KS Engineers P C: New York City Government Payments
as recorded by New York City: KS ENGINEERS P C
KS Engineers P C is the 490th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 72nd in IOTB CONSTRUCTION spending. Its payments amount to 0.2% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 9.2% year over year.
Primary spending category: IOTB CONSTRUCTION
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 322 | $9,976,228 | Sep 17, 2014 – Jun 13, 2025 |
| CONSTRUCTION-BUILDINGS | 202 | $968,357 | May 9, 2022 – Jun 23, 2025 |
| CONTRACTUAL SERVICES GENERAL | 63 | $8,800,741 | Feb 17, 2015 – Jun 25, 2025 |
| IOTB CONSTRUCTION | 825 | $71,173,492 | Feb 11, 2013 – Jun 30, 2025 |
| MAINT & REP GENERAL | 2 | $7,000 | Jun 8, 2017 – Oct 23, 2017 |
| DESIGN-CONSULTANT-IOTB | 1,024 | $54,929,451 | Jan 19, 2010 – Jun 30, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 1 | $2,760 | Jul 12, 2024 – Jul 12, 2024 |
| PROMPT PAYMENT INTEREST | 28 | $1,837 | Dec 14, 2015 – Sep 9, 2024 |
| POLLUTION REMEDIATION OBLIGATIONS | 1 | $13,470 | Feb 11, 2013 – Feb 11, 2013 |
| <Non-Applicable Expenditure Object> | 2 | -$525 | Apr 25, 2018 – Apr 25, 2018 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 394 payments$17,134,053
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 7, 2024 | Department of Environmental Protection | $1,000,891.45 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 11, 2025 | Department of Transportation | $476,824.89 | IOTB CONSTRUCTION | – |
| Feb 6, 2025 | Department of Transportation | $400,407.54 | DESIGN-CONSULTANT-IOTB | – |
| Mar 31, 2025 | Department of Transportation | $368,469.83 | DESIGN-CONSULTANT-IOTB | – |
| Oct 10, 2024 | Department of Transportation | $347,571.28 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2025 | Department of Transportation | $326,207.30 | IOTB CONSTRUCTION | – |
| Feb 27, 2025 | Department of Transportation | $323,735.90 | DESIGN-CONSULTANT-IOTB | – |
| Jan 13, 2025 | Department of Environmental Protection | $316,871.70 | CONTRACTUAL SERVICES GENERAL | – |
| May 23, 2025 | Department of Transportation | $316,393.11 | DESIGN-CONSULTANT-IOTB | – |
| Sep 23, 2024 | Department of Parks and Recreation | $286,757.13 | DESIGN-CONSULTANT-IOTB | – |
| Aug 5, 2024 | Department of Environmental Protection | $275,786.78 | IOTB CONSTRUCTION | – |
| Sep 3, 2024 | Department of Environmental Protection | $267,711.79 | CONTRACTUAL SERVICES GENERAL | – |
| Nov 12, 2024 | Department of Environmental Protection | $250,478.95 | IOTB CONSTRUCTION | – |
| Apr 3, 2025 | Department of Transportation | $238,845.69 | DESIGN-CONSULTANT-IOTB | – |
| Jan 13, 2025 | Department of Environmental Protection | $224,081.60 | DESIGN-CONSULTANT-IOTB | – |
| Aug 7, 2024 | Department of Transportation | $214,481.61 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2024 | Department of Environmental Protection | $196,739.00 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 19, 2024 | Department of Environmental Protection | $196,739.00 | CONTRACTUAL SERVICES GENERAL | – |
| May 19, 2025 | Department of Environmental Protection | $190,634.92 | CONTRACTUAL SERVICES GENERAL | – |
| Sep 16, 2024 | Department of Transportation | $180,784.13 | DESIGN-CONSULTANT-IOTB | – |
FY 2024top 20 of 250 payments$18,859,307
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 10, 2024 | Department of Transportation | $659,514.79 | DESIGN-CONSULTANT-IOTB | – |
| Feb 28, 2024 | Department of Transportation | $555,345.64 | DESIGN-CONSULTANT-IOTB | – |
| Oct 30, 2023 | Department of Transportation | $467,505.35 | IOTB CONSTRUCTION | – |
| Jan 23, 2024 | Department of Environmental Protection | $454,499.53 | DESIGN-CONSULTANT-IOTB | – |
| May 22, 2024 | Department of Transportation | $393,299.48 | DESIGN-CONSULTANT-IOTB | – |
| Apr 17, 2024 | Department of Transportation | $381,048.58 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2023 | Department of Environmental Protection | $376,968.90 | CONTRACTUAL SERVICES GENERAL | – |
| Dec 26, 2023 | Department of Environmental Protection | $369,420.31 | IOTB CONSTRUCTION | – |
| Sep 18, 2023 | Department of Environmental Protection | $349,734.69 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 23, 2024 | Department of Environmental Protection | $348,891.12 | DESIGN-CONSULTANT-IOTB | – |
| Oct 27, 2023 | Department of Transportation | $339,226.18 | IOTB CONSTRUCTION | – |
| Mar 15, 2024 | Department of Transportation | $334,931.96 | DESIGN-CONSULTANT-IOTB | – |
