Innovax Pillar Inc: New York City Government Payments

as recorded by New York City: INNOVAX PILLAR INC

Innovax Pillar Inc is the 363rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 57th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.5% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 63.8% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$196,024,364total received
689payments
1agency
Jan 4, 2010Jun 23, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Innovax Pillar Inc. No spam.

Payments by fiscal year

FY 2025$2,634,443
FY 2024$7,269,351
FY 2023$7,163,550
FY 2022$11,797,263
FY 2021$15,485,583
FY 2020$28,025,661
FY 2019$27,421,222
FY 2018$15,457,683
FY 2017$6,675,705
FY 2016$8,209,351
FY 2015$12,676,567
FY 2014$15,264,032
FY 2013$15,526,524
FY 2012$9,032,845
FY 2011$9,137,241
FY 2010$4,247,344

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority17$2,634,443
FY 2024School Construction Authority20$7,269,351
FY 2023School Construction Authority22$7,163,550
FY 2022School Construction Authority25$11,797,263
FY 2021School Construction Authority35$15,485,583
FY 2020School Construction Authority32$28,025,661
FY 2019School Construction Authority50$27,421,222
FY 2018School Construction Authority52$15,457,683
FY 2017School Construction Authority62$6,675,705
FY 2016School Construction Authority61$8,209,351
FY 2015School Construction Authority44$12,676,567
FY 2014School Construction Authority49$15,264,032
FY 2013School Construction Authority43$15,526,524
FY 2012School Construction Authority71$9,032,845
FY 2011School Construction Authority66$9,137,241
FY 2010School Construction Authority40$4,247,344
Total689$196,024,364

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS689$196,024,364Jan 4, 2010 Jun 23, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 17 of 17 payments$2,634,443
DateAgencyAmountCategoryPurchase order
Aug 13, 2024School Construction Authority$496,413.09CONSTRUCTION-BUILDINGS
Sep 10, 2024School Construction Authority$398,752.43CONSTRUCTION-BUILDINGS
Nov 29, 2024School Construction Authority$306,791.75CONSTRUCTION-BUILDINGS
Nov 6, 2024School Construction Authority$306,791.75CONSTRUCTION-BUILDINGS
Oct 17, 2024School Construction Authority$265,300.70CONSTRUCTION-BUILDINGS
Jul 5, 2024School Construction Authority$246,044.87CONSTRUCTION-BUILDINGS
Jun 23, 2025School Construction Authority$196,555.39CONSTRUCTION-BUILDINGS
Dec 3, 2024School Construction Authority$178,492.65CONSTRUCTION-BUILDINGS
May 7, 2025School Construction Authority$177,572.18CONSTRUCTION-BUILDINGS
Mar 11, 2025School Construction Authority$172,650.98CONSTRUCTION-BUILDINGS
Feb 10, 2025School Construction Authority$96,494.35CONSTRUCTION-BUILDINGS
May 8, 2025School Construction Authority$42,496.44CONSTRUCTION-BUILDINGS
May 21, 2025School Construction Authority$28,560.09CONSTRUCTION-BUILDINGS
Jun 20, 2025School Construction Authority$11,998.80CONSTRUCTION-BUILDINGS
May 8, 2025School Construction Authority$11,287.00CONSTRUCTION-BUILDINGS
Jun 23, 2025School Construction Authority$5,032.60CONSTRUCTION-BUILDINGS
Nov 6, 2024School Construction Authority-$306,791.75CONSTRUCTION-BUILDINGS
FY 2024top 20 of 20 payments$7,269,351
DateAgencyAmountCategoryPurchase order
Aug 28, 2023School Construction Authority$1,657,714.44CONSTRUCTION-BUILDINGS
Jul 27, 2023School Construction Authority$980,141.56CONSTRUCTION-BUILDINGS
Sep 26, 2023School Construction Authority$604,468.85CONSTRUCTION-BUILDINGS
Mar 26, 2024School Construction Authority$557,159.83CONSTRUCTION-BUILDINGS
Nov 3, 2023School Construction Authority$554,701.31CONSTRUCTION-BUILDINGS
Nov 8, 2023School Construction Authority$554,701.31CONSTRUCTION-BUILDINGS
