A Quest Corporation: New York City Government Payments

as recorded by New York City: A QUEST CORPORATION

A Quest Corporation is the 606th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 89th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.2% of everything the School Construction Authority has paid vendors in that span. Payments to it fell 15% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$107,644,072total received
1,936payments
4agencies
Jan 4, 2010Jun 23, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to A Quest Corporation. No spam.

Payments by fiscal year

FY 2025$5,119,820
FY 2024$6,024,548
FY 2023$5,889,256
FY 2022$6,671,074
FY 2021$5,594,732
FY 2020$8,127,122
FY 2019$6,632,570
FY 2018$9,176,198
FY 2017$8,562,180
FY 2016$8,700,712
FY 2015$6,789,085
FY 2014$9,471,820
FY 2013$4,879,843
FY 2012$6,166,244
FY 2011$9,049,509
FY 2010$789,358

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority214$4,760,494
FY 2025Department of Cultural Affairs36$294,399
FY 2025Department of Parks and Recreation16$64,125
FY 2025Department of Design and Construction1$802
FY 2024School Construction Authority116$5,659,700
FY 2024Department of Parks and Recreation8$303,093
FY 2024Department of Cultural Affairs8$61,754
FY 2023School Construction Authority65$5,545,830
FY 2023Department of Cultural Affairs11$198,627
FY 2023Department of Parks and Recreation12$144,798
FY 2022School Construction Authority74$5,110,133
FY 2022Department of Parks and Recreation6$880,817
FY 2022Department of Cultural Affairs30$664,889
FY 2022Department of Design and Construction1$15,236
FY 2021School Construction Authority73$3,174,163
FY 2021Department of Parks and Recreation13$1,344,639
FY 2021Department of Cultural Affairs23$1,075,930
FY 2020School Construction Authority126$5,494,876
FY 2020Department of Cultural Affairs14$2,243,079
FY 2020Department of Parks and Recreation8$389,167
FY 2019School Construction Authority66$4,383,393
FY 2019Department of Cultural Affairs7$1,578,585
FY 2019Department of Parks and Recreation3$670,592
FY 2018School Construction Authority116$7,937,859
FY 2018Department of Cultural Affairs4$1,238,339
FY 2017School Construction Authority116$8,562,180
FY 2016School Construction Authority130$8,700,712
FY 2015School Construction Authority137$6,789,085
FY 2014School Construction Authority147$9,471,820
FY 2013School Construction Authority97$4,879,843
FY 2012School Construction Authority106$6,166,244
FY 2011School Construction Authority140$9,049,509
FY 2010School Construction Authority12$789,358
Total1,936$107,644,072

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PROF SERV ENGINEER & ARCHITECT2$16,038Jul 28, 2021 Aug 26, 2024
CONSTRUCTION-BUILDINGS1,934$107,628,034Jan 4, 2010 Jun 23, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 267 payments$5,119,820
DateAgencyAmountCategoryPurchase order
Sep 6, 2024School Construction Authority$547,014.50CONSTRUCTION-BUILDINGS
Sep 6, 2024School Construction Authority$436,645.46CONSTRUCTION-BUILDINGS
Oct 15, 2024School Construction Authority$309,690.00CONSTRUCTION-BUILDINGS
Oct 17, 2024School Construction Authority$286,984.60CONSTRUCTION-BUILDINGS
Mar 7, 2025School Construction Authority$235,183.00CONSTRUCTION-BUILDINGS
Feb 3, 2025School Construction Authority$190,688.10CONSTRUCTION-BUILDINGS
Apr 21, 2025School Construction Authority$175,092.00CONSTRUCTION-BUILDINGS
May 22, 2025School Construction Authority$159,223.00CONSTRUCTION-BUILDINGS
Jun 10, 2025School Construction Authority$129,375.50CONSTRUCTION-BUILDINGS
Aug 13, 2024School Construction Authority$98,800.50CONSTRUCTION-BUILDINGS
Jul 31, 2024School Construction Authority$90,000.00CONSTRUCTION-BUILDINGS
