Abax Inc.: New York City Government Payments

as recorded by New York City: ABAX INC.

Abax Inc. is the 351st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 55th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.5% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 11.3% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$202,421,177total received
1,830payments
2agencies
Jan 4, 2010May 8, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Abax Inc.. No spam.

Payments by fiscal year

FY 2025$25,049
FY 2024$28,234
FY 2023$272,693
FY 2022$850,966
FY 2021$1,144,629
FY 2020$5,350,658
FY 2019$20,271,585
FY 2018$20,991,807
FY 2017$8,426,933
FY 2016$17,520,298
FY 2015$20,095,304
FY 2014$26,280,593
FY 2013$17,267,100
FY 2012$27,248,758
FY 2011$26,475,188
FY 2010$10,171,383

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority6$25,049
FY 2024School Construction Authority3$28,234
FY 2023School Construction Authority18$272,693
FY 2022School Construction Authority85$850,966
FY 2021School Construction Authority93$1,144,629
FY 2020School Construction Authority102$5,350,658
FY 2019School Construction Authority119$20,271,585
FY 2018School Construction Authority121$20,991,807
FY 2017School Construction Authority61$8,426,933
FY 2016School Construction Authority109$17,520,298
FY 2015School Construction Authority149$20,095,304
FY 2014School Construction Authority156$26,280,593
FY 2013School Construction Authority146$17,264,303
FY 2013Housing Preservation and Development2$2,797
FY 2012School Construction Authority272$27,248,758
FY 2011School Construction Authority267$26,407,694
FY 2011Housing Preservation and Development19$67,494
FY 2010School Construction Authority71$10,054,629
FY 2010Housing Preservation and Development31$116,754
Total1,830$202,421,177

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONTRACTUAL SERVICES GENERAL14$86,471Apr 5, 2010 Jun 13, 2011
CONSTRUCTION-BUILDINGS1,778$202,234,132Jan 4, 2010 May 8, 2025
MAINT & REP GENERAL36$100,580Feb 1, 2010 Sep 12, 2012
<Non-Applicable Expenditure Object>2-$7Jun 13, 2011 Sep 12, 2012

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 6 of 6 payments$25,049
DateAgencyAmountCategoryPurchase order
Apr 23, 2025School Construction Authority$6,822.76CONSTRUCTION-BUILDINGS
Apr 23, 2025School Construction Authority$4,933.55CONSTRUCTION-BUILDINGS
Apr 23, 2025School Construction Authority$4,790.74CONSTRUCTION-BUILDINGS
Apr 23, 2025School Construction Authority$3,671.99CONSTRUCTION-BUILDINGS
May 8, 2025School Construction Authority$3,135.96CONSTRUCTION-BUILDINGS
Apr 23, 2025School Construction Authority$1,693.50CONSTRUCTION-BUILDINGS
FY 2024top 3 of 3 payments$28,234
DateAgencyAmountCategoryPurchase order
Jan 2, 2024School Construction Authority$17,489.12CONSTRUCTION-BUILDINGS
Jan 22, 2024School Construction Authority$10,232.65CONSTRUCTION-BUILDINGS
Jan 22, 2024School Construction Authority$512.00CONSTRUCTION-BUILDINGS
FY 2023top 18 of 18 payments$272,693
DateAgencyAmountCategoryPurchase order
Jul 5, 2022School Construction Authority$195,970.56CONSTRUCTION-BUILDINGS
Aug 18, 2022School Construction Authority$17,489.12CONSTRUCTION-BUILDINGS
Aug 3, 2022School Construction Authority$17,211.61CONSTRUCTION-BUILDINGS
Sep 29, 2022School Construction Authority$15,650.71CONSTRUCTION-BUILDINGS
Sep 13, 2022School Construction Authority$11,627.21CONSTRUCTION-BUILDINGS
Sep 29, 2022School Construction Authority$10,628.57CONSTRUCTION-BUILDINGS
Sep 29, 2022School Construction Authority$9,208.00CONSTRUCTION-BUILDINGS
Jul 5, 2022School Construction Authority$4,880.36CONSTRUCTION-BUILDINGS
Sep 13, 2022School Construction Authority$2,549.76CONSTRUCTION-BUILDINGS
Jul 21, 2022School Construction Authority$2,175.11CONSTRUCTION-BUILDINGS
Oct 20, 2022School Construction Authority$2,175.11CONSTRUCTION-BUILDINGS
Aug 3, 2022School Construction Authority$1,514.00CONSTRUCTION-BUILDINGS
Oct 20, 2022School Construction Authority$764.89CONSTRUCTION-BUILDINGS
Jul 21, 2022School Construction Authority$764.89CONSTRUCTION-BUILDINGS
Sep 29, 2022School Construction Authority$512.00CONSTRUCTION-BUILDINGS
Jul 21, 2022School Construction Authority-$764.89CONSTRUCTION-BUILDINGS
Jul 21, 2022School Construction Authority-$2,175.11CONSTRUCTION-BUILDINGS
Aug 18, 2022School Construction Authority-$17,489.12CONSTRUCTION-BUILDINGS
FY 2022top 20 of 85 payments$850,966
DateAgencyAmountCategoryPurchase order
Nov 12, 2021School Construction Authority$67,275.77CONSTRUCTION-BUILDINGS
Nov 12, 2021School Construction Authority$38,888.63CONSTRUCTION-BUILDINGS
Nov 12, 2021School Construction Authority$37,001.63CONSTRUCTION-BUILDINGS
Nov 4, 2021School Construction Authority$36,882.25CONSTRUCTION-BUILDINGS
Aug 9, 2021School Construction Authority$36,729.00CONSTRUCTION-BUILDINGS
Sep 24, 2021School Construction Authority$33,750.00CONSTRUCTION-BUILDINGS
Sep 30, 2021School Construction Authority$31,411.63CONSTRUCTION-BUILDINGS
Nov 12, 2021School Construction Authority$28,396.08CONSTRUCTION-BUILDINGS
Aug 25, 2021School Construction Authority$28,150.87CONSTRUCTION-BUILDINGS
Aug 25, 2021School Construction Authority$24,284.47CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$23,860.78CONSTRUCTION-BUILDINGS
Jan 13, 2022School Construction Authority$19,513.60CONSTRUCTION-BUILDINGS
Apr 26, 2022School Construction Authority$18,982.05CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$17,267.43CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$16,753.16CONSTRUCTION-BUILDINGS
Jan 27, 2022School Construction Authority$15,168.00CONSTRUCTION-BUILDINGS
May 12, 2022School Construction Authority$15,041.06CONSTRUCTION-BUILDINGS
Feb 28, 2022School Construction Authority$14,112.78CONSTRUCTION-BUILDINGS
Apr 26, 2022School Construction Authority$13,669.38CONSTRUCTION-BUILDINGS
Jan 11, 2022School Construction Authority$12,851.34CONSTRUCTION-BUILDINGS
FY 2021top 20 of 93 payments$1,144,629
DateAgencyAmountCategoryPurchase order
Mar 17, 2021School Construction Authority$190,275.64CONSTRUCTION-BUILDINGS
Dec 17, 2020School Construction Authority$93,901.66CONSTRUCTION-BUILDINGS
Jun 2, 2021School Construction Authority$55,275.12CONSTRUCTION-BUILDINGS
Mar 3, 2021School Construction Authority$53,833.61CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$50,009.00CONSTRUCTION-BUILDINGS
Aug 17, 2020School Construction Authority$49,200.27CONSTRUCTION-BUILDINGS
Jul 2, 2020School Construction Authority$42,618.24CONSTRUCTION-BUILDINGS
Jul 8, 2020School Construction Authority$40,705.42CONSTRUCTION-BUILDINGS
Jan 27, 2021School Construction Authority$31,939.15CONSTRUCTION-BUILDINGS
Jul 8, 2020School Construction Authority$26,911.34CONSTRUCTION-BUILDINGS
Jul 8, 2020School Construction Authority$26,701.79CONSTRUCTION-BUILDINGS
Mar 19, 2021School Construction Authority$24,935.79CONSTRUCTION-BUILDINGS
Jan 27, 2021School Construction Authority$23,131.85CONSTRUCTION-BUILDINGS
Mar 23, 2021School Construction Authority$21,870.93CONSTRUCTION-BUILDINGS
Feb 1, 2021School Construction Authority$20,046.12CONSTRUCTION-BUILDINGS
Sep 11, 2020School Construction Authority$17,106.00CONSTRUCTION-BUILDINGS
Oct 7, 2020School Construction Authority$16,649.60CONSTRUCTION-BUILDINGS
Jan 22, 2021School Construction Authority$15,418.50CONSTRUCTION-BUILDINGS
Jan 27, 2021School Construction Authority$13,455.67CONSTRUCTION-BUILDINGS
Jan 27, 2021School Construction Authority$13,333.78CONSTRUCTION-BUILDINGS
FY 2020top 20 of 102 payments$5,350,658
DateAgencyAmountCategoryPurchase order
Aug 15, 2019School Construction Authority$569,641.44CONSTRUCTION-BUILDINGS
Sep 4, 2019School Construction Authority$411,895.89CONSTRUCTION-BUILDINGS
Sep 10, 2019School Construction Authority$407,894.38CONSTRUCTION-BUILDINGS
Sep 11, 2019School Construction Authority$258,377.67CONSTRUCTION-BUILDINGS
Jan 14, 2020School Construction Authority$226,631.77CONSTRUCTION-BUILDINGS
Feb 18, 2020School Construction Authority$202,407.14CONSTRUCTION-BUILDINGS
Sep 11, 2019School Construction Authority$191,828.21CONSTRUCTION-BUILDINGS
Sep 4, 2019School Construction Authority$187,550.83CONSTRUCTION-BUILDINGS
Jul 2, 2019School Construction Authority$169,668.44CONSTRUCTION-BUILDINGS
Apr 28, 2020School Construction Authority$169,525.76CONSTRUCTION-BUILDINGS
Dec 16, 2019School Construction Authority$156,806.31CONSTRUCTION-BUILDINGS
Jul 2, 2019School Construction Authority$153,051.45CONSTRUCTION-BUILDINGS
Apr 24, 2020School Construction Authority$148,450.50CONSTRUCTION-BUILDINGS
Dec 27, 2019School Construction Authority$105,130.54CONSTRUCTION-BUILDINGS
Jul 2, 2019School Construction Authority$104,565.95CONSTRUCTION-BUILDINGS
Jan 23, 2020School Construction Authority$104,224.43CONSTRUCTION-BUILDINGS
Oct 28, 2019School Construction Authority$99,293.00CONSTRUCTION-BUILDINGS
Sep 4, 2019School Construction Authority$93,274.88CONSTRUCTION-BUILDINGS
Jul 2, 2019School Construction Authority$81,923.96CONSTRUCTION-BUILDINGS
Feb 18, 2020School Construction Authority$77,834.16CONSTRUCTION-BUILDINGS
FY 2019top 20 of 119 payments$20,271,585
DateAgencyAmountCategoryPurchase order
Nov 27, 2018School Construction Authority$1,351,813.43CONSTRUCTION-BUILDINGS
Mar 12, 2019School Construction Authority$1,245,324.30CONSTRUCTION-BUILDINGS
Apr 16, 2019School Construction Authority$1,238,420.44CONSTRUCTION-BUILDINGS
Dec 17, 2018School Construction Authority$944,918.45CONSTRUCTION-BUILDINGS
Jan 3, 2019School Construction Authority$890,926.03CONSTRUCTION-BUILDINGS
Jan 24, 2019School Construction Authority$858,964.83CONSTRUCTION-BUILDINGS
May 15, 2019School Construction Authority$837,210.41CONSTRUCTION-BUILDINGS
Jun 12, 2019School Construction Authority$824,733.00CONSTRUCTION-BUILDINGS
Oct 11, 2018School Construction Authority$663,764.63CONSTRUCTION-BUILDINGS
Sep 25, 2018School Construction Authority$541,357.50CONSTRUCTION-BUILDINGS
Jul 30, 2018School Construction Authority$508,717.88CONSTRUCTION-BUILDINGS
Oct 11, 2018School Construction Authority$471,925.80CONSTRUCTION-BUILDINGS
Jun 11, 2019School Construction Authority$389,253.88CONSTRUCTION-BUILDINGS
Sep 25, 2018School Construction Authority$312,083.55CONSTRUCTION-BUILDINGS
Jul 31, 2018School Construction Authority$294,041.63CONSTRUCTION-BUILDINGS
Dec 12, 2018School Construction Authority$274,911.00CONSTRUCTION-BUILDINGS
Nov 15, 2018School Construction Authority$273,315.00CONSTRUCTION-BUILDINGS
Oct 11, 2018School Construction Authority$266,269.28CONSTRUCTION-BUILDINGS
May 10, 2019School Construction Authority$247,237.50CONSTRUCTION-BUILDINGS
Dec 12, 2018School Construction Authority$244,011.82CONSTRUCTION-BUILDINGS
FY 2018top 20 of 121 payments$20,991,807
DateAgencyAmountCategoryPurchase order
Feb 27, 2018School Construction Authority$875,388.71CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$829,262.60CONSTRUCTION-BUILDINGS
Dec 1, 2017School Construction Authority$764,480.34CONSTRUCTION-BUILDINGS
Jan 31, 2018School Construction Authority$729,122.53CONSTRUCTION-BUILDINGS
Aug 15, 2017School Construction Authority$716,010.25CONSTRUCTION-BUILDINGS
Jun 6, 2018School Construction Authority$686,522.82CONSTRUCTION-BUILDINGS
Oct 18, 2017School Construction Authority$685,299.60CONSTRUCTION-BUILDINGS
Aug 15, 2017School Construction Authority$674,180.23CONSTRUCTION-BUILDINGS
Apr 30, 2018School Construction Authority$600,461.32CONSTRUCTION-BUILDINGS
May 17, 2018School Construction Authority$600,461.32CONSTRUCTION-BUILDINGS
Feb 27, 2018School Construction Authority$553,162.29CONSTRUCTION-BUILDINGS
Jun 21, 2018School Construction Authority$534,115.50CONSTRUCTION-BUILDINGS
Dec 1, 2017School Construction Authority$481,675.18CONSTRUCTION-BUILDINGS
Apr 30, 2018School Construction Authority$427,159.52CONSTRUCTION-BUILDINGS
May 17, 2018School Construction Authority$427,159.52CONSTRUCTION-BUILDINGS
Jun 6, 2018School Construction Authority$401,255.78CONSTRUCTION-BUILDINGS
Jun 6, 2018School Construction Authority$400,729.95CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$388,051.25CONSTRUCTION-BUILDINGS
Sep 12, 2017School Construction Authority$374,038.94CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$373,824.53CONSTRUCTION-BUILDINGS
FY 2017top 20 of 61 payments$8,426,933
DateAgencyAmountCategoryPurchase order
May 31, 2017School Construction Authority$1,075,364.38CONSTRUCTION-BUILDINGS
Apr 17, 2017School Construction Authority$885,754.82CONSTRUCTION-BUILDINGS
Oct 19, 2016School Construction Authority$682,559.98CONSTRUCTION-BUILDINGS
Jun 23, 2017School Construction Authority$514,035.50CONSTRUCTION-BUILDINGS
Jan 24, 2017School Construction Authority$481,163.00CONSTRUCTION-BUILDINGS
Oct 18, 2016School Construction Authority$428,742.12CONSTRUCTION-BUILDINGS
Sep 19, 2016School Construction Authority$372,609.00CONSTRUCTION-BUILDINGS
Jul 19, 2016School Construction Authority$339,190.38CONSTRUCTION-BUILDINGS
Mar 24, 2017School Construction Authority$272,215.95CONSTRUCTION-BUILDINGS
Oct 26, 2016School Construction Authority$259,367.57CONSTRUCTION-BUILDINGS
Jun 20, 2017School Construction Authority$228,819.17CONSTRUCTION-BUILDINGS
Jan 11, 2017School Construction Authority$212,859.00CONSTRUCTION-BUILDINGS
Jan 3, 2017School Construction Authority$181,467.01CONSTRUCTION-BUILDINGS
Jun 20, 2017School Construction Authority$175,912.19CONSTRUCTION-BUILDINGS
Sep 19, 2016School Construction Authority$166,938.75CONSTRUCTION-BUILDINGS
Oct 26, 2016School Construction Authority$154,731.25CONSTRUCTION-BUILDINGS
Jul 19, 2016School Construction Authority$153,810.70CONSTRUCTION-BUILDINGS
Aug 12, 2016School Construction Authority$128,677.86CONSTRUCTION-BUILDINGS
Jun 20, 2017School Construction Authority$127,912.09CONSTRUCTION-BUILDINGS
Jun 23, 2017School Construction Authority$119,367.50CONSTRUCTION-BUILDINGS
FY 2016top 20 of 109 payments$17,520,298
DateAgencyAmountCategoryPurchase order
Oct 23, 2015School Construction Authority$1,496,560.84CONSTRUCTION-BUILDINGS
Jan 14, 2016School Construction Authority$1,015,751.92CONSTRUCTION-BUILDINGS
Jul 14, 2015School Construction Authority$756,639.09CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$724,023.50CONSTRUCTION-BUILDINGS
Jan 14, 2016School Construction Authority$677,046.00CONSTRUCTION-BUILDINGS
Oct 21, 2015School Construction Authority$676,597.60CONSTRUCTION-BUILDINGS
Aug 12, 2015School Construction Authority$653,272.35CONSTRUCTION-BUILDINGS
Oct 21, 2015School Construction Authority$533,549.69CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$499,076.85CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$431,456.28CONSTRUCTION-BUILDINGS
Jan 20, 2016School Construction Authority$422,013.75CONSTRUCTION-BUILDINGS
Apr 27, 2016School Construction Authority$404,946.05CONSTRUCTION-BUILDINGS
Oct 21, 2015School Construction Authority$373,008.00CONSTRUCTION-BUILDINGS
Jun 16, 2016School Construction Authority$329,421.00CONSTRUCTION-BUILDINGS
Jul 8, 2015School Construction Authority$328,497.26CONSTRUCTION-BUILDINGS
Apr 27, 2016School Construction Authority$313,576.00CONSTRUCTION-BUILDINGS
Nov 20, 2015School Construction Authority$310,294.70CONSTRUCTION-BUILDINGS
Mar 4, 2016School Construction Authority$305,700.50CONSTRUCTION-BUILDINGS
Jul 8, 2015School Construction Authority$276,176.88CONSTRUCTION-BUILDINGS
Jun 3, 2016School Construction Authority$273,790.00CONSTRUCTION-BUILDINGS
FY 2015top 20 of 149 payments$20,095,304
DateAgencyAmountCategoryPurchase order
Dec 11, 2014School Construction Authority$1,889,386.78CONSTRUCTION-BUILDINGS
Sep 8, 2014School Construction Authority$1,287,374.55CONSTRUCTION-BUILDINGS
Oct 3, 2014School Construction Authority$1,287,374.55CONSTRUCTION-BUILDINGS
Nov 18, 2014School Construction Authority$1,112,388.25CONSTRUCTION-BUILDINGS
Dec 22, 2014School Construction Authority$1,029,328.74CONSTRUCTION-BUILDINGS
Oct 23, 2014School Construction Authority$558,933.97CONSTRUCTION-BUILDINGS
Nov 18, 2014School Construction Authority$549,627.25CONSTRUCTION-BUILDINGS
Nov 13, 2014School Construction Authority$536,676.38CONSTRUCTION-BUILDINGS
Aug 26, 2014School Construction Authority$488,950.28CONSTRUCTION-BUILDINGS
Aug 1, 2014School Construction Authority$475,800.37CONSTRUCTION-BUILDINGS
Aug 28, 2014School Construction Authority$464,778.76CONSTRUCTION-BUILDINGS
Sep 11, 2014School Construction Authority$444,342.36CONSTRUCTION-BUILDINGS
Dec 18, 2014School Construction Authority$440,050.54CONSTRUCTION-BUILDINGS
Feb 25, 2015School Construction Authority$434,951.18CONSTRUCTION-BUILDINGS
Nov 13, 2014School Construction Authority$422,338.46CONSTRUCTION-BUILDINGS
May 5, 2015School Construction Authority$397,760.25CONSTRUCTION-BUILDINGS
Dec 22, 2014School Construction Authority$396,547.85CONSTRUCTION-BUILDINGS
Mar 30, 2015School Construction Authority$359,747.04CONSTRUCTION-BUILDINGS
May 12, 2015School Construction Authority$338,235.25CONSTRUCTION-BUILDINGS
May 5, 2015School Construction Authority$329,317.50CONSTRUCTION-BUILDINGS
FY 2014top 20 of 156 payments$26,280,593
DateAgencyAmountCategoryPurchase order
Oct 9, 2013School Construction Authority$2,121,971.01CONSTRUCTION-BUILDINGS
Feb 18, 2014School Construction Authority$1,262,981.06CONSTRUCTION-BUILDINGS
May 28, 2014School Construction Authority$1,170,186.25CONSTRUCTION-BUILDINGS
Dec 20, 2013School Construction Authority$1,028,818.37CONSTRUCTION-BUILDINGS
May 27, 2014School Construction Authority$983,997.32CONSTRUCTION-BUILDINGS
Sep 6, 2013School Construction Authority$746,701.52CONSTRUCTION-BUILDINGS
May 29, 2014School Construction Authority$696,910.50CONSTRUCTION-BUILDINGS
Jun 10, 2014School Construction Authority$622,785.80CONSTRUCTION-BUILDINGS
Feb 11, 2014School Construction Authority$585,470.75CONSTRUCTION-BUILDINGS
Oct 3, 2013School Construction Authority$574,664.50CONSTRUCTION-BUILDINGS
Dec 5, 2013School Construction Authority$549,195.00CONSTRUCTION-BUILDINGS
Oct 9, 2013School Construction Authority$537,951.03CONSTRUCTION-BUILDINGS
Dec 2, 2013School Construction Authority$521,108.68CONSTRUCTION-BUILDINGS
Apr 10, 2014School Construction Authority$504,823.40CONSTRUCTION-BUILDINGS
Jan 14, 2014School Construction Authority$483,473.24CONSTRUCTION-BUILDINGS
Aug 12, 2013School Construction Authority$478,433.96CONSTRUCTION-BUILDINGS
May 16, 2014School Construction Authority$469,656.25CONSTRUCTION-BUILDINGS
Jan 8, 2014School Construction Authority$446,880.00CONSTRUCTION-BUILDINGS
Jun 6, 2014School Construction Authority$401,945.95CONSTRUCTION-BUILDINGS
Oct 31, 2013School Construction Authority$397,526.56CONSTRUCTION-BUILDINGS
FY 2013top 20 of 148 payments$17,267,100
DateAgencyAmountCategoryPurchase order
Jul 5, 2012School Construction Authority$681,873.14CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$604,262.70CONSTRUCTION-BUILDINGS
Nov 28, 2012School Construction Authority$563,141.00CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$554,336.02CONSTRUCTION-BUILDINGS
May 23, 2013School Construction Authority$495,782.20CONSTRUCTION-BUILDINGS
May 23, 2013School Construction Authority$444,169.17CONSTRUCTION-BUILDINGS
May 30, 2013School Construction Authority$427,357.50CONSTRUCTION-BUILDINGS
Oct 25, 2012School Construction Authority$421,308.29CONSTRUCTION-BUILDINGS
Sep 12, 2012School Construction Authority$406,315.00CONSTRUCTION-BUILDINGS
Jul 10, 2012School Construction Authority$357,166.75CONSTRUCTION-BUILDINGS
Sep 12, 2012School Construction Authority$352,651.40CONSTRUCTION-BUILDINGS
Jul 5, 2012School Construction Authority$345,762.43CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$330,292.77CONSTRUCTION-BUILDINGS
Jul 10, 2012School Construction Authority$307,277.50CONSTRUCTION-BUILDINGS
May 30, 2013School Construction Authority$304,506.35CONSTRUCTION-BUILDINGS
Jan 8, 2013School Construction Authority$290,662.00CONSTRUCTION-BUILDINGS
Feb 11, 2013School Construction Authority$286,434.50CONSTRUCTION-BUILDINGS
Feb 26, 2013School Construction Authority$284,719.06CONSTRUCTION-BUILDINGS
Mar 7, 2013School Construction Authority$283,969.83CONSTRUCTION-BUILDINGS
May 29, 2013School Construction Authority$283,340.38CONSTRUCTION-BUILDINGS
FY 2012top 20 of 272 payments$27,248,758
DateAgencyAmountCategoryPurchase order
Nov 7, 2011School Construction Authority$1,640,923.33CONSTRUCTION-BUILDINGS
Apr 30, 2012School Construction Authority$1,243,480.84CONSTRUCTION-BUILDINGS
Oct 19, 2011School Construction Authority$1,112,391.13CONSTRUCTION-BUILDINGS
Sep 27, 2011School Construction Authority$1,096,330.46CONSTRUCTION-BUILDINGS
Nov 10, 2011School Construction Authority$1,068,550.50CONSTRUCTION-BUILDINGS
Mar 26, 2012School Construction Authority$1,021,386.80CONSTRUCTION-BUILDINGS
Oct 17, 2011School Construction Authority$808,193.50CONSTRUCTION-BUILDINGS
Nov 15, 2011School Construction Authority$663,135.11CONSTRUCTION-BUILDINGS
Nov 15, 2011School Construction Authority$623,452.60CONSTRUCTION-BUILDINGS
Oct 19, 2011School Construction Authority$590,847.93CONSTRUCTION-BUILDINGS
May 22, 2012School Construction Authority$534,660.00CONSTRUCTION-BUILDINGS
Nov 23, 2011School Construction Authority$516,674.98CONSTRUCTION-BUILDINGS
Nov 3, 2011School Construction Authority$489,221.12CONSTRUCTION-BUILDINGS
Jan 4, 2012School Construction Authority$479,003.30CONSTRUCTION-BUILDINGS
Nov 10, 2011School Construction Authority$468,990.39CONSTRUCTION-BUILDINGS
Nov 14, 2011School Construction Authority$445,682.70CONSTRUCTION-BUILDINGS
Mar 26, 2012School Construction Authority$440,052.68CONSTRUCTION-BUILDINGS
May 22, 2012School Construction Authority$427,780.25CONSTRUCTION-BUILDINGS
Jan 3, 2012School Construction Authority$427,373.68CONSTRUCTION-BUILDINGS
Apr 4, 2012School Construction Authority$414,333.00CONSTRUCTION-BUILDINGS
FY 2011top 20 of 286 payments$26,475,188
DateAgencyAmountCategoryPurchase order
May 9, 2011School Construction Authority$2,529,677.61CONSTRUCTION-BUILDINGS
Nov 22, 2010School Construction Authority$2,229,776.20CONSTRUCTION-BUILDINGS
Dec 17, 2010School Construction Authority$1,561,843.22CONSTRUCTION-BUILDINGS
Jun 17, 2011School Construction Authority$1,406,353.40CONSTRUCTION-BUILDINGS
Dec 8, 2010School Construction Authority$1,295,323.33CONSTRUCTION-BUILDINGS
Dec 16, 2010School Construction Authority$933,599.20CONSTRUCTION-BUILDINGS
Oct 21, 2010School Construction Authority$826,938.99CONSTRUCTION-BUILDINGS
Jun 16, 2011School Construction Authority$662,241.79CONSTRUCTION-BUILDINGS
Nov 29, 2010School Construction Authority$626,743.02CONSTRUCTION-BUILDINGS
Jun 6, 2011School Construction Authority$609,793.12CONSTRUCTION-BUILDINGS
Dec 22, 2010School Construction Authority$561,367.16CONSTRUCTION-BUILDINGS
Jun 28, 2011School Construction Authority$508,707.14CONSTRUCTION-BUILDINGS
May 24, 2011School Construction Authority$508,065.70CONSTRUCTION-BUILDINGS
Apr 14, 2011School Construction Authority$457,704.30CONSTRUCTION-BUILDINGS
Dec 29, 2010School Construction Authority$401,031.10CONSTRUCTION-BUILDINGS
Dec 16, 2010School Construction Authority$390,362.30CONSTRUCTION-BUILDINGS
Dec 7, 2010School Construction Authority$373,739.50CONSTRUCTION-BUILDINGS
May 10, 2011School Construction Authority$305,866.75CONSTRUCTION-BUILDINGS
May 2, 2011School Construction Authority$276,910.32CONSTRUCTION-BUILDINGS
Jul 2, 2010School Construction Authority$263,797.55CONSTRUCTION-BUILDINGS
FY 2010top 20 of 102 payments$10,171,383
DateAgencyAmountCategoryPurchase order
Feb 23, 2010School Construction Authority$1,143,441.38CONSTRUCTION-BUILDINGS
Feb 24, 2010School Construction Authority$1,002,042.00CONSTRUCTION-BUILDINGS
Feb 2, 2010School Construction Authority$832,700.49CONSTRUCTION-BUILDINGS
Apr 22, 2010School Construction Authority$712,775.50CONSTRUCTION-BUILDINGS
Apr 1, 2010School Construction Authority$663,952.34CONSTRUCTION-BUILDINGS
Jan 19, 2010School Construction Authority$564,202.64CONSTRUCTION-BUILDINGS
Jun 7, 2010School Construction Authority$454,730.80CONSTRUCTION-BUILDINGS
Apr 20, 2010School Construction Authority$429,101.74CONSTRUCTION-BUILDINGS
Mar 24, 2010School Construction Authority$407,074.10CONSTRUCTION-BUILDINGS
Jan 6, 2010School Construction Authority$382,245.06CONSTRUCTION-BUILDINGS
Apr 27, 2010School Construction Authority$240,603.65CONSTRUCTION-BUILDINGS
Apr 13, 2010School Construction Authority$232,090.03CONSTRUCTION-BUILDINGS
May 27, 2010School Construction Authority$230,479.50CONSTRUCTION-BUILDINGS
Mar 29, 2010School Construction Authority$223,934.00CONSTRUCTION-BUILDINGS
Jan 4, 2010School Construction Authority$221,952.58CONSTRUCTION-BUILDINGS
Jan 21, 2010School Construction Authority$220,675.50CONSTRUCTION-BUILDINGS
May 6, 2010School Construction Authority$207,093.58CONSTRUCTION-BUILDINGS
Jun 17, 2010School Construction Authority$206,674.04CONSTRUCTION-BUILDINGS
Mar 11, 2010School Construction Authority$178,505.31CONSTRUCTION-BUILDINGS
Apr 22, 2010School Construction Authority$176,902.75CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
May 8, 2025School Construction Authority$3,135.96CONSTRUCTION-BUILDINGSCapital Contracts
Apr 23, 2025School Construction Authority$1,693.50CONSTRUCTION-BUILDINGSCapital Contracts
Apr 23, 2025School Construction Authority$3,671.99CONSTRUCTION-BUILDINGSCapital Contracts
Apr 23, 2025School Construction Authority$4,790.74CONSTRUCTION-BUILDINGSCapital Contracts
Apr 23, 2025School Construction Authority$4,933.55CONSTRUCTION-BUILDINGSCapital Contracts
Apr 23, 2025School Construction Authority$6,822.76CONSTRUCTION-BUILDINGSCapital Contracts
Jan 22, 2024School Construction Authority$512.00CONSTRUCTION-BUILDINGSCapital Contracts
Jan 22, 2024School Construction Authority$10,232.65CONSTRUCTION-BUILDINGSCapital Contracts
Jan 2, 2024School Construction Authority$17,489.12CONSTRUCTION-BUILDINGSCapital Contracts
Oct 20, 2022School Construction Authority$764.89CONSTRUCTION-BUILDINGSCapital Contracts
Oct 20, 2022School Construction Authority$2,175.11CONSTRUCTION-BUILDINGSCapital Contracts
Sep 29, 2022School Construction Authority$10,628.57CONSTRUCTION-BUILDINGSCapital Contracts
Sep 29, 2022School Construction Authority$512.00CONSTRUCTION-BUILDINGSCapital Contracts
Sep 29, 2022School Construction Authority$9,208.00CONSTRUCTION-BUILDINGSCapital Contracts
Sep 29, 2022School Construction Authority$15,650.71CONSTRUCTION-BUILDINGSCapital Contracts
Sep 13, 2022School Construction Authority$11,627.21CONSTRUCTION-BUILDINGSCapital Contracts
Sep 13, 2022School Construction Authority$2,549.76CONSTRUCTION-BUILDINGSCapital Contracts
Aug 18, 2022School Construction Authority-$17,489.12CONSTRUCTION-BUILDINGSCapital Contracts
Aug 18, 2022School Construction Authority$17,489.12CONSTRUCTION-BUILDINGSCapital Contracts
Aug 3, 2022School Construction Authority$1,514.00CONSTRUCTION-BUILDINGSCapital Contracts
Aug 3, 2022School Construction Authority$17,211.61CONSTRUCTION-BUILDINGSCapital Contracts
Jul 21, 2022School Construction Authority-$2,175.11CONSTRUCTION-BUILDINGSCapital Contracts
Jul 21, 2022School Construction Authority$2,175.11CONSTRUCTION-BUILDINGSCapital Contracts
Jul 21, 2022School Construction Authority$764.89CONSTRUCTION-BUILDINGSCapital Contracts
Jul 21, 2022School Construction Authority-$764.89CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data