Euro Castle Construction Corp: New York City Government Payments

as recorded by New York City: EURO CASTLE CONSTRUCTION CORP

Euro Castle Construction Corp is the 831st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 122nd in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.2% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 21.8% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$72,365,568total received
845payments
3agencies
Aug 10, 2015Jun 16, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Euro Castle Construction Corp. No spam.

Payments by fiscal year

FY 2025$11,603,473
FY 2024$9,524,479
FY 2023$10,739,565
FY 2022$5,376,282
FY 2021$4,312,828
FY 2020$6,802,232
FY 2019$8,822,387
FY 2018$5,541,502
FY 2017$5,495,834
FY 2016$4,146,987

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority81$11,603,473
FY 2024School Construction Authority116$9,379,971
FY 2024Department of Cultural Affairs3$144,508
FY 2023School Construction Authority106$10,739,565
FY 2022School Construction Authority69$5,169,992
FY 2022Department of Cultural Affairs4$206,290
FY 2021School Construction Authority60$4,242,592
FY 2021Department of Cultural Affairs2$70,236
FY 2020School Construction Authority57$4,384,403
FY 2020Department of Cultural Affairs26$2,417,832
FY 2020Department of Design and Construction1-$4
FY 2019School Construction Authority102$8,795,424
FY 2019Department of Cultural Affairs1$26,994
FY 2019Department of Design and Construction5-$32
FY 2018School Construction Authority92$5,369,595
FY 2018Department of Cultural Affairs2$171,908
FY 2017School Construction Authority70$5,312,847
FY 2017Department of Cultural Affairs4$182,882
FY 2017Department of Design and Construction1$105
FY 2016School Construction Authority39$3,517,025
FY 2016Department of Cultural Affairs4$629,961
Total845$72,365,568

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
POLLUTION REMEDIATION OBLIGATIONS1$79,532Feb 12, 2018 Feb 12, 2018
CONSTRUCTION-BUILDINGS837$72,285,966Aug 10, 2015 Jun 16, 2025
PROMPT PAYMENT INTEREST1$105Sep 19, 2016 Sep 19, 2016
<Non-Applicable Expenditure Object>6-$35Nov 26, 2018 Jul 22, 2019

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 81 payments$11,603,473
DateAgencyAmountCategoryPurchase order
Oct 18, 2024School Construction Authority$1,048,797.37CONSTRUCTION-BUILDINGS
Mar 18, 2025School Construction Authority$658,133.30CONSTRUCTION-BUILDINGS
Mar 13, 2025School Construction Authority$630,990.00CONSTRUCTION-BUILDINGS
May 29, 2025School Construction Authority$482,026.82CONSTRUCTION-BUILDINGS
Nov 19, 2024School Construction Authority$477,024.40CONSTRUCTION-BUILDINGS
Dec 13, 2024School Construction Authority$407,325.75CONSTRUCTION-BUILDINGS
Apr 24, 2025School Construction Authority$387,699.42CONSTRUCTION-BUILDINGS
May 9, 2025School Construction Authority$376,046.76CONSTRUCTION-BUILDINGS
Dec 16, 2024School Construction Authority$352,881.11CONSTRUCTION-BUILDINGS
Feb 13, 2025School Construction Authority$326,190.92CONSTRUCTION-BUILDINGS
Feb 26, 2025School Construction Authority$317,305.93CONSTRUCTION-BUILDINGS
Oct 29, 2024School Construction Authority$314,947.18CONSTRUCTION-BUILDINGS
Apr 30, 2025School Construction Authority$299,501.39CONSTRUCTION-BUILDINGS
Aug 30, 2024School Construction Authority$289,576.67CONSTRUCTION-BUILDINGS
