Empire Control Abatement Inc.: New York City Government Payments
as recorded by New York City: EMPIRE CONTROL ABATEMENT INC.
Empire Control Abatement Inc. is the 431st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 67th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.3% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 22.7% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| N/A | 27 | $915,652 | May 17, 2019 – Nov 14, 2023 |
| SUPPLIES + MATERIALS - GENERAL | 1 | $7,250 | Oct 25, 2021 – Oct 25, 2021 |
| MAINT & REP GENERAL | 1 | $3,690 | Oct 17, 2016 – Oct 17, 2016 |
| DESIGN-CONSULTANT-BUILDINGS | 1 | $31,034 | Jan 31, 2022 – Jan 31, 2022 |
| POLLUTION REMEDIATION OBLIGATIONS | 1 | $27,750 | Oct 25, 2021 – Oct 25, 2021 |
| CONSTRUCTION-BUILDINGS | 3,934 | $155,016,207 | Jan 4, 2010 – Jun 23, 2025 |
| IOTB CONSTRUCTION | 149 | $11,044,707 | Nov 18, 2010 – Nov 20, 2023 |
| <Non-Applicable Expenditure Object> | 35 | -$749 | Jul 8, 2011 – Aug 10, 2023 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 335 payments$14,940,388
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 3, 2025 | School Construction Authority | $680,466.32 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2025 | School Construction Authority | $523,525.25 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2025 | School Construction Authority | $505,351.41 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2025 | School Construction Authority | $465,046.84 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2025 | School Construction Authority | $241,932.81 | CONSTRUCTION-BUILDINGS | – |
| Jan 3, 2025 | School Construction Authority | $209,859.44 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2024 | School Construction Authority | $208,470.04 | CONSTRUCTION-BUILDINGS | – |
| Jul 31, 2024 | School Construction Authority | $205,942.54 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2024 | School Construction Authority | $204,369.30 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2025 | School Construction Authority | $194,151.82 | CONSTRUCTION-BUILDINGS | – |
| Jul 31, 2024 | School Construction Authority | $194,126.94 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2025 | School Construction Authority | $175,780.28 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2025 | School Construction Authority | $162,956.84 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2025 | School Construction Authority | $161,386.17 | CONSTRUCTION-BUILDINGS | – |
| Feb 13, 2025 | School Construction Authority | $152,793.25 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2024 | School Construction Authority | $149,760.94 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2025 | School Construction Authority | $144,299.50 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2024 | School Construction Authority | $137,495.61 | CONSTRUCTION-BUILDINGS | – |
| Apr 3, 2025 | School Construction Authority | $135,541.84 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2024 | School Construction Authority | $120,892.80 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 268 payments$19,328,854
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 13, 2024 | School Construction Authority | $617,318.02 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2023 | School Construction Authority | $581,945.30 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2023 | School Construction Authority | $541,339.71 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2023 | School Construction Authority | $454,704.25 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2024 | School Construction Authority | $409,182.54 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2023 | School Construction Authority | $408,301.43 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2023 | School Construction Authority | $399,461.06 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2023 | School Construction Authority | $395,810.41 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2023 | School Construction Authority | $387,412.37 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2023 | School Construction Authority | $380,253.60 | CONSTRUCTION-BUILDINGS | – |
| Feb 20, 2024 | School Construction Authority | $376,886.80 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2023 | School Construction Authority | $324,583.64 | CONSTRUCTION-BUILDINGS | – |
| Sep 27, 2023 | School Construction Authority | $317,133.61 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2023 | School Construction Authority | $280,198.10 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2023 | School Construction Authority | $254,076.81 | CONSTRUCTION-BUILDINGS | – |
| Oct 24, 2023 | School Construction Authority | $243,148.81 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2023 | School Construction Authority | $237,686.57 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2024 | School Construction Authority | $237,505.67 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2023 | School Construction Authority | $235,602.80 | CONSTRUCTION-BUILDINGS | – |
