2 Saab Construction Inc: New York City Government Payments

as recorded by New York City: 2 SAAB CONSTRUCTION INC

2 Saab Construction Inc is the 1,051st-largest recipient of New York City government payments tracked by SpendLedger, and ranks 152nd in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.1% of everything the School Construction Authority has paid vendors in that span. Payments to it rose 3% year over year.

Primary spending category: CONSTRUCTION-BUILDINGS

$52,816,900total received
582payments
4agencies
Jan 25, 2010Jun 20, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to 2 Saab Construction Inc. No spam.

Payments by fiscal year

FY 2025$10,007,292
FY 2024$9,716,893
FY 2023$2,962,680
FY 2022$4,038,166
FY 2021$4,706,212
FY 2020$4,299,315
FY 2019$3,521,931
FY 2018$3,786,448
FY 2017$3,574,103
FY 2016$3,284,144
FY 2015$2,124,438
FY 2014$781,446
FY 2013$6,267
FY 2012$4,209
FY 2010$3,356

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025School Construction Authority78$10,007,292
FY 2024School Construction Authority60$9,424,479
FY 2024Department of Parks and Recreation6$292,414
FY 2023School Construction Authority9$2,435,303
FY 2023Department of Parks and Recreation19$453,663
FY 2023Department of Small Business Services8$73,714
FY 2022School Construction Authority16$2,566,501
FY 2022Department of Parks and Recreation23$1,471,665
FY 2021Department of Parks and Recreation36$2,461,305
FY 2021School Construction Authority12$1,892,499
FY 2021Department of Small Business Services3$352,408
FY 2020School Construction Authority16$2,060,444
FY 2020Department of Parks and Recreation41$1,324,198
FY 2020Department of Small Business Services6$914,674
FY 2019Department of Parks and Recreation22$2,271,188
FY 2019School Construction Authority6$1,250,743
FY 2018School Construction Authority25$2,342,806
FY 2018Department of Parks and Recreation27$1,443,642
FY 2017School Construction Authority47$3,020,038
FY 2017Department of Parks and Recreation5$554,065
FY 2016School Construction Authority51$3,284,144
FY 2015School Construction Authority24$2,124,438
FY 2014School Construction Authority7$780,815
FY 2014Housing Preservation and Development6$631
FY 2013Housing Preservation and Development12$6,267
FY 2012Housing Preservation and Development11$4,209
FY 2010Housing Preservation and Development6$3,356
Total582$52,816,900

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
CONSTRUCTION-BUILDINGS351$41,189,502Nov 7, 2013 Jun 20, 2025
PROMPT PAYMENT INTEREST12$2,085Feb 11, 2021 Oct 19, 2022
MAINT & REP GENERAL29$14,526Jan 25, 2010 Jun 30, 2014
IOTB CONSTRUCTION176$11,611,292Dec 7, 2016 Apr 12, 2024
<Non-Applicable Expenditure Object>14-$504May 3, 2012 Aug 7, 2019

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 78 payments$10,007,292
DateAgencyAmountCategoryPurchase order
Sep 23, 2024School Construction Authority$509,625.27CONSTRUCTION-BUILDINGS
Oct 8, 2024School Construction Authority$492,452.99CONSTRUCTION-BUILDINGS
Sep 10, 2024School Construction Authority$443,135.10CONSTRUCTION-BUILDINGS
Aug 14, 2024School Construction Authority$412,540.35CONSTRUCTION-BUILDINGS
Aug 27, 2024School Construction Authority$412,250.66CONSTRUCTION-BUILDINGS
