as recorded by New York City: HOMERIC CONTRACTING CO INC

Homeric Contracting Co Inc is the 1,561st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 242nd in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span.

Primary spending category: CONSTRUCTION-BUILDINGS

$27,609,414total received
778payments
2agencies
Jan 11, 2010Apr 21, 2023first / last payment
Follow this vendorGet an email when New York City publishes new payments to Homeric Contracting Co Inc. No spam.

Payments by fiscal year

FY 2023$93,232
FY 2022$852,212
FY 2021$1,268,953
FY 2020$2,327,247
FY 2019$1,668,254
FY 2018$428,216
FY 2017$580,246
FY 2016$4,596,908
FY 2015$296,968
FY 2014$698,718
FY 2013$2,845,500
FY 2012$2,605,112
FY 2011$4,324,342
FY 2010$5,023,508

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2023School Construction Authority5$93,232
FY 2022School Construction Authority14$852,212
FY 2021School Construction Authority24$1,268,953
FY 2020School Construction Authority30$2,327,247
FY 2019School Construction Authority44$1,668,254
FY 2018School Construction Authority9$428,216
FY 2017School Construction Authority27$580,246
FY 2016School Construction Authority44$4,596,908
FY 2015School Construction Authority8$296,968
FY 2014School Construction Authority16$698,718
FY 2013School Construction Authority26$1,989,634
FY 2013Department of Education54$855,865
FY 2012School Construction Authority76$2,605,112
FY 2011School Construction Authority158$3,793,157
FY 2011Department of Education37$531,185
FY 2010School Construction Authority179$4,413,688
FY 2010Department of Education27$609,820
Total778$27,609,414

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS660$25,612,545Jan 15, 2010 Apr 21, 2023
MAINT & OPER OF INFRASTRUCTURE117$1,995,578Jan 11, 2010 Apr 19, 2013
PROF SERV OTHER1$1,292Apr 19, 2013 Apr 19, 2013

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2023top 5 of 5 payments$93,232
DateAgencyAmountCategoryPurchase order
Nov 9, 2022School Construction Authority$72,768.98CONSTRUCTION-BUILDINGS
Nov 9, 2022School Construction Authority$10,138.59CONSTRUCTION-BUILDINGS
Apr 21, 2023School Construction Authority$6,720.49CONSTRUCTION-BUILDINGS
Apr 21, 2023School Construction Authority$2,286.90CONSTRUCTION-BUILDINGS
Apr 21, 2023School Construction Authority$1,316.70CONSTRUCTION-BUILDINGS
FY 2022top 14 of 14 payments$852,212
DateAgencyAmountCategoryPurchase order
Aug 2, 2021School Construction Authority$174,333.20CONSTRUCTION-BUILDINGS
Mar 22, 2022School Construction Authority$146,648.41CONSTRUCTION-BUILDINGS
Oct 6, 2021School Construction Authority$104,690.00CONSTRUCTION-BUILDINGS
Sep 21, 2021School Construction Authority$100,367.50CONSTRUCTION-BUILDINGS
Apr 5, 2022School Construction Authority$99,513.42CONSTRUCTION-BUILDINGS
Jul 12, 2021School Construction Authority$73,348.96CONSTRUCTION-BUILDINGS
Jul 12, 2021School Construction Authority$46,206.76CONSTRUCTION-BUILDINGS
Jul 12, 2021School Construction Authority$31,190.60CONSTRUCTION-BUILDINGS
Apr 28, 2022School Construction Authority$26,909.59CONSTRUCTION-BUILDINGS
Oct 5, 2021School Construction Authority$24,316.49CONSTRUCTION-BUILDINGS
Oct 5, 2021School Construction Authority$10,377.17CONSTRUCTION-BUILDINGS