Apr 21, 2025School Construction Authority$285,082.83CONSTRUCTION-BUILDINGS
Jan 10, 2025School Construction Authority$251,032.71CONSTRUCTION-BUILDINGS
Jun 16, 2025School Construction Authority$236,239.91CONSTRUCTION-BUILDINGS
Mar 17, 2025School Construction Authority$233,911.47CONSTRUCTION-BUILDINGS
Mar 13, 2025School Construction Authority$217,638.66CONSTRUCTION-BUILDINGS
Sep 30, 2024School Construction Authority$215,627.48CONSTRUCTION-BUILDINGS
FY 2024top 20 of 119 payments$9,524,479
DateAgencyAmountCategoryPurchase order
Jul 26, 2023School Construction Authority$558,457.50CONSTRUCTION-BUILDINGS
Jun 20, 2024School Construction Authority$542,214.97CONSTRUCTION-BUILDINGS
Oct 5, 2023School Construction Authority$507,407.16CONSTRUCTION-BUILDINGS
Jun 24, 2024School Construction Authority$503,919.09CONSTRUCTION-BUILDINGS
Oct 5, 2023School Construction Authority$453,112.00CONSTRUCTION-BUILDINGS
May 21, 2024School Construction Authority$429,600.20CONSTRUCTION-BUILDINGS
Nov 17, 2023School Construction Authority$400,072.36CONSTRUCTION-BUILDINGS
Jul 14, 2023School Construction Authority$381,810.03CONSTRUCTION-BUILDINGS
Apr 23, 2024School Construction Authority$363,188.54CONSTRUCTION-BUILDINGS
May 21, 2024School Construction Authority$361,120.30CONSTRUCTION-BUILDINGS
Jun 18, 2024School Construction Authority$324,807.66CONSTRUCTION-BUILDINGS
Oct 18, 2023School Construction Authority$295,656.62CONSTRUCTION-BUILDINGS
Sep 12, 2023School Construction Authority$250,749.15CONSTRUCTION-BUILDINGS
Feb 26, 2024School Construction Authority$199,758.59CONSTRUCTION-BUILDINGS
Feb 1, 2024School Construction Authority$199,758.59CONSTRUCTION-BUILDINGS
Dec 13, 2023School Construction Authority$190,087.50CONSTRUCTION-BUILDINGS
Apr 10, 2024School Construction Authority$171,136.44CONSTRUCTION-BUILDINGS
Nov 17, 2023School Construction Authority$161,484.32CONSTRUCTION-BUILDINGS
Apr 2, 2024School Construction Authority$135,605.54CONSTRUCTION-BUILDINGS
Aug 11, 2023School Construction Authority$125,456.09CONSTRUCTION-BUILDINGS
FY 2023top 20 of 106 payments$10,739,565
DateAgencyAmountCategoryPurchase order
Apr 10, 2023School Construction Authority$563,270.78CONSTRUCTION-BUILDINGS
Dec 14, 2022School Construction Authority$433,727.09CONSTRUCTION-BUILDINGS
May 11, 2023School Construction Authority$431,893.85CONSTRUCTION-BUILDINGS
Apr 6, 2023School Construction Authority$411,083.75CONSTRUCTION-BUILDINGS
Sep 27, 2022School Construction Authority$411,017.31CONSTRUCTION-BUILDINGS
Nov 10, 2022School Construction Authority$402,082.95CONSTRUCTION-BUILDINGS
Jan 24, 2023School Construction Authority$398,872.65CONSTRUCTION-BUILDINGS
Jul 12, 2022School Construction Authority$352,243.85CONSTRUCTION-BUILDINGS
Oct 20, 2022School Construction Authority$315,100.67CONSTRUCTION-BUILDINGS
Dec 21, 2022School Construction Authority$282,686.28CONSTRUCTION-BUILDINGS
Nov 21, 2022School Construction Authority$280,017.72CONSTRUCTION-BUILDINGS
Jun 9, 2023School Construction Authority$263,045.18CONSTRUCTION-BUILDINGS
Jul 14, 2022School Construction Authority$258,762.58CONSTRUCTION-BUILDINGS
Jan 18, 2023School Construction Authority$250,378.31CONSTRUCTION-BUILDINGS
Mar 15, 2023School Construction Authority$228,547.58CONSTRUCTION-BUILDINGS
Oct 21, 2022School Construction Authority$204,906.45CONSTRUCTION-BUILDINGS
