En-Tech Corp: New York City Government Payments

as recorded by New York City: EN-TECH CORP

En-Tech Corp is the 308th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 52nd in IOTB CONSTRUCTION spending. Its payments amount to 0.6% of everything the Department of Environmental Protection has paid vendors in that span. Payments to it fell 58.3% year over year.

Primary spending category: IOTB CONSTRUCTION

$221,083,906total received
1,930payments
4agencies
Jan 11, 2010Jun 4, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to En-Tech Corp. No spam.

Payments by fiscal year

FY 2025$8,644,756
FY 2024$20,739,526
FY 2023$14,847,078
FY 2022$10,774,259
FY 2021$15,341,619
FY 2020$17,739,997
FY 2019$22,385,551
FY 2018$17,081,711
FY 2017$26,106,003
FY 2016$16,192,192
FY 2015$13,631,546
FY 2014$14,093,239
FY 2013$7,341,443
FY 2012$5,895,124
FY 2011$6,268,388
FY 2010$4,001,475

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Environmental Protection99$8,592,170
FY 2025Department of Design and Construction7$52,586
FY 2024Department of Environmental Protection205$20,346,854
FY 2024Department of Design and Construction3$391,172
FY 2024Department of Parks and Recreation2$1,500
FY 2023Department of Environmental Protection92$13,892,253
FY 2023Department of Design and Construction7$922,324
FY 2023Department of Parks and Recreation2$32,500
FY 2022Department of Environmental Protection152$10,649,932
FY 2022Department of Design and Construction1$124,327
FY 2021Department of Environmental Protection111$14,332,397
FY 2021Department of Design and Construction7$1,004,122
FY 2021Department of Parks and Recreation1$5,100
FY 2020Department of Environmental Protection110$16,549,350
FY 2020Department of Design and Construction14$1,098,545
FY 2020Department of Parks and Recreation1$92,103
FY 2019Department of Environmental Protection182$21,982,207
FY 2019Department of Design and Construction8$393,758
FY 2019Department of Parks and Recreation2$9,586
FY 2018Department of Environmental Protection133$16,747,427
FY 2018Department of Design and Construction22$280,559
FY 2018Department of Transportation1$53,725
FY 2017Department of Environmental Protection224$26,068,447
FY 2017Department of Design and Construction8$37,556
FY 2016Department of Environmental Protection101$16,169,930
FY 2016Department of Parks and Recreation2$12,880
FY 2016Department of Design and Construction3$9,382
FY 2015Department of Environmental Protection94$13,631,546
FY 2014Department of Environmental Protection130$14,093,239
FY 2013Department of Environmental Protection61$7,341,443
FY 2012Department of Environmental Protection31$5,895,124
FY 2011Department of Environmental Protection71$6,268,388
FY 2010Department of Environmental Protection43$4,001,475
Total1,930$221,083,906

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
N/A88$6,269,047Nov 11, 2015 Mar 27, 2025
PROMPT PAYMENT INTEREST15$4,514Mar 8, 2016 Jan 23, 2025
POLLUTION REMEDIATION OBLIGATIONS4$38,379Sep 14, 2017 Feb 10, 2023
IOTB CONSTRUCTION1,610$195,926,847Jan 11, 2010 Jun 3, 2025
CONTRACTUAL SERVICES GENERAL187$17,154,410Oct 19, 2018 Jun 4, 2025
OTHR SERV AND CHRGS-GENERAL17$1,693,859Feb 10, 2010 Oct 2, 2023
<Non-Applicable Expenditure Object>9-$3,150Jun 1, 2018 Jun 1, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 106 payments$8,644,756
DateAgencyAmountCategoryPurchase order
Nov 25, 2024Department of Environmental Protection$1,662,815.03IOTB CONSTRUCTION
Oct 23, 2024Department of Environmental Protection$1,280,229.08IOTB CONSTRUCTION
Jun 3, 2025Department of Environmental Protection$1,099,972.30IOTB CONSTRUCTION
Mar 13, 2025Department of Environmental Protection$507,871.22IOTB CONSTRUCTION
Oct 23, 2024Department of Environmental Protection$375,208.25IOTB CONSTRUCTION
Jul 12, 2024Department of Environmental Protection$351,920.41IOTB CONSTRUCTION
Jan 3, 2025Department of Environmental Protection$341,627.66CONTRACTUAL SERVICES GENERAL
Dec 18, 2024Department of Environmental Protection$321,606.69CONTRACTUAL SERVICES GENERAL
