Computer Logic Group Inc: New York City Government Payments
as recorded by New York City: COMPUTER LOGIC GROUP INC
Computer Logic Group Inc is the 1,879th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 312th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 8.2% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
Confirm your email to activate this follow.
Check your inbox and click the confirmation link to activate this follow and open your watchlist. The link expires in 20 minutes.
A link was requested recently. Check your inbox, or wait one minute and submit this follow again. This request has not added a follow.
We couldn't send the confirmation. Check the email address and try again. This follow is not active until you confirm it.
Sell to government? Put this vendor in your account research.Explore $39/month Pro alerts for advanced filters and saved-search monitoring.
Payments by fiscal year
The payment history
Select a column to see the agencies behind that fiscal year.
16 fiscal years on record. The incoming flows below combine all recorded years.
Fiscal years may be partial; missing years are not zero spending. Negative columns reflect net refunds or corrections. Amounts share a linear scale.
Who pays this supplier?
Select a paying agency to inspect the relationship, then open its profile.
Jan 15, 2010 to Jun 23, 2025 · All recorded fiscal years
Showing 2 of 2 positive agencies in these records.
Flow widths compare the relationships shown. Percentages use the full recorded supplier total for this period: $20,534,354.21. Zero and net-negative relationships are excluded from positive flows.
The relationships at a glance
- Total shown
- $20,534,354.21
- Payments represented
- 4,061
- Paying agencies shown
- 2
- Largest share of supplier total
- 99.3%
Largest displayed relationship: School Construction Authority. Select a flow to explore its details.
Jan 15, 2010 to Jun 23, 2025 · All recorded fiscal years. Amount and payment count cover the relationships shown; shares use the full supplier total.
Computer Logic Group Inc
$20,534,354from the agencies shownComputer Logic Group Inc
$20,534,354 from the agencies shown
- $20,394,68899.3% of supplier total
- $139,6670.7% of supplier total
This is a selection, not a full spending breakdown. Other agencies are not included in the flow. Some recorded agencies have no public profile link. Coverage may be partial. Review the agency table.
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| OFFICE EQUIPMENT MAINTENANCE | 1 | $6,300 | Dec 4, 2018 – Dec 4, 2018 |
| DATA PROCESSING EQUIPMENT MAINTENANCE | 4 | $5,793 | Oct 5, 2010 – Dec 24, 2014 |
| DATA PROCESSING SUPPLIES | 26 | $49,352 | Oct 20, 2010 – Oct 25, 2017 |
| PROF SERV COMPUTER SERVICES | 2 | $4,694 | Nov 10, 2010 – Dec 16, 2014 |
| PROF SERV CURRIC & PROF DEVEL | 1 | $380 | Jun 20, 2011 – Jun 20, 2011 |
| OTHR SERV AND CHRGS-GENERAL | 17 | $37,036 | Jan 27, 2010 – Nov 6, 2017 |
| SUPPLIES + MATERIALS - GENERAL | 25 | $33,191 | Jun 14, 2010 – Jan 12, 2015 |
| PROF SERV DIRECT EDUC SERV | 1 | $300 | Feb 3, 2010 – Feb 3, 2010 |
| EQUIPMENT GENERAL | 2 | $2,620 | Mar 11, 2013 – Mar 25, 2014 |
| CONSTRUCTION-BUILDINGS | 3,982 | $20,394,688 | Jan 15, 2010 – Jun 23, 2025 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 151 payments$747,068
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 18, 2024 | School Construction Authority | $20,404.34 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2024 | School Construction Authority | $19,388.76 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2024 | School Construction Authority | $18,783.08 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2024 | School Construction Authority | $15,970.70 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2025 | School Construction Authority | $13,319.96 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2024 | School Construction Authority | $13,176.79 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2025 | School Construction Authority | $12,460.46 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2024 | School Construction Authority | $12,152.49 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2025 | School Construction Authority | $11,662.69 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2025 | School Construction Authority | $11,281.59 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2024 | School Construction Authority | $10,675.47 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2024 | School Construction Authority | $9,886.97 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2025 | School Construction Authority | $9,393.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 25, 2024 | School Construction Authority | $9,135.62 | CONSTRUCTION-BUILDINGS | – |
| Aug 15, 2024 | School Construction Authority | $8,567.06 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2024 | School Construction Authority | $8,547.49 | CONSTRUCTION-BUILDINGS | – |
| Aug 16, 2024 | School Construction Authority | $8,439.82 | CONSTRUCTION-BUILDINGS | – |
| May 12, 2025 | School Construction Authority | $8,407.93 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2025 | School Construction Authority | $8,290.47 | CONSTRUCTION-BUILDINGS | – |
| Dec 5, 2024 | School Construction Authority | $8,154.51 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 20 of 146 payments$690,193
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 18, 2023 | School Construction Authority | $21,252.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 8, 2024 | School Construction Authority | $18,881.48 | CONSTRUCTION-BUILDINGS | – |
| Nov 28, 2023 | School Construction Authority | $18,607.50 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2023 | School Construction Authority | $15,149.24 | CONSTRUCTION-BUILDINGS | – |
| Aug 9, 2023 | School Construction Authority | $14,746.03 | CONSTRUCTION-BUILDINGS | – |
