Ch2mhill New York, Inc.: New York City Government Payments

as recorded by New York City: CH2MHILL NEW YORK, INC.

Ch2mhill New York, Inc. is the 1,174th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 40th in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Environmental Protection has paid vendors in that span.

Primary spending category: DESIGN-CONSULTANT-IOTB

$44,138,643total received
492payments
5agencies
Mar 27, 2013Sep 27, 2023first / last payment
Follow this vendorGet an email when New York City publishes new payments to Ch2mhill New York, Inc.. No spam.

Payments by fiscal year

FY 2024$996,359
FY 2023$642,055
FY 2022$164,929
FY 2021$341,406
FY 2020$3,441,287
FY 2019$2,800,084
FY 2018$4,629,452
FY 2017$10,947,268
FY 2016$9,302,099
FY 2015$6,667,399
FY 2014$3,961,443
FY 2013$244,861

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2024Department of Design and Construction2$996,359
FY 2023Department of Design and Construction5$642,055
FY 2022Department of Design and Construction4$164,929
FY 2021Department of Design and Construction4$341,406
FY 2020Department of Design and Construction5$3,374,022
FY 2020Department of Environmental Protection11$67,265
FY 2019Department of Design and Construction7$2,789,793
FY 2019Department of Environmental Protection6$10,292
FY 2018Department of Environmental Protection28$3,337,094
FY 2018Department of Design and Construction10$973,659
FY 2018Water Supply6$210,552
FY 2018Department of Transportation3$108,147
FY 2017Department of Environmental Protection44$6,320,475
FY 2017Department of Design and Construction8$2,471,473
FY 2017Water Supply14$1,082,144
FY 2017Department of Transportation18$1,052,243
FY 2017Mayoralty4$20,932
FY 2016Department of Environmental Protection89$6,621,507
FY 2016Department of Transportation11$1,595,348
FY 2016Water Supply32$1,068,360
FY 2016Mayoralty1$16,884
FY 2015Department of Environmental Protection80$4,265,132
FY 2015Water Supply35$1,411,068
FY 2015Department of Transportation8$984,590
FY 2015Mayoralty2$6,610
FY 2014Department of Transportation12$2,092,191
FY 2014Department of Environmental Protection29$1,385,839
FY 2014Water Supply10$446,967
FY 2014Mayoralty1$36,447
FY 2013Mayoralty3$244,861
Total492$44,138,643

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
OTHR SERV AND CHRGS-GENERAL39$800,945Mar 20, 2014 Jan 29, 2018
CONTRACTUAL SERVICES GENERAL19$619,059Apr 10, 2014 Oct 21, 2015
DESIGN-CONSULTANT-IOTB357$30,545,075Mar 17, 2014 Mar 9, 2018
N/A76$12,173,915Mar 27, 2013 Sep 27, 2023
<Non-Applicable Expenditure Object>1-$350May 7, 2014 May 7, 2014

