Delric Construction Company,inc is the 334th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 52nd in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.4% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 5.1% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$207,839,501total received
733payments
4agencies
Sep 23, 2014Jun 20, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Delric Construction Company,inc. No spam.

Payments by fiscal year

FY 2025$41,924,663
FY 2024$39,878,869
FY 2023$29,493,327
FY 2022$17,255,091
FY 2021$9,740,075
FY 2020$28,071,180
FY 2019$15,852,142
FY 2018$1,113,953
FY 2017$6,984,460
FY 2016$10,009,397
FY 2015$7,516,342

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority58$30,093,762
FY 2025Department of Sanitation40$10,395,774
FY 2025Department of Citywide Administrative Services3$1,340,500
FY 2025Department of Design and Construction1$94,627
FY 2024School Construction Authority56$26,182,429
FY 2024Department of Sanitation60$13,635,213
FY 2024Department of Citywide Administrative Services1$50,000
FY 2024Department of Design and Construction1$11,227
FY 2023School Construction Authority79$18,004,367
FY 2023Department of Sanitation28$11,360,917
FY 2023Department of Design and Construction2$118,501
FY 2023Department of Citywide Administrative Services1$9,542
FY 2022Department of Sanitation23$11,406,294
FY 2022School Construction Authority83$5,848,797
FY 2021School Construction Authority78$6,734,893
FY 2021Department of Sanitation6$2,696,973
FY 2021Department of Design and Construction3$308,209
FY 2020School Construction Authority87$27,636,121
FY 2020Department of Design and Construction5$435,060
FY 2019School Construction Authority44$15,819,842
FY 2019Department of Design and Construction1$32,300
FY 2018School Construction Authority9$1,113,953
FY 2017School Construction Authority22$6,984,460
FY 2016School Construction Authority26$10,009,397
FY 2015School Construction Authority16$7,516,342
Total733$207,839,501

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL1$94,627Nov 25, 2024 Nov 25, 2024
N/A9$775,569Mar 14, 2019 Mar 10, 2021
CONSTRUCTION-BUILDINGS711$205,324,422Sep 23, 2014 Jun 20, 2025
POLLUTION REMEDIATION OBLIGATIONS9$1,515,155Feb 22, 2023 Mar 31, 2025
PROMPT PAYMENT INTEREST1$1,480Dec 22, 2022 Dec 22, 2022
OTHR SERV AND CHRGS-GENERAL2$128,247Jun 9, 2023 Jun 4, 2024

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 102 payments$41,924,663
DateAgencyAmountCategoryPurchase order
Sep 19, 2024School Construction Authority$5,910,277.75CONSTRUCTION-BUILDINGS
Jul 26, 2024School Construction Authority$5,249,766.50CONSTRUCTION-BUILDINGS
Jan 3, 2025School Construction Authority$4,659,289.25CONSTRUCTION-BUILDINGS
Dec 4, 2024School Construction Authority$4,659,289.25CONSTRUCTION-BUILDINGS
Aug 19, 2024Department of Sanitation$4,034,595.68CONSTRUCTION-BUILDINGS
Aug 20, 2024School Construction Authority$3,792,704.00CONSTRUCTION-BUILDINGS
Jul 1, 2024School Construction Authority$2,687,972.75CONSTRUCTION-BUILDINGS
Nov 1, 2024School Construction Authority$2,529,427.25CONSTRUCTION-BUILDINGS
Nov 25, 2024Department of Sanitation$1,852,071.15CONSTRUCTION-BUILDINGS
Jan 10, 2025Department of Citywide Administrative Services$888,429.15CONSTRUCTION-BUILDINGS
Aug 19, 2024Department of Sanitation$639,657.75CONSTRUCTION-BUILDINGS
Jun 16, 2025School Construction Authority$629,195.45CONSTRUCTION-BUILDINGS
Mar 6, 2025School Construction Authority$463,017.51CONSTRUCTION-BUILDINGS