Feb 12, 2025School Construction Authority$89,434.50CONSTRUCTION-BUILDINGS
Jun 6, 2025School Construction Authority$46,477.00CONSTRUCTION-BUILDINGS
Mar 17, 2025School Construction Authority$45,076.50CONSTRUCTION-BUILDINGS
Aug 20, 2024Department of Cultural Affairs$43,208.62CONSTRUCTION-BUILDINGS
Mar 27, 2025School Construction Authority$41,072.00CONSTRUCTION-BUILDINGS
Aug 20, 2024Department of Cultural Affairs$34,189.25CONSTRUCTION-BUILDINGS
Jan 22, 2025School Construction Authority$30,046.50CONSTRUCTION-BUILDINGS
Oct 25, 2024School Construction Authority$26,885.50CONSTRUCTION-BUILDINGS
Aug 20, 2024Department of Cultural Affairs$26,244.33CONSTRUCTION-BUILDINGS
FY 2024top 20 of 132 payments$6,024,548
DateAgencyAmountCategoryPurchase order
Sep 26, 2023School Construction Authority$544,601.00CONSTRUCTION-BUILDINGS
Feb 13, 2024School Construction Authority$408,746.30CONSTRUCTION-BUILDINGS
Aug 9, 2023School Construction Authority$395,355.00CONSTRUCTION-BUILDINGS
Jun 10, 2024School Construction Authority$311,805.00CONSTRUCTION-BUILDINGS
Jan 26, 2024School Construction Authority$306,072.20CONSTRUCTION-BUILDINGS
Mar 25, 2024School Construction Authority$280,579.40CONSTRUCTION-BUILDINGS
Oct 25, 2023School Construction Authority$248,097.50CONSTRUCTION-BUILDINGS
Aug 8, 2023School Construction Authority$230,300.00CONSTRUCTION-BUILDINGS
Jul 24, 2023School Construction Authority$225,322.20CONSTRUCTION-BUILDINGS
Jan 25, 2024School Construction Authority$213,639.00CONSTRUCTION-BUILDINGS
Sep 19, 2023School Construction Authority$205,989.00CONSTRUCTION-BUILDINGS
Aug 7, 2023School Construction Authority$169,500.40CONSTRUCTION-BUILDINGS
May 31, 2024School Construction Authority$160,491.00CONSTRUCTION-BUILDINGS
Sep 11, 2023School Construction Authority$142,846.00CONSTRUCTION-BUILDINGS
Jun 5, 2024School Construction Authority$117,859.00CONSTRUCTION-BUILDINGS
Nov 22, 2023Department of Parks and Recreation$96,145.18CONSTRUCTION-BUILDINGS
Oct 19, 2023School Construction Authority$87,970.57CONSTRUCTION-BUILDINGS
Apr 8, 2024School Construction Authority$85,267.00CONSTRUCTION-BUILDINGS
Feb 27, 2024School Construction Authority$85,267.00CONSTRUCTION-BUILDINGS
Aug 2, 2023Department of Parks and Recreation$85,076.00CONSTRUCTION-BUILDINGS
FY 2023top 20 of 88 payments$5,889,256
DateAgencyAmountCategoryPurchase order
Sep 29, 2022School Construction Authority$533,789.00CONSTRUCTION-BUILDINGS
Aug 5, 2022School Construction Authority$485,921.80CONSTRUCTION-BUILDINGS
Sep 26, 2022School Construction Authority$307,316.10CONSTRUCTION-BUILDINGS
May 1, 2023School Construction Authority$285,918.00CONSTRUCTION-BUILDINGS
Sep 20, 2022School Construction Authority$279,852.00CONSTRUCTION-BUILDINGS
Apr 11, 2023School Construction Authority$240,313.50CONSTRUCTION-BUILDINGS
Aug 3, 2022School Construction Authority$238,587.00CONSTRUCTION-BUILDINGS
Aug 9, 2022School Construction Authority$213,922.60CONSTRUCTION-BUILDINGS
Mar 24, 2023School Construction Authority$192,430.10CONSTRUCTION-BUILDINGS
May 15, 2023School Construction Authority$174,619.15CONSTRUCTION-BUILDINGS
Oct 11, 2022School Construction Authority$151,264.30CONSTRUCTION-BUILDINGS
Sep 2, 2022School Construction Authority$150,514.00CONSTRUCTION-BUILDINGS
Sep 29, 2022School Construction Authority$144,236.80CONSTRUCTION-BUILDINGS
Aug 19, 2022School Construction Authority$140,571.00CONSTRUCTION-BUILDINGS
Mar 15, 2023School Construction Authority$138,465.50CONSTRUCTION-BUILDINGS
Mar 13, 2023School Construction Authority$133,487.00CONSTRUCTION-BUILDINGS
Feb 1, 2023School Construction Authority$117,075.10CONSTRUCTION-BUILDINGS
Jan 3, 2023School Construction Authority$96,891.00CONSTRUCTION-BUILDINGS