| Jan 8, 2024 | Department of Transportation | $314,695.68 | IOTB CONSTRUCTION | – |
| Jul 17, 2023 | Department of Transportation | $309,968.44 | IOTB CONSTRUCTION | – |
| Aug 21, 2023 | Department of Parks and Recreation | $277,079.31 | DESIGN-CONSULTANT-IOTB | – |
| Apr 19, 2024 | Department of Transportation | $264,694.98 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2023 | Department of Parks and Recreation | $263,369.76 | DESIGN-CONSULTANT-IOTB | – |
| Apr 4, 2024 | Department of Transportation | $260,885.58 | DESIGN-CONSULTANT-IOTB | – |
| Nov 13, 2023 | Department of Environmental Protection | $260,198.25 | CONTRACTUAL SERVICES GENERAL | – |
| Feb 7, 2024 | Department of Environmental Protection | $258,459.29 | CONTRACTUAL SERVICES GENERAL | – |
FY 2023top 20 of 154 payments$12,609,969
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 25, 2022 | Department of Transportation | $662,692.54 | IOTB CONSTRUCTION | – |
| Oct 13, 2022 | Department of Transportation | $560,206.08 | IOTB CONSTRUCTION | – |
| Oct 5, 2022 | Department of Transportation | $315,252.43 | IOTB CONSTRUCTION | – |
| Nov 21, 2022 | Department of Transportation | $275,100.86 | IOTB CONSTRUCTION | – |
| Sep 14, 2022 | Department of Parks and Recreation | $252,386.20 | DESIGN-CONSULTANT-IOTB | – |
| Sep 14, 2022 | Department of Parks and Recreation | $230,484.99 | DESIGN-CONSULTANT-IOTB | – |
| Oct 17, 2022 | Department of Environmental Protection | $229,188.00 | DESIGN-CONSULTANT-IOTB | – |
| Aug 24, 2022 | Department of Environmental Protection | $218,825.13 | IOTB CONSTRUCTION | – |
| Apr 17, 2023 | Department of Transportation | $195,000.00 | IOTB CONSTRUCTION | – |
| Oct 24, 2022 | Department of Transportation | $189,647.07 | IOTB CONSTRUCTION | – |
| Jun 1, 2023 | Department of Environmental Protection | $175,101.76 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 3, 2022 | Department of Parks and Recreation | $169,218.83 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2023 | Department of Transportation | $166,283.25 | IOTB CONSTRUCTION | – |
| Aug 3, 2022 | Department of Parks and Recreation | $161,376.93 | DESIGN-CONSULTANT-IOTB | – |
| Jul 27, 2022 | Department of Transportation | $148,307.76 | IOTB CONSTRUCTION | – |
| Aug 24, 2022 | Department of Environmental Protection | $143,274.31 | IOTB CONSTRUCTION | – |
| Jan 27, 2023 | Department of Transportation | $138,561.39 | IOTB CONSTRUCTION | – |
| May 1, 2023 | Department of Environmental Protection | $137,266.93 | IOTB CONSTRUCTION | – |
| Sep 26, 2022 | Department of Environmental Protection | $135,087.07 | IOTB CONSTRUCTION | – |
| May 19, 2023 | Department of Transportation | $133,633.83 | IOTB CONSTRUCTION | – |
FY 2022top 20 of 136 payments$7,912,707
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 22, 2021 | Department of Environmental Protection | $400,609.22 | IOTB CONSTRUCTION | – |
| Oct 25, 2021 | Department of Transportation | $328,361.42 | IOTB CONSTRUCTION | – |
| Dec 16, 2021 | Department of Transportation | $260,090.84 | IOTB CONSTRUCTION | – |
| May 5, 2022 | Department of Environmental Protection | $228,274.20 | IOTB CONSTRUCTION | – |
| Dec 13, 2021 | Department of Transportation | $211,018.13 | IOTB CONSTRUCTION | – |
| May 13, 2022 | Department of Transportation | $209,563.05 | IOTB CONSTRUCTION | – |
| Feb 3, 2022 | Department of Transportation | $187,618.33 | IOTB CONSTRUCTION | – |
| Apr 13, 2022 | Department of Parks and Recreation | $177,014.67 | DESIGN-CONSULTANT-IOTB | – |
| Jan 28, 2022 | Department of Transportation | $157,328.66 | IOTB CONSTRUCTION | – |
| Aug 4, 2021 | Department of Transportation | $148,246.91 | IOTB CONSTRUCTION | – |
| Jul 14, 2021 | Department of Environmental Protection | $146,340.10 | IOTB CONSTRUCTION | – |
| Feb 22, 2022 | Department of Environmental Protection | $138,218.40 | IOTB CONSTRUCTION | – |
| May 27, 2022 | Department of Transportation | $127,672.14 | IOTB CONSTRUCTION | – |
| Nov 5, 2021 | Department of Environmental Protection | $125,282.81 | IOTB CONSTRUCTION | – |
| Oct 20, 2021 | Department of Environmental Protection | $124,509.60 | IOTB CONSTRUCTION | – |
| Nov 5, 2021 | Department of Environmental Protection | $121,000.00 | IOTB CONSTRUCTION | – |
| Jan 18, 2022 | Department of Transportation | $120,942.84 | IOTB CONSTRUCTION | – |
| Feb 3, 2022 | Department of Environmental Protection | $119,344.10 | IOTB CONSTRUCTION | – |