Apr 10, 2025School Construction Authority$457,524.75CONSTRUCTION-BUILDINGS
Sep 30, 2024Department of Sanitation$443,510.42CONSTRUCTION-BUILDINGS
Apr 15, 2025School Construction Authority$429,746.75CONSTRUCTION-BUILDINGS
Sep 30, 2024Department of Citywide Administrative Services$330,969.00CONSTRUCTION-BUILDINGS
Oct 22, 2024School Construction Authority$299,010.55CONSTRUCTION-BUILDINGS
Jan 28, 2025School Construction Authority$290,220.25CONSTRUCTION-BUILDINGS
Jan 10, 2025Department of Sanitation$273,219.54CONSTRUCTION-BUILDINGS
FY 2024top 20 of 118 payments$39,878,869
DateAgencyAmountCategoryPurchase order
Apr 8, 2024School Construction Authority$3,272,436.50CONSTRUCTION-BUILDINGS
Sep 7, 2023Department of Sanitation$2,994,690.87CONSTRUCTION-BUILDINGS
Aug 15, 2023School Construction Authority$2,319,382.80CONSTRUCTION-BUILDINGS
Jun 18, 2024School Construction Authority$2,245,272.75CONSTRUCTION-BUILDINGS
Jul 18, 2023School Construction Authority$1,958,676.82CONSTRUCTION-BUILDINGS
Mar 19, 2024School Construction Authority$1,770,800.00CONSTRUCTION-BUILDINGS
Feb 5, 2024Department of Sanitation$1,631,948.95CONSTRUCTION-BUILDINGS
Dec 7, 2023Department of Sanitation$1,624,571.56CONSTRUCTION-BUILDINGS
May 13, 2024School Construction Authority$1,535,361.50CONSTRUCTION-BUILDINGS
Jul 31, 2023Department of Sanitation$1,524,666.09CONSTRUCTION-BUILDINGS
Sep 21, 2023School Construction Authority$1,455,929.14CONSTRUCTION-BUILDINGS
Feb 27, 2024School Construction Authority$1,447,201.50CONSTRUCTION-BUILDINGS
Dec 5, 2023School Construction Authority$1,390,296.50CONSTRUCTION-BUILDINGS
Aug 23, 2023School Construction Authority$1,246,134.00CONSTRUCTION-BUILDINGS
Jan 9, 2024School Construction Authority$1,130,899.00CONSTRUCTION-BUILDINGS
Feb 22, 2024Department of Sanitation$986,950.90CONSTRUCTION-BUILDINGS
Aug 4, 2023School Construction Authority$742,539.00CONSTRUCTION-BUILDINGS
Feb 2, 2024School Construction Authority$732,993.82CONSTRUCTION-BUILDINGS
May 13, 2024Department of Sanitation$667,310.77POLLUTION REMEDIATION OBLIGATIONS
Nov 9, 2023School Construction Authority$662,264.00CONSTRUCTION-BUILDINGS
FY 2023top 20 of 110 payments$29,493,327
DateAgencyAmountCategoryPurchase order
Feb 22, 2023Department of Sanitation$3,017,721.55CONSTRUCTION-BUILDINGS
Apr 21, 2023School Construction Authority$2,010,463.57CONSTRUCTION-BUILDINGS
Mar 23, 2023School Construction Authority$1,866,774.94CONSTRUCTION-BUILDINGS
Aug 31, 2022Department of Sanitation$1,863,470.19CONSTRUCTION-BUILDINGS
May 16, 2023School Construction Authority$1,824,620.19CONSTRUCTION-BUILDINGS
Dec 16, 2022School Construction Authority$1,648,342.18CONSTRUCTION-BUILDINGS
Jun 20, 2023School Construction Authority$1,530,155.38CONSTRUCTION-BUILDINGS
Feb 17, 2023School Construction Authority$1,394,515.94CONSTRUCTION-BUILDINGS
Jan 18, 2023School Construction Authority$1,333,530.17CONSTRUCTION-BUILDINGS
Nov 23, 2022School Construction Authority$1,161,754.48CONSTRUCTION-BUILDINGS
Sep 6, 2022Department of Sanitation$1,153,602.39CONSTRUCTION-BUILDINGS
Oct 20, 2022School Construction Authority$910,714.17CONSTRUCTION-BUILDINGS
Jul 20, 2022Department of Sanitation$889,209.66CONSTRUCTION-BUILDINGS
Dec 2, 2022Department of Sanitation$801,746.38CONSTRUCTION-BUILDINGS
Sep 21, 2022School Construction Authority$785,027.12CONSTRUCTION-BUILDINGS
May 19, 2023Department of Sanitation$686,147.86CONSTRUCTION-BUILDINGS
Apr 3, 2023Department of Sanitation$680,707.78CONSTRUCTION-BUILDINGS