Sep 2, 2022School Construction Authority$91,999.00CONSTRUCTION-BUILDINGS
Sep 2, 2022School Construction Authority$90,742.75CONSTRUCTION-BUILDINGS
FY 2022top 20 of 111 payments$6,671,074
DateAgencyAmountCategoryPurchase order
Oct 8, 2021School Construction Authority$477,621.15CONSTRUCTION-BUILDINGS
Oct 19, 2021Department of Parks and Recreation$471,333.64CONSTRUCTION-BUILDINGS
Aug 30, 2021School Construction Authority$465,696.00CONSTRUCTION-BUILDINGS
Mar 9, 2022School Construction Authority$396,382.70CONSTRUCTION-BUILDINGS
Sep 10, 2021Department of Parks and Recreation$282,366.23CONSTRUCTION-BUILDINGS
Jun 7, 2022School Construction Authority$259,642.30CONSTRUCTION-BUILDINGS
Mar 14, 2022School Construction Authority$242,853.20CONSTRUCTION-BUILDINGS
Aug 3, 2021School Construction Authority$228,123.36CONSTRUCTION-BUILDINGS
Sep 21, 2021School Construction Authority$200,853.50CONSTRUCTION-BUILDINGS
Jul 26, 2021Department of Cultural Affairs$199,424.58CONSTRUCTION-BUILDINGS
Feb 25, 2022School Construction Authority$172,296.20CONSTRUCTION-BUILDINGS
Aug 20, 2021School Construction Authority$151,129.80CONSTRUCTION-BUILDINGS
Sep 21, 2021School Construction Authority$138,474.00CONSTRUCTION-BUILDINGS
May 16, 2022School Construction Authority$126,345.54CONSTRUCTION-BUILDINGS
Dec 3, 2021School Construction Authority$121,673.00CONSTRUCTION-BUILDINGS
Oct 8, 2021School Construction Authority$114,139.80CONSTRUCTION-BUILDINGS
Nov 15, 2021School Construction Authority$100,274.30CONSTRUCTION-BUILDINGS
Sep 16, 2021School Construction Authority$96,670.50CONSTRUCTION-BUILDINGS
Sep 21, 2021School Construction Authority$90,000.00CONSTRUCTION-BUILDINGS
Nov 12, 2021School Construction Authority$88,450.15CONSTRUCTION-BUILDINGS
FY 2021top 20 of 109 payments$5,594,732
DateAgencyAmountCategoryPurchase order
Jan 22, 2021School Construction Authority$472,357.78CONSTRUCTION-BUILDINGS
May 10, 2021Department of Parks and Recreation$338,592.34CONSTRUCTION-BUILDINGS
Dec 14, 2020Department of Parks and Recreation$329,690.80CONSTRUCTION-BUILDINGS
Sep 15, 2020Department of Cultural Affairs$255,212.30CONSTRUCTION-BUILDINGS
Sep 15, 2020School Construction Authority$236,456.91CONSTRUCTION-BUILDINGS
Jan 27, 2021School Construction Authority$233,284.60CONSTRUCTION-BUILDINGS
Jan 19, 2021Department of Parks and Recreation$210,586.41CONSTRUCTION-BUILDINGS
Sep 15, 2020Department of Cultural Affairs$190,000.00CONSTRUCTION-BUILDINGS
Apr 7, 2021School Construction Authority$179,176.77CONSTRUCTION-BUILDINGS
Oct 28, 2020School Construction Authority$179,130.78CONSTRUCTION-BUILDINGS
Mar 11, 2021Department of Parks and Recreation$160,417.99CONSTRUCTION-BUILDINGS
Apr 30, 2021School Construction Authority$144,096.55CONSTRUCTION-BUILDINGS
Nov 10, 2020Department of Cultural Affairs$142,499.99CONSTRUCTION-BUILDINGS
May 20, 2021School Construction Authority$140,106.52CONSTRUCTION-BUILDINGS
Apr 19, 2021Department of Parks and Recreation$116,156.30CONSTRUCTION-BUILDINGS
Jun 15, 2021Department of Parks and Recreation$98,188.63CONSTRUCTION-BUILDINGS
Nov 5, 2020Department of Cultural Affairs$96,441.25CONSTRUCTION-BUILDINGS
Aug 3, 2020Department of Cultural Affairs$75,523.71CONSTRUCTION-BUILDINGS
Nov 5, 2020School Construction Authority$71,886.70CONSTRUCTION-BUILDINGS
May 5, 2021School Construction Authority$68,534.10CONSTRUCTION-BUILDINGS
FY 2020top 20 of 148 payments$8,127,122
DateAgencyAmountCategoryPurchase order
Jul 22, 2019Department of Cultural Affairs$649,595.81CONSTRUCTION-BUILDINGS
Nov 12, 2019Department of Cultural Affairs$463,507.24CONSTRUCTION-BUILDINGS
Sep 16, 2019School Construction Authority$312,849.36CONSTRUCTION-BUILDINGS
Jan 2, 2020Department of Cultural Affairs$271,064.59CONSTRUCTION-BUILDINGS