Dec 13, 2022School Construction Authority$201,939.09CONSTRUCTION-BUILDINGS
Aug 17, 2022School Construction Authority$195,936.89CONSTRUCTION-BUILDINGS
Jun 9, 2023School Construction Authority$184,822.51CONSTRUCTION-BUILDINGS
Jan 18, 2023School Construction Authority$183,916.34CONSTRUCTION-BUILDINGS
FY 2022top 20 of 73 payments$5,376,282
DateAgencyAmountCategoryPurchase order
Jun 13, 2022School Construction Authority$624,489.92CONSTRUCTION-BUILDINGS
Apr 7, 2022School Construction Authority$541,326.53CONSTRUCTION-BUILDINGS
May 10, 2022School Construction Authority$420,218.61CONSTRUCTION-BUILDINGS
Oct 12, 2021School Construction Authority$305,961.75CONSTRUCTION-BUILDINGS
Nov 26, 2021School Construction Authority$231,920.22CONSTRUCTION-BUILDINGS
Jul 26, 2021School Construction Authority$229,436.78CONSTRUCTION-BUILDINGS
Mar 16, 2022School Construction Authority$227,052.03CONSTRUCTION-BUILDINGS
Sep 8, 2021School Construction Authority$218,979.75CONSTRUCTION-BUILDINGS
Aug 11, 2021School Construction Authority$202,901.67CONSTRUCTION-BUILDINGS
Nov 23, 2021School Construction Authority$138,322.85CONSTRUCTION-BUILDINGS
Sep 8, 2021School Construction Authority$122,020.19CONSTRUCTION-BUILDINGS
Dec 17, 2021School Construction Authority$105,319.85CONSTRUCTION-BUILDINGS
Mar 21, 2022Department of Cultural Affairs$97,109.90CONSTRUCTION-BUILDINGS
May 19, 2022School Construction Authority$91,898.63CONSTRUCTION-BUILDINGS
Aug 31, 2021School Construction Authority$91,738.46CONSTRUCTION-BUILDINGS
Sep 27, 2021School Construction Authority$89,396.90CONSTRUCTION-BUILDINGS
Sep 8, 2021School Construction Authority$86,075.70CONSTRUCTION-BUILDINGS
Sep 8, 2021School Construction Authority$83,875.50CONSTRUCTION-BUILDINGS
Mar 7, 2022School Construction Authority$79,324.49CONSTRUCTION-BUILDINGS
Jan 20, 2022School Construction Authority$77,102.00CONSTRUCTION-BUILDINGS
FY 2021top 20 of 62 payments$4,312,828
DateAgencyAmountCategoryPurchase order
May 12, 2021School Construction Authority$504,152.08CONSTRUCTION-BUILDINGS
Dec 21, 2020School Construction Authority$345,627.48CONSTRUCTION-BUILDINGS
Apr 13, 2021School Construction Authority$333,537.69CONSTRUCTION-BUILDINGS
Jan 8, 2021School Construction Authority$280,855.63CONSTRUCTION-BUILDINGS
Jan 8, 2021School Construction Authority$275,181.28CONSTRUCTION-BUILDINGS
Feb 11, 2021School Construction Authority$272,251.00CONSTRUCTION-BUILDINGS
Feb 11, 2021School Construction Authority$191,293.42CONSTRUCTION-BUILDINGS
Jun 21, 2021School Construction Authority$173,622.09CONSTRUCTION-BUILDINGS
Oct 14, 2020School Construction Authority$164,257.85CONSTRUCTION-BUILDINGS
Jun 21, 2021School Construction Authority$134,008.62CONSTRUCTION-BUILDINGS
Sep 3, 2020School Construction Authority$124,133.05CONSTRUCTION-BUILDINGS
Jun 21, 2021School Construction Authority$122,825.74CONSTRUCTION-BUILDINGS
Mar 11, 2021School Construction Authority$113,694.57CONSTRUCTION-BUILDINGS
Mar 11, 2021School Construction Authority$93,281.36CONSTRUCTION-BUILDINGS
May 12, 2021School Construction Authority$81,947.48CONSTRUCTION-BUILDINGS
Oct 21, 2020School Construction Authority$73,582.25CONSTRUCTION-BUILDINGS
May 12, 2021School Construction Authority$66,498.48CONSTRUCTION-BUILDINGS
Sep 3, 2020School Construction Authority$60,968.34CONSTRUCTION-BUILDINGS