| Dec 1, 2023 | School Construction Authority | $234,786.23 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 487 payments$27,958,287
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 1, 2023 | School Construction Authority | $729,976.84 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2023 | School Construction Authority | $589,353.62 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2022 | School Construction Authority | $556,674.87 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2023 | School Construction Authority | $540,611.47 | CONSTRUCTION-BUILDINGS | – |
| May 1, 2023 | School Construction Authority | $385,289.85 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2022 | Department of Environmental Protection | $364,124.37 | IOTB CONSTRUCTION | – |
| Jul 26, 2022 | School Construction Authority | $329,093.06 | CONSTRUCTION-BUILDINGS | – |
| Nov 22, 2022 | School Construction Authority | $316,547.61 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $313,928.23 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $303,556.01 | CONSTRUCTION-BUILDINGS | – |
| Jun 27, 2023 | School Construction Authority | $299,406.75 | CONSTRUCTION-BUILDINGS | – |
| Jun 6, 2023 | School Construction Authority | $292,083.65 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2023 | School Construction Authority | $284,356.18 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2022 | School Construction Authority | $275,684.92 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2022 | School Construction Authority | $261,608.88 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2022 | School Construction Authority | $252,625.34 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2022 | School Construction Authority | $248,495.91 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2023 | School Construction Authority | $245,445.20 | CONSTRUCTION-BUILDINGS | – |
| Jul 11, 2022 | Department of Environmental Protection | $245,292.31 | IOTB CONSTRUCTION | – |
| Dec 23, 2022 | School Construction Authority | $243,786.52 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 404 payments$25,013,923
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 9, 2021 | School Construction Authority | $636,466.64 | CONSTRUCTION-BUILDINGS | – |
| Jul 30, 2021 | School Construction Authority | $625,034.34 | CONSTRUCTION-BUILDINGS | – |
| Sep 8, 2021 | School Construction Authority | $533,777.52 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2021 | School Construction Authority | $533,083.68 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2022 | School Construction Authority | $503,999.17 | CONSTRUCTION-BUILDINGS | – |
| Sep 23, 2021 | School Construction Authority | $492,751.30 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2021 | School Construction Authority | $418,078.02 | CONSTRUCTION-BUILDINGS | – |
| May 3, 2022 | School Construction Authority | $403,895.53 | CONSTRUCTION-BUILDINGS | – |
| Dec 8, 2021 | School Construction Authority | $384,783.39 | CONSTRUCTION-BUILDINGS | – |
| Mar 30, 2022 | School Construction Authority | $384,445.75 | CONSTRUCTION-BUILDINGS | – |
| Jul 13, 2021 | School Construction Authority | $367,970.74 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2021 | School Construction Authority | $363,474.92 | CONSTRUCTION-BUILDINGS | – |
| Jul 13, 2021 | School Construction Authority | $356,441.27 | CONSTRUCTION-BUILDINGS | – |
| May 3, 2022 | School Construction Authority | $318,737.78 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2021 | School Construction Authority | $266,750.87 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2022 | School Construction Authority | $261,904.03 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2021 | School Construction Authority | $243,866.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 27, 2021 | School Construction Authority | $242,780.98 | CONSTRUCTION-BUILDINGS | – |
| Feb 9, 2022 | School Construction Authority | $236,195.02 | CONSTRUCTION-BUILDINGS | – |
| Aug 10, 2021 | School Construction Authority | $233,712.61 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 172 payments$10,855,489
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 14, 2020 | Department of Environmental Protection | $936,340.45 | IOTB CONSTRUCTION | – |
| May 7, 2021 | School Construction Authority | $699,556.49 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2021 | School Construction Authority | $455,644.38 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2020 | School Construction Authority | $427,968.22 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2021 | School Construction Authority | $413,839.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2021 | School Construction Authority | $367,970.74 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2021 | School Construction Authority | $356,441.27 | CONSTRUCTION-BUILDINGS | – |
| Sep 18, 2020 | Department of Environmental Protection | $351,323.59 | IOTB CONSTRUCTION | – |