Jan 30, 2024School Construction Authority$416,601.50CONSTRUCTION-BUILDINGS
Oct 27, 2023School Construction Authority$412,429.01CONSTRUCTION-BUILDINGS
Mar 1, 2024School Construction Authority$393,339.33CONSTRUCTION-BUILDINGS
Dec 28, 2023School Construction Authority$372,573.56CONSTRUCTION-BUILDINGS
Jun 3, 2024School Construction Authority$350,820.75CONSTRUCTION-BUILDINGS
Apr 26, 2024School Construction Authority$325,691.35CONSTRUCTION-BUILDINGS
Dec 5, 2023School Construction Authority$284,095.41CONSTRUCTION-BUILDINGS
Mar 27, 2024School Construction Authority$281,011.61CONSTRUCTION-BUILDINGS
Feb 14, 2024School Construction Authority$59,379.93CONSTRUCTION-BUILDINGS
Feb 14, 2024School Construction Authority$9,155.12CONSTRUCTION-BUILDINGS
Feb 14, 2024School Construction Authority$6,242.38CONSTRUCTION-BUILDINGS
Feb 14, 2024School Construction Authority$3,736.55CONSTRUCTION-BUILDINGS
Feb 14, 2024School Construction Authority$88.47CONSTRUCTION-BUILDINGS
Nov 3, 2023School Construction Authority-$554,701.31CONSTRUCTION-BUILDINGS
FY 2023top 20 of 22 payments$7,163,550
DateAgencyAmountCategoryPurchase order
Jul 21, 2022School Construction Authority$1,664,980.35CONSTRUCTION-BUILDINGS
Feb 24, 2023School Construction Authority$799,533.11CONSTRUCTION-BUILDINGS
Jan 20, 2023School Construction Authority$720,833.37CONSTRUCTION-BUILDINGS
May 16, 2023School Construction Authority$657,260.67CONSTRUCTION-BUILDINGS
Sep 12, 2022School Construction Authority$628,248.05CONSTRUCTION-BUILDINGS
Mar 24, 2023School Construction Authority$469,621.00CONSTRUCTION-BUILDINGS
Nov 10, 2022School Construction Authority$407,454.54CONSTRUCTION-BUILDINGS
Mar 31, 2023School Construction Authority$389,331.87CONSTRUCTION-BUILDINGS
Jun 13, 2023School Construction Authority$362,003.20CONSTRUCTION-BUILDINGS
Jan 31, 2023School Construction Authority$238,628.41CONSTRUCTION-BUILDINGS
Jun 5, 2023School Construction Authority$197,611.46CONSTRUCTION-BUILDINGS
Sep 8, 2022School Construction Authority$150,994.90CONSTRUCTION-BUILDINGS
Dec 20, 2022School Construction Authority$132,848.00CONSTRUCTION-BUILDINGS
Oct 7, 2022School Construction Authority$116,086.40CONSTRUCTION-BUILDINGS
Mar 23, 2023School Construction Authority$48,232.25CONSTRUCTION-BUILDINGS
Feb 8, 2023School Construction Authority$46,718.19CONSTRUCTION-BUILDINGS
Feb 1, 2023School Construction Authority$38,072.56CONSTRUCTION-BUILDINGS
Feb 24, 2023School Construction Authority$26,030.88CONSTRUCTION-BUILDINGS
Feb 8, 2023School Construction Authority$25,477.16CONSTRUCTION-BUILDINGS
Feb 8, 2023School Construction Authority$17,799.62CONSTRUCTION-BUILDINGS
FY 2022top 20 of 25 payments$11,797,263
DateAgencyAmountCategoryPurchase order
Nov 17, 2021School Construction Authority$1,432,187.89CONSTRUCTION-BUILDINGS
Sep 28, 2021School Construction Authority$1,179,748.00CONSTRUCTION-BUILDINGS
Dec 28, 2021School Construction Authority$1,036,256.44CONSTRUCTION-BUILDINGS
Aug 17, 2021School Construction Authority$1,032,217.75CONSTRUCTION-BUILDINGS
Jul 14, 2021School Construction Authority$1,014,310.25CONSTRUCTION-BUILDINGS
Jan 18, 2022School Construction Authority$855,661.16CONSTRUCTION-BUILDINGS
Oct 26, 2021School Construction Authority$815,746.00CONSTRUCTION-BUILDINGS
Mar 23, 2022School Construction Authority$798,323.24CONSTRUCTION-BUILDINGS
Mar 9, 2022School Construction Authority$752,943.30CONSTRUCTION-BUILDINGS
Apr 20, 2022School Construction Authority$664,692.00CONSTRUCTION-BUILDINGS
Jun 3, 2022School Construction Authority$558,285.60CONSTRUCTION-BUILDINGS
Sep 8, 2021School Construction Authority$342,865.86CONSTRUCTION-BUILDINGS
