Gannett Fleming Engineers & Architects PC is the 175th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 31st in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.7% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 11.1% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 462 | $9,857,755 | Jan 4, 2016 – Jun 6, 2025 |
| PROF SERV COMPUTER SERVICES | 4 | $91,157 | Nov 21, 2012 – Mar 3, 2014 |
| EQUIPMENT GENERAL | 2 | $84,441 | Aug 6, 2012 – Sep 17, 2012 |
| PROF SERV ENGINEER & ARCHITECT | 40 | $752,749 | Nov 29, 2010 – Oct 9, 2018 |
| MAINT & OPER OF INFRASTRUCTURE | 1 | $7,500 | Sep 26, 2011 – Sep 26, 2011 |
| PROF SERV OTHER | 9 | $576,161 | May 14, 2012 – Mar 25, 2013 |
| CAPITAL PURCHASED EQUIPMENT | 267 | $5,496,132 | Feb 1, 2010 – Jun 9, 2025 |
| OTHER EXPENDITURES-GENERAL | 1 | $5,164 | Jul 15, 2013 – Jul 15, 2013 |
| CONSTRUCTION-BUILDINGS | 8,172 | $322,244,291 | May 3, 2010 – Jun 23, 2025 |
| DESIGN-CONSULTANT-IOTB | 46 | $2,409,877 | Mar 8, 2010 – Apr 7, 2025 |
| PROF SERV ACCTING & AUDITING | 190 | $22,136,667 | Jan 19, 2010 – Jun 23, 2025 |
| CONTRACTUAL SERVICES GENERAL | 4 | $205,935 | Dec 14, 2011 – Sep 26, 2016 |
| IOTB CONSTRUCTION | 287 | $12,154,902 | Oct 7, 2019 – Jun 13, 2025 |
| DESIGN-CONSULTANT-BUILDINGS | 57 | $1,127,179 | Mar 14, 2011 – Mar 23, 2020 |
| DATA PROCESSING SUPPLIES | 5 | $104,003 | Sep 20, 2010 – Aug 6, 2012 |
| <Non-Applicable Expenditure Object> | 2 | -$700 | Apr 23, 2018 – Apr 23, 2018 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 1,434 payments$56,279,943
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 11, 2024 | School Construction Authority | $1,839,374.44 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2024 | School Construction Authority | $1,269,625.76 | CONSTRUCTION-BUILDINGS | – |
| Nov 22, 2024 | School Construction Authority | $1,201,670.82 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2024 | School Construction Authority | $921,502.10 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2025 | School Construction Authority | $892,100.72 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2025 | School Construction Authority | $852,133.91 | CONSTRUCTION-BUILDINGS | – |
| Jun 10, 2025 | School Construction Authority | $810,468.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 26, 2025 | School Construction Authority | $752,672.99 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2025 | School Construction Authority | $724,468.38 | CONSTRUCTION-BUILDINGS | – |
| Apr 16, 2025 | School Construction Authority | $674,815.34 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2024 | School Construction Authority | $671,980.80 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2024 | School Construction Authority | $663,600.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2024 | School Construction Authority | $626,317.34 | CONSTRUCTION-BUILDINGS | – |
| Jan 28, 2025 | School Construction Authority | $624,989.34 | CONSTRUCTION-BUILDINGS | – |
| Dec 12, 2024 | School Construction Authority | $596,735.56 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2024 | School Construction Authority | $566,232.98 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2024 | School Construction Authority | $513,641.70 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2025 | School Construction Authority | $465,941.24 | CONSTRUCTION-BUILDINGS | – |
| Mar 6, 2025 | School Construction Authority | $459,600.18 | CONSTRUCTION-BUILDINGS | – |
| Dec 5, 2024 | School Construction Authority | $449,736.08 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 1,162 payments$50,653,507
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 13, 2023 | School Construction Authority | $2,993,237.60 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2023 | School Construction Authority | $2,269,899.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2023 | School Construction Authority | $2,246,180.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 2, 2023 | School Construction Authority | $2,165,752.52 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2024 | School Construction Authority | $1,937,448.87 | CONSTRUCTION-BUILDINGS | – |
| Nov 16, 2023 | School Construction Authority | $1,144,136.93 | CONSTRUCTION-BUILDINGS | – |