Nov 18, 2020School Construction Authority$59,540.68CONSTRUCTION-BUILDINGS
Dec 21, 2020School Construction Authority$58,180.38CONSTRUCTION-BUILDINGS
FY 2020top 20 of 84 payments$6,802,232
DateAgencyAmountCategoryPurchase order
Mar 13, 2020School Construction Authority$645,363.50CONSTRUCTION-BUILDINGS
Dec 30, 2019Department of Cultural Affairs$363,910.51CONSTRUCTION-BUILDINGS
Dec 30, 2019School Construction Authority$287,375.00CONSTRUCTION-BUILDINGS
Aug 7, 2019School Construction Authority$275,167.50CONSTRUCTION-BUILDINGS
Feb 10, 2020School Construction Authority$248,016.50CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$218,729.14CONSTRUCTION-BUILDINGS
Jun 29, 2020Department of Cultural Affairs$203,911.65CONSTRUCTION-BUILDINGS
Mar 19, 2020School Construction Authority$173,824.94CONSTRUCTION-BUILDINGS
Mar 13, 2020School Construction Authority$162,488.57CONSTRUCTION-BUILDINGS
Aug 7, 2019School Construction Authority$159,353.13CONSTRUCTION-BUILDINGS
Sep 10, 2019Department of Cultural Affairs$159,288.40CONSTRUCTION-BUILDINGS
Oct 21, 2019School Construction Authority$154,961.81CONSTRUCTION-BUILDINGS
Nov 20, 2019Department of Cultural Affairs$150,894.20CONSTRUCTION-BUILDINGS
Mar 19, 2020School Construction Authority$141,236.62CONSTRUCTION-BUILDINGS
Sep 3, 2019School Construction Authority$138,372.30CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$137,105.98CONSTRUCTION-BUILDINGS
Jan 29, 2020School Construction Authority$122,126.70CONSTRUCTION-BUILDINGS
Dec 9, 2019School Construction Authority$116,213.12CONSTRUCTION-BUILDINGS
Dec 9, 2019School Construction Authority$116,156.11CONSTRUCTION-BUILDINGS
Aug 7, 2019School Construction Authority$114,328.81CONSTRUCTION-BUILDINGS
FY 2019top 20 of 108 payments$8,822,387
DateAgencyAmountCategoryPurchase order
Oct 15, 2018School Construction Authority$737,497.80CONSTRUCTION-BUILDINGS
Jan 15, 2019School Construction Authority$511,741.80CONSTRUCTION-BUILDINGS
Oct 16, 2018School Construction Authority$489,610.72CONSTRUCTION-BUILDINGS
Dec 13, 2018School Construction Authority$396,870.68CONSTRUCTION-BUILDINGS
Jun 17, 2019School Construction Authority$348,070.70CONSTRUCTION-BUILDINGS
Apr 2, 2019School Construction Authority$329,722.90CONSTRUCTION-BUILDINGS
Sep 13, 2018School Construction Authority$319,594.54CONSTRUCTION-BUILDINGS
Feb 22, 2019School Construction Authority$305,058.36CONSTRUCTION-BUILDINGS
Aug 13, 2018School Construction Authority$288,994.18CONSTRUCTION-BUILDINGS
Sep 14, 2018School Construction Authority$285,290.46CONSTRUCTION-BUILDINGS
Aug 13, 2018School Construction Authority$273,740.23CONSTRUCTION-BUILDINGS
Nov 7, 2018School Construction Authority$269,058.97CONSTRUCTION-BUILDINGS
Nov 8, 2018School Construction Authority$266,913.60CONSTRUCTION-BUILDINGS
Oct 15, 2018School Construction Authority$226,504.52CONSTRUCTION-BUILDINGS
Nov 7, 2018School Construction Authority$218,258.30CONSTRUCTION-BUILDINGS
Aug 15, 2018School Construction Authority$216,654.36CONSTRUCTION-BUILDINGS
May 16, 2019School Construction Authority$187,589.28CONSTRUCTION-BUILDINGS
Aug 9, 2018School Construction Authority$171,124.93CONSTRUCTION-BUILDINGS
Mar 27, 2019School Construction Authority$169,982.65CONSTRUCTION-BUILDINGS
Apr 23, 2019School Construction Authority$164,350.87CONSTRUCTION-BUILDINGS
FY 2018top 20 of 94 payments$5,541,502