Sep 13, 2021School Construction Authority$252,955.05CONSTRUCTION-BUILDINGS
Nov 4, 2021School Construction Authority$236,599.32CONSTRUCTION-BUILDINGS
Aug 16, 2021School Construction Authority$168,543.00CONSTRUCTION-BUILDINGS
Mar 9, 2022School Construction Authority$166,674.46CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$149,709.92CONSTRUCTION-BUILDINGS
Jan 7, 2022School Construction Authority$125,511.35CONSTRUCTION-BUILDINGS
Apr 28, 2022School Construction Authority$105,663.34CONSTRUCTION-BUILDINGS
Jan 27, 2022School Construction Authority$50,047.00CONSTRUCTION-BUILDINGS
FY 2021top 20 of 35 payments$15,485,583
DateAgencyAmountCategoryPurchase order
Apr 23, 2021School Construction Authority$2,226,215.75CONSTRUCTION-BUILDINGS
Sep 1, 2020School Construction Authority$1,753,558.45CONSTRUCTION-BUILDINGS
May 18, 2021School Construction Authority$1,503,815.42CONSTRUCTION-BUILDINGS
Jan 15, 2021School Construction Authority$1,099,268.71CONSTRUCTION-BUILDINGS
Jul 24, 2020School Construction Authority$1,017,334.35CONSTRUCTION-BUILDINGS
Mar 22, 2021School Construction Authority$1,010,515.00CONSTRUCTION-BUILDINGS
Dec 18, 2020School Construction Authority$956,356.45CONSTRUCTION-BUILDINGS
Jun 21, 2021School Construction Authority$918,007.80CONSTRUCTION-BUILDINGS
Feb 16, 2021School Construction Authority$832,437.50CONSTRUCTION-BUILDINGS
Oct 2, 2020School Construction Authority$747,679.65CONSTRUCTION-BUILDINGS
Aug 26, 2020School Construction Authority$711,866.63CONSTRUCTION-BUILDINGS
Sep 10, 2020School Construction Authority$615,357.75CONSTRUCTION-BUILDINGS
Dec 1, 2020School Construction Authority$503,143.77CONSTRUCTION-BUILDINGS
Oct 26, 2020School Construction Authority$270,632.97CONSTRUCTION-BUILDINGS
Mar 24, 2021School Construction Authority$253,578.32CONSTRUCTION-BUILDINGS
Aug 3, 2020School Construction Authority$242,198.36CONSTRUCTION-BUILDINGS
Apr 7, 2021School Construction Authority$176,284.03CONSTRUCTION-BUILDINGS
Jul 6, 2020School Construction Authority$135,280.00CONSTRUCTION-BUILDINGS
Jan 29, 2021School Construction Authority$80,320.93CONSTRUCTION-BUILDINGS
Mar 22, 2021School Construction Authority$75,195.69CONSTRUCTION-BUILDINGS
FY 2020top 20 of 32 payments$28,025,661
DateAgencyAmountCategoryPurchase order
Mar 16, 2020School Construction Authority$2,385,934.79CONSTRUCTION-BUILDINGS
Apr 15, 2020School Construction Authority$2,089,931.88CONSTRUCTION-BUILDINGS
Aug 14, 2019School Construction Authority$2,035,426.30CONSTRUCTION-BUILDINGS
Feb 14, 2020School Construction Authority$2,020,399.48CONSTRUCTION-BUILDINGS
Oct 17, 2019School Construction Authority$1,896,457.45CONSTRUCTION-BUILDINGS
Sep 25, 2019School Construction Authority$1,861,896.93CONSTRUCTION-BUILDINGS
Jul 15, 2019School Construction Authority$1,396,179.37CONSTRUCTION-BUILDINGS
Dec 16, 2019School Construction Authority$1,318,776.06CONSTRUCTION-BUILDINGS
Nov 15, 2019School Construction Authority$1,315,077.08CONSTRUCTION-BUILDINGS
Jan 17, 2020School Construction Authority$1,249,645.09CONSTRUCTION-BUILDINGS
Jul 18, 2019School Construction Authority$1,184,745.63CONSTRUCTION-BUILDINGS
Dec 3, 2019School Construction Authority$923,813.25CONSTRUCTION-BUILDINGS
Nov 15, 2019School Construction Authority$911,653.25CONSTRUCTION-BUILDINGS
Oct 17, 2019School Construction Authority$775,097.09CONSTRUCTION-BUILDINGS
Jan 10, 2020School Construction Authority$715,920.00CONSTRUCTION-BUILDINGS
Sep 12, 2019School Construction Authority$616,760.70CONSTRUCTION-BUILDINGS
Feb 28, 2020School Construction Authority$598,991.15CONSTRUCTION-BUILDINGS
Feb 19, 2020School Construction Authority$590,325.33CONSTRUCTION-BUILDINGS