Oct 5, 2021School Construction Authority$7,426.08CONSTRUCTION-BUILDINGS
Apr 28, 2022School Construction Authority$5,667.75CONSTRUCTION-BUILDINGS
Apr 28, 2022School Construction Authority$1,216.13CONSTRUCTION-BUILDINGS
FY 2021top 20 of 24 payments$1,268,953
DateAgencyAmountCategoryPurchase order
Jul 20, 2020School Construction Authority$373,069.75CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$158,909.35CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$121,405.25CONSTRUCTION-BUILDINGS
Dec 4, 2020School Construction Authority$82,745.00CONSTRUCTION-BUILDINGS
May 17, 2021School Construction Authority$81,937.50CONSTRUCTION-BUILDINGS
Mar 8, 2021School Construction Authority$68,258.45CONSTRUCTION-BUILDINGS
Jun 21, 2021School Construction Authority$50,028.52CONSTRUCTION-BUILDINGS
May 4, 2021School Construction Authority$49,281.25CONSTRUCTION-BUILDINGS
May 4, 2021School Construction Authority$45,144.00CONSTRUCTION-BUILDINGS
May 4, 2021School Construction Authority$38,980.93CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$30,129.25CONSTRUCTION-BUILDINGS
Dec 4, 2020School Construction Authority$28,949.82CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$22,286.90CONSTRUCTION-BUILDINGS
Jul 8, 2020School Construction Authority$18,045.25CONSTRUCTION-BUILDINGS
Mar 8, 2021School Construction Authority$16,541.50CONSTRUCTION-BUILDINGS
Jul 15, 2020School Construction Authority$15,283.13CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$13,152.75CONSTRUCTION-BUILDINGS
Jul 15, 2020School Construction Authority$12,673.00CONSTRUCTION-BUILDINGS
Dec 4, 2020School Construction Authority$10,191.13CONSTRUCTION-BUILDINGS
May 17, 2021School Construction Authority$9,262.50CONSTRUCTION-BUILDINGS
FY 2020top 20 of 30 payments$2,327,247
DateAgencyAmountCategoryPurchase order
Dec 18, 2019School Construction Authority$586,097.75CONSTRUCTION-BUILDINGS
Jan 22, 2020School Construction Authority$325,132.75CONSTRUCTION-BUILDINGS
Jul 24, 2019School Construction Authority$212,847.50CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$206,478.22CONSTRUCTION-BUILDINGS
Aug 20, 2019School Construction Authority$188,313.75CONSTRUCTION-BUILDINGS
Mar 17, 2020School Construction Authority$176,030.25CONSTRUCTION-BUILDINGS
Sep 9, 2019School Construction Authority$149,957.50CONSTRUCTION-BUILDINGS
Nov 8, 2019School Construction Authority$67,725.50CONSTRUCTION-BUILDINGS
Apr 17, 2020School Construction Authority$65,193.75CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$60,744.52CONSTRUCTION-BUILDINGS
Dec 23, 2019School Construction Authority$47,102.90CONSTRUCTION-BUILDINGS
Nov 19, 2019School Construction Authority$44,531.25CONSTRUCTION-BUILDINGS
Apr 15, 2020School Construction Authority$41,642.97CONSTRUCTION-BUILDINGS
Apr 15, 2020School Construction Authority$30,629.83CONSTRUCTION-BUILDINGS
Dec 23, 2019School Construction Authority$29,232.45CONSTRUCTION-BUILDINGS
Jul 15, 2019School Construction Authority$18,273.25CONSTRUCTION-BUILDINGS
Dec 23, 2019School Construction Authority$10,564.00CONSTRUCTION-BUILDINGS
Jul 15, 2019School Construction Authority$10,516.50CONSTRUCTION-BUILDINGS
Apr 15, 2020School Construction Authority$9,439.62CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$8,920.50CONSTRUCTION-BUILDINGS
