Litehouse Builders, Inc.: New York City Government Payments

as recorded by New York City: LITEHOUSE BUILDERS, INC.

Litehouse Builders, Inc. is the 420th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 65th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.4% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 21.6% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$172,221,576total received
1,451payments
4agencies
Sep 18, 2013Jun 23, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Litehouse Builders, Inc.. No spam.

Payments by fiscal year

FY 2025$44,289,435
FY 2024$56,469,674
FY 2023$35,378,687
FY 2022$7,040,905
FY 2021$4,579,362
FY 2020$6,275,836
FY 2019$10,202,413
FY 2018$5,291,448
FY 2017$679,198
FY 2016$262,987
FY 2015$952,064
FY 2014$799,568

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority341$37,730,905
FY 2025Department of Citywide Administrative Services27$6,361,190
FY 2025Department of Health and Mental Hygiene5$192,089
FY 2025Department of Design and Construction1$5,251
FY 2024School Construction Authority425$53,561,008
FY 2024Department of Citywide Administrative Services13$2,309,851
FY 2024Department of Health and Mental Hygiene11$584,891
FY 2024Department of Design and Construction2$13,923
FY 2023School Construction Authority182$30,131,114
FY 2023Department of Citywide Administrative Services13$3,022,545
FY 2023Department of Health and Mental Hygiene11$2,225,027
FY 2022School Construction Authority72$5,394,309
FY 2022Department of Health and Mental Hygiene7$1,646,597
FY 2021School Construction Authority50$4,579,362
FY 2020School Construction Authority55$6,275,836
FY 2019School Construction Authority105$10,202,413
FY 2018School Construction Authority68$5,291,448
FY 2017School Construction Authority7$679,198
FY 2016School Construction Authority13$228,687
FY 2016Department of Design and Construction1$34,299
FY 2015School Construction Authority27$952,064
FY 2014School Construction Authority15$799,568
Total1,451$172,221,576

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROMPT PAYMENT INTEREST1$99Jul 10, 2023 Jul 10, 2023
PROF SERV OTHER1$34,299Apr 25, 2016 Apr 25, 2016
PROF SERV COMPUTER SERVICES2$19,075Oct 10, 2023 Feb 4, 2025
POLLUTION REMEDIATION OBLIGATIONS6$185,316Feb 7, 2023 Apr 15, 2025
CONSTRUCTION-BUILDINGS1,441$171,982,787Sep 18, 2013 Jun 23, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 374 payments$44,289,435
DateAgencyAmountCategoryPurchase order
Oct 24, 2024School Construction Authority$1,325,462.47CONSTRUCTION-BUILDINGS
Oct 1, 2024School Construction Authority$1,239,392.47CONSTRUCTION-BUILDINGS
Apr 1, 2025School Construction Authority$1,119,233.00CONSTRUCTION-BUILDINGS
Apr 15, 2025Department of Citywide Administrative Services$1,103,187.33CONSTRUCTION-BUILDINGS
Mar 17, 2025Department of Citywide Administrative Services$1,074,589.33CONSTRUCTION-BUILDINGS
Sep 3, 2024School Construction Authority$1,063,495.22CONSTRUCTION-BUILDINGS
Dec 10, 2024School Construction Authority$984,108.47CONSTRUCTION-BUILDINGS
May 22, 2025School Construction Authority$921,485.75CONSTRUCTION-BUILDINGS
Jul 18, 2024Department of Citywide Administrative Services$877,058.73CONSTRUCTION-BUILDINGS
Feb 14, 2025School Construction Authority$762,356.00CONSTRUCTION-BUILDINGS
Jun 20, 2025School Construction Authority$747,863.75CONSTRUCTION-BUILDINGS
Dec 11, 2024School Construction Authority$668,689.84CONSTRUCTION-BUILDINGS
Apr 11, 2025School Construction Authority$646,498.75CONSTRUCTION-BUILDINGS
May 12, 2025Department of Citywide Administrative Services$622,232.79CONSTRUCTION-BUILDINGS