Feb 7, 2020School Construction Authority$568,604.45CONSTRUCTION-BUILDINGS
Aug 15, 2019School Construction Authority$561,964.57CONSTRUCTION-BUILDINGS
FY 2019top 20 of 50 payments$27,421,222
DateAgencyAmountCategoryPurchase order
Feb 13, 2019School Construction Authority$2,298,420.12CONSTRUCTION-BUILDINGS
Mar 13, 2019School Construction Authority$1,915,216.44CONSTRUCTION-BUILDINGS
Jun 13, 2019School Construction Authority$1,687,398.56CONSTRUCTION-BUILDINGS
May 17, 2019School Construction Authority$1,481,279.58CONSTRUCTION-BUILDINGS
Jan 17, 2019School Construction Authority$1,323,758.12CONSTRUCTION-BUILDINGS
Sep 14, 2018School Construction Authority$1,295,746.42CONSTRUCTION-BUILDINGS
Feb 15, 2019School Construction Authority$1,295,649.58CONSTRUCTION-BUILDINGS
Apr 12, 2019School Construction Authority$1,285,968.45CONSTRUCTION-BUILDINGS
Mar 18, 2019School Construction Authority$1,274,772.38CONSTRUCTION-BUILDINGS
Nov 15, 2018School Construction Authority$1,272,045.34CONSTRUCTION-BUILDINGS
Oct 12, 2018School Construction Authority$1,271,265.87CONSTRUCTION-BUILDINGS
May 16, 2019School Construction Authority$1,244,690.95CONSTRUCTION-BUILDINGS
Dec 19, 2018School Construction Authority$1,182,866.47CONSTRUCTION-BUILDINGS
Apr 12, 2019School Construction Authority$1,072,494.59CONSTRUCTION-BUILDINGS
Sep 10, 2018School Construction Authority$997,647.31CONSTRUCTION-BUILDINGS
Jun 13, 2019School Construction Authority$682,187.06CONSTRUCTION-BUILDINGS
May 20, 2019School Construction Authority$535,458.77CONSTRUCTION-BUILDINGS
Oct 9, 2018School Construction Authority$525,603.36CONSTRUCTION-BUILDINGS
Nov 20, 2018School Construction Authority$502,534.17CONSTRUCTION-BUILDINGS
Sep 18, 2018School Construction Authority$475,181.45CONSTRUCTION-BUILDINGS
FY 2018top 20 of 52 payments$15,457,683
DateAgencyAmountCategoryPurchase order
Feb 16, 2018School Construction Authority$1,247,424.10CONSTRUCTION-BUILDINGS
May 23, 2018School Construction Authority$1,239,520.67CONSTRUCTION-BUILDINGS
Oct 3, 2017School Construction Authority$1,182,212.30CONSTRUCTION-BUILDINGS
Oct 30, 2017School Construction Authority$1,043,718.92CONSTRUCTION-BUILDINGS
Apr 17, 2018School Construction Authority$907,456.38CONSTRUCTION-BUILDINGS
Sep 8, 2017School Construction Authority$842,178.80CONSTRUCTION-BUILDINGS
Apr 24, 2018School Construction Authority$778,921.53CONSTRUCTION-BUILDINGS
Aug 3, 2017School Construction Authority$709,298.50CONSTRUCTION-BUILDINGS
Dec 15, 2017School Construction Authority$704,926.37CONSTRUCTION-BUILDINGS
Jan 23, 2018School Construction Authority$664,974.93CONSTRUCTION-BUILDINGS
Dec 15, 2017School Construction Authority$637,077.60CONSTRUCTION-BUILDINGS
May 4, 2018School Construction Authority$619,550.15CONSTRUCTION-BUILDINGS
Mar 9, 2018School Construction Authority$533,955.10CONSTRUCTION-BUILDINGS
Feb 7, 2018School Construction Authority$466,114.67CONSTRUCTION-BUILDINGS
Aug 16, 2017School Construction Authority$407,496.04CONSTRUCTION-BUILDINGS
Mar 15, 2018School Construction Authority$393,875.56CONSTRUCTION-BUILDINGS
Jan 30, 2018School Construction Authority$366,848.20CONSTRUCTION-BUILDINGS
Jun 18, 2018School Construction Authority$315,803.45CONSTRUCTION-BUILDINGS
Mar 9, 2018School Construction Authority$315,005.24CONSTRUCTION-BUILDINGS
Nov 14, 2017School Construction Authority$236,749.50CONSTRUCTION-BUILDINGS
FY 2017top 20 of 62 payments$6,675,705
DateAgencyAmountCategoryPurchase order
May 1, 2017School Construction Authority$519,036.30CONSTRUCTION-BUILDINGS
Jun 22, 2017School Construction Authority$405,434.35CONSTRUCTION-BUILDINGS
May 11, 2017School Construction Authority$405,289.43CONSTRUCTION-BUILDINGS
