Gottlieb Skanska Inc/Slattery Skanska Inc JV is the 512th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 74th in IOTB CONSTRUCTION spending. Its payments amount to 0.4% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: IOTB CONSTRUCTION

$138,622,046total received
900payments
1agency
Jan 13, 2010May 12, 2021first / last payment
Follow this vendorGet an email when New York City publishes new payments to Gottlieb Skanska Inc/Slattery Skanska Inc JV. No spam.

Payments by fiscal year

FY 2021$941,224
FY 2020$1,450,322
FY 2016$4,072,351
FY 2015$5,230,881
FY 2014$6,821,156
FY 2013$7,148,112
FY 2012$27,767,648
FY 2011$52,164,024
FY 2010$33,026,329

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2021Department of Environmental Protection2$941,224
FY 2020Department of Environmental Protection1$1,450,322
FY 2016Department of Environmental Protection100$4,072,351
FY 2015Department of Environmental Protection41$5,230,881
FY 2014Department of Environmental Protection50$6,821,156
FY 2013Department of Environmental Protection140$7,148,112
FY 2012Department of Environmental Protection199$27,767,648
FY 2011Department of Environmental Protection248$52,164,024
FY 2010Department of Environmental Protection119$33,026,329
Total900$138,622,046

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
POLLUTION REMEDIATION OBLIGATIONS4$962,862Jan 24, 2011 May 3, 2016
PROMPT PAYMENT INTEREST11$204Jun 8, 2011 Jun 8, 2011
IOTB CONSTRUCTION885$137,658,980Jan 13, 2010 May 12, 2021