Sep 17, 2024School Construction Authority$406,647.50CONSTRUCTION-BUILDINGS
Feb 6, 2025School Construction Authority$376,912.50CONSTRUCTION-BUILDINGS
Nov 7, 2024School Construction Authority$342,991.13CONSTRUCTION-BUILDINGS
Dec 9, 2024School Construction Authority$311,125.00CONSTRUCTION-BUILDINGS
Oct 28, 2024School Construction Authority$279,594.31CONSTRUCTION-BUILDINGS
May 12, 2025School Construction Authority$278,597.95CONSTRUCTION-BUILDINGS
Dec 23, 2024School Construction Authority$254,361.26CONSTRUCTION-BUILDINGS
Jul 29, 2024School Construction Authority$242,981.50CONSTRUCTION-BUILDINGS
Mar 7, 2025School Construction Authority$227,984.75CONSTRUCTION-BUILDINGS
Jan 21, 2025School Construction Authority$217,874.52CONSTRUCTION-BUILDINGS
Sep 20, 2024School Construction Authority$217,874.52CONSTRUCTION-BUILDINGS
May 27, 2025School Construction Authority$215,507.50CONSTRUCTION-BUILDINGS
Jun 9, 2025School Construction Authority$207,474.30CONSTRUCTION-BUILDINGS
Nov 1, 2024School Construction Authority$198,483.97CONSTRUCTION-BUILDINGS
May 8, 2025School Construction Authority$198,075.00CONSTRUCTION-BUILDINGS
FY 2024top 20 of 66 payments$9,716,893
DateAgencyAmountCategoryPurchase order
Aug 30, 2023School Construction Authority$648,632.24CONSTRUCTION-BUILDINGS
Jan 18, 2024School Construction Authority$552,372.84CONSTRUCTION-BUILDINGS
Oct 17, 2023School Construction Authority$462,329.90CONSTRUCTION-BUILDINGS
Dec 5, 2023School Construction Authority$440,453.91CONSTRUCTION-BUILDINGS
Apr 5, 2024School Construction Authority$397,121.82CONSTRUCTION-BUILDINGS
Aug 21, 2023School Construction Authority$391,065.78CONSTRUCTION-BUILDINGS
Nov 16, 2023School Construction Authority$376,458.83CONSTRUCTION-BUILDINGS
Oct 17, 2023School Construction Authority$338,543.99CONSTRUCTION-BUILDINGS
Sep 21, 2023School Construction Authority$299,220.17CONSTRUCTION-BUILDINGS
Oct 10, 2023School Construction Authority$288,340.66CONSTRUCTION-BUILDINGS
Jan 2, 2024School Construction Authority$281,716.80CONSTRUCTION-BUILDINGS
May 17, 2024School Construction Authority$272,992.61CONSTRUCTION-BUILDINGS
Dec 4, 2023Department of Parks and Recreation$271,867.00IOTB CONSTRUCTION
Oct 16, 2023School Construction Authority$266,662.40CONSTRUCTION-BUILDINGS
Dec 5, 2023School Construction Authority$254,675.14CONSTRUCTION-BUILDINGS
Mar 8, 2024School Construction Authority$246,214.54CONSTRUCTION-BUILDINGS
May 30, 2024School Construction Authority$228,377.15CONSTRUCTION-BUILDINGS
Apr 26, 2024School Construction Authority$225,100.60CONSTRUCTION-BUILDINGS
Jun 17, 2024School Construction Authority$194,334.47CONSTRUCTION-BUILDINGS
Feb 16, 2024School Construction Authority$191,330.57CONSTRUCTION-BUILDINGS
FY 2023top 20 of 36 payments$2,962,680
DateAgencyAmountCategoryPurchase order
Feb 13, 2023School Construction Authority$525,389.43CONSTRUCTION-BUILDINGS
Mar 15, 2023School Construction Authority$385,703.48CONSTRUCTION-BUILDINGS
Jun 13, 2023School Construction Authority$361,972.12CONSTRUCTION-BUILDINGS
Jun 8, 2023School Construction Authority$284,395.56CONSTRUCTION-BUILDINGS
Aug 3, 2022School Construction Authority$247,079.42CONSTRUCTION-BUILDINGS
Oct 11, 2022School Construction Authority$228,444.07CONSTRUCTION-BUILDINGS
Jun 26, 2023School Construction Authority$211,809.99CONSTRUCTION-BUILDINGS