May 11, 2017School Construction Authority$402,962.49CONSTRUCTION-BUILDINGS
Jun 6, 2017School Construction Authority$389,978.80CONSTRUCTION-BUILDINGS
Oct 25, 2016School Construction Authority$354,466.54CONSTRUCTION-BUILDINGS
Sep 21, 2016School Construction Authority$300,169.04CONSTRUCTION-BUILDINGS
Jan 5, 2017School Construction Authority$299,365.18CONSTRUCTION-BUILDINGS
Jan 20, 2017School Construction Authority$267,451.01CONSTRUCTION-BUILDINGS
Mar 7, 2017School Construction Authority$222,692.18CONSTRUCTION-BUILDINGS
Jan 5, 2017School Construction Authority$220,381.99CONSTRUCTION-BUILDINGS
Mar 10, 2017School Construction Authority$206,372.76CONSTRUCTION-BUILDINGS
Apr 27, 2017School Construction Authority$160,635.64CONSTRUCTION-BUILDINGS
Sep 21, 2016School Construction Authority$159,957.22CONSTRUCTION-BUILDINGS
Sep 28, 2016School Construction Authority$155,343.98CONSTRUCTION-BUILDINGS
May 23, 2017School Construction Authority$152,758.00CONSTRUCTION-BUILDINGS
Jan 5, 2017School Construction Authority$147,950.18CONSTRUCTION-BUILDINGS
Mar 30, 2017School Construction Authority$136,087.50CONSTRUCTION-BUILDINGS
Oct 27, 2016School Construction Authority$115,961.00CONSTRUCTION-BUILDINGS
Sep 28, 2016School Construction Authority$105,355.10CONSTRUCTION-BUILDINGS
FY 2016top 20 of 61 payments$8,209,351
DateAgencyAmountCategoryPurchase order
Aug 14, 2015School Construction Authority$1,289,530.24CONSTRUCTION-BUILDINGS
Jun 14, 2016School Construction Authority$525,481.17CONSTRUCTION-BUILDINGS
Mar 17, 2016School Construction Authority$488,982.75CONSTRUCTION-BUILDINGS
Apr 28, 2016School Construction Authority$352,360.77CONSTRUCTION-BUILDINGS
Mar 4, 2016School Construction Authority$342,060.99CONSTRUCTION-BUILDINGS
Oct 9, 2015School Construction Authority$332,194.35CONSTRUCTION-BUILDINGS
Oct 9, 2015School Construction Authority$303,661.12CONSTRUCTION-BUILDINGS
May 16, 2016School Construction Authority$297,577.85CONSTRUCTION-BUILDINGS
Mar 17, 2016School Construction Authority$278,143.25CONSTRUCTION-BUILDINGS
Oct 9, 2015School Construction Authority$270,757.86CONSTRUCTION-BUILDINGS
May 3, 2016School Construction Authority$260,702.57CONSTRUCTION-BUILDINGS
Oct 9, 2015School Construction Authority$260,206.97CONSTRUCTION-BUILDINGS
Nov 17, 2015School Construction Authority$242,849.12CONSTRUCTION-BUILDINGS
Jan 12, 2016School Construction Authority$206,046.44CONSTRUCTION-BUILDINGS
Jan 5, 2016School Construction Authority$178,837.65CONSTRUCTION-BUILDINGS
Apr 28, 2016School Construction Authority$172,894.80CONSTRUCTION-BUILDINGS
Jan 7, 2016School Construction Authority$162,828.76CONSTRUCTION-BUILDINGS
Sep 15, 2015School Construction Authority$161,741.29CONSTRUCTION-BUILDINGS
Jan 19, 2016School Construction Authority$158,076.14CONSTRUCTION-BUILDINGS
Nov 17, 2015School Construction Authority$147,493.00CONSTRUCTION-BUILDINGS
FY 2015top 20 of 44 payments$12,676,567
DateAgencyAmountCategoryPurchase order
Apr 1, 2015School Construction Authority$2,283,305.85CONSTRUCTION-BUILDINGS
Jun 10, 2015School Construction Authority$1,351,449.80CONSTRUCTION-BUILDINGS
Jun 22, 2015School Construction Authority$966,680.39CONSTRUCTION-BUILDINGS
Sep 30, 2014School Construction Authority$859,226.26CONSTRUCTION-BUILDINGS
Jul 8, 2014School Construction Authority$854,140.96CONSTRUCTION-BUILDINGS
Jun 4, 2015School Construction Authority$765,692.21CONSTRUCTION-BUILDINGS
Mar 12, 2015School Construction Authority$729,098.80CONSTRUCTION-BUILDINGS
May 5, 2015School Construction Authority$666,860.67CONSTRUCTION-BUILDINGS
Aug 5, 2014School Construction Authority$603,024.07CONSTRUCTION-BUILDINGS
Jun 23, 2015School Construction Authority$422,900.53CONSTRUCTION-BUILDINGS