Dec 30, 2024Department of Environmental Protection$310,056.25IOTB CONSTRUCTION
Apr 21, 2025Department of Environmental Protection$292,664.64IOTB CONSTRUCTION
Aug 5, 2024Department of Environmental Protection$273,249.66IOTB CONSTRUCTION
Nov 4, 2024Department of Environmental Protection$237,962.25CONTRACTUAL SERVICES GENERAL
Sep 25, 2024Department of Environmental Protection$177,672.93IOTB CONSTRUCTION
Mar 17, 2025Department of Environmental Protection$155,943.62CONTRACTUAL SERVICES GENERAL
Jun 4, 2025Department of Environmental Protection$139,314.05CONTRACTUAL SERVICES GENERAL
Feb 3, 2025Department of Environmental Protection$120,673.07CONTRACTUAL SERVICES GENERAL
Oct 23, 2024Department of Environmental Protection$115,874.00IOTB CONSTRUCTION
Mar 27, 2025Department of Environmental Protection$91,957.15N/A
Apr 23, 2025Department of Environmental Protection$89,512.09CONTRACTUAL SERVICES GENERAL
Sep 30, 2024Department of Environmental Protection$86,916.00CONTRACTUAL SERVICES GENERAL
FY 2024top 20 of 210 payments$20,739,526
DateAgencyAmountCategoryPurchase order
Sep 7, 2023Department of Environmental Protection$2,300,416.87IOTB CONSTRUCTION
Jul 5, 2023Department of Environmental Protection$2,000,427.13IOTB CONSTRUCTION
Mar 26, 2024Department of Environmental Protection$1,440,388.07IOTB CONSTRUCTION
Apr 18, 2024Department of Environmental Protection$1,430,500.97IOTB CONSTRUCTION
May 16, 2024Department of Environmental Protection$1,325,964.19IOTB CONSTRUCTION
Aug 3, 2023Department of Environmental Protection$1,310,772.85IOTB CONSTRUCTION
Oct 23, 2023Department of Environmental Protection$1,233,755.15IOTB CONSTRUCTION
Oct 6, 2023Department of Environmental Protection$934,111.65IOTB CONSTRUCTION
Jan 24, 2024Department of Environmental Protection$914,576.56IOTB CONSTRUCTION
Oct 2, 2023Department of Environmental Protection$854,949.19IOTB CONSTRUCTION
Dec 1, 2023Department of Environmental Protection$687,313.14IOTB CONSTRUCTION
Mar 13, 2024Department of Environmental Protection$550,462.01IOTB CONSTRUCTION
Dec 15, 2023Department of Environmental Protection$536,218.51IOTB CONSTRUCTION
Sep 18, 2023Department of Environmental Protection$245,620.08IOTB CONSTRUCTION
Jul 12, 2023Department of Environmental Protection$240,638.06IOTB CONSTRUCTION
Aug 2, 2023Department of Environmental Protection$216,388.59CONTRACTUAL SERVICES GENERAL
Nov 15, 2023Department of Design and Construction$202,171.87N/A
Jun 5, 2024Department of Environmental Protection$201,264.00CONTRACTUAL SERVICES GENERAL
Mar 12, 2024Department of Environmental Protection$198,676.82IOTB CONSTRUCTION
Jul 12, 2023Department of Environmental Protection$189,856.45IOTB CONSTRUCTION
FY 2023top 20 of 101 payments$14,847,078
DateAgencyAmountCategoryPurchase order
Feb 17, 2023Department of Environmental Protection$3,241,652.72IOTB CONSTRUCTION
Apr 25, 2023Department of Environmental Protection$1,205,178.48IOTB CONSTRUCTION
Sep 26, 2022Department of Environmental Protection$935,224.83IOTB CONSTRUCTION
Nov 16, 2022Department of Environmental Protection$801,554.61IOTB CONSTRUCTION
Sep 19, 2022Department of Environmental Protection$786,906.06IOTB CONSTRUCTION
Jul 18, 2022Department of Environmental Protection$782,843.40IOTB CONSTRUCTION
Mar 24, 2023Department of Environmental Protection$608,472.59IOTB CONSTRUCTION
Jul 28, 2022Department of Environmental Protection$550,199.67IOTB CONSTRUCTION
Jan 30, 2023Department of Environmental Protection$424,145.47IOTB CONSTRUCTION
Jan 9, 2023Department of Environmental Protection$399,641.32IOTB CONSTRUCTION
Oct 6, 2022Department of Environmental Protection$337,502.24IOTB CONSTRUCTION
Aug 5, 2022Department of Design and Construction$327,691.37N/A
Sep 9, 2022Department of Environmental Protection$312,818.31IOTB CONSTRUCTION
Dec 16, 2022Department of Environmental Protection$280,113.14CONTRACTUAL SERVICES GENERAL
Nov 16, 2022Department of Design and Construction$259,227.45N/A
Apr 25, 2023Department of Environmental Protection$251,829.77IOTB CONSTRUCTION
