Greeley & Hansen-Hazen and Sawyer -Malcolm Pirnie, JV: New York City Government Payments

as recorded by New York City: GREELEY & HANSEN-HAZEN AND SAWYER -MALCOLM PIRNIE, JV

Greeley & Hansen-Hazen and Sawyer -Malcolm Pirnie, JV is the 553rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 10th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.3% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: DESIGN-CONSULTANT-IOTB

$121,630,259total received
551payments
1agency
Jan 11, 2010Jul 25, 2018first / last payment
Follow this vendorGet an email when New York City publishes new payments to Greeley & Hansen-Hazen and Sawyer -Malcolm Pirnie, JV. No spam.

Payments by fiscal year

FY 2019$635,160
FY 2018$1,390,309
FY 2017$2,202,897
FY 2016$7,420,443
FY 2015$6,791,344
FY 2014$15,463,180
FY 2013$19,473,840
FY 2012$30,476,550
FY 2011$22,888,122
FY 2010$14,888,413

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2019Department of Environmental Protection1$635,160
FY 2018Department of Environmental Protection17$1,390,309
FY 2017Department of Environmental Protection46$2,202,897
FY 2016Department of Environmental Protection65$7,420,443
FY 2015Department of Environmental Protection64$6,791,344
FY 2014Department of Environmental Protection74$15,463,180
FY 2013Department of Environmental Protection77$19,473,840
FY 2012Department of Environmental Protection90$30,476,550
FY 2011Department of Environmental Protection73$22,888,122
FY 2010Department of Environmental Protection44$14,888,413
Total551$121,630,259

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
DESIGN-CONSULTANT-IOTB544$121,629,113Jan 11, 2010 Jul 25, 2018
PROMPT PAYMENT INTEREST7$1,146Feb 2, 2010 Feb 8, 2012

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2019top 1 of 1 payments$635,160
DateAgencyAmountCategoryPurchase order
Jul 25, 2018Department of Environmental Protection$635,160.07DESIGN-CONSULTANT-IOTB
FY 2018top 17 of 17 payments$1,390,309
DateAgencyAmountCategoryPurchase order
Feb 23, 2018Department of Environmental Protection$197,264.41DESIGN-CONSULTANT-IOTB
May 7, 2018Department of Environmental Protection$165,535.70DESIGN-CONSULTANT-IOTB
Oct 30, 2017Department of Environmental Protection$152,063.63DESIGN-CONSULTANT-IOTB
Jan 10, 2018Department of Environmental Protection$148,859.61DESIGN-CONSULTANT-IOTB
Dec 13, 2017Department of Environmental Protection$129,078.40DESIGN-CONSULTANT-IOTB
Nov 17, 2017Department of Environmental Protection$112,928.72DESIGN-CONSULTANT-IOTB
Oct 18, 2017Department of Environmental Protection$109,671.10DESIGN-CONSULTANT-IOTB
Jul 24, 2017Department of Environmental Protection$108,488.26DESIGN-CONSULTANT-IOTB
Aug 11, 2017Department of Environmental Protection$95,211.70DESIGN-CONSULTANT-IOTB
Sep 21, 2017Department of Environmental Protection$68,475.29DESIGN-CONSULTANT-IOTB
Aug 14, 2017Department of Environmental Protection$49,656.06DESIGN-CONSULTANT-IOTB
Jul 24, 2017Department of Environmental Protection$36,727.80DESIGN-CONSULTANT-IOTB
Aug 10, 2017Department of Environmental Protection$6,187.18DESIGN-CONSULTANT-IOTB
Dec 18, 2017Department of Environmental Protection$5,455.60DESIGN-CONSULTANT-IOTB
May 9, 2018Department of Environmental Protection$3,263.71DESIGN-CONSULTANT-IOTB
Jul 17, 2017Department of Environmental Protection$1,199.44DESIGN-CONSULTANT-IOTB