Sep 28, 2022Department of Parks and Recreation$201,765.56IOTB CONSTRUCTION
Jun 26, 2023School Construction Authority$133,584.25CONSTRUCTION-BUILDINGS
Jan 17, 2023Department of Parks and Recreation$99,594.16IOTB CONSTRUCTION
Feb 8, 2023Department of Parks and Recreation$97,948.41IOTB CONSTRUCTION
Sep 23, 2022School Construction Authority$56,924.20CONSTRUCTION-BUILDINGS
Sep 29, 2022Department of Small Business Services$19,593.16IOTB CONSTRUCTION
Sep 23, 2022Department of Parks and Recreation$14,260.61IOTB CONSTRUCTION
Sep 29, 2022Department of Small Business Services$13,527.21IOTB CONSTRUCTION
Dec 12, 2022Department of Parks and Recreation$12,636.30IOTB CONSTRUCTION
Oct 11, 2022Department of Parks and Recreation$12,098.09IOTB CONSTRUCTION
Sep 29, 2022Department of Small Business Services$12,042.26IOTB CONSTRUCTION
Sep 29, 2022Department of Small Business Services$11,054.02IOTB CONSTRUCTION
Mar 23, 2023Department of Parks and Recreation$9,536.42IOTB CONSTRUCTION
FY 2022top 20 of 39 payments$4,038,166
DateAgencyAmountCategoryPurchase order
Jul 7, 2021School Construction Authority$679,424.80CONSTRUCTION-BUILDINGS
Apr 22, 2022School Construction Authority$652,732.70CONSTRUCTION-BUILDINGS
Nov 16, 2021School Construction Authority$457,507.92CONSTRUCTION-BUILDINGS
Aug 9, 2021Department of Parks and Recreation$325,831.62IOTB CONSTRUCTION
Jun 8, 2022School Construction Authority$315,227.67CONSTRUCTION-BUILDINGS
Oct 21, 2021Department of Parks and Recreation$240,089.70IOTB CONSTRUCTION
Dec 6, 2021Department of Parks and Recreation$236,814.10IOTB CONSTRUCTION
Sep 13, 2021Department of Parks and Recreation$218,986.87IOTB CONSTRUCTION
May 27, 2022Department of Parks and Recreation$115,738.70IOTB CONSTRUCTION
Nov 1, 2021School Construction Authority$102,938.87CONSTRUCTION-BUILDINGS
Feb 22, 2022Department of Parks and Recreation$96,128.79IOTB CONSTRUCTION
Aug 24, 2021School Construction Authority$69,900.35CONSTRUCTION-BUILDINGS
May 3, 2022School Construction Authority$63,477.58CONSTRUCTION-BUILDINGS
May 3, 2022School Construction Authority$62,691.63CONSTRUCTION-BUILDINGS
Nov 1, 2021School Construction Authority$43,729.11CONSTRUCTION-BUILDINGS
May 31, 2022Department of Parks and Recreation$32,739.42IOTB CONSTRUCTION
Jun 21, 2022Department of Parks and Recreation$32,224.50IOTB CONSTRUCTION
Nov 1, 2021School Construction Authority$27,720.32CONSTRUCTION-BUILDINGS
May 26, 2022School Construction Authority$27,683.85CONSTRUCTION-BUILDINGS
Feb 18, 2022Department of Parks and Recreation$27,263.72IOTB CONSTRUCTION
FY 2021top 20 of 51 payments$4,706,212
DateAgencyAmountCategoryPurchase order
Mar 1, 2021Department of Parks and Recreation$522,048.89IOTB CONSTRUCTION
May 28, 2021School Construction Authority$363,450.29CONSTRUCTION-BUILDINGS
Jan 22, 2021Department of Parks and Recreation$339,612.51IOTB CONSTRUCTION
Mar 22, 2021Department of Small Business Services$320,902.26IOTB CONSTRUCTION
Jun 7, 2021Department of Parks and Recreation$263,143.92IOTB CONSTRUCTION
Aug 11, 2020School Construction Authority$252,374.48CONSTRUCTION-BUILDINGS
Mar 29, 2021Department of Parks and Recreation$245,348.31IOTB CONSTRUCTION
Aug 11, 2020School Construction Authority$221,492.50CONSTRUCTION-BUILDINGS
