Hazen and Sawyer, Pc/Camp Dresser & Mckee, a Joint Vente: New York City Government Payments

as recorded by New York City: HAZEN AND SAWYER, PC/CAMP DRESSER & MCKEE, A JOINT VENTE

Hazen and Sawyer, Pc/Camp Dresser & Mckee, a Joint Vente is the 1,301st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 47th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: DESIGN-CONSULTANT-IOTB

$37,908,458total received
152payments
1agency
Jan 21, 2010Jul 22, 2019first / last payment
Follow this vendorGet an email when New York City publishes new payments to Hazen and Sawyer, Pc/Camp Dresser & Mckee, a Joint Vente. No spam.

Payments by fiscal year

FY 2020$2,309
FY 2019$63,767
FY 2018$355,869
FY 2017$6,160,310
FY 2016$1,491,429
FY 2015$2,466,076
FY 2014$2,335,269
FY 2013$3,577,383
FY 2012$8,768,182
FY 2011$9,139,284
FY 2010$3,548,580

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2020Department of Environmental Protection1$2,309
FY 2019Department of Environmental Protection1$63,767
FY 2018Department of Environmental Protection5$355,869
FY 2017Department of Environmental Protection16$6,160,310
FY 2016Department of Environmental Protection20$1,491,429
FY 2015Department of Environmental Protection25$2,466,076
FY 2014Department of Environmental Protection20$2,335,269
FY 2013Department of Environmental Protection14$3,577,383
FY 2012Department of Environmental Protection20$8,768,182
FY 2011Department of Environmental Protection19$9,139,284
FY 2010Department of Environmental Protection11$3,548,580
Total152$37,908,458

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
DESIGN-CONSULTANT-IOTB152$37,908,458Jan 21, 2010 Jul 22, 2019

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2020top 1 of 1 payments$2,309
DateAgencyAmountCategoryPurchase order
Jul 22, 2019Department of Environmental Protection$2,308.93DESIGN-CONSULTANT-IOTB
FY 2019top 1 of 1 payments$63,767
DateAgencyAmountCategoryPurchase order
Aug 1, 2018Department of Environmental Protection$63,767.34DESIGN-CONSULTANT-IOTB
FY 2018top 5 of 5 payments$355,869
DateAgencyAmountCategoryPurchase order
Aug 8, 2017Department of Environmental Protection$236,300.53DESIGN-CONSULTANT-IOTB
Aug 21, 2017Department of Environmental Protection$37,349.36DESIGN-CONSULTANT-IOTB
Oct 31, 2017Department of Environmental Protection$34,466.50DESIGN-CONSULTANT-IOTB
Nov 16, 2017Department of Environmental Protection$33,172.00DESIGN-CONSULTANT-IOTB
Sep 7, 2017Department of Environmental Protection$14,580.43DESIGN-CONSULTANT-IOTB
FY 2017top 16 of 16 payments$6,160,310
DateAgencyAmountCategoryPurchase order
Dec 12, 2016Department of Environmental Protection$1,190,926.33DESIGN-CONSULTANT-IOTB
Nov 14, 2016Department of Environmental Protection$875,009.65DESIGN-CONSULTANT-IOTB
Oct 19, 2016Department of Environmental Protection$578,417.18DESIGN-CONSULTANT-IOTB
Feb 10, 2017Department of Environmental Protection$489,239.15DESIGN-CONSULTANT-IOTB
Mar 28, 2017Department of Environmental Protection$392,441.07DESIGN-CONSULTANT-IOTB
Jul 18, 2016Department of Environmental Protection$380,441.16DESIGN-CONSULTANT-IOTB
May 15, 2017Department of Environmental Protection$331,747.27DESIGN-CONSULTANT-IOTB
Mar 8, 2017Department of Environmental Protection$319,519.49DESIGN-CONSULTANT-IOTB
Jan 23, 2017Department of Environmental Protection$313,454.38DESIGN-CONSULTANT-IOTB
Jul 11, 2016Department of Environmental Protection$304,105.25DESIGN-CONSULTANT-IOTB
Jun 2, 2017Department of Environmental Protection$293,992.72DESIGN-CONSULTANT-IOTB