| Jan 20, 2022 | Department of Environmental Protection | $117,036.07 | IOTB CONSTRUCTION | – |
| Sep 22, 2021 | Department of Transportation | $115,040.75 | IOTB CONSTRUCTION | – |
FY 2021top 20 of 228 payments$11,337,144
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 9, 2020 | Department of Design and Construction | $463,526.68 | N/A | – |
| Sep 3, 2020 | Department of Environmental Protection | $413,238.83 | IOTB CONSTRUCTION | – |
| Feb 8, 2021 | Department of Environmental Protection | $287,220.93 | IOTB CONSTRUCTION | – |
| Feb 12, 2021 | Department of Transportation | $272,038.30 | IOTB CONSTRUCTION | – |
| Dec 14, 2020 | Department of Environmental Protection | $254,694.19 | IOTB CONSTRUCTION | – |
| Jul 2, 2020 | Department of Environmental Protection | $222,981.20 | IOTB CONSTRUCTION | – |
| Jul 2, 2020 | Department of Transportation | $205,353.04 | IOTB CONSTRUCTION | – |
| Sep 18, 2020 | Department of Design and Construction | $183,054.46 | N/A | – |
| Apr 26, 2021 | Department of Environmental Protection | $160,346.00 | IOTB CONSTRUCTION | – |
| Jun 25, 2021 | Department of Environmental Protection | $153,150.48 | IOTB CONSTRUCTION | – |
| Oct 26, 2020 | Department of Transportation | $152,544.91 | IOTB CONSTRUCTION | – |
| May 19, 2021 | Department of Environmental Protection | $144,515.32 | IOTB CONSTRUCTION | – |
| Dec 2, 2020 | Department of Transportation | $143,805.93 | IOTB CONSTRUCTION | – |
| Nov 25, 2020 | Department of Environmental Protection | $143,433.13 | IOTB CONSTRUCTION | – |
| Oct 13, 2020 | Department of Environmental Protection | $142,791.33 | IOTB CONSTRUCTION | – |
| Jun 1, 2021 | Department of Environmental Protection | $142,079.41 | IOTB CONSTRUCTION | – |
| Dec 18, 2020 | Department of Transportation | $139,060.43 | IOTB CONSTRUCTION | – |
| Nov 19, 2020 | Department of Transportation | $138,803.93 | IOTB CONSTRUCTION | – |
| Mar 1, 2021 | Department of Environmental Protection | $137,110.00 | IOTB CONSTRUCTION | – |
| Oct 7, 2020 | Department of Environmental Protection | $136,142.57 | IOTB CONSTRUCTION | – |
FY 2020top 20 of 211 payments$15,959,247
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 12, 2019 | Department of Design and Construction | $1,115,382.08 | N/A | – |
| May 20, 2020 | Department of Transportation | $468,003.59 | IOTB CONSTRUCTION | – |
| Mar 25, 2020 | Department of Design and Construction | $414,079.90 | N/A | – |
| Jun 22, 2020 | Department of Environmental Protection | $354,817.90 | IOTB CONSTRUCTION | – |
| Jan 6, 2020 | Department of Environmental Protection | $331,922.26 | IOTB CONSTRUCTION | – |
| Sep 5, 2019 | Department of Environmental Protection | $318,381.81 | IOTB CONSTRUCTION | – |
| Oct 17, 2019 | Department of Environmental Protection | $310,298.70 | IOTB CONSTRUCTION | – |
| Sep 3, 2019 | Department of Environmental Protection | $287,100.14 | IOTB CONSTRUCTION | – |
| Jun 3, 2020 | Department of Transportation | $265,471.65 | IOTB CONSTRUCTION | – |
| Jul 25, 2019 | Department of Transportation | $243,046.62 | IOTB CONSTRUCTION | – |
| May 26, 2020 | Department of Transportation | $242,987.31 | IOTB CONSTRUCTION | – |
| Mar 9, 2020 | Department of Transportation | $220,595.68 | IOTB CONSTRUCTION | – |
| Jul 1, 2019 | Department of Environmental Protection | $209,609.00 | IOTB CONSTRUCTION | – |
| Jan 2, 2020 | Department of Environmental Protection | $208,944.68 | IOTB CONSTRUCTION | – |
| May 20, 2020 | Department of Environmental Protection | $173,105.67 | IOTB CONSTRUCTION | – |
| Jul 1, 2019 | Department of Transportation | $153,005.73 | IOTB CONSTRUCTION | – |
| Sep 19, 2019 | Department of Transportation | $148,071.76 | IOTB CONSTRUCTION | – |
| Nov 29, 2019 | Department of Environmental Protection | $141,499.11 | IOTB CONSTRUCTION | – |
| Nov 20, 2019 | Department of Environmental Protection | $134,251.13 | IOTB CONSTRUCTION | – |
| Aug 16, 2019 | Department of Design and Construction | $131,614.17 | N/A | – |
FY 2019top 20 of 169 payments$15,300,367
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 19, 2018 | Department of Environmental Protection | $1,556,248.42 | IOTB CONSTRUCTION | – |
| May 15, 2019 | Department of Transportation | $830,546.18 | IOTB CONSTRUCTION | – |
| Jun 17, 2019 | Department of Transportation | $723,849.91 | IOTB CONSTRUCTION | – |
| Jan 22, 2019 | Department of Design and Construction | $477,160.75 | N/A | – |