| Nov 30, 2023 | School Construction Authority | $1,093,680.31 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2023 | School Construction Authority | $762,468.84 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2024 | School Construction Authority | $712,562.49 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2024 | School Construction Authority | $709,144.08 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2023 | School Construction Authority | $689,547.26 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2024 | School Construction Authority | $645,177.39 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2023 | School Construction Authority | $623,635.34 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2024 | School Construction Authority | $595,530.32 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2023 | School Construction Authority | $569,495.95 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2023 | School Construction Authority | $549,894.28 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2024 | School Construction Authority | $528,334.86 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2024 | School Construction Authority | $525,139.70 | CONSTRUCTION-BUILDINGS | – |
| Mar 18, 2024 | School Construction Authority | $493,897.05 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2023 | School Construction Authority | $460,941.22 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 1,111 payments$96,179,698
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 18, 2022 | School Construction Authority | $3,930,625.84 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2022 | School Construction Authority | $2,999,934.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $2,999,934.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $2,604,032.62 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2022 | School Construction Authority | $2,604,032.62 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2023 | School Construction Authority | $2,416,233.68 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2022 | School Construction Authority | $2,172,752.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2022 | School Construction Authority | $2,170,701.36 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2023 | School Construction Authority | $2,071,584.72 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2022 | School Construction Authority | $1,993,142.49 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2023 | School Construction Authority | $1,955,861.96 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2022 | School Construction Authority | $1,834,545.17 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2022 | School Construction Authority | $1,748,365.26 | CONSTRUCTION-BUILDINGS | – |
| Apr 5, 2023 | School Construction Authority | $1,733,263.59 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2023 | School Construction Authority | $1,707,410.11 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2023 | School Construction Authority | $1,672,547.67 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2022 | School Construction Authority | $1,522,316.92 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2022 | School Construction Authority | $1,443,219.48 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $1,443,219.48 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2023 | School Construction Authority | $1,372,581.59 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 1,339 payments$36,921,505
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 23, 2022 | School Construction Authority | $2,105,258.11 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2022 | School Construction Authority | $1,637,293.65 | CONSTRUCTION-BUILDINGS | – |
| Jun 23, 2022 | School Construction Authority | $1,482,786.03 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2022 | School Construction Authority | $1,146,621.08 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2022 | School Construction Authority | $1,138,483.80 | CONSTRUCTION-BUILDINGS | – |
| Jun 8, 2022 | School Construction Authority | $987,305.89 | CONSTRUCTION-BUILDINGS | – |