| Aug 2, 2023 | School Construction Authority | $13,846.29 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2023 | School Construction Authority | $13,410.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2024 | School Construction Authority | $12,484.15 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2023 | School Construction Authority | $12,095.29 | CONSTRUCTION-BUILDINGS | – |
| Nov 1, 2023 | School Construction Authority | $12,060.82 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2024 | School Construction Authority | $11,794.53 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2024 | School Construction Authority | $10,856.75 | CONSTRUCTION-BUILDINGS | – |
| Apr 22, 2024 | School Construction Authority | $10,737.75 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2023 | School Construction Authority | $9,680.97 | CONSTRUCTION-BUILDINGS | – |
| May 29, 2024 | School Construction Authority | $9,164.94 | CONSTRUCTION-BUILDINGS | – |
| Nov 8, 2023 | School Construction Authority | $9,116.05 | CONSTRUCTION-BUILDINGS | – |
| Dec 6, 2023 | School Construction Authority | $8,950.70 | CONSTRUCTION-BUILDINGS | – |
| Aug 1, 2023 | School Construction Authority | $8,848.73 | CONSTRUCTION-BUILDINGS | – |
| May 23, 2024 | School Construction Authority | $8,523.80 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2023 | School Construction Authority | $8,499.08 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 137 payments$507,948
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 24, 2023 | School Construction Authority | $31,667.35 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2023 | School Construction Authority | $13,411.63 | CONSTRUCTION-BUILDINGS | – |
| Oct 6, 2022 | School Construction Authority | $10,942.24 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2023 | School Construction Authority | $10,536.42 | CONSTRUCTION-BUILDINGS | – |
| Feb 23, 2023 | School Construction Authority | $10,077.52 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2023 | School Construction Authority | $9,053.70 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2023 | School Construction Authority | $8,810.62 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2022 | School Construction Authority | $8,338.88 | CONSTRUCTION-BUILDINGS | – |
| Jun 23, 2023 | School Construction Authority | $8,162.24 | CONSTRUCTION-BUILDINGS | – |
| Aug 25, 2022 | School Construction Authority | $8,100.99 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2022 | School Construction Authority | $7,875.93 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2023 | School Construction Authority | $7,526.21 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2023 | School Construction Authority | $7,168.80 | CONSTRUCTION-BUILDINGS | – |
| Jun 16, 2023 | School Construction Authority | $7,023.57 | CONSTRUCTION-BUILDINGS | – |
| May 15, 2023 | School Construction Authority | $6,975.16 | CONSTRUCTION-BUILDINGS | – |
| Mar 31, 2023 | School Construction Authority | $6,758.56 | CONSTRUCTION-BUILDINGS | – |
| Oct 6, 2022 | School Construction Authority | $6,305.66 | CONSTRUCTION-BUILDINGS | – |
| Feb 14, 2023 | School Construction Authority | $6,196.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 7, 2022 | School Construction Authority | $6,176.91 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2023 | School Construction Authority | $5,904.51 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 201 payments$800,548
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 14, 2022 | School Construction Authority | $19,593.69 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2022 | School Construction Authority | $19,015.38 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2022 | School Construction Authority | $15,344.46 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2022 | School Construction Authority | $15,056.54 | CONSTRUCTION-BUILDINGS | – |
| Feb 1, 2022 | School Construction Authority | $13,509.48 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2022 | School Construction Authority | $12,323.95 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2022 | School Construction Authority | $12,120.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2022 | School Construction Authority | $12,002.59 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2022 | School Construction Authority | $11,843.49 | CONSTRUCTION-BUILDINGS | – |
| May 19, 2022 | School Construction Authority | $11,473.81 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2022 | School Construction Authority | $10,900.49 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2022 | School Construction Authority | $10,563.68 | CONSTRUCTION-BUILDINGS | – |
| Jan 7, 2022 | School Construction Authority | $10,206.27 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2022 | School Construction Authority | $9,907.57 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2022 | School Construction Authority | $9,839.15 | CONSTRUCTION-BUILDINGS | – |
| Feb 25, 2022 | School Construction Authority | $9,507.93 | CONSTRUCTION-BUILDINGS | – |
| Mar 18, 2022 | School Construction Authority | $8,419.22 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2022 | School Construction Authority | $8,010.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2022 | School Construction Authority | $7,808.43 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2022 | School Construction Authority | $7,796.07 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 42 payments$115,834
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 10, 2021 | School Construction Authority | $17,105.88 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $11,279.76 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $10,114.22 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $9,207.29 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $6,993.21 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2021 | School Construction Authority | $5,431.23 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $3,825.60 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2021 | School Construction Authority | $3,570.56 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $3,002.45 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,498.27 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,422.88 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $2,342.62 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,295.36 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,295.36 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,295.36 | CONSTRUCTION-BUILDINGS | – |