Jan 14, 2015School Construction Authority$416,832.39CONSTRUCTION-BUILDINGS
Nov 21, 2014School Construction Authority$396,577.78CONSTRUCTION-BUILDINGS
Feb 19, 2015School Construction Authority$224,778.11CONSTRUCTION-BUILDINGS
May 6, 2015School Construction Authority$195,129.12CONSTRUCTION-BUILDINGS
Nov 26, 2014School Construction Authority$182,841.02CONSTRUCTION-BUILDINGS
Aug 19, 2014School Construction Authority$173,399.14CONSTRUCTION-BUILDINGS
Feb 3, 2015School Construction Authority$172,881.00CONSTRUCTION-BUILDINGS
May 6, 2015School Construction Authority$162,964.73CONSTRUCTION-BUILDINGS
Oct 24, 2014School Construction Authority$146,741.84CONSTRUCTION-BUILDINGS
May 6, 2015School Construction Authority$143,395.40CONSTRUCTION-BUILDINGS
FY 2014top 20 of 49 payments$15,264,032
DateAgencyAmountCategoryPurchase order
Aug 2, 2013School Construction Authority$1,267,476.79CONSTRUCTION-BUILDINGS
Sep 5, 2013School Construction Authority$1,167,374.16CONSTRUCTION-BUILDINGS
Jun 23, 2014School Construction Authority$905,727.08CONSTRUCTION-BUILDINGS
May 15, 2014School Construction Authority$824,605.42CONSTRUCTION-BUILDINGS
Sep 18, 2013School Construction Authority$742,622.60CONSTRUCTION-BUILDINGS
Jul 24, 2013School Construction Authority$702,646.60CONSTRUCTION-BUILDINGS
Nov 6, 2013School Construction Authority$664,927.42CONSTRUCTION-BUILDINGS
Dec 16, 2013School Construction Authority$640,452.22CONSTRUCTION-BUILDINGS
Sep 19, 2013School Construction Authority$581,916.18CONSTRUCTION-BUILDINGS
Jul 11, 2013School Construction Authority$519,550.25CONSTRUCTION-BUILDINGS
May 27, 2014School Construction Authority$506,638.53CONSTRUCTION-BUILDINGS
Jul 8, 2013School Construction Authority$478,553.76CONSTRUCTION-BUILDINGS
Jul 24, 2013School Construction Authority$477,708.83CONSTRUCTION-BUILDINGS
Sep 30, 2013School Construction Authority$477,135.14CONSTRUCTION-BUILDINGS
Feb 6, 2014School Construction Authority$476,480.10CONSTRUCTION-BUILDINGS
Feb 20, 2014School Construction Authority$474,633.51CONSTRUCTION-BUILDINGS
Mar 4, 2014School Construction Authority$473,413.89CONSTRUCTION-BUILDINGS
Aug 28, 2013School Construction Authority$443,648.10CONSTRUCTION-BUILDINGS
Feb 10, 2014School Construction Authority$414,120.20CONSTRUCTION-BUILDINGS
Dec 18, 2013School Construction Authority$333,164.16CONSTRUCTION-BUILDINGS
FY 2013top 20 of 43 payments$15,526,524
DateAgencyAmountCategoryPurchase order
Jul 18, 2012School Construction Authority$1,026,910.10CONSTRUCTION-BUILDINGS
Jan 25, 2013School Construction Authority$1,005,589.52CONSTRUCTION-BUILDINGS
Apr 9, 2013School Construction Authority$982,630.13CONSTRUCTION-BUILDINGS
May 14, 2013School Construction Authority$923,767.10CONSTRUCTION-BUILDINGS
Mar 11, 2013School Construction Authority$870,861.20CONSTRUCTION-BUILDINGS
Feb 15, 2013School Construction Authority$841,045.93CONSTRUCTION-BUILDINGS
Jun 18, 2013School Construction Authority$793,911.31CONSTRUCTION-BUILDINGS
Sep 10, 2012School Construction Authority$776,753.25CONSTRUCTION-BUILDINGS
Sep 20, 2012School Construction Authority$765,099.60CONSTRUCTION-BUILDINGS
Nov 19, 2012School Construction Authority$733,093.15CONSTRUCTION-BUILDINGS
May 28, 2013School Construction Authority$681,969.38CONSTRUCTION-BUILDINGS
Oct 18, 2012School Construction Authority$629,286.65CONSTRUCTION-BUILDINGS
Dec 17, 2012School Construction Authority$618,355.00CONSTRUCTION-BUILDINGS
May 23, 2013School Construction Authority$474,432.70CONSTRUCTION-BUILDINGS
Apr 3, 2013School Construction Authority$407,193.75CONSTRUCTION-BUILDINGS
Apr 26, 2013School Construction Authority$363,343.69CONSTRUCTION-BUILDINGS
