protection$249,597.47IOTB CONSTRUCTION
Jul 16, 2020Department of Transportation$248,404.25IOTB CONSTRUCTION
Jun 10, 2021Department of Environmental Protection$190,973.83IOTB CONSTRUCTION
Sep 23, 2020Department of Transportation$158,672.82IOTB CONSTRUCTION
Nov 19, 2020Department of Transportation$155,533.48IOTB CONSTRUCTION
Nov 23, 2020Department of Transportation$149,291.61IOTB CONSTRUCTION
Nov 23, 2020Department of Transportation$148,304.01IOTB CONSTRUCTION
Jun 3, 2021Department of Environmental Protection$145,254.79IOTB CONSTRUCTION
Nov 16, 2020Department of Transportation$143,272.92IOTB CONSTRUCTION
Dec 3, 2020Department of Environmental Protection$138,327.64IOTB CONSTRUCTION
Jun 18, 2021Department of Environmental Protection$137,984.53IOTB CONSTRUCTION
Mar 15, 2021Department of Environmental Protection$137,569.24IOTB CONSTRUCTION
Sep 21, 2020Department of Environmental Protection$136,845.54IOTB CONSTRUCTION
Apr 12, 2021Department of Transportation$134,233.13IOTB CONSTRUCTION
Mar 24, 2021Department of Transportation$128,667.20IOTB CONSTRUCTION
Nov 20, 2020Department of Transportation$124,249.20IOTB CONSTRUCTION
Dec 18, 2020Department of Environmental Protection$110,342.62N/A
Aug 10, 2020Department of Environmental Protection$104,110.91IOTB CONSTRUCTION
Jul 23, 2020Department of Environmental Protection$100,329.49IOTB CONSTRUCTION
FY 2020top 20 of 57 payments$3,477,926
DateAgencyAmountCategoryPurchase order
Dec 9, 2019Department of Transportation$447,778.14IOTB CONSTRUCTION
May 7, 2020Department of Environmental Protection$189,466.40IOTB CONSTRUCTION
Jan 27, 2020Department of Transportation$108,419.56IOTB CONSTRUCTION
May 6, 2020Department of Transportation$107,543.90IOTB CONSTRUCTION
Dec 16, 2019Department of Transportation$105,065.60IOTB CONSTRUCTION
Oct 24, 2019Department of Transportation$101,047.10IOTB CONSTRUCTION
Sep 16, 2019Department of Transportation$100,032.00IOTB CONSTRUCTION
Mar 2, 2020Department of Environmental Protection$99,366.23IOTB CONSTRUCTION
Sep 27, 2019Department of Transportation$97,678.79IOTB CONSTRUCTION
Apr 13, 2020Department of Transportation$96,953.82IOTB CONSTRUCTION
Jun 4, 2020Department of Environmental Protection$95,925.83IOTB CONSTRUCTION
Nov 4, 2019Department of Transportation$95,891.00IOTB CONSTRUCTION
Feb 3, 2020Department of Transportation$95,858.45IOTB CONSTRUCTION
Mar 2, 2020Department of Transportation$91,554.85IOTB CONSTRUCTION
Apr 13, 2020Department of Environmental Protection$84,694.00IOTB CONSTRUCTION
Apr 17, 2020Department of Transportation$82,575.70IOTB CONSTRUCTION
Oct 18, 2019Department of Transportation$79,037.00IOTB CONSTRUCTION
Dec 16, 2019Department of Transportation$77,979.20IOTB CONSTRUCTION
Mar 9, 2020Department of Transportation$77,821.02IOTB CONSTRUCTION
Nov 8, 2019Department of Transportation$76,872.32IOTB CONSTRUCTION
FY 2019top 20 of 26 payments$1,993,244
DateAgencyAmountCategoryPurchase order
May 6, 2019Department of Transportation$225,872.98IOTB CONSTRUCTION
May 28, 2019Department of Transportation$189,949.75IOTB CONSTRUCTION
May 20, 2019Department of Transportation$165,692.86IOTB CONSTRUCTION
Dec 10, 2018Department of Environmental Protection$103,319.57IOTB CONSTRUCTION
Aug 2, 2018Department of Environmental Protection$102,729.98IOTB CONSTRUCTION
Jul 1, 2018Department of Environmental Protection$101,675.65IOTB CONSTRUCTION
Sep 14, 2018Department of Environmental Protection$94,944.05IOTB CONSTRUCTION