FY 2019top 20 of 44 payments$1,668,254
DateAgencyAmountCategoryPurchase order
Nov 2, 2018School Construction Authority$205,672.63CONSTRUCTION-BUILDINGS
Oct 1, 2018School Construction Authority$195,961.25CONSTRUCTION-BUILDINGS
Dec 6, 2018School Construction Authority$158,982.50CONSTRUCTION-BUILDINGS
Nov 26, 2018School Construction Authority$149,150.00CONSTRUCTION-BUILDINGS
Sep 6, 2018School Construction Authority$144,388.12CONSTRUCTION-BUILDINGS
Jul 3, 2018School Construction Authority$99,180.00CONSTRUCTION-BUILDINGS
Jun 12, 2019School Construction Authority$95,027.55CONSTRUCTION-BUILDINGS
Jan 18, 2019School Construction Authority$83,600.00CONSTRUCTION-BUILDINGS
Oct 1, 2018School Construction Authority$58,439.25CONSTRUCTION-BUILDINGS
Oct 1, 2018School Construction Authority$46,455.00CONSTRUCTION-BUILDINGS
Mar 6, 2019School Construction Authority$44,258.13CONSTRUCTION-BUILDINGS
Feb 8, 2019School Construction Authority$39,952.72CONSTRUCTION-BUILDINGS
Sep 6, 2018School Construction Authority$35,862.50CONSTRUCTION-BUILDINGS
Jul 3, 2018School Construction Authority$33,867.50CONSTRUCTION-BUILDINGS
May 13, 2019School Construction Authority$28,851.50CONSTRUCTION-BUILDINGS
Apr 19, 2019School Construction Authority$28,785.00CONSTRUCTION-BUILDINGS
May 14, 2019School Construction Authority$28,785.00CONSTRUCTION-BUILDINGS
Nov 2, 2018School Construction Authority$27,787.50CONSTRUCTION-BUILDINGS
Mar 26, 2019School Construction Authority$21,090.00CONSTRUCTION-BUILDINGS
Feb 8, 2019School Construction Authority$20,187.50CONSTRUCTION-BUILDINGS
FY 2018top 9 of 9 payments$428,216
DateAgencyAmountCategoryPurchase order
May 22, 2018School Construction Authority$229,959.85CONSTRUCTION-BUILDINGS
May 22, 2018School Construction Authority$77,330.00CONSTRUCTION-BUILDINGS
May 22, 2018School Construction Authority$59,802.50CONSTRUCTION-BUILDINGS
Mar 2, 2018School Construction Authority$16,158.42CONSTRUCTION-BUILDINGS
Oct 6, 2017School Construction Authority$13,546.49CONSTRUCTION-BUILDINGS
Mar 2, 2018School Construction Authority$12,518.94CONSTRUCTION-BUILDINGS
Mar 2, 2018School Construction Authority$9,398.76CONSTRUCTION-BUILDINGS
Oct 6, 2017School Construction Authority$6,968.90CONSTRUCTION-BUILDINGS
Oct 6, 2017School Construction Authority$2,532.03CONSTRUCTION-BUILDINGS
FY 2017top 20 of 27 payments$580,246
DateAgencyAmountCategoryPurchase order
Aug 10, 2016School Construction Authority$78,918.35CONSTRUCTION-BUILDINGS
Sep 16, 2016School Construction Authority$73,372.66CONSTRUCTION-BUILDINGS
Jun 26, 2017School Construction Authority$69,695.90CONSTRUCTION-BUILDINGS
Dec 14, 2016School Construction Authority$65,560.19CONSTRUCTION-BUILDINGS
Aug 10, 2016School Construction Authority$46,132.00CONSTRUCTION-BUILDINGS
Aug 10, 2016School Construction Authority$44,367.04CONSTRUCTION-BUILDINGS
Sep 16, 2016School Construction Authority$41,365.85CONSTRUCTION-BUILDINGS
Sep 16, 2016School Construction Authority$38,519.00CONSTRUCTION-BUILDINGS
Dec 14, 2016School Construction Authority$33,215.11CONSTRUCTION-BUILDINGS
Feb 6, 2017School Construction Authority$26,804.00CONSTRUCTION-BUILDINGS