Oct 2, 2017Department of Environmental Protection$242.12DESIGN-CONSULTANT-IOTB
FY 2017top 20 of 46 payments$2,202,897
DateAgencyAmountCategoryPurchase order
Jan 19, 2017Department of Environmental Protection$175,180.01DESIGN-CONSULTANT-IOTB
Aug 8, 2016Department of Environmental Protection$161,685.97DESIGN-CONSULTANT-IOTB
Jan 19, 2017Department of Environmental Protection$159,251.60DESIGN-CONSULTANT-IOTB
Jul 25, 2016Department of Environmental Protection$130,367.92DESIGN-CONSULTANT-IOTB
Oct 13, 2016Department of Environmental Protection$125,393.38DESIGN-CONSULTANT-IOTB
Dec 9, 2016Department of Environmental Protection$102,052.53DESIGN-CONSULTANT-IOTB
Oct 17, 2016Department of Environmental Protection$101,308.97DESIGN-CONSULTANT-IOTB
Jun 7, 2017Department of Environmental Protection$100,901.36DESIGN-CONSULTANT-IOTB
May 16, 2017Department of Environmental Protection$99,276.97DESIGN-CONSULTANT-IOTB
Nov 9, 2016Department of Environmental Protection$76,477.73DESIGN-CONSULTANT-IOTB
Jul 11, 2016Department of Environmental Protection$75,175.35DESIGN-CONSULTANT-IOTB
Apr 18, 2017Department of Environmental Protection$65,182.15DESIGN-CONSULTANT-IOTB
Feb 6, 2017Department of Environmental Protection$64,645.48DESIGN-CONSULTANT-IOTB
Dec 19, 2016Department of Environmental Protection$64,609.44DESIGN-CONSULTANT-IOTB
Oct 19, 2016Department of Environmental Protection$61,961.05DESIGN-CONSULTANT-IOTB
Mar 20, 2017Department of Environmental Protection$58,640.81DESIGN-CONSULTANT-IOTB
Mar 20, 2017Department of Environmental Protection$57,843.70DESIGN-CONSULTANT-IOTB
Nov 9, 2016Department of Environmental Protection$55,834.91DESIGN-CONSULTANT-IOTB
Aug 12, 2016Department of Environmental Protection$53,221.01DESIGN-CONSULTANT-IOTB
Apr 17, 2017Department of Environmental Protection$51,549.39DESIGN-CONSULTANT-IOTB
FY 2016top 20 of 65 payments$7,420,443
DateAgencyAmountCategoryPurchase order
Nov 23, 2015Department of Environmental Protection$2,438,900.20DESIGN-CONSULTANT-IOTB
Dec 17, 2015Department of Environmental Protection$1,113,265.38DESIGN-CONSULTANT-IOTB
Aug 17, 2015Department of Environmental Protection$301,803.48DESIGN-CONSULTANT-IOTB
Sep 9, 2015Department of Environmental Protection$289,517.94DESIGN-CONSULTANT-IOTB
Oct 22, 2015Department of Environmental Protection$269,805.19DESIGN-CONSULTANT-IOTB
Dec 17, 2015Department of Environmental Protection$252,971.03DESIGN-CONSULTANT-IOTB
Jan 13, 2016Department of Environmental Protection$250,716.64DESIGN-CONSULTANT-IOTB
Jul 22, 2015Department of Environmental Protection$227,529.12DESIGN-CONSULTANT-IOTB
Feb 10, 2016Department of Environmental Protection$226,934.70DESIGN-CONSULTANT-IOTB
Dec 8, 2015Department of Environmental Protection$199,117.24DESIGN-CONSULTANT-IOTB
Apr 21, 2016Department of Environmental Protection$168,042.15DESIGN-CONSULTANT-IOTB
Mar 14, 2016Department of Environmental Protection$163,097.29DESIGN-CONSULTANT-IOTB
May 3, 2016Department of Environmental Protection$158,556.48DESIGN-CONSULTANT-IOTB
Jun 7, 2016Department of Environmental Protection$148,512.75DESIGN-CONSULTANT-IOTB
Jan 13, 2016Department of Environmental Protection$86,505.01DESIGN-CONSULTANT-IOTB
Jul 7, 2015Department of Environmental Protection$79,898.80DESIGN-CONSULTANT-IOTB
Nov 16, 2015Department of Environmental Protection$78,110.14DESIGN-CONSULTANT-IOTB
Oct 21, 2015Department of Environmental Protection$68,830.03DESIGN-CONSULTANT-IOTB