| Jun 3, 2022 | School Construction Authority | $963,717.76 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2022 | School Construction Authority | $961,224.82 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2022 | School Construction Authority | $887,188.03 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2022 | School Construction Authority | $873,822.73 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2021 | School Construction Authority | $778,441.92 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2022 | School Construction Authority | $756,040.33 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2022 | School Construction Authority | $754,147.92 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2021 | School Construction Authority | $498,449.49 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2022 | School Construction Authority | $486,677.44 | CONSTRUCTION-BUILDINGS | – |
| Aug 9, 2021 | School Construction Authority | $485,533.48 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2021 | School Construction Authority | $473,624.77 | CONSTRUCTION-BUILDINGS | – |
| Nov 4, 2021 | School Construction Authority | $458,877.41 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2022 | School Construction Authority | $456,092.15 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2022 | School Construction Authority | $453,819.75 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 1,803 payments$75,847,762
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 8, 2021 | School Construction Authority | $5,670,804.16 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2020 | School Construction Authority | $5,473,337.47 | CONSTRUCTION-BUILDINGS | – |
| Oct 6, 2020 | School Construction Authority | $4,982,728.52 | CONSTRUCTION-BUILDINGS | – |
| Sep 15, 2020 | School Construction Authority | $3,319,818.37 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2020 | School Construction Authority | $2,683,805.08 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2020 | School Construction Authority | $2,460,880.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2021 | School Construction Authority | $2,094,251.25 | CONSTRUCTION-BUILDINGS | – |
| Dec 28, 2020 | School Construction Authority | $2,067,099.70 | CONSTRUCTION-BUILDINGS | – |
| Jul 23, 2020 | School Construction Authority | $2,031,171.25 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2021 | School Construction Authority | $1,945,589.67 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2020 | School Construction Authority | $1,795,426.01 | CONSTRUCTION-BUILDINGS | – |
| Jul 23, 2020 | School Construction Authority | $1,775,169.05 | CONSTRUCTION-BUILDINGS | – |
| Nov 24, 2020 | School Construction Authority | $1,540,045.00 | CONSTRUCTION-BUILDINGS | – |
| May 25, 2021 | School Construction Authority | $1,498,905.92 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2021 | School Construction Authority | $1,440,779.50 | CONSTRUCTION-BUILDINGS | – |
| Sep 15, 2020 | School Construction Authority | $1,348,406.25 | CONSTRUCTION-BUILDINGS | – |
| Jul 31, 2020 | School Construction Authority | $1,326,558.23 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2020 | School Construction Authority | $1,195,781.63 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2021 | School Construction Authority | $1,077,995.10 | CONSTRUCTION-BUILDINGS | – |
| Apr 7, 2021 | School Construction Authority | $1,019,511.20 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 1,720 payments$39,454,439
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 26, 2020 | School Construction Authority | $3,062,373.40 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2020 | School Construction Authority | $2,146,676.33 | CONSTRUCTION-BUILDINGS | – |
| May 27, 2020 | School Construction Authority | $1,738,239.92 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2020 | School Construction Authority | $1,554,580.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2020 | School Construction Authority | $1,544,253.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2020 | School Construction Authority | $1,373,885.75 | CONSTRUCTION-BUILDINGS | – |
| May 1, 2020 | School Construction Authority | $1,316,762.45 | CONSTRUCTION-BUILDINGS | – |