Jan 10, 2017School Construction Authority$26,804.00CONSTRUCTION-BUILDINGS
Dec 14, 2016School Construction Authority$19,748.46CONSTRUCTION-BUILDINGS
Feb 6, 2017School Construction Authority$16,439.86CONSTRUCTION-BUILDINGS
Jan 10, 2017School Construction Authority$16,439.86CONSTRUCTION-BUILDINGS
Jan 10, 2017School Construction Authority$11,297.33CONSTRUCTION-BUILDINGS
Feb 6, 2017School Construction Authority$11,297.33CONSTRUCTION-BUILDINGS
Jan 10, 2017School Construction Authority$9,681.60CONSTRUCTION-BUILDINGS
Feb 6, 2017School Construction Authority$9,681.60CONSTRUCTION-BUILDINGS
Jun 26, 2017School Construction Authority$4,033.26CONSTRUCTION-BUILDINGS
Jun 26, 2017School Construction Authority$845.11CONSTRUCTION-BUILDINGS
FY 2016top 20 of 44 payments$4,596,908
DateAgencyAmountCategoryPurchase order
Feb 29, 2016School Construction Authority$492,734.60CONSTRUCTION-BUILDINGS
Aug 21, 2015School Construction Authority$366,610.27CONSTRUCTION-BUILDINGS
Jan 15, 2016School Construction Authority$250,690.18CONSTRUCTION-BUILDINGS
Sep 24, 2015School Construction Authority$240,689.15CONSTRUCTION-BUILDINGS
Oct 14, 2015School Construction Authority$228,294.12CONSTRUCTION-BUILDINGS
Oct 14, 2015School Construction Authority$225,896.27CONSTRUCTION-BUILDINGS
Sep 24, 2015School Construction Authority$217,108.25CONSTRUCTION-BUILDINGS
Nov 13, 2015School Construction Authority$200,416.75CONSTRUCTION-BUILDINGS
Dec 17, 2015School Construction Authority$172,373.70CONSTRUCTION-BUILDINGS
Aug 21, 2015School Construction Authority$170,292.82CONSTRUCTION-BUILDINGS
Dec 17, 2015School Construction Authority$150,720.16CONSTRUCTION-BUILDINGS
Jul 8, 2015School Construction Authority$140,150.17CONSTRUCTION-BUILDINGS
Nov 13, 2015School Construction Authority$136,431.40CONSTRUCTION-BUILDINGS
Jul 8, 2015School Construction Authority$133,865.45CONSTRUCTION-BUILDINGS
Mar 14, 2016School Construction Authority$117,189.82CONSTRUCTION-BUILDINGS
Oct 14, 2015School Construction Authority$108,190.61CONSTRUCTION-BUILDINGS
Dec 17, 2015School Construction Authority$105,488.00CONSTRUCTION-BUILDINGS
Aug 18, 2015School Construction Authority$92,945.53CONSTRUCTION-BUILDINGS
Jan 15, 2016School Construction Authority$92,363.75CONSTRUCTION-BUILDINGS
Jun 22, 2016School Construction Authority$86,559.36CONSTRUCTION-BUILDINGS
FY 2015top 8 of 8 payments$296,968
DateAgencyAmountCategoryPurchase order
May 15, 2015School Construction Authority$74,521.80CONSTRUCTION-BUILDINGS
May 15, 2015School Construction Authority$52,972.00CONSTRUCTION-BUILDINGS
May 15, 2015School Construction Authority$47,850.55CONSTRUCTION-BUILDINGS
Feb 26, 2015School Construction Authority$38,179.55CONSTRUCTION-BUILDINGS
Feb 26, 2015School Construction Authority$37,494.60CONSTRUCTION-BUILDINGS
Feb 26, 2015School Construction Authority$30,141.60CONSTRUCTION-BUILDINGS
Jun 16, 2015School Construction Authority$9,255.06CONSTRUCTION-BUILDINGS
Jun 16, 2015School Construction Authority$6,552.48CONSTRUCTION-BUILDINGS
FY 2014top 16 of 16 payments$698,718
DateAgencyAmountCategoryPurchase order
Jan 9, 2014School Construction Authority$132,679.00CONSTRUCTION-BUILDINGS
Jan 9, 2014School Construction Authority$120,713.00CONSTRUCTION-BUILDINGS