Mar 13, 2023Department of Environmental Protection$207,747.04IOTB CONSTRUCTION
Mar 15, 2023Department of Environmental Protection$200,903.24CONTRACTUAL SERVICES GENERAL
Dec 29, 2022Department of Design and Construction$167,523.73N/A
Dec 19, 2022Department of Environmental Protection$167,063.20IOTB CONSTRUCTION
FY 2022top 20 of 153 payments$10,774,259
DateAgencyAmountCategoryPurchase order
Jul 19, 2021Department of Environmental Protection$980,913.06IOTB CONSTRUCTION
Dec 27, 2021Department of Environmental Protection$631,276.37IOTB CONSTRUCTION
Jan 18, 2022Department of Environmental Protection$553,872.61IOTB CONSTRUCTION
Nov 22, 2021Department of Environmental Protection$543,364.72IOTB CONSTRUCTION
Sep 9, 2021Department of Environmental Protection$490,940.07IOTB CONSTRUCTION
Aug 2, 2021Department of Environmental Protection$472,083.54IOTB CONSTRUCTION
Jul 19, 2021Department of Environmental Protection$392,615.99IOTB CONSTRUCTION
May 13, 2022Department of Environmental Protection$364,319.86CONTRACTUAL SERVICES GENERAL
Jul 12, 2021Department of Environmental Protection$269,492.36CONTRACTUAL SERVICES GENERAL
Mar 17, 2022Department of Environmental Protection$264,595.56CONTRACTUAL SERVICES GENERAL
Jul 14, 2021Department of Environmental Protection$255,336.84IOTB CONSTRUCTION
Nov 5, 2021Department of Environmental Protection$246,519.94CONTRACTUAL SERVICES GENERAL
Feb 24, 2022Department of Environmental Protection$245,797.01IOTB CONSTRUCTION
Aug 19, 2021Department of Environmental Protection$237,357.23CONTRACTUAL SERVICES GENERAL
Apr 6, 2022Department of Environmental Protection$228,819.97IOTB CONSTRUCTION
Mar 16, 2022Department of Environmental Protection$208,587.37IOTB CONSTRUCTION
Sep 15, 2021Department of Environmental Protection$200,645.72IOTB CONSTRUCTION
Sep 15, 2021Department of Environmental Protection$195,628.57IOTB CONSTRUCTION
Jun 2, 2022Department of Environmental Protection$153,317.31CONTRACTUAL SERVICES GENERAL
Jan 31, 2022Department of Environmental Protection$138,235.82IOTB CONSTRUCTION
FY 2021top 20 of 119 payments$15,341,619
DateAgencyAmountCategoryPurchase order
Nov 20, 2020Department of Environmental Protection$2,184,998.85IOTB CONSTRUCTION
Apr 14, 2021Department of Environmental Protection$1,073,315.99IOTB CONSTRUCTION
Sep 4, 2020Department of Environmental Protection$797,540.11IOTB CONSTRUCTION
Mar 10, 2021Department of Environmental Protection$690,500.34IOTB CONSTRUCTION
Dec 21, 2020Department of Environmental Protection$534,231.47IOTB CONSTRUCTION
Apr 12, 2021Department of Environmental Protection$530,818.10IOTB CONSTRUCTION
Sep 4, 2020Department of Environmental Protection$489,870.84IOTB CONSTRUCTION
Apr 8, 2021Department of Environmental Protection$413,463.81IOTB CONSTRUCTION
Aug 19, 2020Department of Design and Construction$376,435.00N/A
Dec 21, 2020Department of Environmental Protection$370,875.34CONTRACTUAL SERVICES GENERAL
May 10, 2021Department of Environmental Protection$364,144.56IOTB CONSTRUCTION
Nov 6, 2020Department of Environmental Protection$328,771.26IOTB CONSTRUCTION
Oct 26, 2020Department of Environmental Protection$310,731.68IOTB CONSTRUCTION
Sep 4, 2020Department of Environmental Protection$258,808.62IOTB CONSTRUCTION
Jul 28, 2020Department of Environmental Protection$234,979.82IOTB CONSTRUCTION
Feb 8, 2021Department of Environmental Protection$225,031.59CONTRACTUAL SERVICES GENERAL
Sep 21, 2020Department of Environmental Protection$207,914.20IOTB CONSTRUCTION
Nov 27, 2020Department of Environmental Protection$205,584.65IOTB CONSTRUCTION
Dec 21, 2020Department of Environmental Protection$197,938.87IOTB CONSTRUCTION
Nov 27, 2020Department of Environmental Protection$194,306.20CONTRACTUAL SERVICES GENERAL
FY 2020top 20 of 125 payments$17,739,997
DateAgencyAmountCategoryPurchase order
Aug 5, 2019Department of Environmental Protection$3,114,346.08IOTB CONSTRUCTION
Aug 12, 2019Department of Environmental Protection$844,090.24CONTRACTUAL SERVICES GENERAL
