Andron Construction Corp: New York City Government Payments

as recorded by New York City: ANDRON CONSTRUCTION CORP

Andron Construction Corp is the 473rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 75th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.3% of everything the School Construction Authority has paid vendors in that span.

Primary spending category: CONSTRUCTION-BUILDINGS

$154,220,053total received
509payments
2agencies
Jan 12, 2010May 19, 2021first / last payment
Follow this vendorGet an email when New York City publishes new payments to Andron Construction Corp. No spam.

Payments by fiscal year

FY 2021$88,585
FY 2020$914,235
FY 2019$9,277,302
FY 2018$5,122,376
FY 2017$6,313,053
FY 2016$12,248,664
FY 2015$4,855,800
FY 2014$31,147,007
FY 2013$21,677,772
FY 2012$20,043,767
FY 2011$23,835,246
FY 2010$18,696,246

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2021School Construction Authority3$88,585
FY 2020School Construction Authority2$674,272
FY 2020Department of Health and Mental Hygiene39$239,963
FY 2019School Construction Authority6$8,537,174
FY 2019Department of Health and Mental Hygiene17$740,128
FY 2018Department of Health and Mental Hygiene162$3,996,473
FY 2018School Construction Authority11$1,125,904
FY 2017Department of Health and Mental Hygiene60$5,537,771
FY 2017School Construction Authority3$775,283
FY 2016Department of Health and Mental Hygiene23$11,197,629
FY 2016School Construction Authority6$1,051,035
FY 2015School Construction Authority3$4,576,232
FY 2015Department of Health and Mental Hygiene2$279,568
FY 2014School Construction Authority30$31,147,007
FY 2013School Construction Authority29$21,677,772
FY 2012School Construction Authority47$20,043,767
FY 2011School Construction Authority36$23,835,246
FY 2010School Construction Authority30$18,696,246
Total509$154,220,053

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
MAINT & OPER OF INFRASTRUCTURE1$17,832Jul 27, 2016 Jul 27, 2016
CONSTRUCTION-BUILDINGS500$154,189,275Jan 12, 2010 May 19, 2021
POLLUTION REMEDIATION OBLIGATIONS8$12,946Mar 8, 2017 Jun 11, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2021top 3 of 3 payments$88,585
DateAgencyAmountCategoryPurchase order
Jul 2, 2020School Construction Authority$66,340.54CONSTRUCTION-BUILDINGS
Mar 2, 2021School Construction Authority$13,056.92CONSTRUCTION-BUILDINGS
May 19, 2021School Construction Authority$9,187.86CONSTRUCTION-BUILDINGS
FY 2020top 20 of 41 payments$914,235
DateAgencyAmountCategoryPurchase order
Jan 3, 2020School Construction Authority$594,982.55CONSTRUCTION-BUILDINGS
Apr 28, 2020School Construction Authority$79,289.28CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$33,876.00CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$30,157.24CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$28,154.94CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$25,541.56CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$22,487.51CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$21,845.10CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$15,047.26CONSTRUCTION-BUILDINGS
Aug 7, 2019Department of Health and Mental Hygiene$15,000.00CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$7,451.60CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$6,910.10CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$5,757.55CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$4,864.13CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$4,290.96CONSTRUCTION-BUILDINGS