| Feb 26, 2020 | School Construction Authority | $1,095,492.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 14, 2020 | School Construction Authority | $963,659.16 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2019 | School Construction Authority | $867,496.98 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2019 | School Construction Authority | $829,825.42 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2020 | School Construction Authority | $787,550.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2020 | School Construction Authority | $780,425.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2020 | School Construction Authority | $718,770.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2019 | School Construction Authority | $709,387.17 | CONSTRUCTION-BUILDINGS | – |
| May 8, 2020 | School Construction Authority | $675,590.63 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2020 | School Construction Authority | $604,144.18 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2020 | School Construction Authority | $594,985.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2019 | School Construction Authority | $559,413.75 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2019 | School Construction Authority | $558,692.70 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 183 payments$6,065,678
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 7, 2019 | School Construction Authority | $567,210.67 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2019 | Mayoralty | $485,544.36 | PROF SERV ACCTING & AUDITING | – |
| Apr 2, 2019 | School Construction Authority | $321,431.39 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | Mayoralty | $288,109.10 | PROF SERV ACCTING & AUDITING | – |
| Jun 24, 2019 | Mayoralty | $278,075.66 | PROF SERV ACCTING & AUDITING | – |
| Apr 8, 2019 | Mayoralty | $254,925.00 | PROF SERV ACCTING & AUDITING | – |
| Aug 22, 2018 | Mayoralty | $254,925.00 | PROF SERV ACCTING & AUDITING | – |
| Jul 1, 2018 | Mayoralty | $236,812.71 | PROF SERV ACCTING & AUDITING | – |
| Aug 6, 2018 | Mayoralty | $229,375.24 | PROF SERV ACCTING & AUDITING | – |
| Jul 1, 2018 | Mayoralty | $222,037.86 | PROF SERV ACCTING & AUDITING | – |
| Oct 29, 2018 | Mayoralty | $208,134.74 | PROF SERV ACCTING & AUDITING | – |
| Oct 29, 2018 | Mayoralty | $168,364.40 | PROF SERV ACCTING & AUDITING | – |
| Jun 13, 2019 | School Construction Authority | $145,431.86 | CONSTRUCTION-BUILDINGS | – |
| Apr 29, 2019 | Mayoralty | $130,011.75 | PROF SERV ACCTING & AUDITING | – |
| May 7, 2019 | Mayoralty | $127,811.38 | PROF SERV ACCTING & AUDITING | – |
| Feb 19, 2019 | School Construction Authority | $122,476.28 | CONSTRUCTION-BUILDINGS | – |
| Oct 1, 2018 | Department of Citywide Administrative Services | $114,582.05 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 7, 2019 | School Construction Authority | $88,852.36 | CONSTRUCTION-BUILDINGS | – |
| Mar 29, 2019 | School Construction Authority | $75,283.05 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2018 | School Construction Authority | $72,248.92 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 133 payments$2,037,227
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 23, 2017 | Mayoralty | $236,096.71 | PROF SERV ACCTING & AUDITING | – |
| Jun 28, 2018 | Mayoralty | $149,837.76 | PROF SERV ACCTING & AUDITING | – |
| Oct 30, 2017 | Mayoralty | $131,833.70 | PROF SERV ACCTING & AUDITING | – |
| Dec 6, 2017 | Mayoralty | $123,750.00 | PROF SERV ACCTING & AUDITING | – |
| Apr 23, 2018 | Mayoralty | $123,750.00 | PROF SERV ACCTING & AUDITING | – |
| Sep 26, 2017 | Department of Citywide Administrative Services | $122,943.22 | DESIGN-CONSULTANT-BUILDINGS | – |
| Feb 28, 2018 | Mayoralty | $111,829.81 | PROF SERV ACCTING & AUDITING | – |
| Sep 26, 2017 | Department of Citywide Administrative Services | $71,102.78 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 9, 2017 | Department of City Planning | $69,678.27 | PROF SERV ENGINEER & ARCHITECT | – |
| Oct 10, 2017 | Department of Citywide Administrative Services | $50,134.31 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 20, 2017 | Department of Citywide Administrative Services | $49,556.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Oct 2, 2017 | Department of Environmental Protection | $47,866.67 | N/A | – |