Apr 1, 2020Department of Environmental Protection$635,271.54IOTB CONSTRUCTION
Jun 26, 2020Department of Environmental Protection$621,645.99IOTB CONSTRUCTION
Mar 20, 2020Department of Environmental Protection$571,268.81N/A
Dec 13, 2019Department of Environmental Protection$564,663.79IOTB CONSTRUCTION
Jan 6, 2020Department of Environmental Protection$520,580.94IOTB CONSTRUCTION
May 8, 2020Department of Environmental Protection$516,246.16IOTB CONSTRUCTION
Apr 1, 2020Department of Environmental Protection$454,632.82CONTRACTUAL SERVICES GENERAL
Oct 17, 2019Department of Environmental Protection$419,840.22CONTRACTUAL SERVICES GENERAL
Sep 23, 2019Department of Environmental Protection$368,300.95IOTB CONSTRUCTION
Apr 10, 2020Department of Environmental Protection$362,886.32IOTB CONSTRUCTION
Apr 2, 2020Department of Environmental Protection$343,281.80CONTRACTUAL SERVICES GENERAL
Jul 1, 2019Department of Environmental Protection$337,496.91IOTB CONSTRUCTION
Aug 5, 2019Department of Environmental Protection$320,912.88IOTB CONSTRUCTION
Sep 16, 2019Department of Environmental Protection$317,615.47CONTRACTUAL SERVICES GENERAL
Jul 25, 2019Department of Environmental Protection$301,346.45IOTB CONSTRUCTION
Apr 6, 2020Department of Design and Construction$299,057.54N/A
Sep 23, 2019Department of Environmental Protection$291,345.29IOTB CONSTRUCTION
Jul 16, 2019Department of Design and Construction$280,283.96N/A
FY 2019top 20 of 192 payments$22,385,551
DateAgencyAmountCategoryPurchase order
Jul 25, 2018Department of Environmental Protection$3,480,826.98IOTB CONSTRUCTION
Aug 15, 2018Department of Environmental Protection$2,167,537.14IOTB CONSTRUCTION
Oct 3, 2018Department of Environmental Protection$1,303,351.51IOTB CONSTRUCTION
Dec 17, 2018Department of Environmental Protection$1,033,481.23CONTRACTUAL SERVICES GENERAL
Nov 9, 2018Department of Environmental Protection$1,007,395.94IOTB CONSTRUCTION
Aug 13, 2018Department of Environmental Protection$805,606.22IOTB CONSTRUCTION
Aug 8, 2018Department of Environmental Protection$747,345.02IOTB CONSTRUCTION
Mar 18, 2019Department of Environmental Protection$695,639.78IOTB CONSTRUCTION
Jan 17, 2019Department of Environmental Protection$591,361.70CONTRACTUAL SERVICES GENERAL
Jan 31, 2019Department of Environmental Protection$584,732.32IOTB CONSTRUCTION
Feb 22, 2019Department of Environmental Protection$527,009.21CONTRACTUAL SERVICES GENERAL
Nov 5, 2018Department of Environmental Protection$457,712.79CONTRACTUAL SERVICES GENERAL
Dec 5, 2018Department of Environmental Protection$386,296.37CONTRACTUAL SERVICES GENERAL
Mar 4, 2019Department of Environmental Protection$360,466.91CONTRACTUAL SERVICES GENERAL
Nov 5, 2018Department of Environmental Protection$330,156.10IOTB CONSTRUCTION
Dec 28, 2018Department of Environmental Protection$313,078.43IOTB CONSTRUCTION
Jul 18, 2018Department of Environmental Protection$302,716.53IOTB CONSTRUCTION
Mar 22, 2019Department of Environmental Protection$297,951.24CONTRACTUAL SERVICES GENERAL
Nov 5, 2018Department of Environmental Protection$289,768.87IOTB CONSTRUCTION
Dec 28, 2018Department of Environmental Protection$249,671.45IOTB CONSTRUCTION
FY 2018top 20 of 156 payments$17,081,711
DateAgencyAmountCategoryPurchase order
Oct 12, 2017Department of Environmental Protection$1,422,719.00IOTB CONSTRUCTION
Dec 7, 2017Department of Environmental Protection$1,226,685.54IOTB CONSTRUCTION
Aug 28, 2017Department of Environmental Protection$1,206,178.70IOTB CONSTRUCTION
Jan 8, 2018Department of Environmental Protection$926,420.95IOTB CONSTRUCTION
Jun 13, 2018Department of Environmental Protection$799,896.72IOTB CONSTRUCTION
Oct 30, 2017Department of Environmental Protection$660,521.49IOTB CONSTRUCTION
May 31, 2018Department of Environmental Protection$630,795.62OTHR SERV AND CHRGS-GENERAL
Feb 2, 2018Department of Environmental Protection$554,549.25IOTB CONSTRUCTION
Jan 12, 2018Department of Environmental Protection$542,521.72IOTB CONSTRUCTION
Dec 7, 2017Department of Environmental Protection$536,425.89IOTB CONSTRUCTION