| Apr 28, 2021 | School Construction Authority | $291,528.78 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2021 | School Construction Authority | $227,822.19 | CONSTRUCTION-BUILDINGS | – |
| Aug 7, 2020 | Department of Environmental Protection | $220,185.62 | IOTB CONSTRUCTION | – |
| Feb 2, 2021 | School Construction Authority | $209,956.95 | CONSTRUCTION-BUILDINGS | – |
| Feb 2, 2021 | School Construction Authority | $182,966.25 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2020 | School Construction Authority | $181,899.13 | CONSTRUCTION-BUILDINGS | – |
| May 4, 2021 | School Construction Authority | $173,955.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2021 | School Construction Authority | $171,062.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 2, 2020 | School Construction Authority | $162,099.20 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2021 | School Construction Authority | $155,208.59 | CONSTRUCTION-BUILDINGS | – |
| Nov 30, 2020 | School Construction Authority | $151,975.35 | CONSTRUCTION-BUILDINGS | – |
| Feb 2, 2021 | School Construction Authority | $150,499.18 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 261 payments$14,065,242
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 9, 2020 | Department of Environmental Protection | $391,554.80 | IOTB CONSTRUCTION | – |
| Oct 8, 2019 | School Construction Authority | $329,115.64 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2020 | School Construction Authority | $285,828.04 | CONSTRUCTION-BUILDINGS | – |
| Nov 27, 2019 | School Construction Authority | $272,899.47 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2020 | School Construction Authority | $272,894.46 | CONSTRUCTION-BUILDINGS | – |
| Jul 22, 2019 | Department of Environmental Protection | $270,885.44 | IOTB CONSTRUCTION | – |
| Nov 13, 2019 | School Construction Authority | $262,131.82 | CONSTRUCTION-BUILDINGS | – |
| Aug 9, 2019 | School Construction Authority | $228,886.41 | CONSTRUCTION-BUILDINGS | – |
| Sep 9, 2019 | Department of Environmental Protection | $228,296.06 | IOTB CONSTRUCTION | – |
| Feb 10, 2020 | School Construction Authority | $221,973.14 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2019 | School Construction Authority | $217,689.12 | CONSTRUCTION-BUILDINGS | – |
| Aug 1, 2019 | Department of Environmental Protection | $201,573.99 | IOTB CONSTRUCTION | – |
| Dec 24, 2019 | Health and Hospitals Corporation | $194,399.71 | CONSTRUCTION-BUILDINGS | – |
| Mar 26, 2020 | Department of Environmental Protection | $189,296.96 | IOTB CONSTRUCTION | – |
| Oct 8, 2019 | School Construction Authority | $185,654.02 | CONSTRUCTION-BUILDINGS | – |
| Jun 1, 2020 | School Construction Authority | $180,723.93 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2020 | School Construction Authority | $178,226.40 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2019 | School Construction Authority | $175,600.64 | CONSTRUCTION-BUILDINGS | – |
| Aug 7, 2019 | School Construction Authority | $173,857.71 | CONSTRUCTION-BUILDINGS | – |
| Sep 18, 2019 | Department of Environmental Protection | $171,119.91 | IOTB CONSTRUCTION | – |
FY 2019top 20 of 155 payments$8,635,417
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 17, 2018 | School Construction Authority | $440,610.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 12, 2018 | School Construction Authority | $367,412.50 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2018 | Department of Parks and Recreation | $362,713.89 | IOTB CONSTRUCTION | – |
| Oct 18, 2018 | School Construction Authority | $307,182.50 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2019 | School Construction Authority | $235,622.62 | CONSTRUCTION-BUILDINGS | – |
| May 21, 2019 | School Construction Authority | $222,012.95 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | School Construction Authority | $216,980.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2019 | School Construction Authority | $212,810.37 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2018 | Department of Parks and Recreation | $191,405.16 | IOTB CONSTRUCTION | – |
| Jun 5, 2019 | School Construction Authority | $189,212.63 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2019 | Department of Environmental Protection | $171,316.75 | IOTB CONSTRUCTION | – |
| Oct 31, 2018 | School Construction Authority | $143,408.06 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2019 | School Construction Authority | $140,839.86 | CONSTRUCTION-BUILDINGS | – |
| Jul 13, 2018 | School Construction Authority | $140,519.54 | CONSTRUCTION-BUILDINGS | – |
| Jul 6, 2018 | School Construction Authority | $140,519.54 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2018 | School Construction Authority | $137,684.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 11, 2018 | School Construction Authority | $134,472.50 | CONSTRUCTION-BUILDINGS | – |