Aug 7, 2019Department of Health and Mental Hygiene$2,913.27CONSTRUCTION-BUILDINGS
Aug 7, 2019Department of Health and Mental Hygiene$2,335.90CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$1,444.55CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$1,320.54CONSTRUCTION-BUILDINGS
Aug 12, 2019Department of Health and Mental Hygiene$1,134.50CONSTRUCTION-BUILDINGS
FY 2019top 20 of 23 payments$9,277,302
DateAgencyAmountCategoryPurchase order
Dec 17, 2018School Construction Authority$6,208,774.11CONSTRUCTION-BUILDINGS
Jan 22, 2019School Construction Authority$953,082.20CONSTRUCTION-BUILDINGS
Dec 17, 2018School Construction Authority$610,908.72CONSTRUCTION-BUILDINGS
Mar 22, 2019School Construction Authority$526,231.60CONSTRUCTION-BUILDINGS
Jan 22, 2019School Construction Authority$161,403.37CONSTRUCTION-BUILDINGS
Sep 28, 2018Department of Health and Mental Hygiene$143,000.00CONSTRUCTION-BUILDINGS
Sep 28, 2018Department of Health and Mental Hygiene$117,500.00CONSTRUCTION-BUILDINGS
Nov 20, 2018Department of Health and Mental Hygiene$78,973.28CONSTRUCTION-BUILDINGS
May 30, 2019School Construction Authority$76,774.43CONSTRUCTION-BUILDINGS
Nov 20, 2018Department of Health and Mental Hygiene$76,673.52CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$62,364.06CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$62,138.34CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$48,528.81CONSTRUCTION-BUILDINGS
Dec 26, 2018Department of Health and Mental Hygiene$38,357.55CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$26,816.13CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$24,614.37CONSTRUCTION-BUILDINGS
Dec 26, 2018Department of Health and Mental Hygiene$18,939.69CONSTRUCTION-BUILDINGS
Feb 19, 2019Department of Health and Mental Hygiene$16,705.26CONSTRUCTION-BUILDINGS
Dec 26, 2018Department of Health and Mental Hygiene$12,062.16CONSTRUCTION-BUILDINGS
Dec 26, 2018Department of Health and Mental Hygiene$9,071.37CONSTRUCTION-BUILDINGS
FY 2018top 20 of 173 payments$5,122,376
DateAgencyAmountCategoryPurchase order
Jul 12, 2017School Construction Authority$534,902.78CONSTRUCTION-BUILDINGS
Nov 17, 2017Department of Health and Mental Hygiene$507,705.64CONSTRUCTION-BUILDINGS
Jul 11, 2017Department of Health and Mental Hygiene$485,308.04CONSTRUCTION-BUILDINGS
Feb 14, 2018School Construction Authority$292,187.44CONSTRUCTION-BUILDINGS
Feb 12, 2018School Construction Authority$283,328.57CONSTRUCTION-BUILDINGS
Oct 10, 2017Department of Health and Mental Hygiene$215,700.00CONSTRUCTION-BUILDINGS
Jan 23, 2018Department of Health and Mental Hygiene$176,023.16CONSTRUCTION-BUILDINGS
Sep 25, 2017Department of Health and Mental Hygiene$165,176.56CONSTRUCTION-BUILDINGS
Jun 4, 2018Department of Health and Mental Hygiene$151,100.00CONSTRUCTION-BUILDINGS
Nov 17, 2017Department of Health and Mental Hygiene$150,249.44CONSTRUCTION-BUILDINGS
Jun 4, 2018Department of Health and Mental Hygiene$143,013.00CONSTRUCTION-BUILDINGS
Sep 25, 2017Department of Health and Mental Hygiene$123,113.00CONSTRUCTION-BUILDINGS
Jul 12, 2017School Construction Authority$117,117.95CONSTRUCTION-BUILDINGS
Jan 23, 2018Department of Health and Mental Hygiene$109,393.54CONSTRUCTION-BUILDINGS
Sep 25, 2017Department of Health and Mental Hygiene$104,766.88CONSTRUCTION-BUILDINGS
Oct 16, 2017Department of Health and Mental Hygiene$93,369.80CONSTRUCTION-BUILDINGS
Mar 13, 2018School Construction Authority$91,215.30CONSTRUCTION-BUILDINGS
Oct 16, 2017Department of Health and Mental Hygiene$85,127.10CONSTRUCTION-BUILDINGS
Jan 23, 2018Department of Health and Mental Hygiene$81,528.04CONSTRUCTION-BUILDINGS
Nov 17, 2017Department of Health and Mental Hygiene$77,716.08CONSTRUCTION-BUILDINGS
FY 2017top 20 of 63 payments$6,313,053
DateAgencyAmountCategoryPurchase order
Jul 5, 2016Department of Health and Mental Hygiene$927,773.59CONSTRUCTION-BUILDINGS
Aug 2, 2016Department of Health and Mental Hygiene$679,494.15CONSTRUCTION-BUILDINGS
Mar 8, 2017Department of Health and Mental Hygiene$621,798.76CONSTRUCTION-BUILDINGS
Oct 12, 2016Department of Health and Mental Hygiene$543,289.69CONSTRUCTION-BUILDINGS
Jan 30, 2017Department of Health and Mental Hygiene$490,478.00CONSTRUCTION-BUILDINGS
Nov 30, 2016Department of Health and Mental Hygiene$415,056.90CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$387,897.24CONSTRUCTION-BUILDINGS
Oct 18, 2016School Construction Authority$386,129.39CONSTRUCTION-BUILDINGS
Mar 8, 2017Department of Health and Mental Hygiene$310,252.74CONSTRUCTION-BUILDINGS
Jul 27, 2016School Construction Authority$258,004.95CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$183,621.68CONSTRUCTION-BUILDINGS
Jan 31, 2017School Construction Authority$131,148.21CONSTRUCTION-BUILDINGS
May 1, 2017Department of Health and Mental Hygiene$126,580.40CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$80,862.50CONSTRUCTION-BUILDINGS
Mar 8, 2017Department of Health and Mental Hygiene$77,218.00CONSTRUCTION-BUILDINGS
Dec 1, 2016Department of Health and Mental Hygiene$54,387.50CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$49,227.10CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$46,666.85CONSTRUCTION-BUILDINGS
Mar 8, 2017Department of Health and Mental Hygiene$43,043.55CONSTRUCTION-BUILDINGS
Sep 19, 2016Department of Health and Mental Hygiene$37,644.70CONSTRUCTION-BUILDINGS
FY 2016top 20 of 29 payments$12,248,664
DateAgencyAmountCategoryPurchase order
Apr 18, 2016Department of Health and Mental Hygiene$1,774,026.20CONSTRUCTION-BUILDINGS
Mar 14, 2016Department of Health and Mental Hygiene$1,617,414.90CONSTRUCTION-BUILDINGS
Dec 28, 2015Department of Health and Mental Hygiene$1,448,780.32CONSTRUCTION-BUILDINGS
Feb 3, 2016Department of Health and Mental Hygiene$1,344,913.20CONSTRUCTION-BUILDINGS
Jun 2, 2016Department of Health and Mental Hygiene$1,280,003.40CONSTRUCTION-BUILDINGS
Aug 31, 2015Department of Health and Mental Hygiene$939,377.10CONSTRUCTION-BUILDINGS
Nov 16, 2015Department of Health and Mental Hygiene$597,998.10CONSTRUCTION-BUILDINGS
Jun 13, 2016Department of Health and Mental Hygiene$571,727.48CONSTRUCTION-BUILDINGS
Jun 6, 2016School Construction Authority$540,165.92CONSTRUCTION-BUILDINGS
Jul 21, 2015Department of Health and Mental Hygiene$448,673.60CONSTRUCTION-BUILDINGS
Dec 28, 2015Department of Health and Mental Hygiene$333,165.38CONSTRUCTION-BUILDINGS
Jun 6, 2016School Construction Authority$304,981.77CONSTRUCTION-BUILDINGS
Jun 2, 2016Department of Health and Mental Hygiene$278,208.45CONSTRUCTION-BUILDINGS
Mar 14, 2016Department of Health and Mental Hygiene$223,470.40CONSTRUCTION-BUILDINGS
Nov 2, 2015Department of Health and Mental Hygiene$159,609.50CONSTRUCTION-BUILDINGS
Jun 6, 2016School Construction Authority$110,744.73CONSTRUCTION-BUILDINGS
Jun 13, 2016Department of Health and Mental Hygiene$50,516.25CONSTRUCTION-BUILDINGS
Jun 6, 2016School Construction Authority$43,818.76CONSTRUCTION-BUILDINGS