Dec 7, 2017Department of Environmental Protection$536,425.89IOTB CONSTRUCTION
Aug 28, 2017Department of Environmental Protection$492,214.15IOTB CONSTRUCTION
Oct 2, 2017Department of Environmental Protection$435,792.89IOTB CONSTRUCTION
Aug 30, 2017Department of Environmental Protection$428,285.00IOTB CONSTRUCTION
May 31, 2018Department of Environmental Protection$409,215.94IOTB CONSTRUCTION
Nov 20, 2017Department of Environmental Protection$348,191.75IOTB CONSTRUCTION
Dec 8, 2017Department of Environmental Protection$340,548.63IOTB CONSTRUCTION
Jun 1, 2018Department of Environmental Protection$274,406.81IOTB CONSTRUCTION
Feb 28, 2018Department of Environmental Protection$273,218.31IOTB CONSTRUCTION
Jul 26, 2017Department of Environmental Protection$253,545.03IOTB CONSTRUCTION
FY 2017top 20 of 232 payments$26,106,003
DateAgencyAmountCategoryPurchase order
Jul 18, 2016Department of Environmental Protection$1,993,670.94IOTB CONSTRUCTION
Jun 28, 2017Department of Environmental Protection$1,154,766.14IOTB CONSTRUCTION
Jun 9, 2017Department of Environmental Protection$1,111,838.53IOTB CONSTRUCTION
Dec 19, 2016Department of Environmental Protection$1,051,401.10IOTB CONSTRUCTION
Dec 30, 2016Department of Environmental Protection$966,760.09IOTB CONSTRUCTION
Mar 27, 2017Department of Environmental Protection$964,584.43IOTB CONSTRUCTION
Jul 27, 2016Department of Environmental Protection$923,522.17IOTB CONSTRUCTION
Sep 23, 2016Department of Environmental Protection$877,465.45IOTB CONSTRUCTION
Aug 1, 2016Department of Environmental Protection$802,014.63IOTB CONSTRUCTION
Feb 2, 2017Department of Environmental Protection$775,389.97IOTB CONSTRUCTION
Sep 27, 2016Department of Environmental Protection$760,639.08IOTB CONSTRUCTION
Jul 1, 2016Department of Environmental Protection$687,923.02IOTB CONSTRUCTION
Apr 10, 2017Department of Environmental Protection$645,579.17IOTB CONSTRUCTION
Mar 20, 2017Department of Environmental Protection$564,518.09IOTB CONSTRUCTION
Mar 23, 2017Department of Environmental Protection$508,644.36IOTB CONSTRUCTION
Apr 17, 2017Department of Environmental Protection$498,547.57IOTB CONSTRUCTION
Oct 11, 2016Department of Environmental Protection$497,018.28IOTB CONSTRUCTION
Mar 2, 2017Department of Environmental Protection$489,255.27IOTB CONSTRUCTION
Apr 24, 2017Department of Environmental Protection$487,556.35IOTB CONSTRUCTION
Sep 6, 2016Department of Environmental Protection$448,369.26IOTB CONSTRUCTION
FY 2016top 20 of 106 payments$16,192,192
DateAgencyAmountCategoryPurchase order
May 6, 2016Department of Environmental Protection$1,562,755.00IOTB CONSTRUCTION
Jul 24, 2015Department of Environmental Protection$1,015,917.74IOTB CONSTRUCTION
Sep 14, 2015Department of Environmental Protection$988,410.14IOTB CONSTRUCTION
Apr 25, 2016Department of Environmental Protection$947,033.60IOTB CONSTRUCTION
Jun 3, 2016Department of Environmental Protection$924,946.65IOTB CONSTRUCTION
Sep 3, 2015Department of Environmental Protection$834,087.48IOTB CONSTRUCTION
Jan 6, 2016Department of Environmental Protection$698,549.05IOTB CONSTRUCTION
Apr 6, 2016Department of Environmental Protection$667,951.43IOTB CONSTRUCTION
Apr 20, 2016Department of Environmental Protection$616,272.13IOTB CONSTRUCTION
Feb 29, 2016Department of Environmental Protection$528,729.54IOTB CONSTRUCTION
Nov 23, 2015Department of Environmental Protection$415,584.89IOTB CONSTRUCTION
Mar 4, 2016Department of Environmental Protection$406,089.11IOTB CONSTRUCTION
Oct 15, 2015Department of Environmental Protection$398,263.54IOTB CONSTRUCTION
Jan 29, 2016Department of Environmental Protection$377,466.14IOTB CONSTRUCTION
Sep 4, 2015Department of Environmental Protection$362,677.27IOTB CONSTRUCTION
Jan 22, 2016Department of Environmental Protection$281,402.63IOTB CONSTRUCTION
Dec 17, 2015Department of Environmental Protection$239,846.50IOTB CONSTRUCTION
Dec 17, 2015Department of Environmental Protection$231,762.51IOTB CONSTRUCTION
