Skanska Stacy and Witbeck a Joint Venture: Los Angeles Government Payments
as recorded by Los Angeles: SKANSKA STACY AND WITBECK A JOINT VENTURE
Skanska Stacy and Witbeck a Joint Venture is the 41st-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 spending. Its payments amount to 2.2% of everything the Non_departmental has paid vendors in that span. Payments to it fell 95.7% year over year.
Primary spending category: CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2025 | Non_departmental | 6 | $405,760 |
| FY 2024 | Non_departmental | 16 | $9,359,941 |
| FY 2023 | Non_departmental | 30 | $48,601,317 |
| FY 2022 | Non_departmental | 37 | $63,263,568 |
| FY 2021 | Non_departmental | 26 | $74,294,689 |
| FY 2020 | Non_departmental | 33 | $25,323,551 |
| FY 2019 | Non_departmental | 57 | $30,348,225 |
| FY 2018 | Non_departmental | 71 | $42,965,831 |
| FY 2017 | Appropriations to Special Purpose Fund | 43 | $48,529,285 |
| FY 2016 | Appropriations to Special Purpose Fund | 46 | $14,288,076 |
| FY 2015 | Appropriations to Special Purpose Fund | 34 | $3,092,373 |
| FY 2014 | Appropriations to Special Purpose Fund | 6 | $1,044,416 |
| Total | 405 | $361,517,034 |
What the payments were for
Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| PARC CONTAMINATED SOIL REMEDIATION | 1 | $845,200 | Oct 18, 2022 – Oct 18, 2022 |
| PROJECT DETOUR PLAN INTERSECTION WORK | 14 | $790,498 | Sep 22, 2015 – May 3, 2018 |
| CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | 73 | $7,074,519 | Jun 26, 2017 – Jan 31, 2025 |
| CONST. CONTRACT PE PHASE | 33 | $6,673,258 | Apr 16, 2014 – May 3, 2018 |
| SIXTH STREET VIADUCT CONSTRUCTION | 2 | $580,228 | Mar 3, 2023 – May 1, 2023 |
| PACKAGE D CONSTRUCTION | 21 | $5,690,791 | Jun 14, 2017 – Dec 13, 2023 |
| SIX STREET VIADUCT FUNDING-SACO | 8 | $51,358,529 | Sep 23, 2020 – Apr 25, 2022 |
| BSS REPLACEMENT YARD PROJECT | 1 | $500,000 | Mar 20, 2020 – Mar 20, 2020 |
| PACKAGE B CONSTRUCTION | 9 | $3,441,734 | Dec 11, 2015 – Dec 14, 2023 |
| STEEL ARCH SALVAGE FOR HISTORIC PRESERVATION | 3 | $324,000 | Jan 20, 2017 – Dec 12, 2023 |
| SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | 4 | $28,641,471 | Feb 1, 2022 – Dec 21, 2023 |
| 6TH ST VIADUCT DEMOLITION | 39 | $25,526,921 | May 26, 2016 – Dec 11, 2023 |
| FOUNDATIONS-PACKAGE 4 | 24 | $25,282,359 | Nov 16, 2016 – Feb 17, 2023 |
| SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | 8 | $2,145,534 | Oct 8, 2021 – Jul 17, 2024 |
| CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | 80 | $191,684,859 | Jun 26, 2017 – Jan 31, 2025 |
| PACKAGE C CONSTRUCTION | 11 | $1,888,654 | Oct 6, 2016 – Apr 22, 2024 |
| PACKAGE D FUNDED SCOPE | 10 | $1,856,656 | Jun 14, 2017 – Dec 13, 2023 |
| CONST. CONTRACT ROW PHASE | 15 | $1,628,024 | Apr 16, 2014 – Nov 4, 2015 |
| SSW CONSTRUCTION PACKAGE A | 10 | $1,590,466 | Apr 21, 2015 – May 3, 2018 |
| BIP-SIXTH S/LA S-1880 | 30 | $1,419,138 | Apr 16, 2014 – May 3, 2018 |
| SIXTH STREET VIADUCT INTERSECTION WORK | 5 | $1,300,000 | Jul 23, 2015 – Apr 4, 2016 |
| CONSTRUCTION OF TEST PILE | 4 | $1,274,196 | Apr 15, 2016 – May 4, 2018 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 6 of 6 payments$405,760
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 31, 2025 | Non_departmental | $139,626.19 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Jul 15, 2024 | Non_departmental | $82,605.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 17, 2024 | Non_departmental | $60,000.00 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| Jul 15, 2024 | Non_departmental | $58,950.60 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 17, 2024 | Non_departmental | $38,310.25 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Jan 31, 2025 | Non_departmental | $26,268.06 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
FY 2024top 16 of 16 payments$9,359,941
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 21, 2023 | Non_departmental | $4,000,000.00 | SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | PO SC50MSACO13123545M |