Feb 11, 2019Department of Environmental Protection$89,686.72IOTB CONSTRUCTION
Oct 9, 2018Department of Environmental Protection$87,458.83IOTB CONSTRUCTION
Nov 19, 2018Department of Environmental Protection$85,722.48IOTB CONSTRUCTION
Mar 25, 2019Department of Environmental Protection$81,347.69IOTB CONSTRUCTION
Jun 6, 2019Department of Environmental Protection$77,022.63IOTB CONSTRUCTION
Jan 16, 2019Department of Environmental Protection$76,653.24IOTB CONSTRUCTION
Jun 17, 2019Department of Transportation$74,792.23IOTB CONSTRUCTION
May 10, 2019Department of Environmental Protection$74,604.04IOTB CONSTRUCTION
Apr 17, 2019Department of Environmental Protection$69,958.47IOTB CONSTRUCTION
Apr 26, 2019Department of Design and Construction$64,032.94N/A
Jun 17, 2019Department of Transportation$61,250.40IOTB CONSTRUCTION
Jun 10, 2019Department of Transportation$39,536.40IOTB CONSTRUCTION
Jun 27, 2019Department of Environmental Protection$33,733.21IOTB CONSTRUCTION
FY 2018top 20 of 27 payments$902,017
DateAgencyAmountCategoryPurchase order
Jan 31, 2018Department of Environmental Protection$79,886.75IOTB CONSTRUCTION
Dec 26, 2017Department of Design and Construction$76,076.00N/A
Jan 11, 2018Department of Environmental Protection$60,713.52IOTB CONSTRUCTION
Dec 14, 2017Department of Environmental Protection$51,969.92IOTB CONSTRUCTION
Oct 30, 2017Department of Environmental Protection$50,433.19IOTB CONSTRUCTION
Jun 4, 2018Department of Environmental Protection$49,309.26IOTB CONSTRUCTION
Mar 15, 2018Department of Environmental Protection$45,401.44IOTB CONSTRUCTION
Apr 13, 2018Department of Environmental Protection$44,540.25IOTB CONSTRUCTION
May 10, 2018Department of Environmental Protection$41,187.39IOTB CONSTRUCTION
Feb 19, 2018Department of Environmental Protection$39,824.14N/A
Jan 11, 2018Department of Environmental Protection$37,831.61IOTB CONSTRUCTION
Dec 14, 2017Department of Environmental Protection$32,383.33IOTB CONSTRUCTION
Oct 30, 2017Department of Environmental Protection$31,425.80IOTB CONSTRUCTION
Jun 4, 2018Department of Environmental Protection$30,725.43IOTB CONSTRUCTION
Dec 7, 2017Department of Design and Construction$30,179.60N/A
Mar 15, 2018Department of Environmental Protection$28,526.61IOTB CONSTRUCTION
May 10, 2018Department of Environmental Protection$28,157.12IOTB CONSTRUCTION
Apr 13, 2018Department of Environmental Protection$27,749.49IOTB CONSTRUCTION
Nov 8, 2017Department of Design and Construction$21,957.92N/A
Oct 30, 2017Department of Environmental Protection$18,138.21IOTB CONSTRUCTION
FY 2017top 1 of 1 payments$18,817
DateAgencyAmountCategoryPurchase order
Nov 26, 2016Department of Environmental Protection$18,817.06N/A
FY 2016top 15 of 15 payments$296,137
DateAgencyAmountCategoryPurchase order
Oct 9, 2015Department of Environmental Protection$51,167.81N/A
Jun 21, 2016Department of Environmental Protection$38,856.00N/A
Aug 26, 2015Department of Environmental Protection$33,375.24N/A
Jul 8, 2015Department of Environmental Protection$28,156.68N/A
Aug 11, 2015Department of Environmental Protection$26,352.00N/A
Aug 25, 2015Department of Environmental Protection$18,116.70N/A
Oct 15, 2015Department of Environmental Protection$13,921.95N/A
Jul 1, 2015Department of Environmental Protection$13,675.20N/A
Oct 15, 2015Department of Environmental Protection$13,053.60N/A
Jan 4, 2016Department of Environmental Protection$13,053.60N/A