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2024top 2 of 2 payments$996,359
DateAgencyAmountCategoryPurchase order
Sep 27, 2023Department of Design and Construction$843,667.27N/A
Jul 20, 2023Department of Design and Construction$152,691.45N/A
FY 2023top 5 of 5 payments$642,055
DateAgencyAmountCategoryPurchase order
Sep 23, 2022Department of Design and Construction$210,399.48N/A
Jun 20, 2023Department of Design and Construction$187,727.19N/A
Feb 24, 2023Department of Design and Construction$147,257.38N/A
Jan 19, 2023Department of Design and Construction$57,528.29N/A
Oct 27, 2022Department of Design and Construction$39,142.87N/A
FY 2022top 4 of 4 payments$164,929
DateAgencyAmountCategoryPurchase order
Mar 18, 2022Department of Design and Construction$95,750.34N/A
Aug 6, 2021Department of Design and Construction$57,097.83N/A
Nov 15, 2021Department of Design and Construction$10,870.84N/A
Oct 4, 2021Department of Design and Construction$1,209.83N/A
FY 2021top 4 of 4 payments$341,406
DateAgencyAmountCategoryPurchase order
Sep 18, 2020Department of Design and Construction$168,185.35N/A
Jul 9, 2020Department of Design and Construction$90,643.10N/A
Jan 14, 2021Department of Design and Construction$48,621.52N/A
Oct 27, 2020Department of Design and Construction$33,956.45N/A
FY 2020top 16 of 16 payments$3,441,287
DateAgencyAmountCategoryPurchase order
Dec 12, 2019Department of Design and Construction$1,942,014.19N/A
Mar 26, 2020Department of Design and Construction$980,725.07N/A
May 22, 2020Department of Design and Construction$286,261.12N/A
Aug 16, 2019Department of Design and Construction$102,164.94N/A
Oct 2, 2019Department of Design and Construction$62,856.20N/A
Sep 24, 2019Department of Environmental Protection$16,357.38N/A
Sep 17, 2019Department of Environmental Protection$15,602.05N/A
Aug 30, 2019Department of Environmental Protection$14,798.33N/A
Oct 23, 2019Department of Environmental Protection$6,940.16N/A
Nov 27, 2019Department of Environmental Protection$4,520.24N/A
Aug 13, 2019Department of Environmental Protection$4,035.90N/A
Nov 6, 2019Department of Environmental Protection$3,514.45N/A
Feb 7, 2020Department of Environmental Protection$577.70N/A
Dec 11, 2019Department of Environmental Protection$415.66N/A
Jul 9, 2019Department of Environmental Protection$341.44N/A
Jan 16, 2020Department of Environmental Protection$162.04N/A
FY 2019top 13 of 13 payments$2,800,084
DateAgencyAmountCategoryPurchase order
Jun 18, 2019Department of Design and Construction$903,435.62N/A
Nov 30, 2018Department of Design and Construction$538,400.36N/A
Jul 25, 2018Department of Design and Construction$384,119.95N/A
Jan 22, 2019Department of Design and Construction$363,854.27N/A
Aug 27, 2018Department of Design and Construction$261,492.59N/A
Mar 6, 2019Department of Design and Construction$258,560.93N/A
Apr 24, 2019Department of Design and Construction$79,928.98N/A
Aug 29, 2018Department of Environmental Protection$4,303.37N/A
Sep 12, 2018Department of Environmental Protection$2,979.01N/A
May 9, 2019Department of Environmental Protection$1,793.74N/A
Jul 31, 2018Department of Environmental Protection$881.63N/A
Jan 30, 2019Department of Environmental Protection$166.96N/A
Jan 30, 2019Department of Environmental Protection$166.96N/A
FY 2018top 20 of 47 payments$4,629,452
DateAgencyAmountCategoryPurchase order
May 9, 2018Department of Design and Construction$453,337.92N/A
Jul 24, 2017Department of Environmental Protection$319,961.62DESIGN-CONSULTANT-IOTB
Oct 12, 2017Department of Environmental Protection$317,007.36DESIGN-CONSULTANT-IOTB
Oct 19, 2017Department of Environmental Protection$296,312.93DESIGN-CONSULTANT-IOTB
Mar 9, 2018Department of Environmental Protection$258,991.50DESIGN-CONSULTANT-IOTB
Aug 28, 2017Department of Environmental Protection$257,016.03DESIGN-CONSULTANT-IOTB
Nov 3, 2017Department of Environmental Protection$248,049.32DESIGN-CONSULTANT-IOTB