| Apr 14, 2021 | School Construction Authority | $2,295.36 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2021 | School Construction Authority | $2,295.36 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2021 | School Construction Authority | $1,912.80 | CONSTRUCTION-BUILDINGS | – |
| Jan 27, 2021 | School Construction Authority | $1,772.63 | CONSTRUCTION-BUILDINGS | – |
| Apr 13, 2021 | School Construction Authority | $1,530.24 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 214 payments$885,394
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 11, 2020 | School Construction Authority | $24,551.28 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2019 | School Construction Authority | $21,761.16 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2020 | School Construction Authority | $20,103.40 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2019 | School Construction Authority | $19,593.32 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2019 | School Construction Authority | $18,866.72 | CONSTRUCTION-BUILDINGS | – |
| Mar 19, 2020 | School Construction Authority | $18,815.83 | CONSTRUCTION-BUILDINGS | – |
| May 11, 2020 | School Construction Authority | $17,894.20 | CONSTRUCTION-BUILDINGS | – |
| Mar 4, 2020 | School Construction Authority | $17,245.29 | CONSTRUCTION-BUILDINGS | – |
| Jul 11, 2019 | School Construction Authority | $11,192.83 | CONSTRUCTION-BUILDINGS | – |
| Nov 20, 2019 | School Construction Authority | $10,701.68 | CONSTRUCTION-BUILDINGS | – |
| Dec 5, 2019 | School Construction Authority | $10,495.22 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2019 | School Construction Authority | $9,529.24 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2020 | School Construction Authority | $9,310.17 | CONSTRUCTION-BUILDINGS | – |
| Dec 5, 2019 | School Construction Authority | $9,140.07 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2019 | School Construction Authority | $9,018.38 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2020 | School Construction Authority | $8,987.30 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2020 | School Construction Authority | $8,966.15 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2020 | School Construction Authority | $8,874.55 | CONSTRUCTION-BUILDINGS | – |
| Feb 11, 2020 | School Construction Authority | $8,689.56 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2019 | School Construction Authority | $8,567.04 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 333 payments$1,047,002
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 22, 2019 | School Construction Authority | $25,365.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $25,365.75 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $23,406.55 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $22,271.24 | CONSTRUCTION-BUILDINGS | – |
| Jun 5, 2019 | School Construction Authority | $22,125.56 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | School Construction Authority | $19,854.24 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $19,244.79 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $18,149.24 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2018 | School Construction Authority | $18,092.16 | CONSTRUCTION-BUILDINGS | – |
| Mar 22, 2019 | School Construction Authority | $17,384.12 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | School Construction Authority | $17,025.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | School Construction Authority | $15,203.98 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2018 | School Construction Authority | $14,405.66 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2018 | School Construction Authority | $13,462.37 | CONSTRUCTION-BUILDINGS | – |
| Sep 26, 2018 | School Construction Authority | $12,203.06 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | School Construction Authority | $12,172.80 | CONSTRUCTION-BUILDINGS | – |
| Oct 29, 2018 | School Construction Authority | $12,102.88 | CONSTRUCTION-BUILDINGS | – |
| Aug 29, 2018 | School Construction Authority | $11,552.96 | CONSTRUCTION-BUILDINGS | – |
| Dec 12, 2018 | School Construction Authority | $10,570.98 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2018 | School Construction Authority | $9,914.30 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 299 payments$1,321,378
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 21, 2017 | School Construction Authority | $51,350.54 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $50,289.80 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $46,830.76 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $41,099.96 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $36,892.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $32,645.36 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $29,739.98 | CONSTRUCTION-BUILDINGS | – |
| Nov 22, 2017 | School Construction Authority | $28,444.22 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $21,536.36 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $21,408.84 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2017 | School Construction Authority | $17,134.12 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2017 | School Construction Authority | $17,099.36 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2017 | School Construction Authority | $15,522.72 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $14,765.08 | CONSTRUCTION-BUILDINGS | – |
| Sep 21, 2017 | School Construction Authority | $13,791.28 | CONSTRUCTION-BUILDINGS | – |