Mar 22, 2021Department of Parks and Recreation$208,142.06IOTB CONSTRUCTION
Feb 19, 2021School Construction Authority$203,141.61CONSTRUCTION-BUILDINGS
Oct 23, 2020Department of Parks and Recreation$189,928.75IOTB CONSTRUCTION
Feb 22, 2021School Construction Authority$184,846.16CONSTRUCTION-BUILDINGS
Feb 22, 2021School Construction Authority$181,072.33CONSTRUCTION-BUILDINGS
Mar 22, 2021Department of Parks and Recreation$141,966.02IOTB CONSTRUCTION
Oct 6, 2020School Construction Authority$136,677.78CONSTRUCTION-BUILDINGS
Jan 11, 2021Department of Parks and Recreation$113,956.66IOTB CONSTRUCTION
Oct 6, 2020School Construction Authority$104,522.94CONSTRUCTION-BUILDINGS
Jul 27, 2020Department of Parks and Recreation$102,012.66IOTB CONSTRUCTION
Dec 4, 2020School Construction Authority$100,924.50CONSTRUCTION-BUILDINGS
May 24, 2021School Construction Authority$87,760.18CONSTRUCTION-BUILDINGS
FY 2020top 20 of 63 payments$4,299,315
DateAgencyAmountCategoryPurchase order
Feb 21, 2020School Construction Authority$511,794.93CONSTRUCTION-BUILDINGS
Jan 2, 2020School Construction Authority$427,535.62CONSTRUCTION-BUILDINGS
Sep 20, 2019Department of Small Business Services$372,270.54IOTB CONSTRUCTION
Jan 31, 2020School Construction Authority$213,679.70CONSTRUCTION-BUILDINGS
Mar 16, 2020Department of Small Business Services$204,375.99IOTB CONSTRUCTION
Mar 27, 2020School Construction Authority$187,492.71CONSTRUCTION-BUILDINGS
Jul 1, 2019Department of Parks and Recreation$177,170.66IOTB CONSTRUCTION
Jul 22, 2019Department of Small Business Services$163,494.79IOTB CONSTRUCTION
Jul 1, 2019Department of Parks and Recreation$153,160.13IOTB CONSTRUCTION
Aug 29, 2019Department of Parks and Recreation$142,880.54IOTB CONSTRUCTION
Jan 15, 2020Department of Parks and Recreation$140,130.04IOTB CONSTRUCTION
Jul 22, 2019Department of Small Business Services$123,000.00IOTB CONSTRUCTION
Dec 24, 2019School Construction Authority$116,397.32CONSTRUCTION-BUILDINGS
Oct 15, 2019Department of Parks and Recreation$109,816.83IOTB CONSTRUCTION
Aug 14, 2019Department of Parks and Recreation$102,624.36IOTB CONSTRUCTION
May 27, 2020School Construction Authority$95,307.37CONSTRUCTION-BUILDINGS
Jan 15, 2020Department of Parks and Recreation$92,031.71IOTB CONSTRUCTION
Apr 29, 2020Department of Parks and Recreation$90,025.22IOTB CONSTRUCTION
Sep 16, 2019School Construction Authority$83,241.57CONSTRUCTION-BUILDINGS
Mar 24, 2020School Construction Authority$80,983.65CONSTRUCTION-BUILDINGS
FY 2019top 20 of 28 payments$3,521,931
DateAgencyAmountCategoryPurchase order
Sep 13, 2018School Construction Authority$670,653.31CONSTRUCTION-BUILDINGS
May 31, 2019Department of Parks and Recreation$468,637.28IOTB CONSTRUCTION
Dec 14, 2018School Construction Authority$440,241.16CONSTRUCTION-BUILDINGS
Oct 15, 2018Department of Parks and Recreation$373,394.67IOTB CONSTRUCTION
Jan 18, 2019Department of Parks and Recreation$240,205.82IOTB CONSTRUCTION
Dec 3, 2018Department of Parks and Recreation$153,664.48IOTB CONSTRUCTION
Jan 18, 2019Department of Parks and Recreation$143,618.91IOTB CONSTRUCTION
Dec 3, 2018Department of Parks and Recreation$122,213.75IOTB CONSTRUCTION
Nov 23, 2018Department of Parks and Recreation$121,209.08IOTB CONSTRUCTION