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2021top 2 of 2 payments$941,224
DateAgencyAmountCategoryPurchase order
May 12, 2021Department of Environmental Protection$924,905.67IOTB CONSTRUCTION
May 12, 2021Department of Environmental Protection$16,318.11IOTB CONSTRUCTION
FY 2020top 1 of 1 payments$1,450,322
DateAgencyAmountCategoryPurchase order
Nov 18, 2019Department of Environmental Protection$1,450,322.10IOTB CONSTRUCTION
FY 2016top 20 of 100 payments$4,072,351
DateAgencyAmountCategoryPurchase order
Jan 11, 2016Department of Environmental Protection$224,886.04IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$195,645.15IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$179,219.19IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$177,429.71IOTB CONSTRUCTION
Jan 12, 2016Department of Environmental Protection$154,817.56IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$143,123.71IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$142,014.78POLLUTION REMEDIATION OBLIGATIONS
Jan 12, 2016Department of Environmental Protection$128,672.44IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$120,791.63IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$108,802.07IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$101,333.80IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$93,189.10IOTB CONSTRUCTION
Jan 12, 2016Department of Environmental Protection$91,272.61IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$85,797.81IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$84,253.51IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$70,016.38IOTB CONSTRUCTION
Apr 27, 2016Department of Environmental Protection$69,757.13IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$67,200.59IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$66,783.53IOTB CONSTRUCTION
May 3, 2016Department of Environmental Protection$66,768.08IOTB CONSTRUCTION
FY 2015top 20 of 41 payments$5,230,881
DateAgencyAmountCategoryPurchase order
May 1, 2015Department of Environmental Protection$2,342,345.78IOTB CONSTRUCTION
Jun 2, 2015Department of Environmental Protection$1,509,293.79IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$201,787.31IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$156,119.07IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$148,388.46IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$122,151.12IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$93,129.17IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$79,990.99IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$75,311.64IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$55,303.11IOTB CONSTRUCTION
May 1, 2015Department of Environmental Protection$52,743.09IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$49,605.00IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$46,689.26IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$45,158.10IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$37,029.63IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$26,953.89IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$26,234.43IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$21,507.33IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$19,951.42IOTB CONSTRUCTION
Mar 6, 2015Department of Environmental Protection$17,398.24IOTB CONSTRUCTION
FY 2014top 20 of 50 payments$6,821,156
DateAgencyAmountCategoryPurchase order
Aug 8, 2013Department of Environmental Protection$2,936,533.54IOTB CONSTRUCTION
Aug 26, 2013Department of Environmental Protection$437,381.70IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$278,306.53IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$265,249.71IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$252,622.69IOTB CONSTRUCTION
Dec 26, 2013Department of Environmental Protection$238,452.31IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$210,000.00IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$200,657.28IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$168,498.55IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$160,782.98IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$159,296.48IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$159,030.00IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$156,584.14IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$128,657.24IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$123,608.00IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$98,988.10IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$93,619.55IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$72,557.50IOTB CONSTRUCTION
Sep 16, 2013Department of Environmental Protection$68,017.43IOTB CONSTRUCTION
Jun 25, 2014Department of Environmental Protection$67,255.75IOTB CONSTRUCTION
FY 2013top 20 of 140 payments$7,148,112
DateAgencyAmountCategoryPurchase order
Aug 23, 2012Department of Environmental Protection$439,254.48IOTB CONSTRUCTION
Oct 3, 2012Department of Environmental Protection$395,482.92IOTB CONSTRUCTION
Nov 13, 2012Department of Environmental Protection$316,797.50IOTB CONSTRUCTION
Nov 14, 2012Department of Environmental Protection$223,245.57IOTB CONSTRUCTION
Aug 23, 2012Department of Environmental Protection$190,758.00IOTB CONSTRUCTION
Jun 12, 2013Department of Environmental Protection$179,540.03IOTB CONSTRUCTION
Jul 25, 2012Department of Environmental Protection$172,919.73IOTB CONSTRUCTION
Oct 17, 2012Department of Environmental Protection$168,982.70IOTB CONSTRUCTION
Nov 16, 2012Department of Environmental Protection$153,954.84IOTB CONSTRUCTION
Nov 14, 2012Department of Environmental Protection$127,544.21IOTB CONSTRUCTION
Sep 24, 2012Department of Environmental Protection$126,588.64IOTB CONSTRUCTION
Aug 20, 2012Department of Environmental Protection$124,103.59IOTB CONSTRUCTION
Jun 5, 2013Department of Environmental Protection$120,206.15IOTB CONSTRUCTION
Jul 19, 2012Department of Environmental Protection$120,155.42IOTB CONSTRUCTION
Dec 10, 2012Department of Environmental Protection$118,000.00IOTB CONSTRUCTION
Nov 16, 2012Department of Environmental Protection$117,394.52IOTB CONSTRUCTION
Nov 14, 2012Department of Environmental Protection$111,719.65IOTB CONSTRUCTION
Sep 10, 2012Department of Environmental Protection$105,456.79IOTB CONSTRUCTION
Mar 21, 2013Department of Environmental Protection$103,378.85IOTB CONSTRUCTION
Nov 16, 2012Department of Environmental Protection$101,580.30IOTB CONSTRUCTION
FY 2012top 20 of 199 payments$27,767,648
DateAgencyAmountCategoryPurchase order
Jul 11, 2011Department of Environmental Protection$3,405,164.63IOTB CONSTRUCTION
Sep 23, 2011Department of Environmental Protection$1,613,767.63IOTB CONSTRUCTION