| Jun 20, 2018 | School Construction Authority | $13,689.80 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $13,007.04 | CONSTRUCTION-BUILDINGS | – |
| Jul 17, 2017 | School Construction Authority | $12,369.44 | CONSTRUCTION-BUILDINGS | – |
| Oct 4, 2017 | School Construction Authority | $12,277.60 | CONSTRUCTION-BUILDINGS | – |
| Oct 30, 2017 | School Construction Authority | $12,195.60 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 299 payments$1,661,292
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 18, 2016 | School Construction Authority | $56,774.54 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $42,838.02 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $41,488.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $34,682.38 | CONSTRUCTION-BUILDINGS | – |
| Feb 22, 2017 | School Construction Authority | $30,203.04 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $29,309.10 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $29,083.92 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $27,744.54 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $24,379.14 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $24,349.90 | CONSTRUCTION-BUILDINGS | – |
| May 24, 2017 | School Construction Authority | $22,871.04 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $22,346.50 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2016 | School Construction Authority | $21,778.17 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $21,048.48 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $19,201.74 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $15,233.02 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2016 | School Construction Authority | $14,558.34 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $14,490.16 | CONSTRUCTION-BUILDINGS | – |
| Nov 9, 2016 | School Construction Authority | $14,383.80 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2016 | School Construction Authority | $14,242.54 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 431 payments$2,714,637
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 9, 2015 | School Construction Authority | $68,675.98 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $48,815.94 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $47,432.04 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $45,748.12 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $45,618.08 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2015 | School Construction Authority | $40,206.38 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2015 | School Construction Authority | $39,221.78 | CONSTRUCTION-BUILDINGS | – |
| Oct 8, 2015 | School Construction Authority | $38,288.18 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2015 | School Construction Authority | $32,345.24 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $32,056.16 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2015 | School Construction Authority | $28,560.46 | CONSTRUCTION-BUILDINGS | – |
| Dec 24, 2015 | School Construction Authority | $28,015.40 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2015 | School Construction Authority | $27,165.68 | CONSTRUCTION-BUILDINGS | – |
| Dec 24, 2015 | School Construction Authority | $25,266.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2015 | School Construction Authority | $24,739.88 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2015 | School Construction Authority | $23,963.76 | CONSTRUCTION-BUILDINGS | – |
| Dec 24, 2015 | School Construction Authority | $23,822.20 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2015 | School Construction Authority | $22,499.80 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2015 | School Construction Authority | $21,566.20 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2015 | School Construction Authority | $21,423.88 | CONSTRUCTION-BUILDINGS | – |
FY 2015top 20 of 368 payments$1,671,857
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 28, 2014 | School Construction Authority | $41,256.68 | CONSTRUCTION-BUILDINGS | – |
| Aug 28, 2014 | School Construction Authority | $39,389.48 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2014 | School Construction Authority | $32,527.40 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2014 | School Construction Authority | $31,042.12 | CONSTRUCTION-BUILDINGS | – |
| Jan 20, 2015 | School Construction Authority | $22,413.80 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2014 | School Construction Authority | $21,220.24 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2014 | School Construction Authority | $20,932.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2015 | School Construction Authority | $18,679.40 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2015 | School Construction Authority | $18,679.40 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2015 | School Construction Authority | $18,679.40 | CONSTRUCTION-BUILDINGS | – |
| May 13, 2015 | School Construction Authority | $18,679.40 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $18,276.20 | CONSTRUCTION-BUILDINGS | – |
| Mar 16, 2015 | School Construction Authority | $18,212.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2014 | School Construction Authority | $15,101.63 | CONSTRUCTION-BUILDINGS | – |
| Oct 9, 2014 | School Construction Authority | $14,237.40 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $14,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $14,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $14,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $14,075.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2015 | School Construction Authority | $13,702.64 | CONSTRUCTION-BUILDINGS | – |
FY 2014top 20 of 247 payments$1,210,363