Dec 18, 2024School Construction Authority$616,325.47CONSTRUCTION-BUILDINGS
May 6, 2025School Construction Authority$609,448.94CONSTRUCTION-BUILDINGS
Jul 24, 2024School Construction Authority$605,007.50CONSTRUCTION-BUILDINGS
Oct 7, 2024School Construction Authority$558,096.50CONSTRUCTION-BUILDINGS
Jun 11, 2025School Construction Authority$545,998.82CONSTRUCTION-BUILDINGS
Nov 1, 2024School Construction Authority$502,217.50CONSTRUCTION-BUILDINGS
FY 2024top 20 of 451 payments$56,469,674
DateAgencyAmountCategoryPurchase order
Sep 14, 2023School Construction Authority$1,980,275.00CONSTRUCTION-BUILDINGS
Aug 17, 2023School Construction Authority$1,053,808.08CONSTRUCTION-BUILDINGS
Apr 9, 2024School Construction Authority$718,969.50CONSTRUCTION-BUILDINGS
Jul 18, 2023School Construction Authority$700,696.25CONSTRUCTION-BUILDINGS
May 30, 2024School Construction Authority$684,232.88CONSTRUCTION-BUILDINGS
Nov 14, 2023School Construction Authority$668,073.91CONSTRUCTION-BUILDINGS
Feb 6, 2024School Construction Authority$662,187.39CONSTRUCTION-BUILDINGS
Apr 22, 2024School Construction Authority$652,735.50CONSTRUCTION-BUILDINGS
Jul 10, 2023School Construction Authority$639,937.33CONSTRUCTION-BUILDINGS
Nov 22, 2023School Construction Authority$638,694.50CONSTRUCTION-BUILDINGS
Feb 29, 2024School Construction Authority$599,165.00CONSTRUCTION-BUILDINGS
Oct 27, 2023School Construction Authority$555,536.88CONSTRUCTION-BUILDINGS
Aug 17, 2023School Construction Authority$523,715.54CONSTRUCTION-BUILDINGS
Jul 6, 2023School Construction Authority$517,512.50CONSTRUCTION-BUILDINGS
Nov 3, 2023School Construction Authority$507,071.85CONSTRUCTION-BUILDINGS
Mar 11, 2024Department of Citywide Administrative Services$504,450.07CONSTRUCTION-BUILDINGS
Jan 2, 2024School Construction Authority$501,790.18CONSTRUCTION-BUILDINGS
Sep 19, 2023School Construction Authority$487,872.50CONSTRUCTION-BUILDINGS
Feb 6, 2024School Construction Authority$485,545.00CONSTRUCTION-BUILDINGS
Sep 18, 2023School Construction Authority$485,218.83CONSTRUCTION-BUILDINGS
FY 2023top 20 of 206 payments$35,378,687
DateAgencyAmountCategoryPurchase order
Apr 20, 2023School Construction Authority$1,778,333.50CONSTRUCTION-BUILDINGS
Jan 20, 2023School Construction Authority$1,174,580.00CONSTRUCTION-BUILDINGS
Dec 2, 2022School Construction Authority$1,111,452.50CONSTRUCTION-BUILDINGS
Feb 7, 2023School Construction Authority$1,092,025.00CONSTRUCTION-BUILDINGS
Mar 2, 2023School Construction Authority$990,802.50CONSTRUCTION-BUILDINGS
Oct 21, 2022School Construction Authority$950,730.07CONSTRUCTION-BUILDINGS
Dec 28, 2022School Construction Authority$807,500.00CONSTRUCTION-BUILDINGS
Jun 20, 2023Department of Health and Mental Hygiene$740,153.95CONSTRUCTION-BUILDINGS
Apr 11, 2023School Construction Authority$719,387.50CONSTRUCTION-BUILDINGS
Jan 24, 2023School Construction Authority$719,358.53CONSTRUCTION-BUILDINGS
May 26, 2023School Construction Authority$705,206.09CONSTRUCTION-BUILDINGS
Mar 28, 2023Department of Citywide Administrative Services$663,247.67CONSTRUCTION-BUILDINGS
May 8, 2023School Construction Authority$625,820.33CONSTRUCTION-BUILDINGS
May 25, 2023School Construction Authority$620,164.75CONSTRUCTION-BUILDINGS
Aug 30, 2022School Construction Authority$620,042.79CONSTRUCTION-BUILDINGS
Mar 28, 2023Department of Citywide Administrative Services$617,662.77CONSTRUCTION-BUILDINGS
May 23, 2023School Construction Authority$617,538.00CONSTRUCTION-BUILDINGS
Jan 13, 2023School Construction Authority$580,008.82CONSTRUCTION-BUILDINGS