| Oct 1, 2018 | Department of Environmental Protection | $341,809.52 | DESIGN-CONSULTANT-IOTB | – |
| May 15, 2019 | Department of Environmental Protection | $333,694.61 | IOTB CONSTRUCTION | – |
| Apr 18, 2019 | Department of Environmental Protection | $326,493.95 | IOTB CONSTRUCTION | – |
| Dec 20, 2018 | Department of Environmental Protection | $296,623.71 | IOTB CONSTRUCTION | – |
| May 6, 2019 | Department of Environmental Protection | $250,650.84 | DESIGN-CONSULTANT-IOTB | – |
| May 16, 2019 | Department of Environmental Protection | $220,236.53 | IOTB CONSTRUCTION | – |
| Jan 11, 2019 | Department of Environmental Protection | $213,106.23 | IOTB CONSTRUCTION | – |
| Jun 18, 2019 | Department of Design and Construction | $206,848.15 | N/A | – |
| Mar 11, 2019 | Department of Environmental Protection | $201,104.87 | DESIGN-CONSULTANT-IOTB | – |
| Aug 1, 2018 | Department of Environmental Protection | $195,934.55 | IOTB CONSTRUCTION | – |
| Feb 13, 2019 | Department of Environmental Protection | $166,704.78 | IOTB CONSTRUCTION | – |
| Apr 1, 2019 | Department of Transportation | $164,588.96 | DESIGN-CONSULTANT-IOTB | – |
| Apr 24, 2019 | Department of Design and Construction | $162,173.50 | N/A | – |
| Aug 1, 2018 | Department of Environmental Protection | $154,455.40 | IOTB CONSTRUCTION | – |
| Jan 18, 2019 | Department of Parks and Recreation | $151,987.88 | CONTRACTUAL SERVICES GENERAL | – |
| Jun 6, 2019 | Department of Environmental Protection | $148,206.92 | IOTB CONSTRUCTION | – |
FY 2018top 20 of 199 payments$10,398,131
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 10, 2017 | Department of Environmental Protection | $550,089.20 | IOTB CONSTRUCTION | – |
| May 24, 2018 | Department of Parks and Recreation | $516,274.73 | CONTRACTUAL SERVICES GENERAL | – |
| Jan 10, 2018 | Department of Environmental Protection | $451,480.61 | IOTB CONSTRUCTION | – |
| Jan 29, 2018 | Department of Parks and Recreation | $383,226.80 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 5, 2017 | Department of Transportation | $368,945.25 | DESIGN-CONSULTANT-IOTB | – |
| Sep 28, 2017 | Department of Environmental Protection | $300,966.45 | IOTB CONSTRUCTION | – |
| Aug 28, 2017 | Department of Environmental Protection | $267,021.51 | IOTB CONSTRUCTION | – |
| Jun 7, 2018 | Department of Transportation | $240,842.77 | IOTB CONSTRUCTION | – |
| May 31, 2018 | Department of Environmental Protection | $226,649.80 | IOTB CONSTRUCTION | – |
| Jan 2, 2018 | Department of Environmental Protection | $191,985.07 | IOTB CONSTRUCTION | – |
| Jun 14, 2018 | Department of Environmental Protection | $179,608.64 | IOTB CONSTRUCTION | – |
| Jan 2, 2018 | Department of Environmental Protection | $170,067.84 | DESIGN-CONSULTANT-IOTB | – |
| Aug 21, 2017 | Department of Transportation | $169,169.00 | IOTB CONSTRUCTION | – |
| May 11, 2018 | Department of Transportation | $168,225.08 | IOTB CONSTRUCTION | – |
| Aug 21, 2017 | Department of Transportation | $165,000.00 | IOTB CONSTRUCTION | – |
| Apr 6, 2018 | Department of Transportation | $164,497.45 | IOTB CONSTRUCTION | – |
| Oct 30, 2017 | Department of Environmental Protection | $148,628.34 | IOTB CONSTRUCTION | – |
| Aug 21, 2017 | Department of Transportation | $144,000.00 | IOTB CONSTRUCTION | – |
| Mar 5, 2018 | Department of Transportation | $137,710.00 | IOTB CONSTRUCTION | – |
| Apr 11, 2018 | Department of Environmental Protection | $133,500.85 | IOTB CONSTRUCTION | – |
FY 2017top 20 of 145 payments$7,212,679
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 19, 2016 | Department of Transportation | $515,867.33 | IOTB CONSTRUCTION | – |
| Feb 17, 2017 | Department of Environmental Protection | $441,498.93 | IOTB CONSTRUCTION | – |
| Sep 28, 2016 | Department of Environmental Protection | $370,716.42 | DESIGN-CONSULTANT-IOTB | – |
| Sep 6, 2016 | Department of Environmental Protection | $300,000.00 | IOTB CONSTRUCTION | – |
| Feb 17, 2017 | Department of Environmental Protection | $265,800.35 | IOTB CONSTRUCTION | – |
| Sep 28, 2016 | Department of Environmental Protection | $241,890.57 | DESIGN-CONSULTANT-IOTB | – |
| Sep 6, 2016 | Department of Environmental Protection | $212,733.92 | IOTB CONSTRUCTION | – |
| Oct 3, 2016 | Department of Environmental Protection | $212,175.35 | IOTB CONSTRUCTION | – |
| Nov 3, 2016 | Department of Environmental Protection | $203,505.17 | DESIGN-CONSULTANT-IOTB | – |
| Jul 21, 2016 | Department of Environmental Protection | $184,376.01 | DESIGN-CONSULTANT-IOTB | – |