Jun 13, 2016Department of Health and Mental Hygiene$32,381.70CONSTRUCTION-BUILDINGS
Jun 6, 2016School Construction Authority$30,129.72CONSTRUCTION-BUILDINGS
FY 2015top 5 of 5 payments$4,855,800
DateAgencyAmountCategoryPurchase order
Jul 9, 2014School Construction Authority$1,678,833.34CONSTRUCTION-BUILDINGS
Oct 2, 2014School Construction Authority$1,449,369.40CONSTRUCTION-BUILDINGS
Jul 29, 2014School Construction Authority$1,448,029.05CONSTRUCTION-BUILDINGS
May 8, 2015Department of Health and Mental Hygiene$267,483.73CONSTRUCTION-BUILDINGS
Feb 26, 2015Department of Health and Mental Hygiene$12,084.17CONSTRUCTION-BUILDINGS
FY 2014top 20 of 30 payments$31,147,007
DateAgencyAmountCategoryPurchase order
Nov 15, 2013School Construction Authority$3,514,173.50CONSTRUCTION-BUILDINGS
May 2, 2014School Construction Authority$3,305,352.68CONSTRUCTION-BUILDINGS
May 28, 2014School Construction Authority$2,875,755.90CONSTRUCTION-BUILDINGS
Dec 19, 2013School Construction Authority$2,575,661.34CONSTRUCTION-BUILDINGS
Sep 18, 2013School Construction Authority$2,131,070.53CONSTRUCTION-BUILDINGS
Oct 16, 2013School Construction Authority$2,032,283.74CONSTRUCTION-BUILDINGS
Jan 30, 2014School Construction Authority$1,974,518.00CONSTRUCTION-BUILDINGS
Aug 9, 2013School Construction Authority$1,811,967.95CONSTRUCTION-BUILDINGS
Jul 8, 2013School Construction Authority$1,657,848.07CONSTRUCTION-BUILDINGS
Mar 4, 2014School Construction Authority$1,350,063.80CONSTRUCTION-BUILDINGS
May 22, 2014School Construction Authority$1,221,604.89CONSTRUCTION-BUILDINGS
Mar 3, 2014School Construction Authority$1,080,023.71CONSTRUCTION-BUILDINGS
Apr 1, 2014School Construction Authority$1,036,588.68CONSTRUCTION-BUILDINGS
Aug 23, 2013School Construction Authority$1,035,334.41CONSTRUCTION-BUILDINGS
Mar 14, 2014School Construction Authority$939,005.73CONSTRUCTION-BUILDINGS
Mar 25, 2014School Construction Authority$810,313.33CONSTRUCTION-BUILDINGS
Nov 20, 2013School Construction Authority$436,570.50CONSTRUCTION-BUILDINGS
Apr 15, 2014School Construction Authority$419,417.19CONSTRUCTION-BUILDINGS
Nov 1, 2013School Construction Authority$265,246.67CONSTRUCTION-BUILDINGS
May 22, 2014School Construction Authority$228,247.08CONSTRUCTION-BUILDINGS
FY 2013top 20 of 29 payments$21,677,772
DateAgencyAmountCategoryPurchase order
May 28, 2013School Construction Authority$1,894,121.40CONSTRUCTION-BUILDINGS
Mar 21, 2013School Construction Authority$1,804,420.91CONSTRUCTION-BUILDINGS
Nov 28, 2012School Construction Authority$1,765,329.80CONSTRUCTION-BUILDINGS
Oct 16, 2012School Construction Authority$1,680,474.25CONSTRUCTION-BUILDINGS
Dec 28, 2012School Construction Authority$1,444,528.91CONSTRUCTION-BUILDINGS
Feb 12, 2013School Construction Authority$1,421,443.16CONSTRUCTION-BUILDINGS
Jul 30, 2012School Construction Authority$1,388,020.06CONSTRUCTION-BUILDINGS
Aug 10, 2012School Construction Authority$1,215,715.00CONSTRUCTION-BUILDINGS
Sep 24, 2012School Construction Authority$1,210,406.61CONSTRUCTION-BUILDINGS
Jan 16, 2013School Construction Authority$985,447.61CONSTRUCTION-BUILDINGS
Feb 11, 2013School Construction Authority$981,719.15CONSTRUCTION-BUILDINGS
Oct 10, 2012School Construction Authority$920,319.02CONSTRUCTION-BUILDINGS
Aug 13, 2012School Construction Authority$873,475.88CONSTRUCTION-BUILDINGS
Feb 11, 2013School Construction Authority$826,294.75CONSTRUCTION-BUILDINGS
Apr 26, 2013School Construction Authority$571,373.70CONSTRUCTION-BUILDINGS