May 17, 2023School Construction Authority$623,751.00CONSTRUCTION-BUILDINGS
Jan 6, 2023Department of Sanitation$615,577.34CONSTRUCTION-BUILDINGS
Aug 22, 2022School Construction Authority$520,242.35CONSTRUCTION-BUILDINGS
FY 2022top 20 of 106 payments$17,255,091
DateAgencyAmountCategoryPurchase order
Nov 22, 2021Department of Sanitation$2,378,893.74CONSTRUCTION-BUILDINGS
Aug 2, 2021Department of Sanitation$1,860,057.55CONSTRUCTION-BUILDINGS
Oct 25, 2021Department of Sanitation$1,746,806.86CONSTRUCTION-BUILDINGS
Dec 20, 2021Department of Sanitation$1,081,668.77CONSTRUCTION-BUILDINGS
Aug 25, 2021Department of Sanitation$1,021,315.18CONSTRUCTION-BUILDINGS
Jun 22, 2022Department of Sanitation$901,439.56CONSTRUCTION-BUILDINGS
May 20, 2022School Construction Authority$872,976.37CONSTRUCTION-BUILDINGS
Mar 18, 2022School Construction Authority$627,302.86CONSTRUCTION-BUILDINGS
Jun 21, 2022School Construction Authority$547,298.37CONSTRUCTION-BUILDINGS
Jan 12, 2022Department of Sanitation$540,484.33CONSTRUCTION-BUILDINGS
Sep 7, 2021School Construction Authority$528,785.71CONSTRUCTION-BUILDINGS
Apr 21, 2022School Construction Authority$453,993.12CONSTRUCTION-BUILDINGS
Mar 21, 2022Department of Sanitation$377,654.96CONSTRUCTION-BUILDINGS
May 16, 2022Department of Sanitation$367,261.30CONSTRUCTION-BUILDINGS
Nov 8, 2021Department of Sanitation$355,614.62CONSTRUCTION-BUILDINGS
Feb 9, 2022Department of Sanitation$339,255.65CONSTRUCTION-BUILDINGS
Mar 2, 2022School Construction Authority$307,510.25CONSTRUCTION-BUILDINGS
Feb 16, 2022School Construction Authority$293,633.12CONSTRUCTION-BUILDINGS
Mar 23, 2022School Construction Authority$202,738.93CONSTRUCTION-BUILDINGS
Jul 7, 2021School Construction Authority$177,330.03CONSTRUCTION-BUILDINGS
FY 2021top 20 of 87 payments$9,740,075
DateAgencyAmountCategoryPurchase order
Aug 28, 2020School Construction Authority$1,788,573.58CONSTRUCTION-BUILDINGS
Dec 2, 2020Department of Sanitation$825,053.62CONSTRUCTION-BUILDINGS
Sep 15, 2020School Construction Authority$736,354.65CONSTRUCTION-BUILDINGS
Apr 5, 2021Department of Sanitation$712,922.11CONSTRUCTION-BUILDINGS
Oct 19, 2020Department of Sanitation$665,447.56CONSTRUCTION-BUILDINGS
Jul 28, 2020School Construction Authority$569,486.39CONSTRUCTION-BUILDINGS
Sep 23, 2020School Construction Authority$407,502.74CONSTRUCTION-BUILDINGS
Jan 20, 2021Department of Sanitation$388,978.16CONSTRUCTION-BUILDINGS
Dec 3, 2020School Construction Authority$248,243.05CONSTRUCTION-BUILDINGS
Mar 10, 2021Department of Design and Construction$242,820.00N/A
Dec 1, 2020School Construction Authority$184,760.75CONSTRUCTION-BUILDINGS
May 12, 2021School Construction Authority$183,693.92CONSTRUCTION-BUILDINGS
Apr 2, 2021School Construction Authority$183,116.15CONSTRUCTION-BUILDINGS
Oct 26, 2020School Construction Authority$165,727.26CONSTRUCTION-BUILDINGS
Nov 10, 2020School Construction Authority$152,243.02CONSTRUCTION-BUILDINGS
May 4, 2021School Construction Authority$140,976.32CONSTRUCTION-BUILDINGS
Dec 1, 2020School Construction Authority$140,372.00CONSTRUCTION-BUILDINGS
Feb 4, 2021School Construction Authority$133,882.27CONSTRUCTION-BUILDINGS
Jan 4, 2021School Construction Authority$118,525.76CONSTRUCTION-BUILDINGS
Aug 28, 2020School Construction Authority$116,371.08CONSTRUCTION-BUILDINGS
FY 2020top 20 of 92 payments$28,071,180
DateAgencyAmountCategoryPurchase order
Sep 25, 2019School Construction Authority$3,128,584.90CONSTRUCTION-BUILDINGS