Jun 28, 2017Department of Environmental Protection$237,060.39DESIGN-CONSULTANT-IOTB
May 1, 2017Department of Environmental Protection$226,793.38DESIGN-CONSULTANT-IOTB
Nov 4, 2016Department of Environmental Protection$203,286.98DESIGN-CONSULTANT-IOTB
Aug 26, 2016Department of Environmental Protection$15,258.23DESIGN-CONSULTANT-IOTB
Nov 14, 2016Department of Environmental Protection$8,617.53DESIGN-CONSULTANT-IOTB
FY 2016top 20 of 20 payments$1,491,429
DateAgencyAmountCategoryPurchase order
Jun 2, 2016Department of Environmental Protection$196,370.82DESIGN-CONSULTANT-IOTB
Apr 18, 2016Department of Environmental Protection$170,719.79DESIGN-CONSULTANT-IOTB
May 20, 2016Department of Environmental Protection$168,368.43DESIGN-CONSULTANT-IOTB
Jan 13, 2016Department of Environmental Protection$161,149.82DESIGN-CONSULTANT-IOTB
Mar 29, 2016Department of Environmental Protection$155,875.40DESIGN-CONSULTANT-IOTB
Feb 23, 2016Department of Environmental Protection$145,501.33DESIGN-CONSULTANT-IOTB
May 9, 2016Department of Environmental Protection$122,518.93DESIGN-CONSULTANT-IOTB
Feb 1, 2016Department of Environmental Protection$107,359.99DESIGN-CONSULTANT-IOTB
Dec 28, 2015Department of Environmental Protection$93,706.15DESIGN-CONSULTANT-IOTB
Oct 13, 2015Department of Environmental Protection$87,579.18DESIGN-CONSULTANT-IOTB
Oct 7, 2015Department of Environmental Protection$16,100.74DESIGN-CONSULTANT-IOTB
Jan 11, 2016Department of Environmental Protection$13,079.21DESIGN-CONSULTANT-IOTB
Jul 13, 2015Department of Environmental Protection$11,196.13DESIGN-CONSULTANT-IOTB
Sep 2, 2015Department of Environmental Protection$9,178.31DESIGN-CONSULTANT-IOTB
Dec 21, 2015Department of Environmental Protection$6,761.58DESIGN-CONSULTANT-IOTB
Mar 7, 2016Department of Environmental Protection$6,567.51DESIGN-CONSULTANT-IOTB
Sep 21, 2015Department of Environmental Protection$6,423.59DESIGN-CONSULTANT-IOTB
Feb 9, 2016Department of Environmental Protection$5,486.94DESIGN-CONSULTANT-IOTB
Nov 12, 2015Department of Environmental Protection$4,223.87DESIGN-CONSULTANT-IOTB
Apr 5, 2016Department of Environmental Protection$3,261.21DESIGN-CONSULTANT-IOTB
FY 2015top 20 of 25 payments$2,466,076
DateAgencyAmountCategoryPurchase order
Aug 7, 2014Department of Environmental Protection$792,639.54DESIGN-CONSULTANT-IOTB
Aug 18, 2014Department of Environmental Protection$229,041.50DESIGN-CONSULTANT-IOTB
Jul 28, 2014Department of Environmental Protection$139,807.44DESIGN-CONSULTANT-IOTB
Sep 29, 2014Department of Environmental Protection$125,558.12DESIGN-CONSULTANT-IOTB
Nov 26, 2014Department of Environmental Protection$122,456.66DESIGN-CONSULTANT-IOTB
Sep 2, 2014Department of Environmental Protection$120,994.53DESIGN-CONSULTANT-IOTB
Oct 29, 2014Department of Environmental Protection$109,303.13DESIGN-CONSULTANT-IOTB
Oct 14, 2014Department of Environmental Protection$97,191.76DESIGN-CONSULTANT-IOTB
Sep 22, 2014Department of Environmental Protection$95,198.26DESIGN-CONSULTANT-IOTB
Dec 10, 2014Department of Environmental Protection$88,418.05DESIGN-CONSULTANT-IOTB
Dec 1, 2014Department of Environmental Protection$83,376.46DESIGN-CONSULTANT-IOTB
Dec 29, 2014Department of Environmental Protection$75,619.75DESIGN-CONSULTANT-IOTB
Dec 1, 2014Department of Environmental Protection$73,694.89DESIGN-CONSULTANT-IOTB
Jun 25, 2015Department of Environmental Protection$55,925.89DESIGN-CONSULTANT-IOTB
Dec 17, 2014Department of Environmental Protection$47,901.30DESIGN-CONSULTANT-IOTB