Aug 3, 2015Department of Environmental Protection$223,581.81IOTB CONSTRUCTION
Jun 29, 2016Department of Environmental Protection$199,148.20IOTB CONSTRUCTION
FY 2015top 20 of 94 payments$13,631,546
DateAgencyAmountCategoryPurchase order
Dec 8, 2014Department of Environmental Protection$1,109,104.44IOTB CONSTRUCTION
Jun 4, 2015Department of Environmental Protection$1,003,089.30IOTB CONSTRUCTION
Aug 13, 2014Department of Environmental Protection$944,282.16IOTB CONSTRUCTION
Aug 11, 2014Department of Environmental Protection$844,426.64IOTB CONSTRUCTION
Nov 5, 2014Department of Environmental Protection$806,471.51IOTB CONSTRUCTION
Sep 18, 2014Department of Environmental Protection$732,500.89IOTB CONSTRUCTION
Aug 6, 2014Department of Environmental Protection$712,854.35IOTB CONSTRUCTION
Nov 21, 2014Department of Environmental Protection$631,741.26IOTB CONSTRUCTION
Apr 13, 2015Department of Environmental Protection$524,115.86IOTB CONSTRUCTION
Mar 13, 2015Department of Environmental Protection$507,923.60IOTB CONSTRUCTION
Jan 22, 2015Department of Environmental Protection$492,608.65IOTB CONSTRUCTION
May 20, 2015Department of Environmental Protection$436,109.87IOTB CONSTRUCTION
Dec 26, 2014Department of Environmental Protection$250,778.02IOTB CONSTRUCTION
Mar 9, 2015Department of Environmental Protection$249,442.26IOTB CONSTRUCTION
Aug 20, 2014Department of Environmental Protection$240,655.14IOTB CONSTRUCTION
Jan 12, 2015Department of Environmental Protection$239,888.16IOTB CONSTRUCTION
Dec 5, 2014Department of Environmental Protection$238,066.47IOTB CONSTRUCTION
Aug 13, 2014Department of Environmental Protection$237,129.88IOTB CONSTRUCTION
Sep 15, 2014Department of Environmental Protection$195,492.78IOTB CONSTRUCTION
Jun 12, 2015Department of Environmental Protection$159,529.15IOTB CONSTRUCTION
FY 2014top 20 of 130 payments$14,093,239
DateAgencyAmountCategoryPurchase order
Apr 23, 2014Department of Environmental Protection$1,279,663.11IOTB CONSTRUCTION
Mar 27, 2014Department of Environmental Protection$1,038,339.55IOTB CONSTRUCTION
Jan 15, 2014Department of Environmental Protection$1,033,309.96IOTB CONSTRUCTION
Feb 10, 2014Department of Environmental Protection$985,106.68IOTB CONSTRUCTION
Nov 22, 2013Department of Environmental Protection$652,636.52IOTB CONSTRUCTION
Oct 2, 2013Department of Environmental Protection$586,538.87IOTB CONSTRUCTION
Jun 2, 2014Department of Environmental Protection$456,029.93IOTB CONSTRUCTION
Apr 2, 2014Department of Environmental Protection$422,025.62IOTB CONSTRUCTION
Apr 25, 2014Department of Environmental Protection$394,439.05IOTB CONSTRUCTION
May 19, 2014Department of Environmental Protection$391,460.44IOTB CONSTRUCTION
Mar 17, 2014Department of Environmental Protection$340,835.52IOTB CONSTRUCTION
Nov 1, 2013Department of Environmental Protection$318,456.21IOTB CONSTRUCTION
May 22, 2014Department of Environmental Protection$277,492.34IOTB CONSTRUCTION
Apr 24, 2014Department of Environmental Protection$266,390.44IOTB CONSTRUCTION
Mar 12, 2014Department of Environmental Protection$238,221.67IOTB CONSTRUCTION
May 13, 2014Department of Environmental Protection$228,019.62IOTB CONSTRUCTION
Jul 1, 2013Department of Environmental Protection$214,461.46IOTB CONSTRUCTION
Aug 22, 2013Department of Environmental Protection$208,734.72IOTB CONSTRUCTION
Feb 3, 2014Department of Environmental Protection$201,055.52IOTB CONSTRUCTION
Feb 18, 2014Department of Environmental Protection$196,507.65IOTB CONSTRUCTION
FY 2013top 20 of 61 payments$7,341,443
DateAgencyAmountCategoryPurchase order
Jul 11, 2012Department of Environmental Protection$731,649.32IOTB CONSTRUCTION
Nov 5, 2012Department of Environmental Protection$621,641.72IOTB CONSTRUCTION
Sep 7, 2012Department of Environmental Protection$554,615.33IOTB CONSTRUCTION
Apr 4, 2013Department of Environmental Protection$499,787.30IOTB CONSTRUCTION
Oct 15, 2012Department of Environmental Protection$434,771.54IOTB CONSTRUCTION
May 17, 2013Department of Environmental Protection$303,494.21IOTB CONSTRUCTION