Oct 13, 2017Department of Environmental Protection$245,734.05DESIGN-CONSULTANT-IOTB
Jul 5, 2017Department of Environmental Protection$196,718.94DESIGN-CONSULTANT-IOTB
Dec 26, 2017Department of Design and Construction$178,349.94N/A
Aug 21, 2017Department of Environmental Protection$175,668.45DESIGN-CONSULTANT-IOTB
Sep 18, 2017Department of Environmental Protection$173,105.98DESIGN-CONSULTANT-IOTB
Dec 13, 2017Department of Environmental Protection$165,026.64DESIGN-CONSULTANT-IOTB
Jul 27, 2017Department of Environmental Protection$153,938.59DESIGN-CONSULTANT-IOTB
Jan 8, 2018Department of Environmental Protection$130,405.61DESIGN-CONSULTANT-IOTB
Jul 13, 2017Department of Design and Construction$98,350.47N/A
Feb 6, 2018Department of Environmental Protection$89,528.10DESIGN-CONSULTANT-IOTB
Dec 4, 2017Department of Transportation$86,517.55DESIGN-CONSULTANT-IOTB
Nov 24, 2017Department of Environmental Protection$84,131.25DESIGN-CONSULTANT-IOTB
Sep 21, 2017Department of Design and Construction$81,306.57N/A
FY 2017top 20 of 88 payments$10,947,268
DateAgencyAmountCategoryPurchase order
Dec 6, 2016Department of Design and Construction$1,019,198.79N/A
May 22, 2017Department of Environmental Protection$508,341.79DESIGN-CONSULTANT-IOTB
Apr 5, 2017Department of Environmental Protection$447,349.59DESIGN-CONSULTANT-IOTB
Aug 22, 2016Department of Environmental Protection$393,319.74DESIGN-CONSULTANT-IOTB
Mar 28, 2017Department of Transportation$364,259.19DESIGN-CONSULTANT-IOTB
Oct 19, 2016Department of Environmental Protection$325,187.09DESIGN-CONSULTANT-IOTB
Jun 8, 2017Department of Environmental Protection$316,496.46DESIGN-CONSULTANT-IOTB
May 12, 2017Department of Design and Construction$312,291.27N/A
Jun 16, 2017Department of Design and Construction$276,329.84N/A
Dec 6, 2016Department of Environmental Protection$256,147.76DESIGN-CONSULTANT-IOTB
May 22, 2017Department of Design and Construction$242,375.95N/A
Jun 8, 2017Department of Environmental Protection$238,778.90DESIGN-CONSULTANT-IOTB
Sep 14, 2016Department of Environmental Protection$238,455.01DESIGN-CONSULTANT-IOTB
Oct 3, 2016Department of Environmental Protection$233,500.75DESIGN-CONSULTANT-IOTB
Jan 10, 2017Department of Environmental Protection$230,431.80DESIGN-CONSULTANT-IOTB
Jul 25, 2016Department of Environmental Protection$228,540.70DESIGN-CONSULTANT-IOTB
Sep 19, 2016Department of Environmental Protection$223,728.65DESIGN-CONSULTANT-IOTB
Dec 22, 2016Department of Design and Construction$221,330.47N/A
Sep 14, 2016Department of Environmental Protection$218,976.89DESIGN-CONSULTANT-IOTB
Jan 17, 2017Department of Design and Construction$206,454.81N/A
FY 2016top 20 of 133 payments$9,302,099
DateAgencyAmountCategoryPurchase order
Dec 7, 2015Department of Environmental Protection$439,725.58DESIGN-CONSULTANT-IOTB
Jun 8, 2016Department of Environmental Protection$363,110.21DESIGN-CONSULTANT-IOTB
Nov 10, 2015Department of Environmental Protection$349,066.44DESIGN-CONSULTANT-IOTB
Apr 18, 2016Department of Transportation$322,138.91DESIGN-CONSULTANT-IOTB
Aug 24, 2015Department of Transportation$320,375.48DESIGN-CONSULTANT-IOTB
Apr 25, 2016Department of Environmental Protection$286,178.37DESIGN-CONSULTANT-IOTB
Aug 18, 2015Department of Environmental Protection$271,148.65DESIGN-CONSULTANT-IOTB
Jan 19, 2016Department of Environmental Protection$229,952.01DESIGN-CONSULTANT-IOTB
Feb 29, 2016Department of Transportation$229,118.76DESIGN-CONSULTANT-IOTB
Nov 23, 2015Department of Transportation$215,439.61DESIGN-CONSULTANT-IOTB
Feb 29, 2016Department of Transportation$199,752.00DESIGN-CONSULTANT-IOTB
Aug 18, 2015Department of Environmental Protection$197,067.64DESIGN-CONSULTANT-IOTB
Oct 26, 2015Department of Environmental Protection$168,205.12DESIGN-CONSULTANT-IOTB
Feb 10, 2016Department of Environmental Protection$166,365.87DESIGN-CONSULTANT-IOTB