Feb 23, 2015Department of Environmental Protection$43,979.03DESIGN-CONSULTANT-IOTB
Feb 2, 2015Department of Environmental Protection$34,013.61DESIGN-CONSULTANT-IOTB
May 21, 2015Department of Environmental Protection$33,634.41DESIGN-CONSULTANT-IOTB
May 18, 2015Department of Environmental Protection$28,789.60DESIGN-CONSULTANT-IOTB
Jan 12, 2015Department of Environmental Protection$25,870.04DESIGN-CONSULTANT-IOTB
FY 2014top 20 of 20 payments$2,335,269
DateAgencyAmountCategoryPurchase order
Jul 19, 2013Department of Environmental Protection$303,150.17DESIGN-CONSULTANT-IOTB
Jul 22, 2013Department of Environmental Protection$246,283.67DESIGN-CONSULTANT-IOTB
Aug 30, 2013Department of Environmental Protection$215,085.88DESIGN-CONSULTANT-IOTB
Aug 14, 2013Department of Environmental Protection$200,628.01DESIGN-CONSULTANT-IOTB
Aug 16, 2013Department of Environmental Protection$165,382.59DESIGN-CONSULTANT-IOTB
May 20, 2014Department of Environmental Protection$155,186.43DESIGN-CONSULTANT-IOTB
Mar 17, 2014Department of Environmental Protection$146,967.49DESIGN-CONSULTANT-IOTB
Jan 27, 2014Department of Environmental Protection$126,338.04DESIGN-CONSULTANT-IOTB
Jul 15, 2013Department of Environmental Protection$122,310.94DESIGN-CONSULTANT-IOTB
Dec 11, 2013Department of Environmental Protection$99,683.07DESIGN-CONSULTANT-IOTB
Nov 13, 2013Department of Environmental Protection$84,741.97DESIGN-CONSULTANT-IOTB
Sep 23, 2013Department of Environmental Protection$78,826.65DESIGN-CONSULTANT-IOTB
Feb 7, 2014Department of Environmental Protection$78,547.24DESIGN-CONSULTANT-IOTB
Oct 15, 2013Department of Environmental Protection$72,591.96DESIGN-CONSULTANT-IOTB
Sep 23, 2013Department of Environmental Protection$62,665.13DESIGN-CONSULTANT-IOTB
Nov 4, 2013Department of Environmental Protection$60,763.74DESIGN-CONSULTANT-IOTB
May 14, 2014Department of Environmental Protection$58,940.19DESIGN-CONSULTANT-IOTB
Jul 22, 2013Department of Environmental Protection$32,940.00DESIGN-CONSULTANT-IOTB
Jul 22, 2013Department of Environmental Protection$16,930.00DESIGN-CONSULTANT-IOTB
Jul 15, 2013Department of Environmental Protection$7,306.06DESIGN-CONSULTANT-IOTB
FY 2013top 14 of 14 payments$3,577,383
DateAgencyAmountCategoryPurchase order
Jan 24, 2013Department of Environmental Protection$645,649.82DESIGN-CONSULTANT-IOTB
Jul 9, 2012Department of Environmental Protection$533,518.12DESIGN-CONSULTANT-IOTB
Aug 16, 2012Department of Environmental Protection$525,147.58DESIGN-CONSULTANT-IOTB
Sep 26, 2012Department of Environmental Protection$427,600.64DESIGN-CONSULTANT-IOTB
Oct 24, 2012Department of Environmental Protection$346,719.86DESIGN-CONSULTANT-IOTB
Jan 7, 2013Department of Environmental Protection$329,428.47DESIGN-CONSULTANT-IOTB
Mar 14, 2013Department of Environmental Protection$242,042.41DESIGN-CONSULTANT-IOTB
Nov 23, 2012Department of Environmental Protection$236,357.69DESIGN-CONSULTANT-IOTB
Feb 7, 2013Department of Environmental Protection$210,833.78DESIGN-CONSULTANT-IOTB
May 28, 2013Department of Environmental Protection$46,180.03DESIGN-CONSULTANT-IOTB
Jun 10, 2013Department of Environmental Protection$12,668.90DESIGN-CONSULTANT-IOTB
Aug 20, 2012Department of Environmental Protection$9,638.41DESIGN-CONSULTANT-IOTB
May 20, 2013Department of Environmental Protection$6,565.99DESIGN-CONSULTANT-IOTB
Nov 13, 2012Department of Environmental Protection$5,031.61DESIGN-CONSULTANT-IOTB
FY 2012top 20 of 20 payments$8,768,182
DateAgencyAmountCategoryPurchase order
Oct 24, 2011Department of Environmental Protection$838,141.40DESIGN-CONSULTANT-IOTB