Aug 30, 2018Department of Parks and Recreation$97,217.58IOTB CONSTRUCTION
Aug 13, 2018Department of Parks and Recreation$89,029.62IOTB CONSTRUCTION
Aug 13, 2018Department of Parks and Recreation$84,055.50IOTB CONSTRUCTION
Aug 13, 2018Department of Parks and Recreation$83,599.98IOTB CONSTRUCTION
Mar 11, 2019Department of Parks and Recreation$80,816.90IOTB CONSTRUCTION
Oct 15, 2018Department of Parks and Recreation$68,736.00IOTB CONSTRUCTION
Aug 13, 2018Department of Parks and Recreation$59,444.36IOTB CONSTRUCTION
Feb 4, 2019School Construction Authority$44,423.90CONSTRUCTION-BUILDINGS
May 30, 2019School Construction Authority$40,274.54CONSTRUCTION-BUILDINGS
Sep 13, 2018School Construction Authority$39,630.00CONSTRUCTION-BUILDINGS
Dec 3, 2018Department of Parks and Recreation$35,426.43IOTB CONSTRUCTION
FY 2018top 20 of 52 payments$3,786,448
DateAgencyAmountCategoryPurchase order
Jun 22, 2018School Construction Authority$629,556.16CONSTRUCTION-BUILDINGS
Aug 22, 2017School Construction Authority$445,985.98CONSTRUCTION-BUILDINGS
Aug 3, 2017Department of Parks and Recreation$267,546.04IOTB CONSTRUCTION
Jul 5, 2017School Construction Authority$204,770.70CONSTRUCTION-BUILDINGS
Feb 27, 2018School Construction Authority$167,703.41CONSTRUCTION-BUILDINGS
May 2, 2018School Construction Authority$153,955.00CONSTRUCTION-BUILDINGS
Apr 25, 2018Department of Parks and Recreation$140,606.77IOTB CONSTRUCTION
Apr 19, 2018School Construction Authority$128,643.30CONSTRUCTION-BUILDINGS
Aug 22, 2017School Construction Authority$121,269.95CONSTRUCTION-BUILDINGS
Nov 22, 2017Department of Parks and Recreation$109,299.24IOTB CONSTRUCTION
Jun 13, 2018Department of Parks and Recreation$106,456.82IOTB CONSTRUCTION
Mar 7, 2018Department of Parks and Recreation$103,483.52IOTB CONSTRUCTION
Sep 28, 2017Department of Parks and Recreation$78,309.05IOTB CONSTRUCTION
Feb 9, 2018Department of Parks and Recreation$76,479.10IOTB CONSTRUCTION
Feb 5, 2018Department of Parks and Recreation$69,769.65IOTB CONSTRUCTION
Apr 25, 2018Department of Parks and Recreation$69,769.64IOTB CONSTRUCTION
Jan 26, 2018School Construction Authority$66,877.30CONSTRUCTION-BUILDINGS
Jun 13, 2018Department of Parks and Recreation$65,544.49IOTB CONSTRUCTION
Jan 26, 2018School Construction Authority$62,985.57CONSTRUCTION-BUILDINGS
Feb 5, 2018Department of Parks and Recreation$62,052.07IOTB CONSTRUCTION
FY 2017top 20 of 52 payments$3,574,103
DateAgencyAmountCategoryPurchase order
Jun 2, 2017School Construction Authority$387,339.24CONSTRUCTION-BUILDINGS
Dec 28, 2016Department of Parks and Recreation$298,477.57IOTB CONSTRUCTION
Dec 7, 2016Department of Parks and Recreation$298,477.57IOTB CONSTRUCTION
Sep 28, 2016School Construction Authority$282,295.64CONSTRUCTION-BUILDINGS
Sep 28, 2016School Construction Authority$270,478.82CONSTRUCTION-BUILDINGS
Apr 6, 2017Department of Parks and Recreation$255,590.85IOTB CONSTRUCTION
Apr 21, 2017School Construction Authority$223,969.32CONSTRUCTION-BUILDINGS
Mar 24, 2017School Construction Authority$191,268.75CONSTRUCTION-BUILDINGS
Aug 12, 2016School Construction Authority$175,966.88CONSTRUCTION-BUILDINGS
Sep 30, 2016School Construction Authority$169,785.00CONSTRUCTION-BUILDINGS