Mar 28, 2023School Construction Authority$558,989.50CONSTRUCTION-BUILDINGS
May 26, 2023School Construction Authority$556,462.50CONSTRUCTION-BUILDINGS
FY 2022top 20 of 79 payments$7,040,905
DateAgencyAmountCategoryPurchase order
Sep 16, 2021Department of Health and Mental Hygiene$540,188.52CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$291,460.00CONSTRUCTION-BUILDINGS
Sep 10, 2021School Construction Authority$289,479.14CONSTRUCTION-BUILDINGS
Mar 3, 2022Department of Health and Mental Hygiene$289,308.25CONSTRUCTION-BUILDINGS
Apr 6, 2022Department of Health and Mental Hygiene$280,782.66CONSTRUCTION-BUILDINGS
Dec 6, 2021School Construction Authority$243,960.00CONSTRUCTION-BUILDINGS
Sep 21, 2021School Construction Authority$238,925.00CONSTRUCTION-BUILDINGS
Dec 6, 2021School Construction Authority$229,448.75CONSTRUCTION-BUILDINGS
Feb 9, 2022School Construction Authority$213,845.00CONSTRUCTION-BUILDINGS
Apr 14, 2022School Construction Authority$212,800.00CONSTRUCTION-BUILDINGS
Jun 21, 2022School Construction Authority$210,900.00CONSTRUCTION-BUILDINGS
May 31, 2022School Construction Authority$197,125.00CONSTRUCTION-BUILDINGS
Apr 13, 2022School Construction Authority$194,560.00CONSTRUCTION-BUILDINGS
Feb 9, 2022School Construction Authority$186,960.00CONSTRUCTION-BUILDINGS
Jul 9, 2021School Construction Authority$183,632.45CONSTRUCTION-BUILDINGS
Sep 14, 2021School Construction Authority$161,026.14CONSTRUCTION-BUILDINGS
Oct 18, 2021Department of Health and Mental Hygiene$160,912.90CONSTRUCTION-BUILDINGS
Dec 6, 2021School Construction Authority$156,560.00CONSTRUCTION-BUILDINGS
Dec 20, 2021Department of Health and Mental Hygiene$149,519.84CONSTRUCTION-BUILDINGS
Dec 9, 2021School Construction Authority$146,537.50CONSTRUCTION-BUILDINGS
FY 2021top 20 of 50 payments$4,579,362
DateAgencyAmountCategoryPurchase order
Jun 9, 2021School Construction Authority$591,893.70CONSTRUCTION-BUILDINGS
May 17, 2021School Construction Authority$557,134.72CONSTRUCTION-BUILDINGS
Dec 9, 2020School Construction Authority$493,050.00CONSTRUCTION-BUILDINGS
Apr 8, 2021School Construction Authority$322,914.50CONSTRUCTION-BUILDINGS
May 14, 2021School Construction Authority$244,211.50CONSTRUCTION-BUILDINGS
Dec 9, 2020School Construction Authority$225,625.00CONSTRUCTION-BUILDINGS
Sep 14, 2020School Construction Authority$181,998.63CONSTRUCTION-BUILDINGS
Oct 23, 2020School Construction Authority$170,050.00CONSTRUCTION-BUILDINGS
Jun 11, 2021School Construction Authority$130,458.65CONSTRUCTION-BUILDINGS
May 17, 2021School Construction Authority$129,593.77CONSTRUCTION-BUILDINGS
Mar 9, 2021School Construction Authority$126,948.50CONSTRUCTION-BUILDINGS
Jan 13, 2021School Construction Authority$123,025.00CONSTRUCTION-BUILDINGS
Nov 16, 2020School Construction Authority$116,078.83CONSTRUCTION-BUILDINGS
Feb 26, 2021School Construction Authority$91,912.50CONSTRUCTION-BUILDINGS
Oct 28, 2020School Construction Authority$85,690.00CONSTRUCTION-BUILDINGS
Feb 8, 2021School Construction Authority$85,422.68CONSTRUCTION-BUILDINGS
May 7, 2021School Construction Authority$84,838.10CONSTRUCTION-BUILDINGS
Jul 22, 2020School Construction Authority$82,556.78CONSTRUCTION-BUILDINGS
Apr 9, 2021School Construction Authority$81,973.76CONSTRUCTION-BUILDINGS
May 17, 2021School Construction Authority$79,743.95CONSTRUCTION-BUILDINGS
FY 2020top 20 of 55 payments$6,275,836
DateAgencyAmountCategoryPurchase order
Nov 25, 2019School Construction Authority$644,480.00CONSTRUCTION-BUILDINGS
Apr 8, 2020School Construction Authority$444,172.50CONSTRUCTION-BUILDINGS
Mar 31, 2020School Construction Authority$330,669.55CONSTRUCTION-BUILDINGS