Jul 28, 2011Department of Environmental Protection$828,724.11DESIGN-CONSULTANT-IOTB
Nov 21, 2011Department of Environmental Protection$813,043.54DESIGN-CONSULTANT-IOTB
Sep 9, 2011Department of Environmental Protection$783,412.13DESIGN-CONSULTANT-IOTB
Dec 27, 2011Department of Environmental Protection$780,417.31DESIGN-CONSULTANT-IOTB
Aug 15, 2011Department of Environmental Protection$734,628.66DESIGN-CONSULTANT-IOTB
Dec 16, 2011Department of Environmental Protection$704,056.08DESIGN-CONSULTANT-IOTB
Jun 6, 2012Department of Environmental Protection$676,945.06DESIGN-CONSULTANT-IOTB
Mar 8, 2012Department of Environmental Protection$604,796.56DESIGN-CONSULTANT-IOTB
May 9, 2012Department of Environmental Protection$602,990.52DESIGN-CONSULTANT-IOTB
Mar 14, 2012Department of Environmental Protection$581,707.59DESIGN-CONSULTANT-IOTB
Apr 4, 2012Department of Environmental Protection$568,236.36DESIGN-CONSULTANT-IOTB
Dec 1, 2011Department of Environmental Protection$67,887.54DESIGN-CONSULTANT-IOTB
Nov 25, 2011Department of Environmental Protection$65,670.79DESIGN-CONSULTANT-IOTB
Dec 7, 2011Department of Environmental Protection$33,831.35DESIGN-CONSULTANT-IOTB
Nov 14, 2011Department of Environmental Protection$25,742.61DESIGN-CONSULTANT-IOTB
Mar 5, 2012Department of Environmental Protection$21,725.40DESIGN-CONSULTANT-IOTB
Mar 19, 2012Department of Environmental Protection$17,569.79DESIGN-CONSULTANT-IOTB
Feb 21, 2012Department of Environmental Protection$14,168.90DESIGN-CONSULTANT-IOTB
Sep 9, 2011Department of Environmental Protection$4,486.53DESIGN-CONSULTANT-IOTB
FY 2011top 19 of 19 payments$9,139,284
DateAgencyAmountCategoryPurchase order
Dec 27, 2010Department of Environmental Protection$2,356,407.86DESIGN-CONSULTANT-IOTB
May 13, 2011Department of Environmental Protection$808,286.16DESIGN-CONSULTANT-IOTB
Jun 6, 2011Department of Environmental Protection$773,786.85DESIGN-CONSULTANT-IOTB
Feb 22, 2011Department of Environmental Protection$722,533.37DESIGN-CONSULTANT-IOTB
Feb 25, 2011Department of Environmental Protection$698,487.58DESIGN-CONSULTANT-IOTB
Dec 30, 2010Department of Environmental Protection$678,854.94DESIGN-CONSULTANT-IOTB
May 20, 2011Department of Environmental Protection$660,303.07DESIGN-CONSULTANT-IOTB
Jul 6, 2010Department of Environmental Protection$627,485.43DESIGN-CONSULTANT-IOTB
Jul 19, 2010Department of Environmental Protection$626,719.62DESIGN-CONSULTANT-IOTB
May 4, 2011Department of Environmental Protection$620,627.14DESIGN-CONSULTANT-IOTB
Nov 5, 2010Department of Environmental Protection$197,218.17DESIGN-CONSULTANT-IOTB
Aug 9, 2010Department of Environmental Protection$183,610.48DESIGN-CONSULTANT-IOTB
Sep 13, 2010Department of Environmental Protection$64,029.57DESIGN-CONSULTANT-IOTB
Mar 7, 2011Department of Environmental Protection$45,144.55DESIGN-CONSULTANT-IOTB
Nov 12, 2010Department of Environmental Protection$40,778.23DESIGN-CONSULTANT-IOTB
Aug 20, 2010Department of Environmental Protection$14,414.48DESIGN-CONSULTANT-IOTB
Jan 24, 2011Department of Environmental Protection$14,263.82DESIGN-CONSULTANT-IOTB
May 9, 2011Department of Environmental Protection$5,386.46DESIGN-CONSULTANT-IOTB
Mar 14, 2011Department of Environmental Protection$945.93DESIGN-CONSULTANT-IOTB
FY 2010top 11 of 11 payments$3,548,580
DateAgencyAmountCategoryPurchase order
Jan 21, 2010Department of Environmental Protection$755,114.89DESIGN-CONSULTANT-IOTB
Apr 7, 2010Department of Environmental Protection$640,948.37DESIGN-CONSULTANT-IOTB