DateAgencyAmountCategoryPurchase order
Nov 6, 2017School Construction Authority$516,310.47CONSTRUCTION-BUILDINGS
Jul 24, 2017School Construction Authority$378,139.35CONSTRUCTION-BUILDINGS
Jun 18, 2018School Construction Authority$339,214.60CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$310,097.47CONSTRUCTION-BUILDINGS
Feb 14, 2018School Construction Authority$239,184.23CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$234,947.14CONSTRUCTION-BUILDINGS
Nov 20, 2017School Construction Authority$217,341.38CONSTRUCTION-BUILDINGS
Apr 9, 2018School Construction Authority$204,259.50CONSTRUCTION-BUILDINGS
May 7, 2018School Construction Authority$172,806.35CONSTRUCTION-BUILDINGS
Jan 23, 2018School Construction Authority$165,716.75CONSTRUCTION-BUILDINGS
Dec 22, 2017School Construction Authority$161,395.86CONSTRUCTION-BUILDINGS
Jan 23, 2018School Construction Authority$128,496.46CONSTRUCTION-BUILDINGS
Mar 7, 2018School Construction Authority$126,667.56CONSTRUCTION-BUILDINGS
Dec 8, 2017School Construction Authority$125,424.39CONSTRUCTION-BUILDINGS
Mar 7, 2018School Construction Authority$123,851.50CONSTRUCTION-BUILDINGS
Jul 24, 2017School Construction Authority$122,144.82CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$114,714.21CONSTRUCTION-BUILDINGS
Apr 9, 2018School Construction Authority$111,225.92CONSTRUCTION-BUILDINGS
Mar 13, 2018School Construction Authority$101,971.20CONSTRUCTION-BUILDINGS
Feb 12, 2018Department of Cultural Affairs$92,375.15CONSTRUCTION-BUILDINGS
FY 2017top 20 of 75 payments$5,495,834
DateAgencyAmountCategoryPurchase order
Feb 6, 2017School Construction Authority$1,101,330.74CONSTRUCTION-BUILDINGS
Nov 14, 2016School Construction Authority$757,159.57CONSTRUCTION-BUILDINGS
Apr 21, 2017School Construction Authority$518,090.85CONSTRUCTION-BUILDINGS
Mar 24, 2017School Construction Authority$387,413.83CONSTRUCTION-BUILDINGS
Jun 6, 2017School Construction Authority$202,972.31CONSTRUCTION-BUILDINGS
Jun 19, 2017School Construction Authority$186,058.49CONSTRUCTION-BUILDINGS
Mar 1, 2017School Construction Authority$174,891.99CONSTRUCTION-BUILDINGS
Jan 3, 2017School Construction Authority$168,514.21CONSTRUCTION-BUILDINGS
Jun 6, 2017School Construction Authority$143,782.83CONSTRUCTION-BUILDINGS
Aug 31, 2016School Construction Authority$138,377.76CONSTRUCTION-BUILDINGS
Nov 1, 2016School Construction Authority$125,989.48CONSTRUCTION-BUILDINGS
Jun 19, 2017School Construction Authority$124,521.62CONSTRUCTION-BUILDINGS
Jun 6, 2017School Construction Authority$124,038.99CONSTRUCTION-BUILDINGS
Sep 26, 2016School Construction Authority$86,803.21CONSTRUCTION-BUILDINGS
Feb 6, 2017School Construction Authority$80,004.36CONSTRUCTION-BUILDINGS
Oct 20, 2016School Construction Authority$78,923.63CONSTRUCTION-BUILDINGS
Jun 14, 2017Department of Cultural Affairs$70,839.60CONSTRUCTION-BUILDINGS
Aug 19, 2016School Construction Authority$64,350.55CONSTRUCTION-BUILDINGS
Aug 30, 2016Department of Cultural Affairs$59,245.30CONSTRUCTION-BUILDINGS
Jan 3, 2017School Construction Authority$56,395.90CONSTRUCTION-BUILDINGS
FY 2016top 20 of 43 payments$4,146,987
DateAgencyAmountCategoryPurchase order
Jun 21, 2016School Construction Authority$578,610.90CONSTRUCTION-BUILDINGS
Mar 24, 2016School Construction Authority$452,786.61CONSTRUCTION-BUILDINGS