May 1, 2013School Construction Authority$327,168.12CONSTRUCTION-BUILDINGS
Aug 21, 2012School Construction Authority$315,294.36CONSTRUCTION-BUILDINGS
Jan 25, 2013School Construction Authority$272,436.25CONSTRUCTION-BUILDINGS
Jan 3, 2013School Construction Authority$272,178.61CONSTRUCTION-BUILDINGS
FY 2012top 20 of 71 payments$9,032,845
DateAgencyAmountCategoryPurchase order
Sep 26, 2011School Construction Authority$870,360.55CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$730,597.50CONSTRUCTION-BUILDINGS
Apr 23, 2012School Construction Authority$627,950.76CONSTRUCTION-BUILDINGS
May 31, 2012School Construction Authority$594,210.94CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$514,864.82CONSTRUCTION-BUILDINGS
Jun 15, 2012School Construction Authority$440,026.70CONSTRUCTION-BUILDINGS
Aug 15, 2011School Construction Authority$429,629.81CONSTRUCTION-BUILDINGS
Sep 26, 2011School Construction Authority$410,652.70CONSTRUCTION-BUILDINGS
Sep 26, 2011School Construction Authority$386,655.01CONSTRUCTION-BUILDINGS
May 7, 2012School Construction Authority$370,556.49CONSTRUCTION-BUILDINGS
Jan 5, 2012School Construction Authority$298,651.50CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$281,363.40CONSTRUCTION-BUILDINGS
Feb 23, 2012School Construction Authority$247,043.70CONSTRUCTION-BUILDINGS
Dec 27, 2011School Construction Authority$231,406.65CONSTRUCTION-BUILDINGS
Mar 14, 2012School Construction Authority$217,020.49CONSTRUCTION-BUILDINGS
Aug 9, 2011School Construction Authority$211,939.30CONSTRUCTION-BUILDINGS
Nov 2, 2011School Construction Authority$209,716.57CONSTRUCTION-BUILDINGS
Aug 9, 2011School Construction Authority$192,351.25CONSTRUCTION-BUILDINGS
Feb 10, 2012School Construction Authority$185,588.33CONSTRUCTION-BUILDINGS
Mar 14, 2012School Construction Authority$185,298.89CONSTRUCTION-BUILDINGS
FY 2011top 20 of 66 payments$9,137,241
DateAgencyAmountCategoryPurchase order
Mar 22, 2011School Construction Authority$626,425.25CONSTRUCTION-BUILDINGS
Jan 26, 2011School Construction Authority$492,447.66CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$438,725.77CONSTRUCTION-BUILDINGS
Dec 30, 2010School Construction Authority$434,150.69CONSTRUCTION-BUILDINGS
Aug 30, 2010School Construction Authority$413,310.80CONSTRUCTION-BUILDINGS
Apr 7, 2011School Construction Authority$389,301.51CONSTRUCTION-BUILDINGS
Jun 17, 2011School Construction Authority$379,485.19CONSTRUCTION-BUILDINGS
Oct 8, 2010School Construction Authority$369,357.63CONSTRUCTION-BUILDINGS
Jun 13, 2011School Construction Authority$340,100.00CONSTRUCTION-BUILDINGS
Nov 18, 2010School Construction Authority$311,594.30CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$309,177.50CONSTRUCTION-BUILDINGS
Jul 28, 2010School Construction Authority$308,275.00CONSTRUCTION-BUILDINGS
Oct 8, 2010School Construction Authority$303,565.85CONSTRUCTION-BUILDINGS
Nov 23, 2010School Construction Authority$301,245.00CONSTRUCTION-BUILDINGS
Jan 6, 2011School Construction Authority$298,532.36CONSTRUCTION-BUILDINGS
Feb 17, 2011School Construction Authority$243,158.78CONSTRUCTION-BUILDINGS
May 20, 2011School Construction Authority$216,144.95CONSTRUCTION-BUILDINGS
Mar 24, 2011School Construction Authority$211,613.49CONSTRUCTION-BUILDINGS
Aug 30, 2010School Construction Authority$195,542.30CONSTRUCTION-BUILDINGS
Oct 28, 2010School Construction Authority$172,344.29CONSTRUCTION-BUILDINGS
FY 2010top 20 of 40 payments$4,247,344
DateAgencyAmountCategoryPurchase order
May 18, 2010School Construction Authority$494,256.50CONSTRUCTION-BUILDINGS
Feb 18, 2010School Construction Authority$278,160.00CONSTRUCTION-BUILDINGS