Feb 18, 2020Department of Parks and Recreation$247,000.00CONSTRUCTION-BUILDINGS
Sep 25, 2019School Construction Authority$238,765.47CONSTRUCTION-BUILDINGS
Feb 18, 2020Department of Cultural Affairs$224,394.08CONSTRUCTION-BUILDINGS
Apr 15, 2020Department of Cultural Affairs$206,207.44CONSTRUCTION-BUILDINGS
Aug 19, 2019School Construction Authority$203,643.45CONSTRUCTION-BUILDINGS
Sep 17, 2019Department of Cultural Affairs$201,090.09CONSTRUCTION-BUILDINGS
Feb 21, 2020School Construction Authority$199,862.01CONSTRUCTION-BUILDINGS
Oct 23, 2019School Construction Authority$191,619.26CONSTRUCTION-BUILDINGS
Dec 20, 2019School Construction Authority$187,007.28CONSTRUCTION-BUILDINGS
Dec 5, 2019School Construction Authority$182,015.11CONSTRUCTION-BUILDINGS
Feb 5, 2020School Construction Authority$176,079.17CONSTRUCTION-BUILDINGS
Oct 7, 2019School Construction Authority$160,595.96CONSTRUCTION-BUILDINGS
Oct 7, 2019School Construction Authority$151,537.60CONSTRUCTION-BUILDINGS
Jul 10, 2019School Construction Authority$145,100.78CONSTRUCTION-BUILDINGS
Mar 25, 2020School Construction Authority$136,328.54CONSTRUCTION-BUILDINGS
Jul 9, 2019School Construction Authority$120,479.39CONSTRUCTION-BUILDINGS
FY 2019top 20 of 76 payments$6,632,570
DateAgencyAmountCategoryPurchase order
Feb 26, 2019Department of Cultural Affairs$645,369.26CONSTRUCTION-BUILDINGS
Sep 21, 2018Department of Cultural Affairs$387,285.64CONSTRUCTION-BUILDINGS
Sep 25, 2018School Construction Authority$380,330.68CONSTRUCTION-BUILDINGS
Dec 5, 2018Department of Parks and Recreation$280,544.80CONSTRUCTION-BUILDINGS
Oct 31, 2018School Construction Authority$276,318.04CONSTRUCTION-BUILDINGS
Apr 2, 2019School Construction Authority$245,894.48CONSTRUCTION-BUILDINGS
Sep 27, 2018School Construction Authority$222,110.36CONSTRUCTION-BUILDINGS
Feb 26, 2019Department of Cultural Affairs$214,500.00CONSTRUCTION-BUILDINGS
Apr 8, 2019Department of Parks and Recreation$198,520.28CONSTRUCTION-BUILDINGS
May 31, 2019Department of Parks and Recreation$191,527.06CONSTRUCTION-BUILDINGS
Nov 29, 2018School Construction Authority$191,366.83CONSTRUCTION-BUILDINGS
Jun 3, 2019Department of Cultural Affairs$171,000.00CONSTRUCTION-BUILDINGS
Sep 27, 2018School Construction Authority$137,719.81CONSTRUCTION-BUILDINGS
Aug 13, 2018Department of Cultural Affairs$126,206.31CONSTRUCTION-BUILDINGS
Sep 4, 2018School Construction Authority$123,551.84CONSTRUCTION-BUILDINGS
Dec 5, 2018School Construction Authority$110,209.53CONSTRUCTION-BUILDINGS
Aug 7, 2018School Construction Authority$105,299.29CONSTRUCTION-BUILDINGS
Jul 10, 2018School Construction Authority$96,383.99CONSTRUCTION-BUILDINGS
May 29, 2019School Construction Authority$96,117.66CONSTRUCTION-BUILDINGS
Feb 22, 2019School Construction Authority$93,943.85CONSTRUCTION-BUILDINGS
FY 2018top 20 of 120 payments$9,176,198
DateAgencyAmountCategoryPurchase order
Apr 18, 2018Department of Cultural Affairs$468,673.91CONSTRUCTION-BUILDINGS
May 21, 2018Department of Cultural Affairs$350,924.12CONSTRUCTION-BUILDINGS
Jan 5, 2018Department of Cultural Affairs$301,613.13CONSTRUCTION-BUILDINGS
Mar 5, 2018School Construction Authority$288,727.14CONSTRUCTION-BUILDINGS
Dec 15, 2017School Construction Authority$285,145.86CONSTRUCTION-BUILDINGS
Jan 26, 2018School Construction Authority$282,310.19CONSTRUCTION-BUILDINGS
Nov 21, 2017School Construction Authority$276,317.79CONSTRUCTION-BUILDINGS
Jun 14, 2018School Construction Authority$243,252.85CONSTRUCTION-BUILDINGS
Dec 21, 2017School Construction Authority$216,819.12CONSTRUCTION-BUILDINGS
Jul 20, 2017School Construction Authority$216,776.63CONSTRUCTION-BUILDINGS
Sep 28, 2017School Construction Authority$212,109.54CONSTRUCTION-BUILDINGS
Jul 21, 2017School Construction Authority$207,855.56CONSTRUCTION-BUILDINGS
Nov 1, 2017School Construction Authority$198,326.34CONSTRUCTION-BUILDINGS
Jul 14, 2017School Construction Authority$187,515.94CONSTRUCTION-BUILDINGS
Sep 20, 2017School Construction Authority$181,240.27CONSTRUCTION-BUILDINGS
Sep 18, 2017School Construction Authority$180,519.43CONSTRUCTION-BUILDINGS
Aug 25, 2017School Construction Authority$172,918.98CONSTRUCTION-BUILDINGS
Oct 10, 2017School Construction Authority$172,572.50CONSTRUCTION-BUILDINGS
Aug 15, 2017School Construction Authority$163,937.15CONSTRUCTION-BUILDINGS
Feb 9, 2018School Construction Authority$157,225.34CONSTRUCTION-BUILDINGS
FY 2017top 20 of 116 payments$8,562,180
DateAgencyAmountCategoryPurchase order
Jan 5, 2017School Construction Authority$953,061.73CONSTRUCTION-BUILDINGS
Sep 12, 2016School Construction Authority$795,789.35CONSTRUCTION-BUILDINGS
Aug 15, 2016School Construction Authority$392,122.00CONSTRUCTION-BUILDINGS
Apr 11, 2017School Construction Authority$352,701.75CONSTRUCTION-BUILDINGS
Jul 19, 2016School Construction Authority$329,289.00CONSTRUCTION-BUILDINGS
Sep 28, 2016School Construction Authority$294,236.20CONSTRUCTION-BUILDINGS
Oct 27, 2016School Construction Authority$235,188.18CONSTRUCTION-BUILDINGS
Aug 19, 2016School Construction Authority$213,649.89CONSTRUCTION-BUILDINGS
Aug 11, 2016School Construction Authority$199,973.14CONSTRUCTION-BUILDINGS
Sep 13, 2016School Construction Authority$186,010.00CONSTRUCTION-BUILDINGS
Jun 13, 2017School Construction Authority$167,147.44CONSTRUCTION-BUILDINGS
Jun 2, 2017School Construction Authority$161,772.33CONSTRUCTION-BUILDINGS
Jul 22, 2016School Construction Authority$154,065.97CONSTRUCTION-BUILDINGS
May 19, 2017School Construction Authority$145,661.14CONSTRUCTION-BUILDINGS
Apr 21, 2017School Construction Authority$140,666.95CONSTRUCTION-BUILDINGS
Jan 13, 2017School Construction Authority$133,821.30CONSTRUCTION-BUILDINGS
Mar 16, 2017School Construction Authority$133,110.50CONSTRUCTION-BUILDINGS
May 23, 2017School Construction Authority$132,304.49CONSTRUCTION-BUILDINGS
Oct 24, 2016School Construction Authority$130,495.42CONSTRUCTION-BUILDINGS
Feb 21, 2017School Construction Authority$128,375.66CONSTRUCTION-BUILDINGS
FY 2016top 20 of 130 payments$8,700,712
DateAgencyAmountCategoryPurchase order
Sep 8, 2015School Construction Authority$886,895.30CONSTRUCTION-BUILDINGS
Aug 26, 2015School Construction Authority$363,314.20CONSTRUCTION-BUILDINGS
Mar 15, 2016School Construction Authority$336,183.43CONSTRUCTION-BUILDINGS
May 17, 2016School Construction Authority$329,537.90CONSTRUCTION-BUILDINGS
Jul 27, 2015School Construction Authority$310,545.50CONSTRUCTION-BUILDINGS
Jan 21, 2016School Construction Authority$298,737.00CONSTRUCTION-BUILDINGS
Jun 16, 2016School Construction Authority$297,397.50CONSTRUCTION-BUILDINGS
Oct 15, 2015School Construction Authority$277,468.87CONSTRUCTION-BUILDINGS
Sep 16, 2015School Construction Authority$273,742.50CONSTRUCTION-BUILDINGS
Apr 28, 2016School Construction Authority$268,000.70CONSTRUCTION-BUILDINGS
Feb 23, 2016School Construction Authority$238,108.00CONSTRUCTION-BUILDINGS
Nov 10, 2015School Construction Authority$211,168.26CONSTRUCTION-BUILDINGS
Sep 15, 2015School Construction Authority$197,786.60CONSTRUCTION-BUILDINGS
Aug 21, 2015School Construction Authority$149,581.35CONSTRUCTION-BUILDINGS
Oct 5, 2015School Construction Authority$139,770.50CONSTRUCTION-BUILDINGS
Oct 5, 2015School Construction Authority$136,816.10CONSTRUCTION-BUILDINGS
Jun 13, 2016School Construction Authority$135,613.58CONSTRUCTION-BUILDINGS
Oct 28, 2015School Construction Authority$134,180.36CONSTRUCTION-BUILDINGS
Nov 18, 2015School Construction Authority$131,551.25CONSTRUCTION-BUILDINGS
Nov 2, 2015School Construction Authority$130,402.42CONSTRUCTION-BUILDINGS
FY 2015top 20 of 137 payments$6,789,085
DateAgencyAmountCategoryPurchase order
May 5, 2015School Construction Authority$356,567.84CONSTRUCTION-BUILDINGS
Oct 8, 2014School Construction Authority$236,791.21CONSTRUCTION-BUILDINGS
Nov 14, 2014School Construction Authority$234,502.75CONSTRUCTION-BUILDINGS
Nov 18, 2014School Construction Authority$222,777.61CONSTRUCTION-BUILDINGS
May 15, 2015School Construction Authority$197,778.11CONSTRUCTION-BUILDINGS
Sep 23, 2014School Construction Authority$197,718.58CONSTRUCTION-BUILDINGS
Feb 12, 2015School Construction Authority$183,867.58CONSTRUCTION-BUILDINGS
Nov 12, 2014School Construction Authority$176,132.91CONSTRUCTION-BUILDINGS
Jul 14, 2014School Construction Authority$167,958.84CONSTRUCTION-BUILDINGS
Nov 17, 2014School Construction Authority$165,050.34CONSTRUCTION-BUILDINGS
Feb 13, 2015School Construction Authority$164,107.04CONSTRUCTION-BUILDINGS
Apr 6, 2015School Construction Authority$153,990.36CONSTRUCTION-BUILDINGS
Nov 14, 2014School Construction Authority$152,700.00CONSTRUCTION-BUILDINGS
Oct 2, 2014School Construction Authority$151,115.27CONSTRUCTION-BUILDINGS
Jan 15, 2015School Construction Authority$142,581.78CONSTRUCTION-BUILDINGS
Nov 10, 2014School Construction Authority$140,311.36CONSTRUCTION-BUILDINGS
Nov 5, 2014School Construction Authority$133,039.77CONSTRUCTION-BUILDINGS
Sep 17, 2014School Construction Authority$128,235.28CONSTRUCTION-BUILDINGS
Jul 17, 2014School Construction Authority$127,181.25CONSTRUCTION-BUILDINGS
Dec 29, 2014School Construction Authority$127,116.74CONSTRUCTION-BUILDINGS
FY 2014top 20 of 147 payments$9,471,820
DateAgencyAmountCategoryPurchase order
Oct 1, 2013School Construction Authority$1,500,000.00CONSTRUCTION-BUILDINGS
Jul 31, 2013School Construction Authority$368,914.75CONSTRUCTION-BUILDINGS
Sep 5, 2013School Construction Authority$315,542.50CONSTRUCTION-BUILDINGS
Sep 9, 2013School Construction Authority$312,265.24CONSTRUCTION-BUILDINGS
Feb 24, 2014School Construction Authority$285,665.42CONSTRUCTION-BUILDINGS
Feb 12, 2014School Construction Authority$272,160.27CONSTRUCTION-BUILDINGS
Oct 1, 2013School Construction Authority$242,308.40CONSTRUCTION-BUILDINGS
Feb 6, 2014School Construction Authority$216,353.08CONSTRUCTION-BUILDINGS
Dec 2, 2013School Construction Authority$204,963.84CONSTRUCTION-BUILDINGS
Dec 12, 2013School Construction Authority$195,788.58CONSTRUCTION-BUILDINGS
Aug 6, 2013School Construction Authority$158,042.00CONSTRUCTION-BUILDINGS
Nov 6, 2013School Construction Authority$156,882.04CONSTRUCTION-BUILDINGS
Oct 30, 2013School Construction Authority$154,242.00CONSTRUCTION-BUILDINGS
Nov 13, 2013School Construction Authority$152,935.66CONSTRUCTION-BUILDINGS
Sep 17, 2013School Construction Authority$150,960.60CONSTRUCTION-BUILDINGS
Jun 6, 2014School Construction Authority$144,281.81CONSTRUCTION-BUILDINGS
Dec 16, 2013School Construction Authority$143,889.85CONSTRUCTION-BUILDINGS
Feb 19, 2014School Construction Authority$141,023.23CONSTRUCTION-BUILDINGS
Feb 20, 2014School Construction Authority$130,086.11CONSTRUCTION-BUILDINGS
May 12, 2014School Construction Authority$127,228.28CONSTRUCTION-BUILDINGS
FY 2013top 20 of 97 payments$4,879,843
DateAgencyAmountCategoryPurchase order
Sep 24, 2012School Construction Authority$242,908.97CONSTRUCTION-BUILDINGS
Aug 8, 2012School Construction Authority$225,240.72CONSTRUCTION-BUILDINGS
Jun 20, 2013School Construction Authority$215,853.14CONSTRUCTION-BUILDINGS
Aug 24, 2012School Construction Authority$209,332.50CONSTRUCTION-BUILDINGS