| Apr 12, 2019 | School Construction Authority | $123,693.81 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2019 | School Construction Authority | $116,533.36 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2018 | Department of Parks and Recreation | $115,514.30 | IOTB CONSTRUCTION | – |
FY 2018top 20 of 59 payments$3,598,883
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 28, 2017 | School Construction Authority | $400,520.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 29, 2017 | School Construction Authority | $266,712.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2018 | Department of Environmental Protection | $236,510.45 | IOTB CONSTRUCTION | – |
| Aug 25, 2017 | School Construction Authority | $211,755.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2017 | School Construction Authority | $198,017.59 | CONSTRUCTION-BUILDINGS | – |
| May 29, 2018 | Department of Parks and Recreation | $178,412.36 | IOTB CONSTRUCTION | – |
| Nov 29, 2017 | Department of Parks and Recreation | $163,731.74 | IOTB CONSTRUCTION | – |
| May 4, 2018 | School Construction Authority | $162,117.50 | CONSTRUCTION-BUILDINGS | – |
| Apr 23, 2018 | Department of Parks and Recreation | $161,884.75 | IOTB CONSTRUCTION | – |
| Sep 8, 2017 | School Construction Authority | $136,070.38 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2018 | School Construction Authority | $124,513.88 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2018 | School Construction Authority | $120,080.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 11, 2018 | School Construction Authority | $111,342.64 | CONSTRUCTION-BUILDINGS | – |
| Nov 2, 2017 | School Construction Authority | $110,912.50 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2018 | School Construction Authority | $93,653.96 | CONSTRUCTION-BUILDINGS | – |
| Jul 26, 2017 | School Construction Authority | $91,782.52 | CONSTRUCTION-BUILDINGS | – |
| May 8, 2018 | School Construction Authority | $83,473.66 | CONSTRUCTION-BUILDINGS | – |
| Jul 13, 2017 | School Construction Authority | $74,777.35 | CONSTRUCTION-BUILDINGS | – |
| Apr 16, 2018 | School Construction Authority | $56,315.90 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2017 | Health and Hospitals Corporation | $56,050.20 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 157 payments$6,600,541
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 14, 2016 | School Construction Authority | $562,087.84 | CONSTRUCTION-BUILDINGS | – |
| Oct 13, 2016 | School Construction Authority | $309,434.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2016 | School Construction Authority | $304,214.29 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2017 | School Construction Authority | $301,041.41 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2017 | School Construction Authority | $297,540.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2016 | School Construction Authority | $275,352.37 | CONSTRUCTION-BUILDINGS | – |
| Feb 17, 2017 | School Construction Authority | $264,472.60 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2016 | School Construction Authority | $251,750.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2016 | School Construction Authority | $244,599.94 | CONSTRUCTION-BUILDINGS | – |
| May 26, 2017 | School Construction Authority | $233,795.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 4, 2016 | School Construction Authority | $213,983.29 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2016 | School Construction Authority | $199,958.92 | CONSTRUCTION-BUILDINGS | – |
| Aug 25, 2016 | School Construction Authority | $168,650.64 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2016 | School Construction Authority | $164,274.03 | CONSTRUCTION-BUILDINGS | – |
| Nov 4, 2016 | School Construction Authority | $143,639.69 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2016 | School Construction Authority | $125,934.41 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2016 | School Construction Authority | $125,000.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2017 | School Construction Authority | $124,337.23 | CONSTRUCTION-BUILDINGS | – |
| May 5, 2017 | Department of Parks and Recreation | $123,680.61 | IOTB CONSTRUCTION | – |
| Jul 7, 2016 | School Construction Authority | $121,389.70 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 251 payments$5,068,217
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 9, 2015 | School Construction Authority | $261,762.24 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2015 | School Construction Authority | $259,720.04 | CONSTRUCTION-BUILDINGS | – |
| Nov 2, 2015 | School Construction Authority | $247,096.06 | CONSTRUCTION-BUILDINGS | – |
| Oct 6, 2015 | School Construction Authority | $197,409.81 | CONSTRUCTION-BUILDINGS | – |
| Sep 2, 2015 | School Construction Authority | $174,155.71 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2015 | School Construction Authority | $163,975.52 | CONSTRUCTION-BUILDINGS | – |
| Jul 10, 2015 | School Construction Authority | $143,375.70 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2016 | School Construction Authority | $138,267.73 | CONSTRUCTION-BUILDINGS | – |