Apr 16, 2013School Construction Authority$528,171.50CONSTRUCTION-BUILDINGS
Dec 11, 2012School Construction Authority$524,788.55CONSTRUCTION-BUILDINGS
Nov 13, 2012School Construction Authority$471,969.46CONSTRUCTION-BUILDINGS
Feb 5, 2013School Construction Authority$453,620.40CONSTRUCTION-BUILDINGS
May 14, 2013School Construction Authority$289,600.00CONSTRUCTION-BUILDINGS
FY 2012top 20 of 47 payments$20,043,767
DateAgencyAmountCategoryPurchase order
Aug 11, 2011School Construction Authority$2,378,961.50CONSTRUCTION-BUILDINGS
Oct 12, 2011School Construction Authority$2,247,669.82CONSTRUCTION-BUILDINGS
Dec 14, 2011School Construction Authority$2,014,928.29CONSTRUCTION-BUILDINGS
Feb 17, 2012School Construction Authority$1,760,627.87CONSTRUCTION-BUILDINGS
May 22, 2012School Construction Authority$1,615,037.75CONSTRUCTION-BUILDINGS
Jan 20, 2012School Construction Authority$1,324,531.48CONSTRUCTION-BUILDINGS
Nov 18, 2011School Construction Authority$1,226,307.24CONSTRUCTION-BUILDINGS
Sep 9, 2011School Construction Authority$1,115,175.45CONSTRUCTION-BUILDINGS
Apr 20, 2012School Construction Authority$1,071,310.08CONSTRUCTION-BUILDINGS
Apr 4, 2012School Construction Authority$901,646.76CONSTRUCTION-BUILDINGS
Jun 19, 2012School Construction Authority$849,915.22CONSTRUCTION-BUILDINGS
Feb 14, 2012School Construction Authority$527,323.60CONSTRUCTION-BUILDINGS
Jun 15, 2012School Construction Authority$479,682.69CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$331,052.32CONSTRUCTION-BUILDINGS
Jan 9, 2012School Construction Authority$291,157.92CONSTRUCTION-BUILDINGS
Jan 20, 2012School Construction Authority$222,942.99CONSTRUCTION-BUILDINGS
May 24, 2012School Construction Authority$155,459.44CONSTRUCTION-BUILDINGS
Nov 9, 2011School Construction Authority$146,365.00CONSTRUCTION-BUILDINGS
Sep 8, 2011School Construction Authority$127,943.00CONSTRUCTION-BUILDINGS
Apr 4, 2012School Construction Authority$115,342.40CONSTRUCTION-BUILDINGS
FY 2011top 20 of 36 payments$23,835,246
DateAgencyAmountCategoryPurchase order
Aug 10, 2010School Construction Authority$3,741,826.22CONSTRUCTION-BUILDINGS
Jul 14, 2010School Construction Authority$3,383,337.60CONSTRUCTION-BUILDINGS
Sep 10, 2010School Construction Authority$2,974,715.90CONSTRUCTION-BUILDINGS
Jan 4, 2011School Construction Authority$1,430,361.77CONSTRUCTION-BUILDINGS
Mar 2, 2011School Construction Authority$1,035,703.60CONSTRUCTION-BUILDINGS
Jun 21, 2011School Construction Authority$889,171.50CONSTRUCTION-BUILDINGS
Oct 28, 2010School Construction Authority$868,164.69CONSTRUCTION-BUILDINGS
Nov 5, 2010School Construction Authority$858,581.50CONSTRUCTION-BUILDINGS
Nov 23, 2010School Construction Authority$783,959.00CONSTRUCTION-BUILDINGS
Aug 11, 2010School Construction Authority$715,904.68CONSTRUCTION-BUILDINGS
May 11, 2011School Construction Authority$690,873.25CONSTRUCTION-BUILDINGS
Jun 9, 2011School Construction Authority$656,672.86CONSTRUCTION-BUILDINGS
Dec 29, 2010School Construction Authority$617,692.41CONSTRUCTION-BUILDINGS
Sep 15, 2010School Construction Authority$570,972.90CONSTRUCTION-BUILDINGS
Mar 10, 2011School Construction Authority$564,236.86CONSTRUCTION-BUILDINGS
May 17, 2011School Construction Authority$481,421.03CONSTRUCTION-BUILDINGS
Apr 6, 2011School Construction Authority$463,114.78CONSTRUCTION-BUILDINGS
Jan 14, 2011School Construction Authority$437,865.70CONSTRUCTION-BUILDINGS
Oct 4, 2010School Construction Authority$412,984.00CONSTRUCTION-BUILDINGS