Oct 19, 2015Department of Environmental Protection$166,179.40DESIGN-CONSULTANT-IOTB
Feb 1, 2016Department of Environmental Protection$162,369.15DESIGN-CONSULTANT-IOTB
Dec 21, 2015Department of Environmental Protection$161,295.17DESIGN-CONSULTANT-IOTB
Apr 26, 2016Department of Environmental Protection$160,729.47DESIGN-CONSULTANT-IOTB
Sep 14, 2015Department of Environmental Protection$157,827.79DESIGN-CONSULTANT-IOTB
Apr 12, 2016Department of Environmental Protection$157,139.77DESIGN-CONSULTANT-IOTB
FY 2015top 20 of 125 payments$6,667,399
DateAgencyAmountCategoryPurchase order
Feb 23, 2015Department of Environmental Protection$540,266.13DESIGN-CONSULTANT-IOTB
Apr 6, 2015Department of Environmental Protection$378,854.18DESIGN-CONSULTANT-IOTB
Jun 8, 2015Department of Transportation$351,037.45DESIGN-CONSULTANT-IOTB
Jun 10, 2015Department of Environmental Protection$301,155.04DESIGN-CONSULTANT-IOTB
May 6, 2015Department of Environmental Protection$241,635.13DESIGN-CONSULTANT-IOTB
Mar 23, 2015Department of Transportation$241,590.98DESIGN-CONSULTANT-IOTB
May 22, 2015Department of Environmental Protection$239,062.81DESIGN-CONSULTANT-IOTB
Dec 12, 2014Department of Environmental Protection$204,233.72DESIGN-CONSULTANT-IOTB
Sep 8, 2014Department of Environmental Protection$184,219.19DESIGN-CONSULTANT-IOTB
Nov 17, 2014Department of Environmental Protection$162,325.70DESIGN-CONSULTANT-IOTB
Aug 4, 2014Department of Environmental Protection$149,502.01DESIGN-CONSULTANT-IOTB
Aug 11, 2014Department of Environmental Protection$139,763.21DESIGN-CONSULTANT-IOTB
Oct 23, 2014Department of Environmental Protection$134,443.37DESIGN-CONSULTANT-IOTB
Jan 20, 2015Department of Environmental Protection$133,497.07DESIGN-CONSULTANT-IOTB
Dec 26, 2014Water Supply$125,448.15DESIGN-CONSULTANT-IOTB
Jul 28, 2014Water Supply$111,901.92DESIGN-CONSULTANT-IOTB
Mar 23, 2015Water Supply$107,820.25DESIGN-CONSULTANT-IOTB
Apr 27, 2015Water Supply$102,424.52DESIGN-CONSULTANT-IOTB
May 27, 2015Water Supply$101,181.46DESIGN-CONSULTANT-IOTB
Jul 3, 2014Water Supply$94,474.74DESIGN-CONSULTANT-IOTB
FY 2014top 20 of 52 payments$3,961,443
DateAgencyAmountCategoryPurchase order
May 7, 2014Department of Transportation$657,384.54DESIGN-CONSULTANT-IOTB
May 19, 2014Department of Transportation$376,468.93DESIGN-CONSULTANT-IOTB
Apr 14, 2014Department of Transportation$299,789.56DESIGN-CONSULTANT-IOTB
Apr 7, 2014Department of Environmental Protection$221,312.07DESIGN-CONSULTANT-IOTB
May 7, 2014Department of Transportation$208,014.10DESIGN-CONSULTANT-IOTB
Mar 20, 2014Department of Environmental Protection$185,787.64DESIGN-CONSULTANT-IOTB
Jun 23, 2014Department of Transportation$169,063.36DESIGN-CONSULTANT-IOTB
Apr 14, 2014Department of Transportation$151,454.70DESIGN-CONSULTANT-IOTB
Mar 17, 2014Department of Transportation$148,810.65DESIGN-CONSULTANT-IOTB
Mar 31, 2014Water Supply$134,764.78DESIGN-CONSULTANT-IOTB
May 5, 2014Department of Environmental Protection$129,861.73DESIGN-CONSULTANT-IOTB
May 12, 2014Water Supply$106,655.54DESIGN-CONSULTANT-IOTB
Apr 29, 2014Department of Environmental Protection$98,058.66CONTRACTUAL SERVICES GENERAL
May 29, 2014Department of Environmental Protection$96,658.69DESIGN-CONSULTANT-IOTB
Jun 2, 2014Water Supply$89,472.96DESIGN-CONSULTANT-IOTB
May 7, 2014Department of Environmental Protection$80,265.54DESIGN-CONSULTANT-IOTB
Mar 20, 2014Department of Environmental Protection$79,074.00DESIGN-CONSULTANT-IOTB
Jun 9, 2014Department of Environmental Protection$78,391.89DESIGN-CONSULTANT-IOTB
Apr 10, 2014Department of Environmental Protection$72,450.29CONTRACTUAL SERVICES GENERAL
Apr 21, 2014Department of Environmental Protection$66,456.29DESIGN-CONSULTANT-IOTB
FY 2013top 3 of 3 payments$244,861
DateAgencyAmountCategoryPurchase order
Mar 27, 2013Mayoralty$126,043.08N/A
Jun 28, 2013Mayoralty$69,940.46N/A
May 13, 2013Mayoralty$48,877.84N/A