Aug 3, 2016School Construction Authority$166,896.00CONSTRUCTION-BUILDINGS
Jul 14, 2016School Construction Authority$158,006.28CONSTRUCTION-BUILDINGS
Dec 14, 2016School Construction Authority$150,552.77CONSTRUCTION-BUILDINGS
Mar 24, 2017School Construction Authority$129,995.83CONSTRUCTION-BUILDINGS
Jan 12, 2017School Construction Authority$103,930.38CONSTRUCTION-BUILDINGS
May 16, 2017School Construction Authority$94,379.40CONSTRUCTION-BUILDINGS
Jun 6, 2017School Construction Authority$89,334.00CONSTRUCTION-BUILDINGS
May 16, 2017School Construction Authority$75,022.25CONSTRUCTION-BUILDINGS
Oct 12, 2016School Construction Authority$71,380.91CONSTRUCTION-BUILDINGS
Dec 23, 2016School Construction Authority$62,893.59CONSTRUCTION-BUILDINGS
FY 2016top 20 of 51 payments$3,284,144
DateAgencyAmountCategoryPurchase order
Apr 18, 2016School Construction Authority$218,813.50CONSTRUCTION-BUILDINGS
Sep 23, 2015School Construction Authority$170,045.25CONSTRUCTION-BUILDINGS
Aug 27, 2015School Construction Authority$160,811.25CONSTRUCTION-BUILDINGS
Sep 16, 2015School Construction Authority$160,811.25CONSTRUCTION-BUILDINGS
Aug 13, 2015School Construction Authority$154,256.25CONSTRUCTION-BUILDINGS
Jun 1, 2016School Construction Authority$141,949.76CONSTRUCTION-BUILDINGS
Aug 25, 2015School Construction Authority$134,914.25CONSTRUCTION-BUILDINGS
Oct 29, 2015School Construction Authority$126,901.00CONSTRUCTION-BUILDINGS
Oct 30, 2015School Construction Authority$121,191.41CONSTRUCTION-BUILDINGS
Oct 29, 2015School Construction Authority$121,100.30CONSTRUCTION-BUILDINGS
Mar 3, 2016School Construction Authority$119,263.24CONSTRUCTION-BUILDINGS
Dec 8, 2015School Construction Authority$117,430.45CONSTRUCTION-BUILDINGS
Mar 3, 2016School Construction Authority$105,546.29CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$98,715.40CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$98,173.00CONSTRUCTION-BUILDINGS
Dec 15, 2015School Construction Authority$96,755.98CONSTRUCTION-BUILDINGS
Aug 13, 2015School Construction Authority$92,007.50CONSTRUCTION-BUILDINGS
Apr 18, 2016School Construction Authority$88,640.94CONSTRUCTION-BUILDINGS
Jun 10, 2016School Construction Authority$88,002.11CONSTRUCTION-BUILDINGS
Dec 15, 2015School Construction Authority$87,781.90CONSTRUCTION-BUILDINGS
FY 2015top 20 of 24 payments$2,124,438
DateAgencyAmountCategoryPurchase order
Apr 9, 2015School Construction Authority$274,906.25CONSTRUCTION-BUILDINGS
May 7, 2015School Construction Authority$228,903.45CONSTRUCTION-BUILDINGS
Aug 26, 2014School Construction Authority$169,608.25CONSTRUCTION-BUILDINGS
Jun 1, 2015School Construction Authority$156,417.50CONSTRUCTION-BUILDINGS
Jun 23, 2015School Construction Authority$144,645.24CONSTRUCTION-BUILDINGS
May 7, 2015School Construction Authority$144,623.25CONSTRUCTION-BUILDINGS
Sep 29, 2014School Construction Authority$119,182.23CONSTRUCTION-BUILDINGS
Feb 13, 2015School Construction Authority$116,042.97CONSTRUCTION-BUILDINGS
Jan 28, 2015School Construction Authority$102,932.50CONSTRUCTION-BUILDINGS
Apr 14, 2015School Construction Authority$97,222.61CONSTRUCTION-BUILDINGS
Mar 9, 2015School Construction Authority$70,615.17CONSTRUCTION-BUILDINGS
Jun 12, 2015School Construction Authority$68,799.00CONSTRUCTION-BUILDINGS