Jan 22, 2010School Construction Authority$277,400.00CONSTRUCTION-BUILDINGS
Jan 28, 2010School Construction Authority$266,675.00CONSTRUCTION-BUILDINGS
Jun 18, 2010School Construction Authority$264,381.20CONSTRUCTION-BUILDINGS
Jan 4, 2010School Construction Authority$238,036.12CONSTRUCTION-BUILDINGS
Jun 25, 2010School Construction Authority$212,215.75CONSTRUCTION-BUILDINGS
Mar 8, 2010School Construction Authority$201,039.00CONSTRUCTION-BUILDINGS
Jun 25, 2010School Construction Authority$189,717.43CONSTRUCTION-BUILDINGS
Jun 2, 2010School Construction Authority$158,253.37CONSTRUCTION-BUILDINGS
Feb 16, 2010School Construction Authority$157,651.89CONSTRUCTION-BUILDINGS
Apr 2, 2010School Construction Authority$147,250.00CONSTRUCTION-BUILDINGS
Jun 18, 2010School Construction Authority$127,600.00CONSTRUCTION-BUILDINGS
Apr 26, 2010School Construction Authority$123,437.59CONSTRUCTION-BUILDINGS
Mar 8, 2010School Construction Authority$121,782.87CONSTRUCTION-BUILDINGS
Jun 18, 2010School Construction Authority$121,590.50CONSTRUCTION-BUILDINGS
Jan 29, 2010School Construction Authority$98,912.10CONSTRUCTION-BUILDINGS
Jun 2, 2010School Construction Authority$83,391.00CONSTRUCTION-BUILDINGS
Jun 1, 2010School Construction Authority$74,290.48CONSTRUCTION-BUILDINGS
Jan 29, 2010School Construction Authority$72,342.50CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025School Construction Authority$5,032.60CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$196,555.39CONSTRUCTION-BUILDINGSCapital Contracts
Jun 20, 2025School Construction Authority$11,998.80CONSTRUCTION-BUILDINGSCapital Contracts
May 21, 2025School Construction Authority$28,560.09CONSTRUCTION-BUILDINGSCapital Contracts
May 8, 2025School Construction Authority$42,496.44CONSTRUCTION-BUILDINGSCapital Contracts
May 8, 2025School Construction Authority$11,287.00CONSTRUCTION-BUILDINGSCapital Contracts
May 7, 2025School Construction Authority$177,572.18CONSTRUCTION-BUILDINGSCapital Contracts
Mar 11, 2025School Construction Authority$172,650.98CONSTRUCTION-BUILDINGSCapital Contracts
Feb 10, 2025School Construction Authority$96,494.35CONSTRUCTION-BUILDINGSCapital Contracts
Dec 3, 2024School Construction Authority$178,492.65CONSTRUCTION-BUILDINGSCapital Contracts
Nov 29, 2024School Construction Authority$306,791.75CONSTRUCTION-BUILDINGSCapital Contracts
Nov 6, 2024School Construction Authority-$306,791.75CONSTRUCTION-BUILDINGSCapital Contracts
Nov 6, 2024School Construction Authority$306,791.75CONSTRUCTION-BUILDINGSCapital Contracts
Oct 17, 2024School Construction Authority$265,300.70CONSTRUCTION-BUILDINGSCapital Contracts
Sep 10, 2024School Construction Authority$398,752.43CONSTRUCTION-BUILDINGSCapital Contracts
Aug 13, 2024School Construction Authority$496,413.09CONSTRUCTION-BUILDINGSCapital Contracts
Jul 5, 2024School Construction Authority$246,044.87CONSTRUCTION-BUILDINGSCapital Contracts
Jun 3, 2024School Construction Authority$350,820.75CONSTRUCTION-BUILDINGSCapital Contracts
Apr 26, 2024School Construction Authority$325,691.35CONSTRUCTION-BUILDINGSCapital Contracts
Mar 27, 2024School Construction Authority$281,011.61CONSTRUCTION-BUILDINGSCapital Contracts
Mar 26, 2024School Construction Authority$557,159.83CONSTRUCTION-BUILDINGSCapital Contracts
Mar 1, 2024School Construction Authority$393,339.33CONSTRUCTION-BUILDINGSCapital Contracts
Feb 14, 2024School Construction Authority$59,379.93CONSTRUCTION-BUILDINGSCapital Contracts
Feb 14, 2024School Construction Authority$9,155.12CONSTRUCTION-BUILDINGSCapital Contracts
Feb 14, 2024School Construction Authority$3,736.55CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data