Dec 20, 2019School Construction Authority$2,743,023.74CONSTRUCTION-BUILDINGS
Nov 6, 2019School Construction Authority$2,363,790.09CONSTRUCTION-BUILDINGS
Nov 21, 2019School Construction Authority$2,263,579.07CONSTRUCTION-BUILDINGS
Sep 6, 2019School Construction Authority$2,117,467.77CONSTRUCTION-BUILDINGS
Apr 9, 2020School Construction Authority$1,941,784.55CONSTRUCTION-BUILDINGS
Mar 26, 2020School Construction Authority$1,858,914.39CONSTRUCTION-BUILDINGS
Feb 10, 2020School Construction Authority$1,616,552.00CONSTRUCTION-BUILDINGS
Jul 2, 2019School Construction Authority$1,499,303.29CONSTRUCTION-BUILDINGS
Feb 28, 2020School Construction Authority$1,429,644.35CONSTRUCTION-BUILDINGS
Jul 18, 2019School Construction Authority$1,246,405.57CONSTRUCTION-BUILDINGS
Jun 17, 2020School Construction Authority$1,076,206.97CONSTRUCTION-BUILDINGS
Sep 4, 2019School Construction Authority$821,123.00CONSTRUCTION-BUILDINGS
Oct 3, 2019School Construction Authority$639,230.81CONSTRUCTION-BUILDINGS
Jul 3, 2019School Construction Authority$449,492.50CONSTRUCTION-BUILDINGS
Aug 1, 2019School Construction Authority$263,093.95CONSTRUCTION-BUILDINGS
Sep 23, 2019School Construction Authority$206,781.25CONSTRUCTION-BUILDINGS
Mar 19, 2020Department of Design and Construction$179,977.50N/A
Jul 24, 2019School Construction Authority$177,521.75CONSTRUCTION-BUILDINGS
Apr 14, 2020School Construction Authority$167,077.84CONSTRUCTION-BUILDINGS
FY 2019top 20 of 45 payments$15,852,142
DateAgencyAmountCategoryPurchase order
May 22, 2019School Construction Authority$1,756,621.25CONSTRUCTION-BUILDINGS
Nov 29, 2018School Construction Authority$1,415,197.24CONSTRUCTION-BUILDINGS
Dec 19, 2018School Construction Authority$1,301,668.43CONSTRUCTION-BUILDINGS
Jun 10, 2019School Construction Authority$1,179,116.25CONSTRUCTION-BUILDINGS
Feb 27, 2019School Construction Authority$1,161,379.93CONSTRUCTION-BUILDINGS
Oct 23, 2018School Construction Authority$1,071,044.86CONSTRUCTION-BUILDINGS
Apr 5, 2019School Construction Authority$1,070,234.38CONSTRUCTION-BUILDINGS
Apr 23, 2019School Construction Authority$895,733.49CONSTRUCTION-BUILDINGS
Jan 24, 2019School Construction Authority$866,422.76CONSTRUCTION-BUILDINGS
Feb 21, 2019School Construction Authority$675,248.12CONSTRUCTION-BUILDINGS
Mar 18, 2019School Construction Authority$647,805.00CONSTRUCTION-BUILDINGS
May 24, 2019School Construction Authority$622,677.87CONSTRUCTION-BUILDINGS
Oct 3, 2018School Construction Authority$596,773.09CONSTRUCTION-BUILDINGS
Mar 25, 2019School Construction Authority$458,529.29CONSTRUCTION-BUILDINGS
Aug 17, 2018School Construction Authority$291,717.98CONSTRUCTION-BUILDINGS
May 6, 2019School Construction Authority$275,158.00CONSTRUCTION-BUILDINGS
Jan 11, 2019School Construction Authority$259,136.25CONSTRUCTION-BUILDINGS
Jul 30, 2018School Construction Authority$243,045.44CONSTRUCTION-BUILDINGS
May 31, 2019School Construction Authority$219,397.75CONSTRUCTION-BUILDINGS
Apr 4, 2019School Construction Authority$184,466.25CONSTRUCTION-BUILDINGS
FY 2018top 9 of 9 payments$1,113,953
DateAgencyAmountCategoryPurchase order
Jun 25, 2018School Construction Authority$321,477.10CONSTRUCTION-BUILDINGS
Jun 7, 2018School Construction Authority$313,856.40CONSTRUCTION-BUILDINGS
Sep 6, 2017School Construction Authority$189,485.09CONSTRUCTION-BUILDINGS
May 2, 2018School Construction Authority$99,920.80CONSTRUCTION-BUILDINGS
Oct 10, 2017School Construction Authority$58,542.41CONSTRUCTION-BUILDINGS