Jan 28, 2015School Construction Authority$68,685.00CONSTRUCTION-BUILDINGS
Jul 14, 2014School Construction Authority$65,787.50CONSTRUCTION-BUILDINGS
Apr 20, 2015School Construction Authority$65,455.00CONSTRUCTION-BUILDINGS
Jan 9, 2015School Construction Authority$54,055.00CONSTRUCTION-BUILDINGS
Dec 2, 2014School Construction Authority$51,727.50CONSTRUCTION-BUILDINGS
Jan 14, 2015School Construction Authority$43,229.75CONSTRUCTION-BUILDINGS
Jan 5, 2015School Construction Authority$33,820.00CONSTRUCTION-BUILDINGS
Apr 20, 2015School Construction Authority$25,056.25CONSTRUCTION-BUILDINGS
FY 2014top 13 of 13 payments$781,446
DateAgencyAmountCategoryPurchase order
May 6, 2014School Construction Authority$229,613.96CONSTRUCTION-BUILDINGS
Dec 26, 2013School Construction Authority$168,558.56CONSTRUCTION-BUILDINGS
Dec 26, 2013School Construction Authority$119,064.64CONSTRUCTION-BUILDINGS
Mar 5, 2014School Construction Authority$111,909.96CONSTRUCTION-BUILDINGS
Mar 5, 2014School Construction Authority$77,491.50CONSTRUCTION-BUILDINGS
Nov 7, 2013School Construction Authority$40,926.00CONSTRUCTION-BUILDINGS
Nov 20, 2013School Construction Authority$33,250.00CONSTRUCTION-BUILDINGS
Jun 30, 2014Housing Preservation and Development$445.00MAINT & REP GENERAL
Mar 3, 2014Housing Preservation and Development$100.00MAINT & REP GENERAL
Oct 30, 2013Housing Preservation and Development$100.00MAINT & REP GENERAL
Mar 3, 2014Housing Preservation and Development-$3.50<Non-Applicable Expenditure Object>
Jun 30, 2014Housing Preservation and Development-$3.50<Non-Applicable Expenditure Object>
Oct 30, 2013Housing Preservation and Development-$7.00<Non-Applicable Expenditure Object>
FY 2013top 12 of 12 payments$6,267
DateAgencyAmountCategoryPurchase order
Sep 13, 2012Housing Preservation and Development$4,200.00MAINT & REP GENERAL
Aug 31, 2012Housing Preservation and Development$465.00MAINT & REP GENERAL
Aug 27, 2012Housing Preservation and Development$420.00MAINT & REP GENERAL
Aug 31, 2012Housing Preservation and Development$360.00MAINT & REP GENERAL
Sep 4, 2012Housing Preservation and Development$350.00MAINT & REP GENERAL
Nov 23, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Sep 26, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Oct 15, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Nov 23, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Nov 23, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Aug 27, 2012Housing Preservation and Development-$10.50<Non-Applicable Expenditure Object>
Nov 23, 2012Housing Preservation and Development-$17.50<Non-Applicable Expenditure Object>
FY 2012top 11 of 11 payments$4,209
DateAgencyAmountCategoryPurchase order
May 3, 2012Housing Preservation and Development$1,580.00MAINT & REP GENERAL
Nov 28, 2011Housing Preservation and Development$1,420.00MAINT & REP GENERAL
Dec 27, 2011Housing Preservation and Development$340.00MAINT & REP GENERAL
Dec 2, 2011Housing Preservation and Development$290.00MAINT & REP GENERAL
Dec 7, 2011Housing Preservation and Development$100.00MAINT & REP GENERAL
Dec 15, 2011Housing Preservation and Development$100.00MAINT & REP GENERAL
Jun 1, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
Dec 7, 2011Housing Preservation and Development$100.00MAINT & REP GENERAL