Aug 8, 2011Department of Environmental Protection$1,608,131.60IOTB CONSTRUCTION
Jan 11, 2012Department of Environmental Protection$1,216,927.92IOTB CONSTRUCTION
Oct 19, 2011Department of Environmental Protection$1,141,048.86IOTB CONSTRUCTION
Dec 2, 2011Department of Environmental Protection$1,014,679.12IOTB CONSTRUCTION
Sep 12, 2011Department of Environmental Protection$880,989.29IOTB CONSTRUCTION
Mar 16, 2012Department of Environmental Protection$788,298.23IOTB CONSTRUCTION
Oct 4, 2011Department of Environmental Protection$716,499.78IOTB CONSTRUCTION
Feb 24, 2012Department of Environmental Protection$649,988.55IOTB CONSTRUCTION
Mar 12, 2012Department of Environmental Protection$633,320.80IOTB CONSTRUCTION
Aug 25, 2011Department of Environmental Protection$618,471.86IOTB CONSTRUCTION
Sep 12, 2011Department of Environmental Protection$464,242.00IOTB CONSTRUCTION
Aug 29, 2011Department of Environmental Protection$458,404.93IOTB CONSTRUCTION
Apr 16, 2012Department of Environmental Protection$454,496.66IOTB CONSTRUCTION
Sep 12, 2011Department of Environmental Protection$333,667.24IOTB CONSTRUCTION
Jun 14, 2012Department of Environmental Protection$323,493.80IOTB CONSTRUCTION
Feb 8, 2012Department of Environmental Protection$320,231.60IOTB CONSTRUCTION
Oct 17, 2011Department of Environmental Protection$315,327.24IOTB CONSTRUCTION
Dec 22, 2011Department of Environmental Protection$311,950.64IOTB CONSTRUCTION
FY 2011top 20 of 248 payments$52,164,024
DateAgencyAmountCategoryPurchase order
Jul 23, 2010Department of Environmental Protection$4,022,272.01IOTB CONSTRUCTION
Nov 8, 2010Department of Environmental Protection$3,924,688.22IOTB CONSTRUCTION
May 5, 2011Department of Environmental Protection$3,416,559.30IOTB CONSTRUCTION
Aug 23, 2010Department of Environmental Protection$3,083,770.77IOTB CONSTRUCTION
May 16, 2011Department of Environmental Protection$2,645,630.43IOTB CONSTRUCTION
Jun 27, 2011Department of Environmental Protection$2,618,870.45IOTB CONSTRUCTION
Dec 13, 2010Department of Environmental Protection$2,423,339.84IOTB CONSTRUCTION
Jan 10, 2011Department of Environmental Protection$1,796,723.63IOTB CONSTRUCTION
Sep 13, 2010Department of Environmental Protection$1,779,798.74IOTB CONSTRUCTION
Feb 16, 2011Department of Environmental Protection$1,743,067.49IOTB CONSTRUCTION
Feb 23, 2011Department of Environmental Protection$1,643,214.75IOTB CONSTRUCTION
Mar 30, 2011Department of Environmental Protection$1,446,068.24IOTB CONSTRUCTION
May 19, 2011Department of Environmental Protection$697,100.52POLLUTION REMEDIATION OBLIGATIONS
May 19, 2011Department of Environmental Protection$661,006.00IOTB CONSTRUCTION
Nov 8, 2010Department of Environmental Protection$627,738.27IOTB CONSTRUCTION
Jun 13, 2011Department of Environmental Protection$612,157.16IOTB CONSTRUCTION
Apr 21, 2011Department of Environmental Protection$601,573.68IOTB CONSTRUCTION
Jun 23, 2011Department of Environmental Protection$552,398.90IOTB CONSTRUCTION
Apr 21, 2011Department of Environmental Protection$533,782.92IOTB CONSTRUCTION
May 31, 2011Department of Environmental Protection$521,945.10IOTB CONSTRUCTION
FY 2010top 20 of 119 payments$33,026,329
DateAgencyAmountCategoryPurchase order
Jun 17, 2010Department of Environmental Protection$5,382,059.40IOTB CONSTRUCTION
May 17, 2010Department of Environmental Protection$4,083,123.08IOTB CONSTRUCTION
Jan 13, 2010Department of Environmental Protection$3,610,831.72IOTB CONSTRUCTION
Mar 24, 2010Department of Environmental Protection$2,591,973.03IOTB CONSTRUCTION
Feb 22, 2010Department of Environmental Protection$2,269,457.73IOTB CONSTRUCTION
May 6, 2010Department of Environmental Protection$1,786,781.33IOTB CONSTRUCTION
Feb 8, 2010Department of Environmental Protection$1,640,706.80IOTB CONSTRUCTION
Apr 12, 2010Department of Environmental Protection$1,525,841.90IOTB CONSTRUCTION
Feb 2, 2010Department of Environmental Protection$1,339,438.48IOTB CONSTRUCTION
May 21, 2010Department of Environmental Protection$763,077.24IOTB CONSTRUCTION
Apr 5, 2010Department of Environmental Protection$697,433.80IOTB CONSTRUCTION
Mar 1, 2010Department of Environmental Protection$600,855.05IOTB CONSTRUCTION
May 26, 2010Department of Environmental Protection$516,838.85IOTB CONSTRUCTION
Mar 22, 2010Department of Environmental Protection$502,511.46IOTB CONSTRUCTION
Feb 2, 2010Department of Environmental Protection$464,568.85IOTB CONSTRUCTION
Apr 19, 2010Department of Environmental Protection$435,381.67IOTB CONSTRUCTION
Jan 21, 2010Department of Environmental Protection$425,684.39IOTB CONSTRUCTION
Feb 26, 2010Department of Environmental Protection$411,924.61IOTB CONSTRUCTION
Feb 2, 2010Department of Environmental Protection$374,836.20IOTB CONSTRUCTION
Jan 15, 2010Department of Environmental Protection$362,919.01IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
May 12, 2021Department of Environmental Protection$924,905.67IOTB CONSTRUCTIONCapital Contracts
May 12, 2021Department of Environmental Protection$16,318.11IOTB CONSTRUCTIONCapital Contracts
Nov 18, 2019Department of Environmental Protection$1,450,322.10IOTB CONSTRUCTIONCapital Contracts
May 4, 2016Department of Environmental Protection$7,964.17IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$66,023.42IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$35,981.36IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$885.01IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$21,680.25IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$0.49IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$85,797.81IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$361.10IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$23,020.10IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$1,132.23IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$175.22IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$12,713.69IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$66,783.53IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$2,736.97IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$51,693.92IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$9,892.21IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$14,458.40IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$51,565.46IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$24,577.92IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$4,363.01IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$14,779.74IOTB CONSTRUCTIONCapital Contracts
May 3, 2016Department of Environmental Protection$143,123.71IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection