Home New York City Vendors Alps Mechanical Inc Alps Mechanical Inc: New York City Government Payments as recorded by New York City: ALPS MECHANICAL INC
Alps Mechanical Inc is the 1,063rd-largest recipient of New York City government payments tracked by SpendLedger, and ranks 154th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span.
Primary spending category: CONSTRUCTION-BUILDINGS
$51,909,773 total received
659 payments
1 agency
Jan 7, 2010 – Jan 2, 2024 first / last payment
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year FY 2024 $9,104
FY 2021 $33,694
FY 2020 $12,334
FY 2019 $146,300
FY 2018 $160,211
FY 2017 $274,633
FY 2016 $599,126
FY 2015 $1,711,861
FY 2014 $3,569,520
FY 2013 $7,583,513
FY 2012 $12,111,209
FY 2011 $16,104,606
FY 2010 $9,593,664
Payments by fiscal year and agency Fiscal year Agency Payments Total FY 2024 School Construction Authority 1 $9,104 FY 2021 School Construction Authority 4 $33,694 FY 2020 School Construction Authority 3 $12,334 FY 2019 School Construction Authority 17 $146,300 FY 2018 School Construction Authority 4 $160,211 FY 2017 School Construction Authority 14 $274,633 FY 2016 School Construction Authority 13 $599,126 FY 2015 School Construction Authority 32 $1,711,861 FY 2014 School Construction Authority 48 $3,569,520 FY 2013 School Construction Authority 111 $7,583,513 FY 2012 School Construction Authority 163 $12,111,209 FY 2011 School Construction Authority 170 $16,104,606 FY 2010 School Construction Authority 79 $9,593,664 Total 659 $51,909,773
What the payments were for Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
Category Payments Total First / last CONSTRUCTION-BUILDINGS 659 $51,909,773 Jan 7, 2010 – Jan 2, 2024
Largest payments by fiscal year The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2024 top 1 of 1 payments $9,104 FY 2021 top 4 of 4 payments $33,694 FY 2020 top 3 of 3 payments $12,334 FY 2019 top 17 of 17 payments $146,300 Date Agency Amount Category Purchase order Sep 19, 2018 School Construction Authority $41,146.50 CONSTRUCTION-BUILDINGS – Mar 20, 2019 School Construction Authority $28,176.69 CONSTRUCTION-BUILDINGS – Sep 17, 2018 School Construction Authority $22,000.00 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority $22,000.00 CONSTRUCTION-BUILDINGS – Mar 20, 2019 School Construction Authority $19,947.18 CONSTRUCTION-BUILDINGS – Sep 17, 2018 School Construction Authority $19,920.71 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority $19,920.71 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority $9,182.53 CONSTRUCTION-BUILDINGS – Sep 17, 2018 School Construction Authority $9,182.53 CONSTRUCTION-BUILDINGS – Mar 20, 2019 School Construction Authority $2,784.30 CONSTRUCTION-BUILDINGS – Sep 17, 2018 School Construction Authority $1,992.49 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority $1,992.49 CONSTRUCTION-BUILDINGS – Mar 20, 2019 School Construction Authority $1,150.00 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority -$1,992.49 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority -$9,182.53 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority -$19,920.71 CONSTRUCTION-BUILDINGS – Aug 27, 2018 School Construction Authority -$22,000.00 CONSTRUCTION-BUILDINGS –
FY 2018 top 4 of 4 payments $160,211 FY 2017 top 14 of 14 payments $274,633 Date Agency Amount Category Purchase order Oct 13, 2016 School Construction Authority $140,616.27 CONSTRUCTION-BUILDINGS – Oct 14, 2016 School Construction Authority $140,616.27 CONSTRUCTION-BUILDINGS – Oct 13, 2016 School Construction Authority $79,446.70 CONSTRUCTION-BUILDINGS – Oct 14, 2016 School Construction Authority $79,446.70 CONSTRUCTION-BUILDINGS – Jul 25, 2016 School Construction Authority $34,847.81 CONSTRUCTION-BUILDINGS – Jul 26, 2016 School Construction Authority $34,847.81 CONSTRUCTION-BUILDINGS – Jul 5, 2016 School Construction Authority $34,847.81 CONSTRUCTION-BUILDINGS – Oct 13, 2016 School Construction Authority $19,772.11 CONSTRUCTION-BUILDINGS – Oct 14, 2016 School Construction Authority $19,722.11 CONSTRUCTION-BUILDINGS – Oct 13, 2016 School Construction Authority -$19,772.11 CONSTRUCTION-BUILDINGS – Jul 25, 2016 School Construction Authority -$34,847.81 CONSTRUCTION-BUILDINGS – Jul 5, 2016 School Construction Authority -$34,847.81 CONSTRUCTION-BUILDINGS – Oct 13, 2016 School Construction Authority -$79,446.70 CONSTRUCTION-BUILDINGS – Oct 13, 2016 School Construction Authority -$140,616.27 CONSTRUCTION-BUILDINGS –
FY 2016 top 13 of 13 payments $599,126 Date Agency Amount Category Purchase order Jun 6, 2016 School Construction Authority $195,471.02 CONSTRUCTION-BUILDINGS – Jun 6, 2016 School Construction Authority $133,183.86 CONSTRUCTION-BUILDINGS – Dec 3, 2015 School Construction Authority $83,220.00 CONSTRUCTION-BUILDINGS – Jan 19, 2016 School Construction Authority $83,220.00 CONSTRUCTION-BUILDINGS – Jun 6, 2016 School Construction Authority $70,228.70 CONSTRUCTION-BUILDINGS – Oct 1, 2015 School Construction Authority $65,775.54 CONSTRUCTION-BUILDINGS – Oct 1, 2015 School Construction Authority $20,550.01 CONSTRUCTION-BUILDINGS – Dec 15, 2015 School Construction Authority $17,404.76 CONSTRUCTION-BUILDINGS – Jun 6, 2016 School Construction Authority $9,729.54 CONSTRUCTION-BUILDINGS – Jan 19, 2016 School Construction Authority $3,562.50 CONSTRUCTION-BUILDINGS – Dec 3, 2015 School Construction Authority $3,562.50 CONSTRUCTION-BUILDINGS – Dec 3, 2015 School Construction Authority -$3,562.50 CONSTRUCTION-BUILDINGS – Dec 3, 2015 School Construction Authority -$83,220.00 CONSTRUCTION-BUILDINGS –
FY 2015 top 20 of 32 payments $1,711,861 Date Agency Amount Category Purchase order Mar 11, 2015 School Construction Authority $608,730.28 CONSTRUCTION-BUILDINGS – Feb 18, 2015 School Construction Authority $608,730.28 CONSTRUCTION-BUILDINGS – Aug 27, 2014 School Construction Authority $245,249.62 CONSTRUCTION-BUILDINGS – Dec 3, 2014 School Construction Authority $244,924.06 CONSTRUCTION-BUILDINGS – May 5, 2015 School Construction Authority $241,912.94 CONSTRUCTION-BUILDINGS – Mar 25, 2015 School Construction Authority $124,751.13 CONSTRUCTION-BUILDINGS – Mar 20, 2015 School Construction Authority $50,510.18 CONSTRUCTION-BUILDINGS – Feb 24, 2015 School Construction Authority $41,927.21 CONSTRUCTION-BUILDINGS – Mar 11, 2015 School Construction Authority $41,927.21 CONSTRUCTION-BUILDINGS – Feb 24, 2015 School Construction Authority $38,831.98 CONSTRUCTION-BUILDINGS – Mar 11, 2015 School Construction Authority $38,831.98 CONSTRUCTION-BUILDINGS – Apr 1, 2015 School Construction Authority $21,997.77 CONSTRUCTION-BUILDINGS – Mar 26, 2015 School Construction Authority $21,997.77 CONSTRUCTION-BUILDINGS – Mar 20, 2015 School Construction Authority $20,126.51 CONSTRUCTION-BUILDINGS – Feb 18, 2015 School Construction Authority $16,447.92 CONSTRUCTION-BUILDINGS – Mar 11, 2015 School Construction Authority $16,447.92 CONSTRUCTION-BUILDINGS – Mar 20, 2015 School Construction Authority $12,845.80 CONSTRUCTION-BUILDINGS – Mar 26, 2015 School Construction Authority $10,608.00 CONSTRUCTION-BUILDINGS – Mar 25, 2015 School Construction Authority $9,300.00 CONSTRUCTION-BUILDINGS – Nov 14, 2014 School Construction Authority $8,585.17 CONSTRUCTION-BUILDINGS –
FY 2014 top 20 of 48 payments $3,569,520 Date Agency Amount Category Purchase order Dec 12, 2013 School Construction Authority $508,725.00 CONSTRUCTION-BUILDINGS – Jun 2, 2014 School Construction Authority $470,611.00 CONSTRUCTION-BUILDINGS – May 19, 2014 School Construction Authority $470,611.00 CONSTRUCTION-BUILDINGS – Dec 2, 2013 School Construction Authority $401,586.56 CONSTRUCTION-BUILDINGS – Nov 14, 2013 School Construction Authority $401,586.56 CONSTRUCTION-BUILDINGS – Jan 8, 2014 School Construction Authority $401,586.56 CONSTRUCTION-BUILDINGS – Nov 13, 2013 School Construction Authority $325,332.79 CONSTRUCTION-BUILDINGS – Oct 30, 2013 School Construction Authority $218,631.12 CONSTRUCTION-BUILDINGS – Dec 12, 2013 School Construction Authority $216,899.25 CONSTRUCTION-BUILDINGS – Jul 16, 2013 School Construction Authority $173,057.96 CONSTRUCTION-BUILDINGS – May 23, 2014 School Construction Authority $144,156.68 CONSTRUCTION-BUILDINGS – Jul 30, 2013 School Construction Authority $142,393.55 CONSTRUCTION-BUILDINGS – Jan 7, 2014 School Construction Authority $103,734.59 CONSTRUCTION-BUILDINGS – Nov 14, 2013 School Construction Authority $91,437.50 CONSTRUCTION-BUILDINGS – Dec 2, 2013 School Construction Authority $91,437.50 CONSTRUCTION-BUILDINGS – Jan 8, 2014 School Construction Authority $91,437.50 CONSTRUCTION-BUILDINGS – Mar 13, 2014 School Construction Authority $82,685.63 CONSTRUCTION-BUILDINGS – Oct 4, 2013 School Construction Authority $74,983.67 CONSTRUCTION-BUILDINGS – May 19, 2014 School Construction Authority $61,750.00 CONSTRUCTION-BUILDINGS – Jun 2, 2014 School Construction Authority $61,750.00 CONSTRUCTION-BUILDINGS –
FY 2013 top 20 of 111 payments $7,583,513 Date Agency Amount Category Purchase order Nov 14, 2012 School Construction Authority $668,316.60 CONSTRUCTION-BUILDINGS – Mar 14, 2013 School Construction Authority $555,201.79 CONSTRUCTION-BUILDINGS – Jan 30, 2013 School Construction Authority $333,846.44 CONSTRUCTION-BUILDINGS – Jul 5, 2012 School Construction Authority $292,125.00 CONSTRUCTION-BUILDINGS – Oct 1, 2012 School Construction Authority $275,500.00 CONSTRUCTION-BUILDINGS – Sep 10, 2012 School Construction Authority $266,237.50 CONSTRUCTION-BUILDINGS – Feb 11, 2013 School Construction Authority $232,382.08 CONSTRUCTION-BUILDINGS – Sep 7, 2012 School Construction Authority $206,796.67 CONSTRUCTION-BUILDINGS – Nov 7, 2012 School Construction Authority $189,413.75 CONSTRUCTION-BUILDINGS – Aug 7, 2012 School Construction Authority $175,750.00 CONSTRUCTION-BUILDINGS – Apr 1, 2013 School Construction Authority $170,099.59 CONSTRUCTION-BUILDINGS – Jan 7, 2013 School Construction Authority $164,826.47 CONSTRUCTION-BUILDINGS – Nov 19, 2012 School Construction Authority $147,131.36 CONSTRUCTION-BUILDINGS – Aug 24, 2012 School Construction Authority $146,099.93 CONSTRUCTION-BUILDINGS – Apr 19, 2013 School Construction Authority $144,422.81 CONSTRUCTION-BUILDINGS – Jun 21, 2013 School Construction Authority $141,415.29 CONSTRUCTION-BUILDINGS – Jun 4, 2013 School Construction Authority $133,993.55 CONSTRUCTION-BUILDINGS – Jul 16, 2012 School Construction Authority $128,250.00 CONSTRUCTION-BUILDINGS – Dec 21, 2012 School Construction Authority $121,552.50 CONSTRUCTION-BUILDINGS – May 21, 2013 School Construction Authority $116,612.50 CONSTRUCTION-BUILDINGS –
FY 2012 top 20 of 163 payments $12,111,209 Date Agency Amount Category Purchase order Sep 9, 2011 School Construction Authority $430,896.25 CONSTRUCTION-BUILDINGS – Nov 15, 2011 School Construction Authority $427,441.58 CONSTRUCTION-BUILDINGS – Jan 17, 2012 School Construction Authority $363,142.46 CONSTRUCTION-BUILDINGS – Jul 21, 2011 School Construction Authority $355,290.50 CONSTRUCTION-BUILDINGS – Feb 28, 2012 School Construction Authority $339,545.17 CONSTRUCTION-BUILDINGS – Oct 24, 2011 School Construction Authority $320,000.00 CONSTRUCTION-BUILDINGS – Aug 2, 2011 School Construction Authority $318,535.00 CONSTRUCTION-BUILDINGS – Nov 21, 2011 School Construction Authority $303,050.00 CONSTRUCTION-BUILDINGS – Jan 11, 2012 School Construction Authority $296,000.00 CONSTRUCTION-BUILDINGS – Apr 30, 2012 School Construction Authority $278,777.50 CONSTRUCTION-BUILDINGS – Jul 20, 2011 School Construction Authority $266,712.50 CONSTRUCTION-BUILDINGS – Feb 23, 2012 School Construction Authority $255,590.60 CONSTRUCTION-BUILDINGS – Jul 21, 2011 School Construction Authority $248,795.90 CONSTRUCTION-BUILDINGS – Jul 29, 2011 School Construction Authority $244,625.00 CONSTRUCTION-BUILDINGS – Aug 16, 2011 School Construction Authority $244,553.75 CONSTRUCTION-BUILDINGS – Oct 27, 2011 School Construction Authority $241,557.69 CONSTRUCTION-BUILDINGS – Jul 20, 2011 School Construction Authority $239,162.50 CONSTRUCTION-BUILDINGS – Oct 21, 2011 School Construction Authority $219,687.50 CONSTRUCTION-BUILDINGS – Aug 9, 2011 School Construction Authority $209,666.32 CONSTRUCTION-BUILDINGS – Apr 2, 2012 School Construction Authority $192,140.06 CONSTRUCTION-BUILDINGS –
FY 2011 top 20 of 170 payments $16,104,606 Date Agency Amount Category Purchase order Aug 6, 2010 School Construction Authority $737,758.63 CONSTRUCTION-BUILDINGS – Oct 8, 2010 School Construction Authority $697,490.00 CONSTRUCTION-BUILDINGS – Sep 15, 2010 School Construction Authority $554,434.25 CONSTRUCTION-BUILDINGS – Jul 9, 2010 School Construction Authority $495,040.25 CONSTRUCTION-BUILDINGS – Nov 3, 2010 School Construction Authority $474,264.22 CONSTRUCTION-BUILDINGS – Jan 14, 2011 School Construction Authority $464,473.26 CONSTRUCTION-BUILDINGS – Sep 2, 2010 School Construction Authority $449,196.14 CONSTRUCTION-BUILDINGS – Dec 3, 2010 School Construction Authority $434,921.42 CONSTRUCTION-BUILDINGS – Sep 2, 2010 School Construction Authority $430,469.70 CONSTRUCTION-BUILDINGS – May 6, 2011 School Construction Authority $363,180.25 CONSTRUCTION-BUILDINGS – Oct 8, 2010 School Construction Authority $354,531.45 CONSTRUCTION-BUILDINGS – Nov 3, 2010 School Construction Authority $348,792.50 CONSTRUCTION-BUILDINGS – Aug 17, 2010 School Construction Authority $342,921.50 CONSTRUCTION-BUILDINGS – Dec 9, 2010 School Construction Authority $325,576.47 CONSTRUCTION-BUILDINGS – Jun 3, 2011 School Construction Authority $320,625.00 CONSTRUCTION-BUILDINGS – Apr 28, 2011 School Construction Authority $272,650.00 CONSTRUCTION-BUILDINGS – Jun 14, 2011 School Construction Authority $258,729.85 CONSTRUCTION-BUILDINGS – Mar 22, 2011 School Construction Authority $256,384.26 CONSTRUCTION-BUILDINGS – Aug 10, 2010 School Construction Authority $247,589.10 CONSTRUCTION-BUILDINGS – Apr 6, 2011 School Construction Authority $234,175.00 CONSTRUCTION-BUILDINGS –
FY 2010 top 20 of 79 payments $9,593,664 Date Agency Amount Category Purchase order Jan 25, 2010 School Construction Authority $816,525.00 CONSTRUCTION-BUILDINGS – Feb 25, 2010 School Construction Authority $810,312.09 CONSTRUCTION-BUILDINGS – Jan 25, 2010 School Construction Authority $577,866.05 CONSTRUCTION-BUILDINGS – Jun 1, 2010 School Construction Authority $560,690.03 CONSTRUCTION-BUILDINGS – Apr 15, 2010 School Construction Authority $534,831.05 CONSTRUCTION-BUILDINGS – Jun 10, 2010 School Construction Authority $411,171.40 CONSTRUCTION-BUILDINGS – Apr 30, 2010 School Construction Authority $350,502.50 CONSTRUCTION-BUILDINGS – Jun 4, 2010 School Construction Authority $329,005.47 CONSTRUCTION-BUILDINGS – Feb 4, 2010 School Construction Authority $282,952.75 CONSTRUCTION-BUILDINGS – Jan 22, 2010 School Construction Authority $276,720.26 CONSTRUCTION-BUILDINGS – Mar 16, 2010 School Construction Authority $275,323.41 CONSTRUCTION-BUILDINGS – Jan 8, 2010 School Construction Authority $264,067.56 CONSTRUCTION-BUILDINGS – Apr 8, 2010 School Construction Authority $248,662.50 CONSTRUCTION-BUILDINGS – May 13, 2010 School Construction Authority $239,685.00 CONSTRUCTION-BUILDINGS – Apr 7, 2010 School Construction Authority $214,432.81 CONSTRUCTION-BUILDINGS – May 3, 2010 School Construction Authority $211,042.50 CONSTRUCTION-BUILDINGS – Apr 15, 2010 School Construction Authority $199,120.00 CONSTRUCTION-BUILDINGS – Jan 29, 2010 School Construction Authority $196,412.50 CONSTRUCTION-BUILDINGS – Feb 16, 2010 School Construction Authority $188,337.50 CONSTRUCTION-BUILDINGS – Apr 26, 2010 School Construction Authority $187,407.79 CONSTRUCTION-BUILDINGS –
Recent payments Date Agency Amount Category Method Jan 2, 2024 School Construction Authority $9,103.50 CONSTRUCTION-BUILDINGS Capital Contracts May 5, 2021 School Construction Authority $361.52 CONSTRUCTION-BUILDINGS Capital Contracts Dec 9, 2020 School Construction Authority $9,718.58 CONSTRUCTION-BUILDINGS Capital Contracts Dec 9, 2020 School Construction Authority $11,323.43 CONSTRUCTION-BUILDINGS Capital Contracts Dec 9, 2020 School Construction Authority $12,290.64 CONSTRUCTION-BUILDINGS Capital Contracts May 28, 2020 School Construction Authority -$7,832.65 CONSTRUCTION-BUILDINGS Capital Contracts May 28, 2020 School Construction Authority $12,333.61 CONSTRUCTION-BUILDINGS Capital Contracts May 28, 2020 School Construction Authority $7,832.65 CONSTRUCTION-BUILDINGS Capital Contracts Mar 20, 2019 School Construction Authority $1,150.00 CONSTRUCTION-BUILDINGS Capital Contracts Mar 20, 2019 School Construction Authority $28,176.69 CONSTRUCTION-BUILDINGS Capital Contracts Mar 20, 2019 School Construction Authority $2,784.30 CONSTRUCTION-BUILDINGS Capital Contracts Mar 20, 2019 School Construction Authority $19,947.18 CONSTRUCTION-BUILDINGS Capital Contracts Sep 19, 2018 School Construction Authority $41,146.50 CONSTRUCTION-BUILDINGS Capital Contracts Sep 17, 2018 School Construction Authority $19,920.71 CONSTRUCTION-BUILDINGS Capital Contracts Sep 17, 2018 School Construction Authority $22,000.00 CONSTRUCTION-BUILDINGS Capital Contracts Sep 17, 2018 School Construction Authority $9,182.53 CONSTRUCTION-BUILDINGS Capital Contracts Sep 17, 2018 School Construction Authority $1,992.49 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority $9,182.53 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority -$1,992.49 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority -$9,182.53 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority -$19,920.71 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority $1,992.49 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority $19,920.71 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority $22,000.00 CONSTRUCTION-BUILDINGS Capital Contracts Aug 27, 2018 School Construction Authority -$22,000.00 CONSTRUCTION-BUILDINGS Capital Contracts
Other vendors serving School Construction Authority Ace American Insurance Co. $1,766,191,960 Leon D. Dematteis Construction Corp $1,571,596,886 Nyc School Construction Authority $1,225,861,906 TDX Construction Corp $971,148,427 Citnalta Construction Corp $963,925,562 Whitestone Construction Corp $856,318,363 Turner Construction Co. $691,468,025 Technico Construction Services Inc. $660,818,591 Arnell Construction Corp. $619,850,912 Iannelli Construction Co Inc $560,693,902 Verified Data refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data