Mar 18, 2011School Construction Authority$325,935.60CONSTRUCTION-BUILDINGS
FY 2010top 20 of 30 payments$18,696,246
DateAgencyAmountCategoryPurchase order
May 27, 2010School Construction Authority$3,332,662.21CONSTRUCTION-BUILDINGS
Jun 15, 2010School Construction Authority$3,040,996.23CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$2,487,410.49CONSTRUCTION-BUILDINGS
Mar 15, 2010School Construction Authority$2,047,151.67CONSTRUCTION-BUILDINGS
Jan 12, 2010School Construction Authority$1,507,760.60CONSTRUCTION-BUILDINGS
Jan 27, 2010School Construction Authority$1,238,800.02CONSTRUCTION-BUILDINGS
May 3, 2010School Construction Authority$1,051,270.00CONSTRUCTION-BUILDINGS
Jun 25, 2010School Construction Authority$899,545.50CONSTRUCTION-BUILDINGS
Jun 2, 2010School Construction Authority$863,580.31CONSTRUCTION-BUILDINGS
Apr 16, 2010School Construction Authority$478,372.50CONSTRUCTION-BUILDINGS
Mar 11, 2010School Construction Authority$241,300.00CONSTRUCTION-BUILDINGS
Jan 21, 2010School Construction Authority$208,800.89CONSTRUCTION-BUILDINGS
Jan 14, 2010School Construction Authority$152,103.10CONSTRUCTION-BUILDINGS
Jan 14, 2010School Construction Authority$133,735.12CONSTRUCTION-BUILDINGS
Jan 14, 2010School Construction Authority$115,675.21CONSTRUCTION-BUILDINGS
May 19, 2010School Construction Authority$113,858.70CONSTRUCTION-BUILDINGS
May 19, 2010School Construction Authority$79,952.74CONSTRUCTION-BUILDINGS
May 19, 2010School Construction Authority$79,355.82CONSTRUCTION-BUILDINGS
Jan 14, 2010School Construction Authority$76,302.63CONSTRUCTION-BUILDINGS
Jan 14, 2010School Construction Authority$71,562.00CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
May 19, 2021School Construction Authority$9,187.86CONSTRUCTION-BUILDINGSCapital Contracts
Mar 2, 2021School Construction Authority$13,056.92CONSTRUCTION-BUILDINGSCapital Contracts
Jul 2, 2020School Construction Authority$66,340.54CONSTRUCTION-BUILDINGSCapital Contracts
Apr 28, 2020School Construction Authority$79,289.28CONSTRUCTION-BUILDINGSCapital Contracts
Jan 3, 2020School Construction Authority$594,982.55CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$15,047.26CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$25,541.56CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$629.94CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$913.90CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$1,444.55CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$248.63CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$4,290.96CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$490.19CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$797.72CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$91.63CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$774.48CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$2.18CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$168.74CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$30,157.24CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$7,451.60CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$269.35CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$1,089.85CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$22,487.51CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$121.84CONSTRUCTION-BUILDINGSCapital Contracts
Aug 12, 2019Department of Health and Mental Hygiene$4,864.13CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data