| Jun 28, 2018 | Mayoralty | $42,350.00 | PROF SERV ACCTING & AUDITING | – |
| Nov 21, 2017 | Department of Environmental Protection | $41,041.24 | N/A | – |
| Jan 17, 2018 | Department of Environmental Protection | $29,872.14 | N/A | – |
| Jan 16, 2018 | Department of Citywide Administrative Services | $27,340.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Dec 21, 2017 | Department of Environmental Protection | $24,205.53 | N/A | – |
| Nov 21, 2017 | Department of Environmental Protection | $24,102.81 | N/A | – |
| Oct 2, 2017 | School Construction Authority | $21,720.40 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2017 | Department of Environmental Protection | $20,297.62 | N/A | – |
FY 2017top 20 of 100 payments$2,037,692
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 8, 2017 | Mayoralty | $296,447.22 | PROF SERV ACCTING & AUDITING | – |
| Jul 19, 2016 | Mayoralty | $184,556.05 | PROF SERV ACCTING & AUDITING | – |
| Jan 30, 2017 | Mayoralty | $181,432.91 | PROF SERV ACCTING & AUDITING | – |
| Jun 5, 2017 | Mayoralty | $162,112.71 | PROF SERV ACCTING & AUDITING | – |
| Aug 29, 2016 | Department of Citywide Administrative Services | $100,150.13 | DESIGN-CONSULTANT-BUILDINGS | – |
| Aug 23, 2016 | Department of City Planning | $99,938.72 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 5, 2017 | Mayoralty | $99,000.00 | PROF SERV ACCTING & AUDITING | – |
| Jul 19, 2016 | Mayoralty | $90,314.59 | PROF SERV ACCTING & AUDITING | – |
| Apr 5, 2017 | School Construction Authority | $56,099.74 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2016 | Department of Information Technology and Telecommunications | $52,906.03 | CONTRACTUAL SERVICES GENERAL | – |
| Apr 5, 2017 | School Construction Authority | $50,839.95 | CONSTRUCTION-BUILDINGS | – |
| Oct 3, 2016 | Department of Environmental Protection | $50,158.99 | N/A | – |
| Aug 26, 2016 | Department of Environmental Protection | $49,071.49 | N/A | – |
| Jul 5, 2016 | Department of Environmental Protection | $46,444.80 | N/A | – |
| Jul 26, 2016 | Department of Environmental Protection | $45,942.17 | N/A | – |
| Sep 26, 2016 | Department of Citywide Administrative Services | $37,301.68 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 29, 2016 | Department of Citywide Administrative Services | $34,498.77 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 1, 2016 | Department of Environmental Protection | $25,563.84 | N/A | – |
| Dec 12, 2016 | Department of Citywide Administrative Services | $23,281.75 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 5, 2017 | School Construction Authority | $22,709.41 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 121 payments$2,354,224
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 14, 2015 | Mayoralty | $292,886.95 | PROF SERV ACCTING & AUDITING | – |
| Feb 3, 2016 | Department of Citywide Administrative Services | $216,776.32 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 17, 2015 | Mayoralty | $206,955.99 | PROF SERV ACCTING & AUDITING | – |
| Feb 22, 2016 | Department of City Planning | $135,804.98 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 11, 2016 | Mayoralty | $127,066.42 | PROF SERV ACCTING & AUDITING | – |
| Dec 14, 2015 | Mayoralty | $91,648.36 | PROF SERV ACCTING & AUDITING | – |
| Feb 4, 2016 | School Construction Authority | $69,136.04 | CONSTRUCTION-BUILDINGS | – |
| Apr 11, 2016 | Mayoralty | $66,618.69 | PROF SERV ACCTING & AUDITING | – |
| Jun 28, 2016 | Mayoralty | $65,443.95 | PROF SERV ACCTING & AUDITING | – |
| Jun 16, 2016 | School Construction Authority | $55,308.82 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2016 | Department of Environmental Protection | $55,169.43 | N/A | – |
| Feb 3, 2016 | Department of Citywide Administrative Services | $52,487.20 | CAPITAL PURCHASED EQUIPMENT | – |
| Aug 17, 2015 | Mayoralty | $48,715.42 | PROF SERV ACCTING & AUDITING | – |
| Jan 27, 2016 | Department of Citywide Administrative Services | $46,578.65 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 16, 2016 | Mayoralty | $45,831.90 | PROF SERV ACCTING & AUDITING | – |
| Oct 14, 2015 | Department of Citywide Administrative Services | $43,653.41 | DESIGN-CONSULTANT-BUILDINGS | – |
| Apr 11, 2016 | Mayoralty | $42,039.68 | PROF SERV ACCTING & AUDITING | – |