Recent payments

DateAgencyAmountCategoryMethod
Sep 27, 2023Department of Design and Construction$843,667.27N/AContracts
Jul 20, 2023Department of Design and Construction$152,691.45N/AContracts
Jun 20, 2023Department of Design and Construction$187,727.19N/AContracts
Feb 24, 2023Department of Design and Construction$147,257.38N/AContracts
Jan 19, 2023Department of Design and Construction$57,528.29N/AContracts
Oct 27, 2022Department of Design and Construction$39,142.87N/AContracts
Sep 23, 2022Department of Design and Construction$210,399.48N/AContracts
Mar 18, 2022Department of Design and Construction$95,750.34N/AContracts
Nov 15, 2021Department of Design and Construction$10,870.84N/AContracts
Oct 4, 2021Department of Design and Construction$1,209.83N/AContracts
Aug 6, 2021Department of Design and Construction$57,097.83N/AContracts
Jan 14, 2021Department of Design and Construction$48,621.52N/AContracts
Oct 27, 2020Department of Design and Construction$33,956.45N/AContracts
Sep 18, 2020Department of Design and Construction$168,185.35N/AContracts
Jul 9, 2020Department of Design and Construction$90,643.10N/AContracts
May 22, 2020Department of Design and Construction$286,261.12N/AContracts
Mar 26, 2020Department of Design and Construction$980,725.07N/AContracts
Feb 7, 2020Department of Environmental Protection$577.70N/AContracts
Jan 16, 2020Department of Environmental Protection$162.04N/AContracts
Dec 12, 2019Department of Design and Construction$1,942,014.19N/AContracts
Dec 11, 2019Department of Environmental Protection$415.66N/AContracts
Nov 27, 2019Department of Environmental Protection$4,520.24N/AContracts
Nov 6, 2019Department of Environmental Protection$3,514.45N/AContracts
Oct 23, 2019Department of Environmental Protection$6,940.16N/AContracts
Oct 2, 2019Department of Design and Construction$62,856.20N/AContracts

Other vendors serving Department of Environmental Protection

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data