| Apr 12, 2017 | Department of Transportation | $152,589.46 | IOTB CONSTRUCTION | – |
| Oct 6, 2016 | Department of Environmental Protection | $148,826.91 | DESIGN-CONSULTANT-IOTB | – |
| Dec 5, 2016 | Department of Transportation | $145,750.66 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2016 | Department of Environmental Protection | $131,202.87 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2016 | Department of Environmental Protection | $129,595.73 | DESIGN-CONSULTANT-IOTB | – |
| Jul 25, 2016 | Department of Environmental Protection | $127,494.13 | DESIGN-CONSULTANT-IOTB | – |
| Nov 14, 2016 | Department of Environmental Protection | $125,670.29 | IOTB CONSTRUCTION | – |
| Aug 3, 2016 | Department of Environmental Protection | $122,794.05 | DESIGN-CONSULTANT-IOTB | – |
| May 19, 2017 | Department of Design and Construction | $111,471.12 | N/A | – |
| Jun 30, 2017 | Department of Environmental Protection | $110,799.70 | IOTB CONSTRUCTION | – |
FY 2016top 20 of 130 payments$5,037,765
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 30, 2015 | Department of Environmental Protection | $498,770.97 | DESIGN-CONSULTANT-IOTB | – |
| Apr 29, 2016 | Department of Environmental Protection | $323,770.76 | DESIGN-CONSULTANT-IOTB | – |
| Dec 23, 2015 | Department of Environmental Protection | $269,230.00 | DESIGN-CONSULTANT-IOTB | – |
| Jan 4, 2016 | Department of Environmental Protection | $254,395.86 | DESIGN-CONSULTANT-IOTB | – |
| Dec 23, 2015 | Department of Environmental Protection | $171,114.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2015 | Department of Environmental Protection | $157,826.30 | DESIGN-CONSULTANT-IOTB | – |
| Jun 9, 2016 | Department of Transportation | $148,098.64 | DESIGN-CONSULTANT-IOTB | – |
| Jul 31, 2015 | Department of Transportation | $139,006.58 | DESIGN-CONSULTANT-IOTB | – |
| May 18, 2016 | Department of Environmental Protection | $116,975.60 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2016 | Department of Environmental Protection | $116,632.44 | DESIGN-CONSULTANT-IOTB | – |
| Oct 9, 2015 | Department of Transportation | $108,744.01 | DESIGN-CONSULTANT-IOTB | – |
| Oct 13, 2015 | Department of Environmental Protection | $99,820.79 | N/A | – |
| Mar 16, 2016 | Department of Environmental Protection | $90,648.07 | DESIGN-CONSULTANT-IOTB | – |
| Aug 3, 2015 | Department of Environmental Protection | $84,763.32 | DESIGN-CONSULTANT-IOTB | – |
| Dec 30, 2015 | Department of Environmental Protection | $84,178.69 | DESIGN-CONSULTANT-IOTB | – |
| Jul 10, 2015 | Department of Environmental Protection | $81,413.51 | DESIGN-CONSULTANT-IOTB | – |
| Sep 11, 2015 | Department of Environmental Protection | $81,206.31 | IOTB CONSTRUCTION | – |
| Nov 24, 2015 | Department of Environmental Protection | $77,288.03 | DESIGN-CONSULTANT-IOTB | – |
| Jul 8, 2015 | Department of Transportation | $73,330.63 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2016 | Department of Parks and Recreation | $71,326.58 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 95 payments$5,138,934
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 10, 2015 | Department of Transportation | $501,396.37 | DESIGN-CONSULTANT-IOTB | – |
| Aug 13, 2014 | Department of Citywide Administrative Services | $326,723.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 11, 2014 | Department of Transportation | $284,396.91 | DESIGN-CONSULTANT-IOTB | – |
| May 11, 2015 | Department of Parks and Recreation | $221,658.75 | DESIGN-CONSULTANT-IOTB | – |
| Jul 30, 2014 | Department of Parks and Recreation | $185,271.13 | DESIGN-CONSULTANT-IOTB | – |
| Jun 22, 2015 | Department of Environmental Protection | $177,560.95 | DESIGN-CONSULTANT-IOTB | – |
| Nov 20, 2014 | Department of Environmental Protection | $173,611.73 | DESIGN-CONSULTANT-IOTB | – |
| Oct 9, 2014 | Department of Environmental Protection | $148,570.08 | DESIGN-CONSULTANT-IOTB | – |
| Nov 20, 2014 | Department of Environmental Protection | $146,621.40 | DESIGN-CONSULTANT-IOTB | – |
| Jun 1, 2015 | Department of Transportation | $145,203.84 | DESIGN-CONSULTANT-IOTB | – |
| Jan 15, 2015 | Department of Environmental Protection | $127,383.38 | DESIGN-CONSULTANT-IOTB | – |
| Sep 8, 2014 | Department of Parks and Recreation | $115,966.13 | DESIGN-CONSULTANT-IOTB | – |
| Jun 8, 2015 | Department of Environmental Protection | $108,350.59 | IOTB CONSTRUCTION | – |
| Nov 20, 2014 | Department of Parks and Recreation | $104,422.15 | DESIGN-CONSULTANT-IOTB | – |
| Sep 4, 2014 | Department of Environmental Protection | $93,814.63 | DESIGN-CONSULTANT-IOTB | – |
| Jul 14, 2014 | Department of Environmental Protection | $93,660.00 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2015 | Department of Transportation | $87,867.36 | DESIGN-CONSULTANT-IOTB | – |
| Jul 11, 2014 | Department of Environmental Protection | $86,985.25 | DESIGN-CONSULTANT-IOTB | – |
| Dec 10, 2014 | Department of Environmental Protection | $82,495.61 | DESIGN-CONSULTANT-IOTB | – |
| Nov 10, 2014 | Department of Environmental Protection | $80,911.95 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 150 payments$6,633,076
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 23, 2013 | Department of Environmental Protection | $432,433.00 | DESIGN-CONSULTANT-IOTB | – |
| Mar 5, 2014 | Department of Transportation | $366,827.19 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2013 | Department of Transportation | $241,780.46 | DESIGN-CONSULTANT-IOTB | – |
| Nov 14, 2013 | Department of Environmental Protection | $224,811.11 | DESIGN-CONSULTANT-IOTB | – |
| Aug 16, 2013 | Department of Environmental Protection | $209,482.57 | DESIGN-CONSULTANT-IOTB | – |
| Mar 10, 2014 | Department of Environmental Protection | $209,286.85 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2013 | Department of Transportation | $171,857.66 | DESIGN-CONSULTANT-IOTB | – |
| Jan 8, 2014 | Department of Environmental Protection | $157,089.60 | DESIGN-CONSULTANT-IOTB | – |
| Nov 21, 2013 | Department of Environmental Protection | $139,513.40 | DESIGN-CONSULTANT-IOTB | – |
| Feb 10, 2014 | Department of Transportation | $138,318.59 | DESIGN-CONSULTANT-IOTB | – |
| Nov 4, 2013 | Department of Environmental Protection | $131,657.65 | DESIGN-CONSULTANT-IOTB | – |
| Sep 26, 2013 | Department of Environmental Protection | $124,334.00 | IOTB CONSTRUCTION | – |
| May 19, 2014 | Department of Environmental Protection | $117,412.18 | DESIGN-CONSULTANT-IOTB | – |
| Dec 11, 2013 | Department of Environmental Protection | $116,529.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 23, 2013 | Department of Environmental Protection | $106,488.93 | DESIGN-CONSULTANT-IOTB | – |
| Aug 7, 2013 | Department of Environmental Protection | $103,130.61 | DESIGN-CONSULTANT-IOTB | – |
| Jul 17, 2013 | Department of Parks and Recreation | $102,059.18 | DESIGN-CONSULTANT-IOTB | – |
| Sep 9, 2013 | Department of Transportation | $101,992.95 | DESIGN-CONSULTANT-IOTB | – |
| Aug 14, 2013 | Department of Environmental Protection | $99,326.33 | DESIGN-CONSULTANT-IOTB | – |
| Jun 9, 2014 | Department of Environmental Protection | $96,615.34 | DESIGN-CONSULTANT-IOTB | – |
FY 2013top 20 of 73 payments$4,776,757
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 5, 2012 | Department of Environmental Protection | $424,243.42 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2013 | Department of Environmental Protection | $222,245.76 | DESIGN-CONSULTANT-IOTB | – |
| Jul 23, 2012 | Department of Environmental Protection | $186,395.35 | DESIGN-CONSULTANT-IOTB | – |
| Aug 30, 2012 | Department of Environmental Protection | $183,741.45 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2013 | Department of Environmental Protection | $182,158.35 | DESIGN-CONSULTANT-IOTB | – |
| Sep 7, 2012 | Department of Transportation | $177,873.57 | DESIGN-CONSULTANT-IOTB | – |
| Nov 5, 2012 | Department of Environmental Protection | $146,968.03 | DESIGN-CONSULTANT-IOTB | – |
| Oct 24, 2012 | Department of Environmental Protection | $132,120.56 | DESIGN-CONSULTANT-IOTB | – |
| Feb 11, 2013 | Department of Environmental Protection | $130,774.00 | IOTB CONSTRUCTION | – |
| May 13, 2013 | Department of Transportation | $114,898.61 | DESIGN-CONSULTANT-IOTB | – |
| Jun 17, 2013 | Department of Environmental Protection | $109,840.94 | DESIGN-CONSULTANT-IOTB | – |
| Jul 18, 2012 | Department of Transportation | $108,767.78 | DESIGN-CONSULTANT-IOTB | – |
| Oct 24, 2012 | Department of Environmental Protection | $94,459.24 | DESIGN-CONSULTANT-IOTB | – |
| Jan 2, 2013 | Department of Environmental Protection | $92,461.70 | DESIGN-CONSULTANT-IOTB | – |
| May 6, 2013 | Department of Environmental Protection | $90,983.32 | DESIGN-CONSULTANT-IOTB | – |
| Jul 30, 2012 | Department of Transportation | $82,561.56 | DESIGN-CONSULTANT-IOTB | – |
| Jul 23, 2012 | Department of Environmental Protection | $79,151.34 | DESIGN-CONSULTANT-IOTB | – |
| Apr 5, 2013 | Department of Environmental Protection | $71,233.43 | DESIGN-CONSULTANT-IOTB | – |
| Aug 1, 2012 | Department of Transportation | $70,171.03 | DESIGN-CONSULTANT-IOTB | – |
| Nov 23, 2012 | Department of Transportation | $68,366.60 | DESIGN-CONSULTANT-IOTB | – |
FY 2012top 20 of 48 payments$2,398,248
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 5, 2012 | Department of Environmental Protection | $299,692.84 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2011 | Department of Transportation | $208,097.98 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2012 | Department of Environmental Protection | $140,785.17 | DESIGN-CONSULTANT-IOTB | – |
| Jul 14, 2011 | Department of Transportation | $114,316.47 | DESIGN-CONSULTANT-IOTB | – |
| Sep 16, 2011 | Department of Environmental Protection | $110,324.38 | DESIGN-CONSULTANT-IOTB | – |
| Aug 31, 2011 | Department of Environmental Protection | $106,576.50 | DESIGN-CONSULTANT-IOTB | – |
| Mar 12, 2012 | Department of Environmental Protection | $105,741.08 | DESIGN-CONSULTANT-IOTB | – |
| Aug 11, 2011 | Department of Environmental Protection | $101,046.31 | DESIGN-CONSULTANT-IOTB | – |
| Apr 16, 2012 | Department of Environmental Protection | $98,658.06 | DESIGN-CONSULTANT-IOTB | – |
| Dec 7, 2011 | Department of Environmental Protection | $83,111.03 | DESIGN-CONSULTANT-IOTB | – |
| Oct 28, 2011 | Department of Environmental Protection | $82,125.95 | DESIGN-CONSULTANT-IOTB | – |
| Jan 5, 2012 | Department of Environmental Protection | $80,567.99 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2012 | Department of Environmental Protection | $78,929.38 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2011 | Department of Environmental Protection | $62,627.20 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2011 | Department of Transportation | $55,885.92 | DESIGN-CONSULTANT-IOTB | – |
| Oct 6, 2011 | Department of Environmental Protection | $53,923.19 | DESIGN-CONSULTANT-IOTB | – |
| Jan 30, 2012 | Department of Transportation | $49,549.50 | DESIGN-CONSULTANT-IOTB | – |
| Aug 29, 2011 | Department of Transportation | $49,068.12 | DESIGN-CONSULTANT-IOTB | – |
| Apr 30, 2012 | Department of Transportation | $47,008.00 | DESIGN-CONSULTANT-IOTB | – |
| Jun 6, 2012 | Department of Transportation | $46,877.34 | DESIGN-CONSULTANT-IOTB | – |
FY 2011top 20 of 61 payments$3,967,925
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 20, 2011 | Department of Transportation | $535,113.59 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2011 | Department of Transportation | $272,848.65 | DESIGN-CONSULTANT-IOTB | – |
| May 23, 2011 | Department of Transportation | $203,452.78 | DESIGN-CONSULTANT-IOTB | – |
| Sep 7, 2010 | Department of Transportation | $193,469.90 | DESIGN-CONSULTANT-IOTB | – |
| Aug 13, 2010 | Department of Environmental Protection | $176,587.36 | DESIGN-CONSULTANT-IOTB | – |
| Feb 22, 2011 | Department of Environmental Protection | $161,818.07 | DESIGN-CONSULTANT-IOTB | – |
| May 16, 2011 | Department of Environmental Protection | $109,040.58 | DESIGN-CONSULTANT-IOTB | – |
| Jan 18, 2011 | Department of Environmental Protection | $102,075.24 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2011 | Department of Environmental Protection | $101,061.43 | DESIGN-CONSULTANT-IOTB | – |
| Apr 7, 2011 | Department of Environmental Protection | $97,577.95 | DESIGN-CONSULTANT-IOTB | – |
| Mar 17, 2011 | Department of Environmental Protection | $93,417.69 | DESIGN-CONSULTANT-IOTB | – |
| Nov 17, 2010 | Department of Environmental Protection | $93,042.42 | DESIGN-CONSULTANT-IOTB | – |
| Aug 13, 2010 | Department of Environmental Protection | $92,443.02 | DESIGN-CONSULTANT-IOTB | – |
| May 31, 2011 | Department of Environmental Protection | $90,873.11 | DESIGN-CONSULTANT-IOTB | – |
| Aug 27, 2010 | Department of Environmental Protection | $90,221.53 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2010 | Department of Environmental Protection | $86,501.93 | DESIGN-CONSULTANT-IOTB | – |
| Aug 20, 2010 | Department of Environmental Protection | $85,662.02 | DESIGN-CONSULTANT-IOTB | – |
| Feb 18, 2011 | Department of Transportation | $82,067.88 | DESIGN-CONSULTANT-IOTB | – |
| Sep 1, 2010 | Department of Transportation | $80,987.69 | DESIGN-CONSULTANT-IOTB | – |
| Sep 13, 2010 | Department of Environmental Protection | $74,287.95 | DESIGN-CONSULTANT-IOTB | – |