Dec 21, 2011Housing Preservation and Development$100.00MAINT & REP GENERAL
May 9, 2012Housing Preservation and Development$100.00MAINT & REP GENERAL
May 3, 2012Housing Preservation and Development-$21.00<Non-Applicable Expenditure Object>
FY 2010top 6 of 6 payments$3,356
DateAgencyAmountCategoryPurchase order
Feb 10, 2010Housing Preservation and Development$1,498.00MAINT & REP GENERAL
Feb 3, 2010Housing Preservation and Development$1,138.00MAINT & REP GENERAL
Jan 25, 2010Housing Preservation and Development$450.00MAINT & REP GENERAL
Apr 30, 2010Housing Preservation and Development$100.00MAINT & REP GENERAL
Apr 30, 2010Housing Preservation and Development$100.00MAINT & REP GENERAL
Jan 29, 2010Housing Preservation and Development$70.00MAINT & REP GENERAL

Recent payments

DateAgencyAmountCategoryMethod
Jun 20, 2025School Construction Authority$91,482.15CONSTRUCTION-BUILDINGSCapital Contracts
Jun 17, 2025School Construction Authority$116,059.41CONSTRUCTION-BUILDINGSCapital Contracts
Jun 17, 2025School Construction Authority$190,350.93CONSTRUCTION-BUILDINGSCapital Contracts
Jun 9, 2025School Construction Authority$207,474.30CONSTRUCTION-BUILDINGSCapital Contracts
May 29, 2025School Construction Authority$56,763.74CONSTRUCTION-BUILDINGSCapital Contracts
May 27, 2025School Construction Authority$215,507.50CONSTRUCTION-BUILDINGSCapital Contracts
May 12, 2025School Construction Authority$278,597.95CONSTRUCTION-BUILDINGSCapital Contracts
May 8, 2025School Construction Authority$198,075.00CONSTRUCTION-BUILDINGSCapital Contracts
May 2, 2025School Construction Authority$103,887.11CONSTRUCTION-BUILDINGSCapital Contracts
Apr 21, 2025School Construction Authority$50,319.60CONSTRUCTION-BUILDINGSCapital Contracts
Apr 18, 2025School Construction Authority$152,813.20CONSTRUCTION-BUILDINGSCapital Contracts
Apr 18, 2025School Construction Authority$47,737.50CONSTRUCTION-BUILDINGSCapital Contracts
Apr 18, 2025School Construction Authority$93,100.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 14, 2025School Construction Authority$160,321.72CONSTRUCTION-BUILDINGSCapital Contracts
Apr 9, 2025School Construction Authority$90,444.08CONSTRUCTION-BUILDINGSCapital Contracts
Apr 9, 2025School Construction Authority$22,617.22CONSTRUCTION-BUILDINGSCapital Contracts
Apr 9, 2025School Construction Authority$30,697.00CONSTRUCTION-BUILDINGSCapital Contracts
Apr 8, 2025School Construction Authority$30,804.04CONSTRUCTION-BUILDINGSCapital Contracts
Apr 8, 2025School Construction Authority$81,892.23CONSTRUCTION-BUILDINGSCapital Contracts
Apr 7, 2025School Construction Authority$90,445.70CONSTRUCTION-BUILDINGSCapital Contracts
Apr 3, 2025School Construction Authority$60,323.75CONSTRUCTION-BUILDINGSCapital Contracts
Mar 25, 2025School Construction Authority$51,044.12CONSTRUCTION-BUILDINGSCapital Contracts
Mar 24, 2025School Construction Authority$20,828.18CONSTRUCTION-BUILDINGSCapital Contracts
Mar 24, 2025School Construction Authority$4,344.22CONSTRUCTION-BUILDINGSCapital Contracts
Mar 7, 2025School Construction Authority$227,984.75CONSTRUCTION-BUILDINGSCapital Contracts

Other vendors serving School Construction Authority

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data