| Nov 30, 2015 | School Construction Authority | $113,179.09 | CONSTRUCTION-BUILDINGS | – |
| Dec 8, 2015 | School Construction Authority | $109,053.16 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2015 | School Construction Authority | $102,402.17 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2016 | Health and Hospitals Corporation | $77,940.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2016 | School Construction Authority | $76,337.21 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2015 | School Construction Authority | $75,752.06 | CONSTRUCTION-BUILDINGS | – |
| Nov 4, 2015 | School Construction Authority | $74,051.26 | CONSTRUCTION-BUILDINGS | – |
| Dec 4, 2015 | School Construction Authority | $68,979.79 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2015 | School Construction Authority | $59,675.85 | CONSTRUCTION-BUILDINGS | – |
| Nov 24, 2015 | School Construction Authority | $57,503.82 | CONSTRUCTION-BUILDINGS | – |
| Nov 2, 2015 | School Construction Authority | $56,372.88 | CONSTRUCTION-BUILDINGS | – |
| Feb 16, 2016 | School Construction Authority | $54,924.88 | CONSTRUCTION-BUILDINGS | – |
FY 2015top 20 of 224 payments$4,079,283
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 16, 2015 | School Construction Authority | $187,807.14 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2014 | School Construction Authority | $178,351.34 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2014 | School Construction Authority | $166,390.52 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2014 | School Construction Authority | $153,651.82 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2014 | School Construction Authority | $150,864.56 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2014 | School Construction Authority | $150,384.79 | CONSTRUCTION-BUILDINGS | – |
| Jun 29, 2015 | Health and Hospitals Corporation | $148,402.98 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2015 | School Construction Authority | $133,890.84 | CONSTRUCTION-BUILDINGS | – |
| Mar 6, 2015 | School Construction Authority | $133,157.96 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2015 | School Construction Authority | $132,765.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2015 | School Construction Authority | $115,187.99 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2015 | School Construction Authority | $112,699.98 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2014 | School Construction Authority | $107,800.86 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2015 | School Construction Authority | $91,535.92 | CONSTRUCTION-BUILDINGS | – |
| Apr 16, 2015 | School Construction Authority | $84,163.40 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2014 | School Construction Authority | $78,134.65 | CONSTRUCTION-BUILDINGS | – |
| Jun 4, 2015 | School Construction Authority | $77,395.59 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2015 | School Construction Authority | $71,287.60 | CONSTRUCTION-BUILDINGS | – |
| Dec 5, 2014 | School Construction Authority | $65,782.38 | CONSTRUCTION-BUILDINGS | – |
| Jun 29, 2015 | Health and Hospitals Corporation | $63,601.85 | CONSTRUCTION-BUILDINGS | – |
FY 2014top 20 of 354 payments$6,216,251
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 15, 2013 | Health and Hospitals Corporation | $709,946.56 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2014 | School Construction Authority | $260,243.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 11, 2013 | Department of Parks and Recreation | $251,725.64 | IOTB CONSTRUCTION | – |
| Jun 19, 2014 | School Construction Authority | $232,752.99 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2013 | School Construction Authority | $226,866.72 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2013 | School Construction Authority | $171,541.50 | CONSTRUCTION-BUILDINGS | – |
| Dec 10, 2013 | School Construction Authority | $150,926.50 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2013 | School Construction Authority | $143,077.44 | CONSTRUCTION-BUILDINGS | – |
| Feb 6, 2014 | School Construction Authority | $141,538.20 | CONSTRUCTION-BUILDINGS | – |
| Jun 19, 2014 | School Construction Authority | $141,158.38 | CONSTRUCTION-BUILDINGS | – |
| Nov 20, 2013 | School Construction Authority | $138,766.50 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2014 | Health and Hospitals Corporation | $135,013.98 | CONSTRUCTION-BUILDINGS | – |
| May 6, 2014 | School Construction Authority | $118,874.63 | CONSTRUCTION-BUILDINGS | – |
| Mar 17, 2014 | School Construction Authority | $104,356.02 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2014 | School Construction Authority | $94,224.08 | CONSTRUCTION-BUILDINGS | – |
| Jan 28, 2014 | School Construction Authority | $89,228.69 | CONSTRUCTION-BUILDINGS | – |
| Jun 19, 2014 | School Construction Authority | $83,361.47 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2013 | School Construction Authority | $82,035.66 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2013 | Health and Hospitals Corporation | $78,882.95 | CONSTRUCTION-BUILDINGS | – |