Jun 13, 2013Department of Environmental Protection$301,214.35IOTB CONSTRUCTION
Jan 28, 2013Department of Environmental Protection$296,203.46IOTB CONSTRUCTION
May 20, 2013Department of Environmental Protection$275,449.26IOTB CONSTRUCTION
Apr 8, 2013Department of Environmental Protection$271,715.63IOTB CONSTRUCTION
Jun 13, 2013Department of Environmental Protection$236,313.01IOTB CONSTRUCTION
Dec 20, 2012Department of Environmental Protection$213,920.52IOTB CONSTRUCTION
Jun 21, 2013Department of Environmental Protection$191,328.57IOTB CONSTRUCTION
Jan 14, 2013Department of Environmental Protection$165,556.93IOTB CONSTRUCTION
Apr 5, 2013Department of Environmental Protection$151,451.95IOTB CONSTRUCTION
Nov 19, 2012Department of Environmental Protection$116,799.49IOTB CONSTRUCTION
Sep 17, 2012Department of Environmental Protection$114,390.78IOTB CONSTRUCTION
Feb 27, 2013Department of Environmental Protection$114,347.88IOTB CONSTRUCTION
Jun 3, 2013Department of Environmental Protection$113,812.07IOTB CONSTRUCTION
May 17, 2013Department of Environmental Protection$91,048.28IOTB CONSTRUCTION
FY 2012top 20 of 31 payments$5,895,124
DateAgencyAmountCategoryPurchase order
Oct 19, 2011Department of Environmental Protection$1,030,111.63IOTB CONSTRUCTION
Aug 26, 2011Department of Environmental Protection$754,667.72IOTB CONSTRUCTION
Jun 4, 2012Department of Environmental Protection$743,542.26IOTB CONSTRUCTION
May 24, 2012Department of Environmental Protection$578,478.27IOTB CONSTRUCTION
Oct 31, 2011Department of Environmental Protection$546,667.18IOTB CONSTRUCTION
Oct 31, 2011Department of Environmental Protection$536,087.04IOTB CONSTRUCTION
Nov 28, 2011Department of Environmental Protection$355,550.12IOTB CONSTRUCTION
Feb 16, 2012Department of Environmental Protection$288,943.13IOTB CONSTRUCTION
Dec 22, 2011Department of Environmental Protection$222,125.64IOTB CONSTRUCTION
Jan 9, 2012Department of Environmental Protection$172,054.96IOTB CONSTRUCTION
Oct 11, 2011Department of Environmental Protection$100,854.06IOTB CONSTRUCTION
Oct 17, 2011Department of Environmental Protection$99,840.18IOTB CONSTRUCTION
Mar 26, 2012Department of Environmental Protection$85,467.77IOTB CONSTRUCTION
Jun 22, 2012Department of Environmental Protection$77,828.66IOTB CONSTRUCTION
Apr 23, 2012Department of Environmental Protection$66,406.68IOTB CONSTRUCTION
May 14, 2012Department of Environmental Protection$28,110.42IOTB CONSTRUCTION
Jun 22, 2012Department of Environmental Protection$23,348.60IOTB CONSTRUCTION
Jun 22, 2012Department of Environmental Protection$23,348.60IOTB CONSTRUCTION
Jun 22, 2012Department of Environmental Protection$23,348.60IOTB CONSTRUCTION
Apr 23, 2012Department of Environmental Protection$19,922.03IOTB CONSTRUCTION
FY 2011top 20 of 71 payments$6,268,388
DateAgencyAmountCategoryPurchase order
May 25, 2011Department of Environmental Protection$556,923.56IOTB CONSTRUCTION
Feb 14, 2011Department of Environmental Protection$551,089.21IOTB CONSTRUCTION
Feb 22, 2011Department of Environmental Protection$488,994.96IOTB CONSTRUCTION
Aug 11, 2010Department of Environmental Protection$350,102.94IOTB CONSTRUCTION
Jul 21, 2010Department of Environmental Protection$349,996.40IOTB CONSTRUCTION
Dec 13, 2010Department of Environmental Protection$326,744.43IOTB CONSTRUCTION
Jun 27, 2011Department of Environmental Protection$295,863.49IOTB CONSTRUCTION
Apr 7, 2011Department of Environmental Protection$260,956.18IOTB CONSTRUCTION
Nov 5, 2010Department of Environmental Protection$187,674.33IOTB CONSTRUCTION
Oct 12, 2010Department of Environmental Protection$187,448.73IOTB CONSTRUCTION
Oct 21, 2010Department of Environmental Protection$166,672.68IOTB CONSTRUCTION
Oct 12, 2010Department of Environmental Protection$147,733.41IOTB CONSTRUCTION
Apr 1, 2011Department of Environmental Protection$141,238.07IOTB CONSTRUCTION
Nov 22, 2010Department of Environmental Protection$141,213.36IOTB CONSTRUCTION
Nov 22, 2010Department of Environmental Protection$133,992.48IOTB CONSTRUCTION