Jan 9, 2014School Construction Authority$108,750.00CONSTRUCTION-BUILDINGS
Mar 11, 2014School Construction Authority$100,586.12CONSTRUCTION-BUILDINGS
Sep 30, 2013School Construction Authority$60,811.44CONSTRUCTION-BUILDINGS
Mar 11, 2014School Construction Authority$51,019.51CONSTRUCTION-BUILDINGS
May 16, 2014School Construction Authority$24,739.90CONSTRUCTION-BUILDINGS
Mar 18, 2014School Construction Authority$24,600.42CONSTRUCTION-BUILDINGS
Mar 18, 2014School Construction Authority$23,465.99CONSTRUCTION-BUILDINGS
May 16, 2014School Construction Authority$15,212.59CONSTRUCTION-BUILDINGS
Mar 18, 2014School Construction Authority$13,209.90CONSTRUCTION-BUILDINGS
Oct 10, 2013School Construction Authority$9,789.00CONSTRUCTION-BUILDINGS
Sep 30, 2013School Construction Authority$9,625.00CONSTRUCTION-BUILDINGS
May 16, 2014School Construction Authority$2,757.15CONSTRUCTION-BUILDINGS
Mar 18, 2014School Construction Authority$750.00CONSTRUCTION-BUILDINGS
Oct 10, 2013School Construction Authority$8.84CONSTRUCTION-BUILDINGS
FY 2013top 20 of 80 payments$2,845,500
DateAgencyAmountCategoryPurchase order
Apr 2, 2013School Construction Authority$448,413.30CONSTRUCTION-BUILDINGS
Apr 2, 2013School Construction Authority$213,137.44CONSTRUCTION-BUILDINGS
Apr 2, 2013School Construction Authority$206,501.50CONSTRUCTION-BUILDINGS
Apr 2, 2013School Construction Authority$180,481.00CONSTRUCTION-BUILDINGS
Apr 2, 2013School Construction Authority$174,543.50CONSTRUCTION-BUILDINGS
Oct 24, 2012School Construction Authority$157,781.68CONSTRUCTION-BUILDINGS
Jan 7, 2013School Construction Authority$154,830.38CONSTRUCTION-BUILDINGS
Apr 19, 2013Department of Education$72,204.74MAINT & OPER OF INFRASTRUCTURE
Apr 2, 2013School Construction Authority$61,465.00CONSTRUCTION-BUILDINGS
Apr 19, 2013Department of Education$58,368.38MAINT & OPER OF INFRASTRUCTURE
Apr 19, 2013Department of Education$58,125.42MAINT & OPER OF INFRASTRUCTURE
Apr 2, 2013School Construction Authority$54,587.58CONSTRUCTION-BUILDINGS
Mar 25, 2013School Construction Authority$47,772.50CONSTRUCTION-BUILDINGS
Apr 19, 2013Department of Education$45,487.48MAINT & OPER OF INFRASTRUCTURE
Apr 19, 2013Department of Education$44,779.50MAINT & OPER OF INFRASTRUCTURE
Apr 19, 2013Department of Education$43,092.70MAINT & OPER OF INFRASTRUCTURE
Apr 19, 2013Department of Education$41,442.82MAINT & OPER OF INFRASTRUCTURE
Apr 19, 2013Department of Education$40,000.13MAINT & OPER OF INFRASTRUCTURE
Apr 2, 2013School Construction Authority$37,819.50CONSTRUCTION-BUILDINGS
Apr 19, 2013Department of Education$33,388.48MAINT & OPER OF INFRASTRUCTURE
FY 2012top 20 of 76 payments$2,605,112
DateAgencyAmountCategoryPurchase order
Aug 5, 2011School Construction Authority$285,265.67CONSTRUCTION-BUILDINGS
Mar 22, 2012School Construction Authority$200,325.55CONSTRUCTION-BUILDINGS
Jun 19, 2012School Construction Authority$174,211.95CONSTRUCTION-BUILDINGS
Aug 9, 2011School Construction Authority$160,592.75CONSTRUCTION-BUILDINGS
Mar 22, 2012School Construction Authority$131,906.03CONSTRUCTION-BUILDINGS
Aug 5, 2011School Construction Authority$131,841.00CONSTRUCTION-BUILDINGS
Mar 22, 2012School Construction Authority$114,712.50CONSTRUCTION-BUILDINGS