Jan 30, 2018School Construction Authority$35,746.34CONSTRUCTION-BUILDINGS
Feb 5, 2018School Construction Authority$32,782.12CONSTRUCTION-BUILDINGS
Nov 21, 2017School Construction Authority$32,034.64CONSTRUCTION-BUILDINGS
Sep 29, 2017School Construction Authority$30,108.59CONSTRUCTION-BUILDINGS
FY 2017top 20 of 22 payments$6,984,460
DateAgencyAmountCategoryPurchase order
Jan 31, 2017School Construction Authority$1,180,689.34CONSTRUCTION-BUILDINGS
Jan 6, 2017School Construction Authority$1,098,095.88CONSTRUCTION-BUILDINGS
Jan 6, 2017School Construction Authority$749,275.11CONSTRUCTION-BUILDINGS
Nov 10, 2016School Construction Authority$610,872.75CONSTRUCTION-BUILDINGS
Mar 29, 2017School Construction Authority$477,936.56CONSTRUCTION-BUILDINGS
Sep 8, 2016School Construction Authority$413,630.08CONSTRUCTION-BUILDINGS
Oct 20, 2016School Construction Authority$384,296.74CONSTRUCTION-BUILDINGS
Jul 13, 2016School Construction Authority$297,686.30CONSTRUCTION-BUILDINGS
Oct 12, 2016School Construction Authority$250,710.82CONSTRUCTION-BUILDINGS
Aug 15, 2016School Construction Authority$243,738.17CONSTRUCTION-BUILDINGS
Aug 8, 2016School Construction Authority$235,744.13CONSTRUCTION-BUILDINGS
Sep 14, 2016School Construction Authority$157,270.23CONSTRUCTION-BUILDINGS
Jul 18, 2016School Construction Authority$146,750.84CONSTRUCTION-BUILDINGS
Mar 17, 2017School Construction Authority$143,038.30CONSTRUCTION-BUILDINGS
Jun 23, 2017School Construction Authority$132,701.04CONSTRUCTION-BUILDINGS
Mar 10, 2017School Construction Authority$124,482.83CONSTRUCTION-BUILDINGS
Apr 6, 2017School Construction Authority$105,737.93CONSTRUCTION-BUILDINGS
May 15, 2017School Construction Authority$90,361.00CONSTRUCTION-BUILDINGS
Oct 31, 2016School Construction Authority$80,191.98CONSTRUCTION-BUILDINGS
Oct 24, 2016School Construction Authority$31,084.82CONSTRUCTION-BUILDINGS
FY 2016top 20 of 26 payments$10,009,397
DateAgencyAmountCategoryPurchase order
Jul 8, 2015School Construction Authority$997,827.27CONSTRUCTION-BUILDINGS
Aug 11, 2015School Construction Authority$959,560.86CONSTRUCTION-BUILDINGS
Sep 23, 2015School Construction Authority$766,550.25CONSTRUCTION-BUILDINGS
Oct 23, 2015School Construction Authority$656,193.50CONSTRUCTION-BUILDINGS
Aug 17, 2015School Construction Authority$595,766.85CONSTRUCTION-BUILDINGS
Jun 7, 2016School Construction Authority$592,613.62CONSTRUCTION-BUILDINGS
Jan 28, 2016School Construction Authority$571,206.03CONSTRUCTION-BUILDINGS
Dec 9, 2015School Construction Authority$568,786.37CONSTRUCTION-BUILDINGS
Mar 22, 2016School Construction Authority$509,884.71CONSTRUCTION-BUILDINGS
Jun 7, 2016School Construction Authority$485,925.47CONSTRUCTION-BUILDINGS
Jul 30, 2015School Construction Authority$482,115.50CONSTRUCTION-BUILDINGS
Jan 15, 2016School Construction Authority$427,739.32CONSTRUCTION-BUILDINGS
Apr 28, 2016School Construction Authority$413,332.34CONSTRUCTION-BUILDINGS
Dec 30, 2015School Construction Authority$374,234.92CONSTRUCTION-BUILDINGS
Apr 8, 2016School Construction Authority$357,349.91CONSTRUCTION-BUILDINGS
Sep 9, 2015School Construction Authority$269,271.90CONSTRUCTION-BUILDINGS
Feb 12, 2016School Construction Authority$217,576.78CONSTRUCTION-BUILDINGS
Mar 4, 2016School Construction Authority$180,281.36CONSTRUCTION-BUILDINGS
Nov 5, 2015School Construction Authority$138,903.97CONSTRUCTION-BUILDINGS
Jun 13, 2016School Construction Authority$101,584.99CONSTRUCTION-BUILDINGS
FY 2015top 16 of 16 payments$7,516,342