Oct 18, 2012School Construction Authority$166,817.37CONSTRUCTION-BUILDINGS
Sep 20, 2012School Construction Authority$160,787.50CONSTRUCTION-BUILDINGS
Jun 14, 2013School Construction Authority$154,886.06CONSTRUCTION-BUILDINGS
Jan 28, 2013School Construction Authority$137,110.68CONSTRUCTION-BUILDINGS
May 13, 2013School Construction Authority$135,580.24CONSTRUCTION-BUILDINGS
Aug 30, 2012School Construction Authority$131,373.35CONSTRUCTION-BUILDINGS
May 17, 2013School Construction Authority$118,750.82CONSTRUCTION-BUILDINGS
Jul 26, 2012School Construction Authority$115,995.00CONSTRUCTION-BUILDINGS
Dec 27, 2012School Construction Authority$111,523.88CONSTRUCTION-BUILDINGS
Mar 27, 2013School Construction Authority$110,602.94CONSTRUCTION-BUILDINGS
Nov 7, 2012School Construction Authority$110,485.00CONSTRUCTION-BUILDINGS
Feb 14, 2013School Construction Authority$107,459.28CONSTRUCTION-BUILDINGS
Feb 15, 2013School Construction Authority$103,678.25CONSTRUCTION-BUILDINGS
Oct 1, 2012School Construction Authority$95,871.36CONSTRUCTION-BUILDINGS
Mar 27, 2013School Construction Authority$78,841.30CONSTRUCTION-BUILDINGS
Dec 27, 2012School Construction Authority$76,490.26CONSTRUCTION-BUILDINGS
FY 2012top 20 of 106 payments$6,166,244
DateAgencyAmountCategoryPurchase order
Oct 27, 2011School Construction Authority$465,009.34CONSTRUCTION-BUILDINGS
Aug 9, 2011School Construction Authority$337,289.90CONSTRUCTION-BUILDINGS
Jun 11, 2012School Construction Authority$336,956.42CONSTRUCTION-BUILDINGS
Oct 12, 2011School Construction Authority$230,185.25CONSTRUCTION-BUILDINGS
Oct 12, 2011School Construction Authority$209,197.60CONSTRUCTION-BUILDINGS
Oct 11, 2011School Construction Authority$184,676.14CONSTRUCTION-BUILDINGS
May 9, 2012School Construction Authority$183,658.58CONSTRUCTION-BUILDINGS
Apr 23, 2012School Construction Authority$183,246.66CONSTRUCTION-BUILDINGS
Oct 26, 2011School Construction Authority$169,413.46CONSTRUCTION-BUILDINGS
Nov 23, 2011School Construction Authority$156,275.00CONSTRUCTION-BUILDINGS
Jun 18, 2012School Construction Authority$141,464.76CONSTRUCTION-BUILDINGS
Sep 9, 2011School Construction Authority$126,815.50CONSTRUCTION-BUILDINGS
Jun 14, 2012School Construction Authority$118,987.06CONSTRUCTION-BUILDINGS
Oct 21, 2011School Construction Authority$109,161.61CONSTRUCTION-BUILDINGS
Sep 20, 2011School Construction Authority$105,839.15CONSTRUCTION-BUILDINGS
Nov 29, 2011School Construction Authority$98,640.58CONSTRUCTION-BUILDINGS
Feb 28, 2012School Construction Authority$97,457.12CONSTRUCTION-BUILDINGS
Oct 11, 2011School Construction Authority$95,612.76CONSTRUCTION-BUILDINGS
Jan 19, 2012School Construction Authority$95,468.10CONSTRUCTION-BUILDINGS
Nov 29, 2011School Construction Authority$92,822.98CONSTRUCTION-BUILDINGS
FY 2011top 20 of 140 payments$9,049,509
DateAgencyAmountCategoryPurchase order
Aug 12, 2010School Construction Authority$737,971.40CONSTRUCTION-BUILDINGS
Jul 23, 2010School Construction Authority$709,973.00CONSTRUCTION-BUILDINGS
Mar 14, 2011School Construction Authority$524,708.75CONSTRUCTION-BUILDINGS
Jan 28, 2011School Construction Authority$426,526.25CONSTRUCTION-BUILDINGS
Sep 10, 2010School Construction Authority$305,601.70CONSTRUCTION-BUILDINGS
Nov 3, 2010School Construction Authority$300,795.63CONSTRUCTION-BUILDINGS
May 6, 2011School Construction Authority$270,341.50CONSTRUCTION-BUILDINGS
May 5, 2011School Construction Authority$240,556.33CONSTRUCTION-BUILDINGS
Sep 17, 2010School Construction Authority$231,667.00CONSTRUCTION-BUILDINGS
Jan 31, 2011School Construction Authority$200,925.00CONSTRUCTION-BUILDINGS
Jun 14, 2011School Construction Authority$190,482.51CONSTRUCTION-BUILDINGS