Feb 28, 2012School Construction Authority$105,553.84CONSTRUCTION-BUILDINGS
Aug 5, 2011School Construction Authority$103,379.00CONSTRUCTION-BUILDINGS
Sep 19, 2011School Construction Authority$98,529.25CONSTRUCTION-BUILDINGS
Aug 9, 2011School Construction Authority$94,525.00CONSTRUCTION-BUILDINGS
Jan 31, 2012School Construction Authority$87,438.00CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$73,530.00CONSTRUCTION-BUILDINGS
Jun 19, 2012School Construction Authority$73,150.00CONSTRUCTION-BUILDINGS
Jan 30, 2012School Construction Authority$71,991.02CONSTRUCTION-BUILDINGS
Sep 28, 2011School Construction Authority$68,346.30CONSTRUCTION-BUILDINGS
Jun 19, 2012School Construction Authority$60,862.70CONSTRUCTION-BUILDINGS
Jan 31, 2012School Construction Authority$52,429.92CONSTRUCTION-BUILDINGS
Mar 22, 2012School Construction Authority$48,069.00CONSTRUCTION-BUILDINGS
Oct 18, 2011School Construction Authority$47,775.50CONSTRUCTION-BUILDINGS
FY 2011top 20 of 195 payments$4,324,342
DateAgencyAmountCategoryPurchase order
Dec 30, 2010School Construction Authority$423,605.00CONSTRUCTION-BUILDINGS
Aug 16, 2010School Construction Authority$367,935.76CONSTRUCTION-BUILDINGS
Sep 21, 2010School Construction Authority$348,412.50CONSTRUCTION-BUILDINGS
Dec 30, 2010School Construction Authority$292,980.00CONSTRUCTION-BUILDINGS
Sep 21, 2010School Construction Authority$218,101.00CONSTRUCTION-BUILDINGS
Jan 31, 2011School Construction Authority$202,967.50CONSTRUCTION-BUILDINGS
Nov 15, 2010School Construction Authority$193,100.80CONSTRUCTION-BUILDINGS
Jul 27, 2010School Construction Authority$145,093.50CONSTRUCTION-BUILDINGS
Sep 20, 2010School Construction Authority$132,849.23CONSTRUCTION-BUILDINGS
Jan 31, 2011School Construction Authority$129,713.00CONSTRUCTION-BUILDINGS
Mar 23, 2011School Construction Authority$98,372.50CONSTRUCTION-BUILDINGS
Dec 16, 2010Department of Education$89,888.85MAINT & OPER OF INFRASTRUCTURE
Jul 7, 2010School Construction Authority$82,601.10CONSTRUCTION-BUILDINGS
Aug 16, 2010School Construction Authority$77,900.00CONSTRUCTION-BUILDINGS
Oct 29, 2010School Construction Authority$68,020.00CONSTRUCTION-BUILDINGS
Aug 9, 2010Department of Education$65,838.43MAINT & OPER OF INFRASTRUCTURE
Mar 7, 2011School Construction Authority$62,932.75CONSTRUCTION-BUILDINGS
Jul 27, 2010School Construction Authority$61,987.50CONSTRUCTION-BUILDINGS
Jul 27, 2010School Construction Authority$56,124.10CONSTRUCTION-BUILDINGS
Oct 29, 2010School Construction Authority$54,083.50CONSTRUCTION-BUILDINGS
FY 2010top 20 of 206 payments$5,023,508
DateAgencyAmountCategoryPurchase order
Jan 28, 2010School Construction Authority$387,552.50CONSTRUCTION-BUILDINGS
Mar 17, 2010School Construction Authority$386,127.50CONSTRUCTION-BUILDINGS
Jan 28, 2010School Construction Authority$348,213.00CONSTRUCTION-BUILDINGS
Jun 25, 2010School Construction Authority$245,432.50CONSTRUCTION-BUILDINGS
Jun 25, 2010School Construction Authority$221,952.30CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$187,530.00CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$180,785.00CONSTRUCTION-BUILDINGS
Jan 28, 2010School Construction Authority$180,196.00CONSTRUCTION-BUILDINGS
May 25, 2010School Construction Authority$152,522.50CONSTRUCTION-BUILDINGS