| Sep 21, 2015 | School Construction Authority | $39,658.49 | CONSTRUCTION-BUILDINGS | – |
| Jan 8, 2016 | School Construction Authority | $34,596.87 | CONSTRUCTION-BUILDINGS | – |
| Nov 23, 2015 | Mayoralty | $31,878.00 | PROF SERV ACCTING & AUDITING | – |
FY 2015top 20 of 74 payments$1,481,748
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 31, 2014 | Mayoralty | $150,493.47 | PROF SERV ACCTING & AUDITING | – |
| Jul 7, 2014 | Mayoralty | $133,657.86 | PROF SERV ACCTING & AUDITING | – |
| Nov 26, 2014 | School Construction Authority | $125,718.21 | CONSTRUCTION-BUILDINGS | – |
| Feb 23, 2015 | Mayoralty | $113,587.10 | PROF SERV ACCTING & AUDITING | – |
| Jul 22, 2014 | Mayoralty | $106,691.74 | PROF SERV ACCTING & AUDITING | – |
| Apr 21, 2015 | Mayoralty | $100,868.10 | PROF SERV ACCTING & AUDITING | – |
| Jan 12, 2015 | Mayoralty | $95,614.77 | PROF SERV ACCTING & AUDITING | – |
| Mar 24, 2015 | Department of Citywide Administrative Services | $59,659.95 | DESIGN-CONSULTANT-BUILDINGS | – |
| Jun 15, 2015 | Mayoralty | $50,000.00 | PROF SERV ACCTING & AUDITING | – |
| Jul 21, 2014 | Mayoralty | $47,314.77 | PROF SERV ACCTING & AUDITING | – |
| Apr 21, 2015 | Mayoralty | $45,000.00 | PROF SERV ACCTING & AUDITING | – |
| Aug 11, 2014 | School Construction Authority | $42,475.65 | CONSTRUCTION-BUILDINGS | – |
| Sep 30, 2014 | Mayoralty | $36,010.60 | PROF SERV ACCTING & AUDITING | – |
| Aug 11, 2014 | School Construction Authority | $31,246.54 | CONSTRUCTION-BUILDINGS | – |
| Aug 11, 2014 | School Construction Authority | $26,640.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2014 | School Construction Authority | $24,574.22 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2014 | School Construction Authority | $23,625.04 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2015 | Mayoralty | $22,602.32 | PROF SERV ACCTING & AUDITING | – |
| Nov 26, 2014 | School Construction Authority | $18,507.19 | CONSTRUCTION-BUILDINGS | – |
| Jun 4, 2015 | School Construction Authority | $16,761.06 | CONSTRUCTION-BUILDINGS | – |
FY 2014top 20 of 111 payments$1,032,391
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 9, 2014 | Mayoralty | $209,392.72 | PROF SERV ACCTING & AUDITING | – |
| Feb 3, 2014 | Mayoralty | $85,917.72 | PROF SERV ACCTING & AUDITING | – |
| Jul 29, 2013 | Mayoralty | $51,466.53 | PROF SERV ACCTING & AUDITING | – |
| Apr 2, 2014 | Mayoralty | $50,873.54 | PROF SERV ACCTING & AUDITING | – |
| Mar 3, 2014 | Department of Citywide Administrative Services | $49,166.39 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 3, 2013 | School Construction Authority | $42,305.92 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2013 | School Construction Authority | $35,235.68 | CONSTRUCTION-BUILDINGS | – |
| Jun 23, 2014 | Mayoralty | $34,800.12 | PROF SERV ACCTING & AUDITING | – |
| Nov 6, 2013 | School Construction Authority | $33,281.39 | CONSTRUCTION-BUILDINGS | – |
| Jun 19, 2014 | School Construction Authority | $29,531.31 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2014 | Department of Information Technology and Telecommunications | $28,781.93 | PROF SERV COMPUTER SERVICES | – |
| Dec 18, 2013 | School Construction Authority | $26,625.11 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2014 | School Construction Authority | $23,700.78 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2013 | School Construction Authority | $22,565.50 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2014 | Mayoralty | $20,224.25 | PROF SERV ACCTING & AUDITING | – |
| Mar 13, 2014 | School Construction Authority | $19,318.07 | CONSTRUCTION-BUILDINGS | – |
| Jan 7, 2014 | School Construction Authority | $19,000.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2013 | Mayoralty | $18,889.80 | PROF SERV ACCTING & AUDITING | – |
| Feb 13, 2014 | School Construction Authority | $17,849.66 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2014 | School Construction Authority | $15,192.00 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 124 payments$2,271,116
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 20, 2013 | Mayoralty | $186,593.28 | PROF SERV ACCTING & AUDITING | – |