Jul 26, 2010School Construction Authority$183,065.00CONSTRUCTION-BUILDINGS
Sep 23, 2010School Construction Authority$183,002.84CONSTRUCTION-BUILDINGS
Nov 4, 2010School Construction Authority$160,674.59CONSTRUCTION-BUILDINGS
Mar 1, 2011School Construction Authority$158,728.17CONSTRUCTION-BUILDINGS
Jun 24, 2011School Construction Authority$158,393.72CONSTRUCTION-BUILDINGS
Jun 22, 2011School Construction Authority$155,829.53CONSTRUCTION-BUILDINGS
Jun 3, 2011School Construction Authority$141,968.00CONSTRUCTION-BUILDINGS
Jun 28, 2011School Construction Authority$133,487.79CONSTRUCTION-BUILDINGS
Apr 15, 2011School Construction Authority$132,841.53CONSTRUCTION-BUILDINGS
FY 2010top 12 of 12 payments$789,358
DateAgencyAmountCategoryPurchase order
Jun 7, 2010School Construction Authority$357,485.00CONSTRUCTION-BUILDINGS
Feb 4, 2010School Construction Authority$95,645.46CONSTRUCTION-BUILDINGS
Feb 22, 2010School Construction Authority$76,708.25CONSTRUCTION-BUILDINGS
Mar 10, 2010School Construction Authority$68,615.50CONSTRUCTION-BUILDINGS
Jan 4, 2010School Construction Authority$58,800.00CONSTRUCTION-BUILDINGS
Apr 7, 2010School Construction Authority$48,503.53CONSTRUCTION-BUILDINGS
Jan 25, 2010School Construction Authority$33,357.17CONSTRUCTION-BUILDINGS
Apr 21, 2010School Construction Authority$16,385.65CONSTRUCTION-BUILDINGS
Apr 21, 2010School Construction Authority$12,707.00CONSTRUCTION-BUILDINGS
Apr 21, 2010School Construction Authority$7,488.25CONSTRUCTION-BUILDINGS
Mar 11, 2010School Construction Authority$7,066.13CONSTRUCTION-BUILDINGS
Mar 10, 2010School Construction Authority$6,595.92CONSTRUCTION-BUILDINGS

Recent payments

DateAgencyAmountCategoryMethod
Jun 23, 2025School Construction Authority$5,950.44CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$6,050.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$21,385.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$25,464.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 23, 2025School Construction Authority$5,950.44CONSTRUCTION-BUILDINGSCapital Contracts
Jun 16, 2025School Construction Authority$21,959.20CONSTRUCTION-BUILDINGSCapital Contracts
Jun 16, 2025School Construction Authority$22,011.00CONSTRUCTION-BUILDINGSCapital Contracts
Jun 10, 2025School Construction Authority$129,375.50CONSTRUCTION-BUILDINGSCapital Contracts
Jun 6, 2025School Construction Authority$46,477.00CONSTRUCTION-BUILDINGSCapital Contracts
May 30, 2025School Construction Authority$9,454.03CONSTRUCTION-BUILDINGSCapital Contracts
May 23, 2025School Construction Authority$5,966.04CONSTRUCTION-BUILDINGSCapital Contracts
May 22, 2025School Construction Authority$159,223.00CONSTRUCTION-BUILDINGSCapital Contracts
May 21, 2025School Construction Authority$23,267.00CONSTRUCTION-BUILDINGSCapital Contracts
May 21, 2025School Construction Authority$20,363.00CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$6,049.10CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$5,966.04CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$6,049.10CONSTRUCTION-BUILDINGSCapital Contracts
May 20, 2025School Construction Authority$6,759.29CONSTRUCTION-BUILDINGSCapital Contracts
May 19, 2025School Construction Authority$5,891.04CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$11,387.55CONSTRUCTION-BUILDINGSCapital Contracts
May 16, 2025School Construction Authority$8,580.00CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$5,262.00CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$5,882.81CONSTRUCTION-BUILDINGSCapital Contracts
May 13, 2025School Construction Authority$5,885.51CONSTRUCTION-BUILDINGSCapital Contracts
May 12, 2025School Construction Authority$11,819.93CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data