Nov 22, 2010Department of Environmental Protection$133,992.48IOTB CONSTRUCTION
Nov 22, 2010Department of Environmental Protection$133,992.48IOTB CONSTRUCTION
Jun 6, 2011Department of Environmental Protection$133,724.66IOTB CONSTRUCTION
Aug 11, 2010Department of Environmental Protection$129,841.39IOTB CONSTRUCTION
Feb 14, 2011Department of Environmental Protection$120,579.08IOTB CONSTRUCTION
FY 2010top 20 of 43 payments$4,001,475
DateAgencyAmountCategoryPurchase order
May 17, 2010Department of Environmental Protection$588,173.41IOTB CONSTRUCTION
Feb 5, 2010Department of Environmental Protection$580,287.29IOTB CONSTRUCTION
May 12, 2010Department of Environmental Protection$392,765.43IOTB CONSTRUCTION
Jan 11, 2010Department of Environmental Protection$222,126.00IOTB CONSTRUCTION
Feb 22, 2010Department of Environmental Protection$221,003.76IOTB CONSTRUCTION
Feb 10, 2010Department of Environmental Protection$196,855.00OTHR SERV AND CHRGS-GENERAL
Mar 24, 2010Department of Environmental Protection$154,485.43IOTB CONSTRUCTION
Mar 1, 2010Department of Environmental Protection$131,564.70OTHR SERV AND CHRGS-GENERAL
Jun 10, 2010Department of Environmental Protection$125,704.33IOTB CONSTRUCTION
May 17, 2010Department of Environmental Protection$120,680.16IOTB CONSTRUCTION
Feb 10, 2010Department of Environmental Protection$115,529.60OTHR SERV AND CHRGS-GENERAL
Mar 4, 2010Department of Environmental Protection$110,221.76IOTB CONSTRUCTION
Jun 7, 2010Department of Environmental Protection$74,997.31IOTB CONSTRUCTION
Jan 11, 2010Department of Environmental Protection$66,637.80IOTB CONSTRUCTION
Jan 11, 2010Department of Environmental Protection$66,637.80IOTB CONSTRUCTION
Mar 4, 2010Department of Environmental Protection$58,063.21IOTB CONSTRUCTION
May 17, 2010Department of Environmental Protection$55,460.75IOTB CONSTRUCTION
Mar 24, 2010Department of Environmental Protection$49,295.15IOTB CONSTRUCTION
Mar 24, 2010Department of Environmental Protection$49,295.15IOTB CONSTRUCTION
Mar 24, 2010Department of Environmental Protection$49,295.15IOTB CONSTRUCTION

Recent payments

DateAgencyAmountCategoryMethod
Jun 4, 2025Department of Environmental Protection$139,314.05CONTRACTUAL SERVICES GENERALContracts
Jun 3, 2025Department of Environmental Protection$1,099,972.30IOTB CONSTRUCTIONCapital Contracts
Apr 23, 2025Department of Environmental Protection$89,512.09CONTRACTUAL SERVICES GENERALContracts
Apr 21, 2025Department of Environmental Protection$292,664.64IOTB CONSTRUCTIONCapital Contracts
Mar 27, 2025Department of Environmental Protection$91,957.15N/AContracts
Mar 21, 2025Department of Environmental Protection$697.50N/AContracts
Mar 17, 2025Department of Environmental Protection$16,477.82IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$2,323.24IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$90.43IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$567.52IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$2,307.91IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$808.09IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$1,333.95IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$39.33IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$10,998.10IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$5,572.01IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$4,145.41IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$15,333.96IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$16,890.15IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$38.66IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$11,115.86IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$155,943.62CONTRACTUAL SERVICES GENERALContracts
Mar 17, 2025Department of Environmental Protection$9,763.07IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$189.21IOTB CONSTRUCTIONCapital Contracts
Mar 17, 2025Department of Environmental Protection$137.74IOTB CONSTRUCTIONCapital Contracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data