| Sep 26, 2012 | Department of City Planning | $178,355.33 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 25, 2012 | Department of Information Technology and Telecommunications | $145,510.49 | PROF SERV OTHER | – |
| Mar 25, 2013 | Department of Information Technology and Telecommunications | $127,695.40 | PROF SERV OTHER | – |
| May 7, 2013 | Mayoralty | $125,593.84 | PROF SERV ACCTING & AUDITING | – |
| May 28, 2013 | Mayoralty | $110,623.28 | PROF SERV ACCTING & AUDITING | – |
| Jul 18, 2012 | Mayoralty | $97,014.27 | PROF SERV ACCTING & AUDITING | – |
| Dec 17, 2012 | Mayoralty | $79,056.52 | PROF SERV ACCTING & AUDITING | – |
| May 7, 2013 | Mayoralty | $65,247.97 | PROF SERV ACCTING & AUDITING | – |
| Mar 12, 2013 | Mayoralty | $64,134.75 | PROF SERV ACCTING & AUDITING | – |
| Aug 20, 2012 | Department of Information Technology and Telecommunications | $55,684.86 | PROF SERV OTHER | – |
| Nov 21, 2012 | Department of Small Business Services | $54,029.00 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 6, 2012 | Department of Information Technology and Telecommunications | $53,676.56 | PROF SERV OTHER | – |
| Jul 17, 2012 | Department of Citywide Administrative Services | $49,293.00 | DESIGN-CONSULTANT-BUILDINGS | – |
| Sep 17, 2012 | Department of Emergency Management | $48,998.45 | PROF SERV OTHER | – |
| Sep 17, 2012 | Department of Emergency Management | $45,537.80 | EQUIPMENT GENERAL | – |
| Nov 21, 2012 | Department of Information Technology and Telecommunications | $44,972.43 | CONTRACTUAL SERVICES GENERAL | – |
| Aug 6, 2012 | Department of Emergency Management | $38,903.43 | EQUIPMENT GENERAL | – |
| Nov 21, 2012 | Department of Information Technology and Telecommunications | $37,084.79 | PROF SERV COMPUTER SERVICES | – |
| Jul 19, 2012 | School Construction Authority | $35,637.58 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 73 payments$1,723,339
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 14, 2011 | Mayoralty | $128,334.04 | PROF SERV ACCTING & AUDITING | – |
| Jul 7, 2011 | Mayoralty | $102,016.67 | PROF SERV ACCTING & AUDITING | – |
| Jun 4, 2012 | Mayoralty | $89,761.45 | PROF SERV ACCTING & AUDITING | – |
| Jun 4, 2012 | Mayoralty | $89,609.48 | PROF SERV ACCTING & AUDITING | – |
| Mar 21, 2012 | Mayoralty | $81,270.20 | PROF SERV ACCTING & AUDITING | – |
| May 29, 2012 | Department of Information Technology and Telecommunications | $81,186.64 | PROF SERV OTHER | – |
| Mar 28, 2012 | Department of Citywide Administrative Services | $80,515.92 | CAPITAL PURCHASED EQUIPMENT | – |
| Jul 18, 2011 | Mayoralty | $76,767.11 | PROF SERV ACCTING & AUDITING | – |
| Aug 3, 2011 | Department of Citywide Administrative Services | $60,861.37 | DESIGN-CONSULTANT-BUILDINGS | – |
| Nov 30, 2011 | School Construction Authority | $58,162.64 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2011 | Mayoralty | $57,881.73 | PROF SERV ACCTING & AUDITING | – |
| Dec 14, 2011 | Department of Small Business Services | $54,027.57 | CONTRACTUAL SERVICES GENERAL | – |
| Jul 7, 2011 | Mayoralty | $46,305.38 | PROF SERV ACCTING & AUDITING | – |
| Feb 21, 2012 | Mayoralty | $46,237.46 | PROF SERV ACCTING & AUDITING | – |
| Apr 18, 2012 | Mayoralty | $44,748.67 | PROF SERV ACCTING & AUDITING | – |
| Aug 15, 2011 | School Construction Authority | $42,418.95 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2011 | Department of Transportation | $40,897.43 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 18, 2012 | Department of Emergency Management | $40,000.00 | DATA PROCESSING SUPPLIES | – |
| Aug 15, 2011 | School Construction Authority | $39,978.91 | CONSTRUCTION-BUILDINGS | – |
| Jan 30, 2012 | Mayoralty | $38,876.86 | PROF SERV ACCTING & AUDITING | – |
FY 2011top 20 of 46 payments$1,876,292
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 7, 2010 | Department of Parks and Recreation | $297,511.39 | DESIGN-CONSULTANT-IOTB | – |
| Nov 10, 2010 | Department of Citywide Administrative Services | $134,927.58 | CAPITAL PURCHASED EQUIPMENT | – |
| May 23, 2011 | Mayoralty | $117,766.09 | PROF SERV ACCTING & AUDITING | – |
| Aug 24, 2010 | Department of Citywide Administrative Services | $105,156.73 | CAPITAL PURCHASED EQUIPMENT | – |
| Oct 4, 2010 | Department of Parks and Recreation | $96,910.48 | DESIGN-CONSULTANT-IOTB | – |