Sep 9, 2015Department of Environmental Protection$68,200.61DESIGN-CONSULTANT-IOTB
Feb 5, 2016Department of Environmental Protection$66,583.94DESIGN-CONSULTANT-IOTB
FY 2015top 20 of 64 payments$6,791,344
DateAgencyAmountCategoryPurchase order
Jul 10, 2014Department of Environmental Protection$648,064.47DESIGN-CONSULTANT-IOTB
Aug 25, 2014Department of Environmental Protection$548,178.40DESIGN-CONSULTANT-IOTB
Sep 22, 2014Department of Environmental Protection$509,509.58DESIGN-CONSULTANT-IOTB
Nov 12, 2014Department of Environmental Protection$472,355.24DESIGN-CONSULTANT-IOTB
Jan 23, 2015Department of Environmental Protection$462,856.62DESIGN-CONSULTANT-IOTB
Oct 31, 2014Department of Environmental Protection$448,830.86DESIGN-CONSULTANT-IOTB
Feb 19, 2015Department of Environmental Protection$378,271.19DESIGN-CONSULTANT-IOTB
Apr 22, 2015Department of Environmental Protection$328,814.22DESIGN-CONSULTANT-IOTB
Mar 16, 2015Department of Environmental Protection$321,263.33DESIGN-CONSULTANT-IOTB
Dec 22, 2014Department of Environmental Protection$306,074.53DESIGN-CONSULTANT-IOTB
May 6, 2015Department of Environmental Protection$271,689.51DESIGN-CONSULTANT-IOTB
Jun 9, 2015Department of Environmental Protection$246,738.78DESIGN-CONSULTANT-IOTB
Aug 18, 2014Department of Environmental Protection$154,640.70DESIGN-CONSULTANT-IOTB
Jul 14, 2014Department of Environmental Protection$139,736.14DESIGN-CONSULTANT-IOTB
Sep 24, 2014Department of Environmental Protection$118,422.95DESIGN-CONSULTANT-IOTB
Jan 26, 2015Department of Environmental Protection$103,582.78DESIGN-CONSULTANT-IOTB
Jul 11, 2014Department of Environmental Protection$103,163.14DESIGN-CONSULTANT-IOTB
Oct 30, 2014Department of Environmental Protection$100,387.43DESIGN-CONSULTANT-IOTB
Oct 3, 2014Department of Environmental Protection$90,728.35DESIGN-CONSULTANT-IOTB
Mar 16, 2015Department of Environmental Protection$90,162.96DESIGN-CONSULTANT-IOTB
FY 2014top 20 of 74 payments$15,463,180
DateAgencyAmountCategoryPurchase order
Jul 3, 2013Department of Environmental Protection$1,050,702.34DESIGN-CONSULTANT-IOTB
Jul 24, 2013Department of Environmental Protection$915,064.50DESIGN-CONSULTANT-IOTB
Sep 3, 2013Department of Environmental Protection$880,924.19DESIGN-CONSULTANT-IOTB
Oct 7, 2013Department of Environmental Protection$860,495.73DESIGN-CONSULTANT-IOTB
Nov 29, 2013Department of Environmental Protection$805,388.05DESIGN-CONSULTANT-IOTB
Jun 11, 2014Department of Environmental Protection$755,203.04DESIGN-CONSULTANT-IOTB
Dec 30, 2013Department of Environmental Protection$736,300.28DESIGN-CONSULTANT-IOTB
Feb 18, 2014Department of Environmental Protection$682,886.31DESIGN-CONSULTANT-IOTB
Feb 10, 2014Department of Environmental Protection$678,425.48DESIGN-CONSULTANT-IOTB
Nov 18, 2013Department of Environmental Protection$611,259.63DESIGN-CONSULTANT-IOTB
Apr 4, 2014Department of Environmental Protection$579,474.40DESIGN-CONSULTANT-IOTB
Apr 24, 2014Department of Environmental Protection$559,276.81DESIGN-CONSULTANT-IOTB
Mar 17, 2014Department of Environmental Protection$517,521.68DESIGN-CONSULTANT-IOTB
Feb 5, 2014Department of Environmental Protection$470,943.57DESIGN-CONSULTANT-IOTB
Aug 12, 2013Department of Environmental Protection$278,577.61DESIGN-CONSULTANT-IOTB
Apr 9, 2014Department of Environmental Protection$258,046.08DESIGN-CONSULTANT-IOTB