Mar 6, 2020School Construction Authority$326,800.00CONSTRUCTION-BUILDINGS
Apr 1, 2020School Construction Authority$316,551.87CONSTRUCTION-BUILDINGS
Feb 10, 2020School Construction Authority$313,495.25CONSTRUCTION-BUILDINGS
Oct 8, 2019School Construction Authority$287,850.00CONSTRUCTION-BUILDINGS
Mar 6, 2020School Construction Authority$266,802.30CONSTRUCTION-BUILDINGS
Dec 10, 2019School Construction Authority$265,738.75CONSTRUCTION-BUILDINGS
Sep 18, 2019School Construction Authority$263,767.50CONSTRUCTION-BUILDINGS
Dec 16, 2019School Construction Authority$252,225.00CONSTRUCTION-BUILDINGS
Dec 5, 2019School Construction Authority$233,462.50CONSTRUCTION-BUILDINGS
Jul 18, 2019School Construction Authority$226,842.99CONSTRUCTION-BUILDINGS
Jan 7, 2020School Construction Authority$222,433.00CONSTRUCTION-BUILDINGS
Oct 1, 2019School Construction Authority$205,660.46CONSTRUCTION-BUILDINGS
Nov 14, 2019School Construction Authority$162,877.50CONSTRUCTION-BUILDINGS
Jul 24, 2019School Construction Authority$131,016.35CONSTRUCTION-BUILDINGS
Sep 9, 2019School Construction Authority$126,872.50CONSTRUCTION-BUILDINGS
Feb 10, 2020School Construction Authority$124,481.96CONSTRUCTION-BUILDINGS
Oct 3, 2019School Construction Authority$114,495.26CONSTRUCTION-BUILDINGS
FY 2019top 20 of 105 payments$10,202,413
DateAgencyAmountCategoryPurchase order
Jun 13, 2019School Construction Authority$629,563.05CONSTRUCTION-BUILDINGS
Oct 12, 2018School Construction Authority$522,523.75CONSTRUCTION-BUILDINGS
Aug 9, 2018School Construction Authority$329,863.28CONSTRUCTION-BUILDINGS
Aug 7, 2018School Construction Authority$318,712.50CONSTRUCTION-BUILDINGS
May 28, 2019School Construction Authority$313,814.93CONSTRUCTION-BUILDINGS
Sep 18, 2018School Construction Authority$294,618.75CONSTRUCTION-BUILDINGS
May 2, 2019School Construction Authority$287,430.55CONSTRUCTION-BUILDINGS
Aug 7, 2018School Construction Authority$263,966.05CONSTRUCTION-BUILDINGS
Nov 20, 2018School Construction Authority$228,399.00CONSTRUCTION-BUILDINGS
Oct 12, 2018School Construction Authority$226,716.30CONSTRUCTION-BUILDINGS
Aug 7, 2018School Construction Authority$222,442.50CONSTRUCTION-BUILDINGS
Jul 16, 2018School Construction Authority$205,485.00CONSTRUCTION-BUILDINGS
Jun 13, 2019School Construction Authority$203,231.81CONSTRUCTION-BUILDINGS
Oct 23, 2018School Construction Authority$201,571.00CONSTRUCTION-BUILDINGS
Aug 9, 2018School Construction Authority$200,985.80CONSTRUCTION-BUILDINGS
Nov 7, 2018School Construction Authority$185,155.00CONSTRUCTION-BUILDINGS
Dec 17, 2018School Construction Authority$183,920.35CONSTRUCTION-BUILDINGS
Dec 14, 2018School Construction Authority$179,882.50CONSTRUCTION-BUILDINGS
May 2, 2019School Construction Authority$178,191.66CONSTRUCTION-BUILDINGS
Jun 13, 2019School Construction Authority$166,200.11CONSTRUCTION-BUILDINGS
FY 2018top 20 of 68 payments$5,291,448
DateAgencyAmountCategoryPurchase order
Jun 7, 2018School Construction Authority$223,075.68CONSTRUCTION-BUILDINGS
Jul 12, 2017School Construction Authority$217,217.50CONSTRUCTION-BUILDINGS
Aug 10, 2017School Construction Authority$185,820.00CONSTRUCTION-BUILDINGS
Jun 25, 2018School Construction Authority$183,959.11CONSTRUCTION-BUILDINGS
Jun 7, 2018School Construction Authority$155,325.00CONSTRUCTION-BUILDINGS
Apr 20, 2018School Construction Authority$154,905.10CONSTRUCTION-BUILDINGS
Oct 12, 2017School Construction Authority$154,327.50CONSTRUCTION-BUILDINGS
Jan 18, 2018School Construction Authority$154,280.00CONSTRUCTION-BUILDINGS