Mar 14, 2016School Construction Authority$446,288.82CONSTRUCTION-BUILDINGS
May 9, 2016School Construction Authority$304,290.00CONSTRUCTION-BUILDINGS
May 5, 2016School Construction Authority$258,751.74CONSTRUCTION-BUILDINGS
Oct 26, 2015Department of Cultural Affairs$238,504.39CONSTRUCTION-BUILDINGS
Jun 7, 2016School Construction Authority$198,067.40CONSTRUCTION-BUILDINGS
Mar 14, 2016School Construction Authority$175,943.18CONSTRUCTION-BUILDINGS
Feb 10, 2016Department of Cultural Affairs$153,221.13CONSTRUCTION-BUILDINGS
Feb 24, 2016School Construction Authority$136,708.63CONSTRUCTION-BUILDINGS
Jan 6, 2016Department of Cultural Affairs$127,536.50CONSTRUCTION-BUILDINGS
May 9, 2016School Construction Authority$124,251.03CONSTRUCTION-BUILDINGS
Mar 21, 2016Department of Cultural Affairs$110,699.22CONSTRUCTION-BUILDINGS
May 5, 2016School Construction Authority$98,982.35CONSTRUCTION-BUILDINGS
Dec 16, 2015School Construction Authority$96,013.56CONSTRUCTION-BUILDINGS
Feb 24, 2016School Construction Authority$85,925.92CONSTRUCTION-BUILDINGS
Jun 20, 2016School Construction Authority$76,821.88CONSTRUCTION-BUILDINGS
Jan 4, 2016School Construction Authority$68,051.27CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$56,111.75CONSTRUCTION-BUILDINGS
Jun 14, 2016School Construction Authority$44,730.88CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 16, 2025School Construction Authority$47,184.13CONSTRUCTION-BUILDINGSCapital Contracts
Jun 16, 2025School Construction Authority$236,239.91CONSTRUCTION-BUILDINGSCapital Contracts
Jun 16, 2025School Construction Authority$32,288.60CONSTRUCTION-BUILDINGSCapital Contracts
Jun 13, 2025School Construction Authority$185,884.68CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$7,327.92CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$26,199.61CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$24,491.82CONSTRUCTION-BUILDINGSCapital Contracts
Jun 12, 2025School Construction Authority$55,564.12CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$55,629.72CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$482,026.82CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$8,072.15CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$84,672.93CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$65,968.48CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$12,998.42CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$82,033.26CONSTRUCTION-BUILDINGSCapital Contracts
May 9, 2025School Construction Authority$376,046.76CONSTRUCTION-BUILDINGSCapital Contracts
Apr 30, 2025School Construction Authority$299,501.39CONSTRUCTION-BUILDINGSCapital Contracts
Apr 24, 2025School Construction Authority$387,699.42CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025School Construction Authority$285,082.83CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025School Construction Authority$124,895.08CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025School Construction Authority$72,143.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$13,137.21CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$17,098.47CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$189,108.77CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$88,196.77CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data