Mar 9, 2010School Construction Authority$133,118.75CONSTRUCTION-BUILDINGS
Jan 15, 2010School Construction Authority$121,790.00CONSTRUCTION-BUILDINGS
Mar 18, 2010School Construction Authority$87,344.28CONSTRUCTION-BUILDINGS
Jan 28, 2010School Construction Authority$81,177.50CONSTRUCTION-BUILDINGS
May 25, 2010School Construction Authority$71,487.50CONSTRUCTION-BUILDINGS
Mar 16, 2010Department of Education$70,267.19MAINT & OPER OF INFRASTRUCTURE
Jan 15, 2010School Construction Authority$65,749.69CONSTRUCTION-BUILDINGS
Mar 8, 2010Department of Education$62,845.92MAINT & OPER OF INFRASTRUCTURE
Mar 9, 2010School Construction Authority$62,061.12CONSTRUCTION-BUILDINGS
Mar 29, 2010School Construction Authority$61,828.50CONSTRUCTION-BUILDINGS
Jan 19, 2010Department of Education$57,984.58MAINT & OPER OF INFRASTRUCTURE

Recent payments

DateAgencyAmountCategoryMethod
Apr 21, 2023School Construction Authority$6,720.49CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2023School Construction Authority$2,286.90CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2023School Construction Authority$1,316.70CONSTRUCTION-BUILDINGSCapital Contracts
Nov 9, 2022School Construction Authority$72,768.98CONSTRUCTION-BUILDINGSCapital Contracts
Nov 9, 2022School Construction Authority$10,138.59CONSTRUCTION-BUILDINGSCapital Contracts
Apr 28, 2022School Construction Authority$26,909.59CONSTRUCTION-BUILDINGSCapital Contracts
Apr 28, 2022School Construction Authority$1,216.13CONSTRUCTION-BUILDINGSCapital Contracts
Apr 28, 2022School Construction Authority$5,667.75CONSTRUCTION-BUILDINGSCapital Contracts
Apr 5, 2022School Construction Authority$99,513.42CONSTRUCTION-BUILDINGSCapital Contracts
Mar 22, 2022School Construction Authority$146,648.41CONSTRUCTION-BUILDINGSCapital Contracts
Oct 6, 2021School Construction Authority$104,690.00CONSTRUCTION-BUILDINGSCapital Contracts
Oct 5, 2021School Construction Authority$10,377.17CONSTRUCTION-BUILDINGSCapital Contracts
Oct 5, 2021School Construction Authority$7,426.08CONSTRUCTION-BUILDINGSCapital Contracts
Oct 5, 2021School Construction Authority$24,316.49CONSTRUCTION-BUILDINGSCapital Contracts
Sep 21, 2021School Construction Authority$100,367.50CONSTRUCTION-BUILDINGSCapital Contracts
Aug 2, 2021School Construction Authority$174,333.20CONSTRUCTION-BUILDINGSCapital Contracts
Jul 12, 2021School Construction Authority$73,348.96CONSTRUCTION-BUILDINGSCapital Contracts
Jul 12, 2021School Construction Authority$46,206.76CONSTRUCTION-BUILDINGSCapital Contracts
Jul 12, 2021School Construction Authority$31,190.60CONSTRUCTION-BUILDINGSCapital Contracts
Jun 21, 2021School Construction Authority$50,028.52CONSTRUCTION-BUILDINGSCapital Contracts
May 17, 2021School Construction Authority$2,956.87CONSTRUCTION-BUILDINGSCapital Contracts
May 17, 2021School Construction Authority$9,262.50CONSTRUCTION-BUILDINGSCapital Contracts
May 17, 2021School Construction Authority$81,937.50CONSTRUCTION-BUILDINGSCapital Contracts
May 4, 2021School Construction Authority$45,144.00CONSTRUCTION-BUILDINGSCapital Contracts
May 4, 2021School Construction Authority$38,980.93CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data