Oct 7, 2013Department of Environmental Protection$250,703.41DESIGN-CONSULTANT-IOTB
Feb 20, 2014Department of Environmental Protection$244,762.41DESIGN-CONSULTANT-IOTB
Oct 21, 2013Department of Environmental Protection$237,533.08DESIGN-CONSULTANT-IOTB
Nov 15, 2013Department of Environmental Protection$235,361.09DESIGN-CONSULTANT-IOTB
FY 2013top 20 of 77 payments$19,473,840
DateAgencyAmountCategoryPurchase order
Dec 6, 2012Department of Environmental Protection$1,022,477.43DESIGN-CONSULTANT-IOTB
Sep 17, 2012Department of Environmental Protection$962,202.58DESIGN-CONSULTANT-IOTB
Oct 22, 2012Department of Environmental Protection$924,246.59DESIGN-CONSULTANT-IOTB
Jul 27, 2012Department of Environmental Protection$871,167.60DESIGN-CONSULTANT-IOTB
Sep 10, 2012Department of Environmental Protection$870,200.14DESIGN-CONSULTANT-IOTB
Feb 27, 2013Department of Environmental Protection$848,863.82DESIGN-CONSULTANT-IOTB
May 28, 2013Department of Environmental Protection$834,994.09DESIGN-CONSULTANT-IOTB
May 8, 2013Department of Environmental Protection$829,926.46DESIGN-CONSULTANT-IOTB
Dec 31, 2012Department of Environmental Protection$816,565.85DESIGN-CONSULTANT-IOTB
Apr 15, 2013Department of Environmental Protection$788,301.84DESIGN-CONSULTANT-IOTB
Feb 11, 2013Department of Environmental Protection$782,638.18DESIGN-CONSULTANT-IOTB
Dec 10, 2012Department of Environmental Protection$581,216.34DESIGN-CONSULTANT-IOTB
Aug 15, 2012Department of Environmental Protection$558,947.67DESIGN-CONSULTANT-IOTB
Dec 24, 2012Department of Environmental Protection$439,121.54DESIGN-CONSULTANT-IOTB
Sep 24, 2012Department of Environmental Protection$428,967.58DESIGN-CONSULTANT-IOTB
Jan 31, 2013Department of Environmental Protection$420,855.03DESIGN-CONSULTANT-IOTB
Aug 6, 2012Department of Environmental Protection$404,240.82DESIGN-CONSULTANT-IOTB
Jun 10, 2013Department of Environmental Protection$381,006.39DESIGN-CONSULTANT-IOTB
Apr 1, 2013Department of Environmental Protection$357,672.85DESIGN-CONSULTANT-IOTB
Dec 13, 2012Department of Environmental Protection$352,722.56DESIGN-CONSULTANT-IOTB
FY 2012top 20 of 90 payments$30,476,550
DateAgencyAmountCategoryPurchase order
Oct 26, 2011Department of Environmental Protection$1,587,088.21DESIGN-CONSULTANT-IOTB
Sep 26, 2011Department of Environmental Protection$1,551,497.06DESIGN-CONSULTANT-IOTB
Dec 12, 2011Department of Environmental Protection$1,149,975.95DESIGN-CONSULTANT-IOTB
Nov 4, 2011Department of Environmental Protection$1,107,189.29DESIGN-CONSULTANT-IOTB
Nov 9, 2011Department of Environmental Protection$1,096,051.65DESIGN-CONSULTANT-IOTB
Jul 29, 2011Department of Environmental Protection$1,076,649.24DESIGN-CONSULTANT-IOTB
Dec 27, 2011Department of Environmental Protection$1,000,174.61DESIGN-CONSULTANT-IOTB
Jan 17, 2012Department of Environmental Protection$991,018.89DESIGN-CONSULTANT-IOTB
Dec 5, 2011Department of Environmental Protection$979,985.06DESIGN-CONSULTANT-IOTB
Jun 18, 2012Department of Environmental Protection$965,270.31DESIGN-CONSULTANT-IOTB
Apr 26, 2012Department of Environmental Protection$952,773.00DESIGN-CONSULTANT-IOTB
May 3, 2012Department of Environmental Protection$927,767.21DESIGN-CONSULTANT-IOTB
May 23, 2012Department of Environmental Protection$838,583.68DESIGN-CONSULTANT-IOTB
Feb 14, 2012Department of Environmental Protection$834,787.54DESIGN-CONSULTANT-IOTB
Oct 3, 2011Department of Environmental Protection$820,256.30DESIGN-CONSULTANT-IOTB
Jul 15, 2011Department of Environmental Protection$655,846.81DESIGN-CONSULTANT-IOTB
Jul 5, 2011Department of Environmental Protection$629,823.17DESIGN-CONSULTANT-IOTB
Sep 13, 2011Department of Environmental Protection$608,894.72DESIGN-CONSULTANT-IOTB
Nov 3, 2011Department of Environmental Protection$571,063.40DESIGN-CONSULTANT-IOTB
Jan 19, 2012Department of Environmental Protection$554,560.90DESIGN-CONSULTANT-IOTB
FY 2011top 20 of 73 payments$22,888,122
DateAgencyAmountCategoryPurchase order
Sep 23, 2010Department of Environmental Protection$1,365,564.40DESIGN-CONSULTANT-IOTB
Apr 5, 2011Department of Environmental Protection$1,279,190.44DESIGN-CONSULTANT-IOTB
Feb 16, 2011Department of Environmental Protection$1,165,040.74DESIGN-CONSULTANT-IOTB
Oct 28, 2010Department of Environmental Protection$1,118,533.82DESIGN-CONSULTANT-IOTB
Jul 14, 2010Department of Environmental Protection$1,094,138.47DESIGN-CONSULTANT-IOTB
Feb 23, 2011Department of Environmental Protection$1,026,429.71DESIGN-CONSULTANT-IOTB
Nov 22, 2010Department of Environmental Protection$1,014,473.18DESIGN-CONSULTANT-IOTB
Apr 7, 2011Department of Environmental Protection$906,945.38DESIGN-CONSULTANT-IOTB
Mar 21, 2011Department of Environmental Protection$848,852.22DESIGN-CONSULTANT-IOTB
Apr 27, 2011Department of Environmental Protection$783,605.90DESIGN-CONSULTANT-IOTB
Mar 9, 2011Department of Environmental Protection$740,309.18DESIGN-CONSULTANT-IOTB
Feb 17, 2011Department of Environmental Protection$722,257.61DESIGN-CONSULTANT-IOTB
Nov 22, 2010Department of Environmental Protection$666,866.09DESIGN-CONSULTANT-IOTB
Dec 17, 2010Department of Environmental Protection$620,294.42DESIGN-CONSULTANT-IOTB
Apr 19, 2011Department of Environmental Protection$616,548.96DESIGN-CONSULTANT-IOTB
Dec 8, 2010Department of Environmental Protection$561,480.02DESIGN-CONSULTANT-IOTB
May 4, 2011Department of Environmental Protection$473,091.42DESIGN-CONSULTANT-IOTB
Aug 27, 2010Department of Environmental Protection$432,454.24DESIGN-CONSULTANT-IOTB
Jun 27, 2011Department of Environmental Protection$427,227.95DESIGN-CONSULTANT-IOTB
Aug 27, 2010Department of Environmental Protection$325,132.72DESIGN-CONSULTANT-IOTB
FY 2010top 20 of 44 payments$14,888,413
DateAgencyAmountCategoryPurchase order
Jan 29, 2010Department of Environmental Protection$1,314,693.88DESIGN-CONSULTANT-IOTB
Jun 4, 2010Department of Environmental Protection$1,179,451.79DESIGN-CONSULTANT-IOTB
Apr 15, 2010Department of Environmental Protection$1,100,108.95DESIGN-CONSULTANT-IOTB
Jun 10, 2010Department of Environmental Protection$1,046,198.91DESIGN-CONSULTANT-IOTB
Apr 26, 2010Department of Environmental Protection$988,589.60DESIGN-CONSULTANT-IOTB
Jan 19, 2010Department of Environmental Protection$953,567.24DESIGN-CONSULTANT-IOTB
Jan 21, 2010Department of Environmental Protection$685,862.98DESIGN-CONSULTANT-IOTB
May 20, 2010Department of Environmental Protection$658,857.21DESIGN-CONSULTANT-IOTB
Jan 12, 2010Department of Environmental Protection$649,885.34DESIGN-CONSULTANT-IOTB
Apr 9, 2010Department of Environmental Protection$629,045.71DESIGN-CONSULTANT-IOTB
Jun 14, 2010Department of Environmental Protection$583,319.64DESIGN-CONSULTANT-IOTB