| Mar 21, 2014 | Health and Hospitals Corporation | $66,027.41 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 419 payments$5,983,061
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 15, 2012 | Department of Environmental Protection | $750,567.48 | IOTB CONSTRUCTION | – |
| Jan 14, 2013 | Department of Environmental Protection | $463,276.58 | IOTB CONSTRUCTION | – |
| Jun 26, 2013 | Department of Parks and Recreation | $232,280.76 | IOTB CONSTRUCTION | – |
| Feb 26, 2013 | School Construction Authority | $232,025.89 | CONSTRUCTION-BUILDINGS | – |
| Sep 5, 2012 | School Construction Authority | $223,566.66 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2013 | Department of Parks and Recreation | $160,942.82 | IOTB CONSTRUCTION | – |
| Jan 14, 2013 | School Construction Authority | $152,243.08 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2013 | School Construction Authority | $122,777.39 | CONSTRUCTION-BUILDINGS | – |
| Aug 20, 2012 | Department of Homeless Services | $119,570.07 | CONSTRUCTION-BUILDINGS | – |
| Aug 3, 2012 | Department of Environmental Protection | $111,510.65 | IOTB CONSTRUCTION | – |
| Apr 19, 2013 | Department of Environmental Protection | $111,038.66 | IOTB CONSTRUCTION | – |
| Jun 20, 2013 | School Construction Authority | $105,377.23 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2012 | School Construction Authority | $92,991.74 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2013 | School Construction Authority | $83,438.42 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2013 | School Construction Authority | $60,000.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2013 | School Construction Authority | $59,202.37 | CONSTRUCTION-BUILDINGS | – |
| Jan 18, 2013 | School Construction Authority | $56,669.89 | CONSTRUCTION-BUILDINGS | – |
| Jun 4, 2013 | School Construction Authority | $41,450.12 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2013 | Health and Hospitals Corporation | $39,799.98 | CONSTRUCTION-BUILDINGS | – |
| Nov 7, 2012 | School Construction Authority | $39,009.60 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 352 payments$8,319,911
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 14, 2011 | Department of Homeless Services | $424,771.60 | CONSTRUCTION-BUILDINGS | – |
| Dec 16, 2011 | Department of Homeless Services | $391,797.10 | CONSTRUCTION-BUILDINGS | – |
| Feb 6, 2012 | Department of Homeless Services | $382,643.44 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2011 | Department of Parks and Recreation | $369,251.49 | IOTB CONSTRUCTION | – |
| Sep 20, 2011 | School Construction Authority | $348,754.61 | CONSTRUCTION-BUILDINGS | – |
| May 14, 2012 | Department of Homeless Services | $310,766.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 14, 2011 | Department of Environmental Protection | $246,607.95 | IOTB CONSTRUCTION | – |
| Mar 30, 2012 | School Construction Authority | $224,033.45 | CONSTRUCTION-BUILDINGS | – |
| Feb 21, 2012 | Department of Environmental Protection | $194,450.70 | IOTB CONSTRUCTION | – |
| Aug 11, 2011 | School Construction Authority | $183,939.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2011 | School Construction Authority | $183,283.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 30, 2011 | School Construction Authority | $175,830.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2012 | Department of Homeless Services | $164,045.05 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2012 | School Construction Authority | $143,116.47 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2011 | School Construction Authority | $128,137.58 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2011 | Department of Parks and Recreation | $125,468.78 | IOTB CONSTRUCTION | – |
| Jan 19, 2012 | School Construction Authority | $124,566.19 | CONSTRUCTION-BUILDINGS | – |
| Oct 31, 2011 | School Construction Authority | $116,566.06 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2011 | School Construction Authority | $111,926.98 | CONSTRUCTION-BUILDINGS | – |
| Jul 20, 2011 | School Construction Authority | $109,725.00 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 229 payments$4,678,131
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2010 | School Construction Authority | $437,905.19 | CONSTRUCTION-BUILDINGS | – |
| Mar 1, 2011 | Department of Parks and Recreation | $296,428.47 | IOTB CONSTRUCTION | – |
| Dec 21, 2010 | School Construction Authority | $204,033.38 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2011 | Department of Parks and Recreation | $190,127.30 | IOTB CONSTRUCTION | – |
| Dec 21, 2010 | School Construction Authority | $164,302.84 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2010 | School Construction Authority | $134,531.30 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2011 | Department of Parks and Recreation | $120,200.77 | IOTB CONSTRUCTION | – |