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2013 | School Construction Authority | $45,145.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $43,300.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2013 | School Construction Authority | $38,840.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2013 | School Construction Authority | $38,240.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $36,540.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 22, 2013 | School Construction Authority | $31,675.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $29,660.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $26,127.60 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $23,940.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2013 | School Construction Authority | $15,520.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2013 | School Construction Authority | $15,520.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2013 | School Construction Authority | $15,456.95 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2013 | School Construction Authority | $14,700.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 26, 2013 | School Construction Authority | $12,531.25 | CONSTRUCTION-BUILDINGS | – |
| Nov 26, 2013 | School Construction Authority | $12,324.30 | CONSTRUCTION-BUILDINGS | – |
| Jul 24, 2013 | School Construction Authority | $11,860.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2013 | School Construction Authority | $11,240.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 2, 2013 | School Construction Authority | $11,065.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 18, 2013 | School Construction Authority | $10,924.30 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2013 | School Construction Authority | $10,889.05 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 317 payments$1,920,294
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 24, 2012 | School Construction Authority | $78,020.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2012 | School Construction Authority | $56,825.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2012 | School Construction Authority | $37,580.00 | CONSTRUCTION-BUILDINGS | – |
| Nov 5, 2012 | School Construction Authority | $34,560.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2012 | School Construction Authority | $25,750.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2012 | School Construction Authority | $25,245.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 11, 2012 | School Construction Authority | $22,740.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2012 | School Construction Authority | $22,410.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 6, 2013 | School Construction Authority | $20,470.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2012 | School Construction Authority | $20,145.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2012 | School Construction Authority | $18,660.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 13, 2012 | School Construction Authority | $18,660.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2012 | School Construction Authority | $18,300.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2012 | School Construction Authority | $17,970.00 | CONSTRUCTION-BUILDINGS | – |
| May 22, 2013 | School Construction Authority | $16,440.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 3, 2013 | School Construction Authority | $15,780.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2012 | School Construction Authority | $15,755.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2013 | School Construction Authority | $14,821.70 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2012 | School Construction Authority | $14,455.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2013 | School Construction Authority | $14,440.00 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 389 payments$2,237,993
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 12, 2011 | School Construction Authority | $32,220.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 14, 2011 | School Construction Authority | $29,740.00 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2012 | School Construction Authority | $25,385.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $25,385.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2011 | School Construction Authority | $24,230.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2012 | School Construction Authority | $23,900.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2012 | School Construction Authority | $23,900.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2012 | School Construction Authority | $23,900.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 27, 2012 | School Construction Authority | $23,900.00 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2012 | School Construction Authority | $23,900.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2011 | School Construction Authority | $22,590.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 12, 2011 | School Construction Authority | $22,490.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 26, 2012 | School Construction Authority | $21,635.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2012 | School Construction Authority | $19,650.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2012 | School Construction Authority | $19,650.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2011 | School Construction Authority | $19,460.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 14, 2011 | School Construction Authority | $19,270.00 | CONSTRUCTION-BUILDINGS | – |
| May 17, 2012 | School Construction Authority | $17,960.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 25, 2012 | School Construction Authority | $16,945.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 21, 2011 | School Construction Authority | $16,375.00 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 339 payments$1,813,952