Mar 29, 2010Department of Environmental Protection$577,481.40DESIGN-CONSULTANT-IOTB
Jun 25, 2010Department of Environmental Protection$378,097.13DESIGN-CONSULTANT-IOTB
May 10, 2010Department of Environmental Protection$374,413.87DESIGN-CONSULTANT-IOTB
Jun 16, 2010Department of Environmental Protection$300,204.84DESIGN-CONSULTANT-IOTB
Jan 28, 2010Department of Environmental Protection$292,889.20DESIGN-CONSULTANT-IOTB
Apr 23, 2010Department of Environmental Protection$285,091.32DESIGN-CONSULTANT-IOTB
Jun 24, 2010Department of Environmental Protection$249,029.63DESIGN-CONSULTANT-IOTB
Feb 18, 2010Department of Environmental Protection$244,690.23DESIGN-CONSULTANT-IOTB
May 13, 2010Department of Environmental Protection$237,661.01DESIGN-CONSULTANT-IOTB

Recent payments

DateAgencyAmountCategoryMethod
Jul 25, 2018Department of Environmental Protection$635,160.07DESIGN-CONSULTANT-IOTBCapital Contracts
May 9, 2018Department of Environmental Protection$3,263.71DESIGN-CONSULTANT-IOTBCapital Contracts
May 7, 2018Department of Environmental Protection$165,535.70DESIGN-CONSULTANT-IOTBCapital Contracts
Feb 23, 2018Department of Environmental Protection$197,264.41DESIGN-CONSULTANT-IOTBCapital Contracts
Jan 10, 2018Department of Environmental Protection$148,859.61DESIGN-CONSULTANT-IOTBCapital Contracts
Dec 18, 2017Department of Environmental Protection$5,455.60DESIGN-CONSULTANT-IOTBCapital Contracts
Dec 13, 2017Department of Environmental Protection$129,078.40DESIGN-CONSULTANT-IOTBCapital Contracts
Nov 17, 2017Department of Environmental Protection$112,928.72DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 30, 2017Department of Environmental Protection$152,063.63DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 18, 2017Department of Environmental Protection$109,671.10DESIGN-CONSULTANT-IOTBCapital Contracts
Oct 2, 2017Department of Environmental Protection$242.12DESIGN-CONSULTANT-IOTBCapital Contracts
Sep 21, 2017Department of Environmental Protection$68,475.29DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 14, 2017Department of Environmental Protection$49,656.06DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 11, 2017Department of Environmental Protection$95,211.70DESIGN-CONSULTANT-IOTBCapital Contracts
Aug 10, 2017Department of Environmental Protection$6,187.18DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 24, 2017Department of Environmental Protection$36,727.80DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 24, 2017Department of Environmental Protection$108,488.26DESIGN-CONSULTANT-IOTBCapital Contracts
Jul 17, 2017Department of Environmental Protection$1,199.44DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 7, 2017Department of Environmental Protection$819.54DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 7, 2017Department of Environmental Protection$100,901.36DESIGN-CONSULTANT-IOTBCapital Contracts
Jun 7, 2017Department of Environmental Protection$38,098.69DESIGN-CONSULTANT-IOTBCapital Contracts
May 17, 2017Department of Environmental Protection$3,397.91DESIGN-CONSULTANT-IOTBCapital Contracts
May 17, 2017Department of Environmental Protection$47,502.08DESIGN-CONSULTANT-IOTBCapital Contracts
May 16, 2017Department of Environmental Protection$99,276.97DESIGN-CONSULTANT-IOTBCapital Contracts
Apr 20, 2017Department of Environmental Protection$5,512.22DESIGN-CONSULTANT-IOTBCapital Contracts