| Jun 28, 2011 | School Construction Authority | $111,303.66 | CONSTRUCTION-BUILDINGS | – |
| Dec 8, 2010 | School Construction Authority | $110,400.31 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2011 | School Construction Authority | $106,628.88 | CONSTRUCTION-BUILDINGS | – |
| Jan 6, 2011 | School Construction Authority | $104,106.48 | CONSTRUCTION-BUILDINGS | – |
| Dec 16, 2010 | School Construction Authority | $103,912.11 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2010 | School Construction Authority | $95,770.06 | CONSTRUCTION-BUILDINGS | – |
| Nov 18, 2010 | Department of Parks and Recreation | $94,128.32 | IOTB CONSTRUCTION | – |
| Apr 27, 2011 | School Construction Authority | $84,004.16 | CONSTRUCTION-BUILDINGS | – |
| Dec 8, 2010 | School Construction Authority | $80,403.91 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2011 | School Construction Authority | $80,299.68 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2011 | School Construction Authority | $74,583.85 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2011 | School Construction Authority | $67,811.72 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2010 | School Construction Authority | $67,435.46 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 20 of 22 payments$1,703,663
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 15, 2010 | School Construction Authority | $311,382.45 | CONSTRUCTION-BUILDINGS | – |
| May 14, 2010 | School Construction Authority | $276,226.75 | CONSTRUCTION-BUILDINGS | – |
| Jan 28, 2010 | School Construction Authority | $254,932.50 | CONSTRUCTION-BUILDINGS | – |
| Feb 17, 2010 | School Construction Authority | $247,190.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2010 | Health and Hospitals Corporation | $203,568.00 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2010 | School Construction Authority | $159,933.69 | CONSTRUCTION-BUILDINGS | – |
| May 18, 2010 | School Construction Authority | $109,334.08 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2010 | School Construction Authority | $28,347.20 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2010 | School Construction Authority | $20,683.20 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2010 | School Construction Authority | $19,920.22 | CONSTRUCTION-BUILDINGS | – |
| Jan 12, 2010 | School Construction Authority | $13,554.06 | CONSTRUCTION-BUILDINGS | – |
| Mar 12, 2010 | School Construction Authority | $11,702.24 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2010 | School Construction Authority | $7,086.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2010 | School Construction Authority | $6,411.99 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2010 | School Construction Authority | $6,310.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2010 | School Construction Authority | $4,581.92 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2010 | School Construction Authority | $4,310.10 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2010 | School Construction Authority | $4,287.08 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2010 | School Construction Authority | $4,287.07 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2010 | School Construction Authority | $4,287.07 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 23, 2025 | School Construction Authority | $97,255.39 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $465,046.84 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $40,432.82 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $60,864.79 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $7,080.16 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $70,276.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $20,600.35 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $35,991.22 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $105,800.03 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $1,821.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $1,231.66 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $505,351.41 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $91,567.48 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $1,566.27 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $77,093.39 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $4,722.32 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $72,031.35 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 20, 2025 | School Construction Authority | $11,563.99 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $7,613.81 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $44,259.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $16,919.29 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $63,484.61 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $7,738.41 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $2,856.54 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 3, 2025 | School Construction Authority | $15,135.37 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data