DateAgencyAmountCategoryPurchase order
May 18, 2015School Construction Authority$1,490,799.66CONSTRUCTION-BUILDINGS
Apr 29, 2015School Construction Authority$1,131,716.00CONSTRUCTION-BUILDINGS
Mar 25, 2015School Construction Authority$840,018.50CONSTRUCTION-BUILDINGS
Nov 19, 2014School Construction Authority$773,268.65CONSTRUCTION-BUILDINGS
Feb 20, 2015School Construction Authority$648,926.00CONSTRUCTION-BUILDINGS
Jan 29, 2015School Construction Authority$633,322.25CONSTRUCTION-BUILDINGS
Jan 6, 2015School Construction Authority$510,843.50CONSTRUCTION-BUILDINGS
Apr 14, 2015School Construction Authority$405,146.50CONSTRUCTION-BUILDINGS
Oct 23, 2014School Construction Authority$226,183.60CONSTRUCTION-BUILDINGS
May 29, 2015School Construction Authority$181,499.40CONSTRUCTION-BUILDINGS
Jun 12, 2015School Construction Authority$175,930.50CONSTRUCTION-BUILDINGS
Oct 6, 2014School Construction Authority$138,700.00CONSTRUCTION-BUILDINGS
Sep 23, 2014School Construction Authority$121,660.80CONSTRUCTION-BUILDINGS
Jan 28, 2015School Construction Authority$104,509.50CONSTRUCTION-BUILDINGS
Dec 22, 2014School Construction Authority$90,558.75CONSTRUCTION-BUILDINGS
Feb 11, 2015School Construction Authority$43,258.25CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 20, 2025School Construction Authority$41,853.35CONSTRUCTION-BUILDINGSCapital Contracts
Jun 16, 2025School Construction Authority$629,195.45CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$206,922.35CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$145,344.68CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$237.50CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$190.00CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$475.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 17, 2025School Construction Authority$45,423.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 15, 2025School Construction Authority$475.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 15, 2025School Construction Authority$429,746.75CONSTRUCTION-BUILDINGSCapital Contracts
Apr 15, 2025School Construction Authority$47,419.25CONSTRUCTION-BUILDINGSCapital Contracts
Apr 10, 2025School Construction Authority$457,524.75CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025Department of Citywide Administrative Services$121,101.85CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025Department of Sanitation$85,041.70POLLUTION REMEDIATION OBLIGATIONSCapital Contracts
Mar 31, 2025Department of Sanitation$4,493.40CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025Department of Sanitation$18,673.33CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025Department of Sanitation$61,036.16CONSTRUCTION-BUILDINGSCapital Contracts
Mar 31, 2025Department of Sanitation$17,276.79CONSTRUCTION-BUILDINGSCapital Contracts
Mar 21, 2025School Construction Authority$131,558.99CONSTRUCTION-BUILDINGSCapital Contracts
Mar 10, 2025Department of Sanitation$246,050.00CONSTRUCTION-BUILDINGSCapital Contracts
Mar 6, 2025School Construction Authority$463,017.51CONSTRUCTION-BUILDINGSCapital Contracts
Feb 18, 2025School Construction Authority$96,196.02CONSTRUCTION-BUILDINGSCapital Contracts
Feb 11, 2025School Construction Authority$7,362.50CONSTRUCTION-BUILDINGSCapital Contracts
Feb 11, 2025School Construction Authority$190.00CONSTRUCTION-BUILDINGSCapital Contracts
Feb 11, 2025School Construction Authority$85,097.20CONSTRUCTION-BUILDINGSCapital Contracts