Feb 11, 2010Department of Environmental Protection$621,520.71DESIGN-CONSULTANT-IOTB
Mar 31, 2010Department of Environmental Protection$620,882.40DESIGN-CONSULTANT-IOTB
Jun 7, 2010Department of Environmental Protection$617,044.68DESIGN-CONSULTANT-IOTB
May 26, 2010Department of Environmental Protection$104,315.79DESIGN-CONSULTANT-IOTB
Jan 27, 2010Department of Environmental Protection$61,955.70DESIGN-CONSULTANT-IOTB
Apr 26, 2010Department of Environmental Protection$57,132.11DESIGN-CONSULTANT-IOTB
Mar 1, 2010Department of Environmental Protection$31,302.12DESIGN-CONSULTANT-IOTB
Mar 22, 2010Department of Environmental Protection$27,441.30DESIGN-CONSULTANT-IOTB
Jun 9, 2010Department of Environmental Protection$10,922.25DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
Jul 22, 2019Department of Environmental Protection$2,308.93DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 1, 2018Department of Environmental Protection$63,767.34DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 16, 2017Department of Environmental Protection$33,172.00DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 31, 2017Department of Environmental Protection$34,466.50DESIGN-CONSULTANT-IOTBCapital Contracts
Sep 7, 2017Department of Environmental Protection$14,580.43DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 21, 2017Department of Environmental Protection$37,349.36DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 8, 2017Department of Environmental Protection$236,300.53DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 28, 2017Department of Environmental Protection$237,060.39DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 2, 2017Department of Environmental Protection$293,992.72DESIGN-CONSULTANT-IOTBCapital Contracts
May 15, 2017Department of Environmental Protection$331,747.27DESIGN-CONSULTANT-IOTBCapital Contracts
May 1, 2017Department of Environmental Protection$226,793.38DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 28, 2017Department of Environmental Protection$392,441.07DESIGN-CONSULTANT-IOTBCapital Contracts
Mar 8, 2017Department of Environmental Protection$319,519.49DESIGN-CONSULTANT-IOTBCapital Contracts
Feb 10, 2017Department of Environmental Protection$489,239.15DESIGN-CONSULTANT-IOTBCapital Contracts
Jan 23, 2017Department of Environmental Protection$313,454.38DESIGN-CONSULTANT-IOTBCapital Contracts
Dec 12, 2016Department of Environmental Protection$1,190,926.33DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 14, 2016Department of Environmental Protection$8,617.53DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 14, 2016Department of Environmental Protection$875,009.65DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 4, 2016Department of Environmental Protection$203,286.98DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 19, 2016Department of Environmental Protection$578,417.18DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 26, 2016Department of Environmental Protection$15,258.23DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 18, 2016Department of Environmental Protection$380,441.16DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 11, 2016Department of Environmental Protection$304,105.25DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 2, 2016Department of Environmental Protection$196,370.82DESIGN-CONSULTANT-IOTBCapital Contracts
May 20, 2016Department of Environmental Protection$168,368.43DESIGN-CONSULTANT-IOTBCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data