FY 2010top 20 of 27 payments$1,196,501
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 3, 2010 | Department of Environmental Protection | $122,788.09 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2010 | Department of Transportation | $91,995.79 | DESIGN-CONSULTANT-IOTB | – |
| Apr 1, 2010 | Department of Environmental Protection | $87,006.87 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2010 | Department of Transportation | $83,299.98 | DESIGN-CONSULTANT-IOTB | – |
| Mar 5, 2010 | Department of Transportation | $81,794.03 | DESIGN-CONSULTANT-IOTB | – |
| Mar 15, 2010 | Department of Environmental Protection | $67,767.95 | DESIGN-CONSULTANT-IOTB | – |
| Feb 5, 2010 | Department of Transportation | $62,013.40 | DESIGN-CONSULTANT-IOTB | – |
| Apr 21, 2010 | Department of Transportation | $61,470.26 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2010 | Department of Transportation | $52,573.98 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2010 | Department of Environmental Protection | $51,618.19 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2010 | Department of Transportation | $49,533.63 | DESIGN-CONSULTANT-IOTB | – |
| May 7, 2010 | Department of Transportation | $47,233.04 | DESIGN-CONSULTANT-IOTB | – |
| Apr 21, 2010 | Department of Transportation | $46,507.91 | DESIGN-CONSULTANT-IOTB | – |
| Jun 18, 2010 | Department of Transportation | $40,270.72 | DESIGN-CONSULTANT-IOTB | – |
| Feb 4, 2010 | Department of Transportation | $36,597.60 | DESIGN-CONSULTANT-IOTB | – |
| Jun 7, 2010 | Department of Transportation | $31,986.60 | DESIGN-CONSULTANT-IOTB | – |
| Feb 5, 2010 | Department of Transportation | $31,752.57 | DESIGN-CONSULTANT-IOTB | – |
| Apr 28, 2010 | Department of Transportation | $28,031.64 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2010 | Department of Transportation | $24,335.62 | DESIGN-CONSULTANT-IOTB | – |
| Mar 3, 2010 | Department of Transportation | $23,505.56 | DESIGN-CONSULTANT-IOTB | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 30, 2025 | Department of Parks and Recreation | $78,169.72 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Parks and Recreation | $67,353.45 | DESIGN-CONSULTANT-IOTB | Capital Contracts |
| Jun 30, 2025 | Department of Parks and Recreation | $22,680.00 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 30, 2025 | Department of Parks and Recreation | $31,280.00 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 26, 2025 | Department of Environmental Protection | $83,933.76 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $59,365.08 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Jun 25, 2025 | Department of Parks and Recreation | $15,680.00 | IOTB CONSTRUCTION | Capital Contracts |
| Jun 25, 2025 | Department of Environmental Protection | $106,697.42 | CONTRACTUAL SERVICES GENERAL | Contracts |
| Jun 23, 2025 | School Construction Authority | $1,050.40 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $909.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,925.83 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $22,247.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $8,536.33 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $525.20 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,456.70 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $16,828.80 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,772.45 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,296.91 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,283.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $32,109.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,378.68 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,050.40 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $4,252.10 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $520.15 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $21,902.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving Department of Environmental Protection
- Slattery Skanska/Gottlieb Skanska/Tully Const. JV $780,656,292
- New York City Economic Development Corporation $727,117,935
- Cac Industries Inc $720,373,938
- Sew Construction - JV $687,835,200
- WDF Inc $617,437,825
- Maspeth Supply Co LLC $515,469,345
- Jett Industries Inc $475,916,558
- John Picone Inc $459,591,951
- Hazen & Sawyer $455,192,970
- New York Power Authority $434,611,466
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data