Aug 25, 2015Department of Environmental Protection$12,432.00N/A
Jul 1, 2015Department of Environmental Protection$11,810.40N/A
Jul 1, 2015Department of Environmental Protection$11,188.80N/A
Dec 14, 2015Department of Environmental Protection$6,936.30N/A
Jan 4, 2016Department of Environmental Protection$4,040.40N/A
FY 2015top 13 of 13 payments$221,005
DateAgencyAmountCategoryPurchase order
Jun 10, 2015Department of Environmental Protection$26,388.72N/A
May 13, 2015Department of Environmental Protection$24,725.52N/A
Oct 8, 2014Department of Environmental Protection$23,846.40N/A
Oct 30, 2014Department of Environmental Protection$17,487.36N/A
Feb 11, 2015Department of Environmental Protection$16,692.48N/A
Dec 29, 2014Department of Environmental Protection$16,692.48N/A
Dec 19, 2014Department of Environmental Protection$15,897.60N/A
Apr 17, 2015Department of Environmental Protection$15,102.72N/A
Feb 18, 2015Department of Environmental Protection$13,675.20N/A
Mar 4, 2015Department of Environmental Protection$13,512.96N/A
Jun 16, 2015Department of Environmental Protection$13,221.60N/A
Jun 16, 2015Department of Environmental Protection$13,194.30N/A
Feb 18, 2015Department of Environmental Protection$10,567.20N/A

Recent payments

DateAgencyAmountCategoryMethod
Aug 21, 2024Department of Environmental Protection$22,498.69N/AContracts
Aug 21, 2024Department of Environmental Protection$2,661.28N/AContracts
Aug 7, 2024Department of Environmental Protection$48,837.18N/AContracts
Jul 30, 2024Department of Transportation$482,086.21IOTB CONSTRUCTIONCapital Contracts
Jul 22, 2024Department of Small Business Services$18,058.17IOTB CONSTRUCTIONCapital Contracts
Jul 22, 2024Department of Small Business Services$6,921.83IOTB CONSTRUCTIONCapital Contracts
Jul 17, 2024Department of Transportation$151,135.98IOTB CONSTRUCTIONCapital Contracts
Jul 16, 2024Department of Environmental Protection$190,386.00IOTB CONSTRUCTIONCapital Contracts
Jul 15, 2024Department of Environmental Protection$60,893.20IOTB CONSTRUCTIONCapital Contracts
Jul 12, 2024Department of Environmental Protection$48,774.92N/AContracts
Jul 1, 2024Department of Small Business Services$20,010.01IOTB CONSTRUCTIONCapital Contracts
Jul 1, 2024Department of Small Business Services$7,669.99IOTB CONSTRUCTIONCapital Contracts
Jun 28, 2024Department of Environmental Protection$9,186.50N/AContracts
Jun 26, 2024Department of Environmental Protection$57,998.00IOTB CONSTRUCTIONCapital Contracts
Jun 25, 2024Department of Small Business Services$6,600.00IOTB CONSTRUCTIONCapital Contracts
Jun 17, 2024Department of Transportation$410,023.63IOTB CONSTRUCTIONCapital Contracts
Jun 14, 2024Department of Environmental Protection$5,322.56N/AContracts
Jun 13, 2024Department of Environmental Protection$44,311.20N/AContracts
Jun 12, 2024Department of Environmental Protection$66,270.00IOTB CONSTRUCTIONCapital Contracts
Jun 12, 2024Department of Transportation$151,365.78IOTB CONSTRUCTIONCapital Contracts
Jun 12, 2024Department of Environmental Protection$138,420.64IOTB CONSTRUCTIONCapital Contracts
Jun 10, 2024Department of Transportation$136,499.66IOTB CONSTRUCTIONCapital Contracts
Jun 7, 2024Department of Environmental Protection$53,361.28N/AContracts
Jun 5, 2024Department of Small Business Services$20,226.88IOTB CONSTRUCTIONCapital Contracts
Jun 5, 2024Department of Small Business Services$7,753.12IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data