| Oct 5, 2010 | Department of Citywide Administrative Services | $91,482.23 | CAPITAL PURCHASED EQUIPMENT | – |
| Dec 27, 2010 | Department of Citywide Administrative Services | $81,852.83 | CAPITAL PURCHASED EQUIPMENT | – |
| Feb 14, 2011 | Mayoralty | $76,866.67 | PROF SERV ACCTING & AUDITING | – |
| May 23, 2011 | Mayoralty | $74,397.55 | PROF SERV ACCTING & AUDITING | – |
| Nov 3, 2010 | Department of Parks and Recreation | $74,112.43 | DESIGN-CONSULTANT-IOTB | – |
| Feb 8, 2011 | Department of Parks and Recreation | $67,678.36 | DESIGN-CONSULTANT-IOTB | – |
| Jan 3, 2011 | Mayoralty | $55,643.29 | PROF SERV ACCTING & AUDITING | – |
| Dec 20, 2010 | Department of Parks and Recreation | $54,787.34 | DESIGN-CONSULTANT-IOTB | – |
| Sep 22, 2010 | Mayoralty | $52,927.38 | PROF SERV ACCTING & AUDITING | – |
| Dec 28, 2010 | Department of Parks and Recreation | $52,548.31 | DESIGN-CONSULTANT-IOTB | – |
| Nov 24, 2010 | Mayoralty | $48,192.37 | PROF SERV ACCTING & AUDITING | – |
| Aug 18, 2010 | Department of Parks and Recreation | $48,019.52 | DESIGN-CONSULTANT-IOTB | – |
| May 26, 2011 | Department of Transportation | $40,356.90 | PROF SERV ENGINEER & ARCHITECT | – |
| Apr 11, 2011 | Mayoralty | $39,840.81 | PROF SERV ACCTING & AUDITING | – |
| Feb 2, 2011 | School Construction Authority | $34,430.51 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 15 of 15 payments$1,036,651
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 8, 2010 | Department of Parks and Recreation | $263,276.28 | DESIGN-CONSULTANT-IOTB | – |
| Mar 24, 2010 | Department of Citywide Administrative Services | $116,911.23 | CAPITAL PURCHASED EQUIPMENT | – |
| May 12, 2010 | Mayoralty | $108,594.74 | PROF SERV ACCTING & AUDITING | – |
| May 18, 2010 | Mayoralty | $85,430.66 | PROF SERV ACCTING & AUDITING | – |
| Feb 8, 2010 | Mayoralty | $83,142.08 | PROF SERV ACCTING & AUDITING | – |
| Jan 19, 2010 | Mayoralty | $62,726.40 | PROF SERV ACCTING & AUDITING | – |
| Apr 14, 2010 | Mayoralty | $58,806.00 | PROF SERV ACCTING & AUDITING | – |
| May 18, 2010 | Mayoralty | $57,916.14 | PROF SERV ACCTING & AUDITING | – |
| Jun 30, 2010 | Mayoralty | $54,756.60 | PROF SERV ACCTING & AUDITING | – |
| Feb 1, 2010 | Department of Citywide Administrative Services | $47,267.62 | CAPITAL PURCHASED EQUIPMENT | – |
| May 26, 2010 | School Construction Authority | $33,112.03 | CONSTRUCTION-BUILDINGS | – |
| Jun 30, 2010 | Mayoralty | $29,515.20 | PROF SERV ACCTING & AUDITING | – |
| May 4, 2010 | Mayoralty | $20,092.64 | PROF SERV ACCTING & AUDITING | – |
| May 3, 2010 | School Construction Authority | $10,312.00 | CONSTRUCTION-BUILDINGS | – |
| May 3, 2010 | School Construction Authority | $4,791.24 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 23, 2025 | School Construction Authority | $2,778.68 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,510.61 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,679.51 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $6,724.41 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $5,293.61 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,338.45 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,397.76 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,887.36 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,833.40 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,786.50 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,512.46 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,467.59 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,736.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $10,013.76 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $4,065.81 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $11,072.82 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,935.18 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,827.43 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,036.68 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,980.63 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,451.17 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $748.57 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,475.34 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $769.50 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $1,555.38 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902