Jan 5, 2018School Construction Authority$139,127.50CONSTRUCTION-BUILDINGS
Jan 3, 2018School Construction Authority$132,468.00CONSTRUCTION-BUILDINGS
May 9, 2018School Construction Authority$126,973.20CONSTRUCTION-BUILDINGS
Mar 5, 2018School Construction Authority$126,446.46CONSTRUCTION-BUILDINGS
Aug 14, 2017School Construction Authority$124,687.50CONSTRUCTION-BUILDINGS
Oct 24, 2017School Construction Authority$120,412.50CONSTRUCTION-BUILDINGS
Oct 12, 2017School Construction Authority$118,712.00CONSTRUCTION-BUILDINGS
May 30, 2018School Construction Authority$113,971.50CONSTRUCTION-BUILDINGS
Apr 20, 2018School Construction Authority$113,895.50CONSTRUCTION-BUILDINGS
Mar 19, 2018School Construction Authority$113,477.50CONSTRUCTION-BUILDINGS
Sep 8, 2017School Construction Authority$110,295.00CONSTRUCTION-BUILDINGS
Oct 4, 2017School Construction Authority$103,054.10CONSTRUCTION-BUILDINGS
FY 2017top 7 of 7 payments$679,198
DateAgencyAmountCategoryPurchase order
May 18, 2017School Construction Authority$234,792.50CONSTRUCTION-BUILDINGS
Jun 12, 2017School Construction Authority$178,172.50CONSTRUCTION-BUILDINGS
Apr 21, 2017School Construction Authority$80,892.50CONSTRUCTION-BUILDINGS
Mar 13, 2017School Construction Authority$60,567.21CONSTRUCTION-BUILDINGS
Jun 22, 2017School Construction Authority$58,729.00CONSTRUCTION-BUILDINGS
Jun 1, 2017School Construction Authority$34,371.00CONSTRUCTION-BUILDINGS
Jan 17, 2017School Construction Authority$31,673.00CONSTRUCTION-BUILDINGS
FY 2016top 14 of 14 payments$262,987
DateAgencyAmountCategoryPurchase order
Dec 16, 2015School Construction Authority$48,421.50CONSTRUCTION-BUILDINGS
Mar 9, 2016School Construction Authority$44,323.95CONSTRUCTION-BUILDINGS
Apr 25, 2016Department of Design and Construction$34,299.26PROF SERV OTHER
Jun 8, 2016School Construction Authority$27,391.42CONSTRUCTION-BUILDINGS
Jul 22, 2015School Construction Authority$17,581.03CONSTRUCTION-BUILDINGS
Oct 14, 2015School Construction Authority$17,505.43CONSTRUCTION-BUILDINGS
Aug 21, 2015School Construction Authority$15,700.03CONSTRUCTION-BUILDINGS
Jul 22, 2015School Construction Authority$15,093.13CONSTRUCTION-BUILDINGS
Jun 8, 2016School Construction Authority$14,568.45CONSTRUCTION-BUILDINGS
Dec 11, 2015School Construction Authority$13,658.81CONSTRUCTION-BUILDINGS
Dec 11, 2015School Construction Authority$6,573.06CONSTRUCTION-BUILDINGS
Oct 14, 2015School Construction Authority$6,519.39CONSTRUCTION-BUILDINGS
Aug 21, 2015School Construction Authority$1,211.25CONSTRUCTION-BUILDINGS
Mar 9, 2016School Construction Authority$140.00CONSTRUCTION-BUILDINGS
FY 2015top 20 of 27 payments$952,064
DateAgencyAmountCategoryPurchase order
May 13, 2015School Construction Authority$111,804.65CONSTRUCTION-BUILDINGS
Apr 20, 2015School Construction Authority$89,478.13CONSTRUCTION-BUILDINGS
Jun 16, 2015School Construction Authority$86,063.07CONSTRUCTION-BUILDINGS
Jun 26, 2015School Construction Authority$86,063.07CONSTRUCTION-BUILDINGS
Feb 19, 2015School Construction Authority$85,452.50CONSTRUCTION-BUILDINGS
Mar 19, 2015School Construction Authority$78,873.75CONSTRUCTION-BUILDINGS
Jan 21, 2015School Construction Authority$76,783.75CONSTRUCTION-BUILDINGS
Nov 12, 2014School Construction Authority$70,917.50CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$57,712.50CONSTRUCTION-BUILDINGS
Jul 9, 2014School Construction Authority$40,470.00CONSTRUCTION-BUILDINGS
Dec 10, 2014School Construction Authority$36,290.00CONSTRUCTION-BUILDINGS
Sep 18, 2014School Construction Authority$34,779.50CONSTRUCTION-BUILDINGS
Jun 26, 2015School Construction Authority$33,651.37CONSTRUCTION-BUILDINGS