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 15, 2010 | School Construction Authority | $37,310.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2010 | School Construction Authority | $34,670.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2010 | School Construction Authority | $30,670.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2010 | School Construction Authority | $30,670.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2010 | School Construction Authority | $25,785.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2010 | School Construction Authority | $24,405.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2011 | School Construction Authority | $24,390.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 7, 2010 | School Construction Authority | $22,080.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2010 | School Construction Authority | $21,760.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 27, 2010 | School Construction Authority | $21,690.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 9, 2010 | School Construction Authority | $19,220.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2011 | School Construction Authority | $19,200.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 5, 2011 | School Construction Authority | $18,810.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 10, 2010 | School Construction Authority | $18,240.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 7, 2010 | School Construction Authority | $17,620.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2011 | School Construction Authority | $17,345.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2010 | School Construction Authority | $17,190.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2010 | School Construction Authority | $15,460.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2010 | School Construction Authority | $15,460.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 15, 2010 | School Construction Authority | $15,460.00 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 20 of 148 payments$1,188,601
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 9, 2010 | School Construction Authority | $31,830.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $25,360.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $25,360.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $24,960.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $24,960.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $24,960.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $22,080.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2010 | School Construction Authority | $20,330.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $20,330.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2010 | School Construction Authority | $20,330.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2010 | School Construction Authority | $20,160.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $19,830.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2010 | School Construction Authority | $17,790.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2010 | School Construction Authority | $15,540.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2010 | School Construction Authority | $15,540.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2010 | School Construction Authority | $14,790.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 6, 2010 | School Construction Authority | $14,790.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2010 | School Construction Authority | $14,580.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 9, 2010 | School Construction Authority | $13,790.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 28, 2010 | School Construction Authority | $13,790.00 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 23, 2025 | School Construction Authority | $2,126.95 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $3,666.80 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $3,791.43 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 23, 2025 | School Construction Authority | $2,957.13 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $9,393.60 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 17, 2025 | School Construction Authority | $13,319.96 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | School Construction Authority | $1,062.96 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | School Construction Authority | $12,460.46 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | School Construction Authority | $1,539.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | School Construction Authority | $829.15 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 16, 2025 | School Construction Authority | $4,928.55 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $8,032.97 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $3,693.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $6,680.58 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $3,266.13 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $3,229.05 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $7,221.37 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $6,957.17 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $1,539.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $4,449.12 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $4,753.45 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $6,889.19 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jun 5, 2025 | School Construction Authority | $4,352.78 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 12, 2025 | School Construction Authority | $8,407.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| May 12, 2025 | School Construction Authority | $4,440.33 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving School Construction Authority
- Ace American Insurance Co. $1,766,191,960
- Leon D. Dematteis Construction Corp $1,571,596,886
- Nyc School Construction Authority $1,225,861,906
- TDX Construction Corp $971,148,427
- Citnalta Construction Corp $963,925,562
- Whitestone Construction Corp $856,318,363
- Turner Construction Co. $691,468,025
- Technico Construction Services Inc. $660,818,591
- Arnell Construction Corp. $619,850,912
- Iannelli Construction Co Inc $560,693,902
VerifiedData refreshed Sep 24, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data