Jun 16, 2015School Construction Authority$33,651.37CONSTRUCTION-BUILDINGS
Nov 21, 2014School Construction Authority$32,771.50CONSTRUCTION-BUILDINGS
Jan 21, 2015School Construction Authority$27,645.00CONSTRUCTION-BUILDINGS
Oct 16, 2014School Construction Authority$22,325.00CONSTRUCTION-BUILDINGS
Nov 12, 2014School Construction Authority$20,900.00CONSTRUCTION-BUILDINGS
May 13, 2015School Construction Authority$13,193.12CONSTRUCTION-BUILDINGS
Feb 19, 2015School Construction Authority$10,687.50CONSTRUCTION-BUILDINGS
FY 2014top 15 of 15 payments$799,568
DateAgencyAmountCategoryPurchase order
Apr 17, 2014School Construction Authority$233,063.50CONSTRUCTION-BUILDINGS
Mar 5, 2014School Construction Authority$166,373.50CONSTRUCTION-BUILDINGS
Sep 30, 2013School Construction Authority$132,430.00CONSTRUCTION-BUILDINGS
Dec 12, 2013School Construction Authority$114,142.50CONSTRUCTION-BUILDINGS
Dec 13, 2013School Construction Authority$114,142.50CONSTRUCTION-BUILDINGS
Nov 7, 2013School Construction Authority$63,412.50CONSTRUCTION-BUILDINGS
Nov 12, 2013School Construction Authority$63,412.50CONSTRUCTION-BUILDINGS
Sep 19, 2013School Construction Authority$52,392.50CONSTRUCTION-BUILDINGS
Sep 18, 2013School Construction Authority$52,392.50CONSTRUCTION-BUILDINGS
Jun 20, 2014School Construction Authority$40,470.00CONSTRUCTION-BUILDINGS
Jan 24, 2014School Construction Authority$37,753.00CONSTRUCTION-BUILDINGS
Jun 20, 2014School Construction Authority-$40,470.00CONSTRUCTION-BUILDINGS
Sep 18, 2013School Construction Authority-$52,392.50CONSTRUCTION-BUILDINGS
Nov 7, 2013School Construction Authority-$63,412.50CONSTRUCTION-BUILDINGS
Dec 12, 2013School Construction Authority-$114,142.50CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025School Construction Authority$19,237.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$102,709.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$327,930.35CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$747,863.75CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$29,821.20CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$125,846.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$65,424.03CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$12,563.75CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$59,739.66CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$23,479.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$6,066.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$81,066.92CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$230,137.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025School Construction Authority$57,317.16CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025School Construction Authority$35,679.86CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025School Construction Authority$1,187.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025Department of Citywide Administrative Services$419,492.54CONSTRUCTION-BUILDINGSCapital Contracts
Jun 11, 2025School Construction Authority$545,998.82CONSTRUCTION-BUILDINGSCapital Contracts
Jun 9, 2025School Construction Authority$260,542.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$2,921.25CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$99,260.79CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$72,719.65CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$3,049.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$255,802.68CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$7,125.00CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data