| Dec 27, 2023 | Non_departmental | $2,150,936.81 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 27, 2023 | Non_departmental | $1,742,966.76 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 27, 2023 | Non_departmental | $369,100.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 13, 2023 | Non_departmental | $284,539.55 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Apr 4, 2024 | Non_departmental | $268,629.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 4, 2024 | Non_departmental | $198,727.00 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| Feb 12, 2024 | Non_departmental | $94,170.20 | PACKAGE C CONSTRUCTION | PO SC50MSACO13123545M |
| Nov 15, 2023 | Non_departmental | $93,039.42 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 13, 2023 | Non_departmental | $92,832.80 | PACKAGE D FUNDED SCOPE | PO SC50MSACO13123545M |
| Dec 11, 2023 | Non_departmental | $49,325.18 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
| Dec 21, 2023 | Non_departmental | $6,322.40 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| Apr 22, 2024 | Non_departmental | $5,250.00 | PACKAGE C CONSTRUCTION | PO SC50MSACO13123545M |
| May 28, 2024 | Non_departmental | $2,772.50 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 12, 2023 | Non_departmental | $729.68 | STEEL ARCH SALVAGE FOR HISTORIC PRESERVATION | PO SC50MSACO13123545M |
| Dec 14, 2023 | Non_departmental | $600.10 | PACKAGE B CONSTRUCTION | PO SC50MSACO13123545M |
FY 2023top 20 of 30 payments$48,601,317
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 29, 2022 | Non_departmental | $19,000,000.00 | SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | PO SC50MSACO13123545M |
| Jul 25, 2022 | Non_departmental | $7,173,161.87 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 17, 2022 | Non_departmental | $6,670,009.82 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Sep 29, 2022 | Non_departmental | $2,700,005.41 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 18, 2022 | Non_departmental | $1,937,628.47 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 2, 2023 | Non_departmental | $1,057,754.36 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 5, 2022 | Non_departmental | $1,049,282.27 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 18, 2022 | Non_departmental | $1,010,026.23 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Aug 18, 2022 | Non_departmental | $975,018.71 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Aug 4, 2022 | Non_departmental | $925,716.86 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
| Oct 18, 2022 | Non_departmental | $855,015.13 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| Oct 18, 2022 | Non_departmental | $845,200.00 | PARC CONTAMINATED SOIL REMEDIATION | PO SC50MSACO13123545M |
| May 1, 2023 | Non_departmental | $838,757.96 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 17, 2023 | Non_departmental | $805,056.00 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Sep 23, 2022 | Non_departmental | $651,448.32 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 3, 2023 | Non_departmental | $486,680.20 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| May 1, 2023 | Non_departmental | $326,277.64 | SIXTH STREET VIADUCT CONSTRUCTION | PO SC50MSACO13123545M |
| Mar 3, 2023 | Non_departmental | $253,950.56 | SIXTH STREET VIADUCT CONSTRUCTION | PO SC50MSACO13123545M |
| Oct 18, 2022 | Non_departmental | $215,831.00 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | PO SC50MSACO13123545M |
| Nov 7, 2022 | Non_departmental | $209,778.00 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
FY 2022top 20 of 37 payments$63,263,568
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 17, 2021 | Non_departmental | $7,577,809.75 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| May 17, 2022 | Non_departmental | $6,355,020.71 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 25, 2022 | Non_departmental | $5,625,437.63 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 15, 2022 | Non_departmental | $5,285,855.83 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jun 17, 2022 | Non_departmental | $5,111,462.87 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 25, 2022 | Non_departmental | $4,340,503.74 | SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | PO SC50MSACO13123545M |
| Feb 1, 2022 | Non_departmental | $4,065,234.98 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 15, 2022 | Non_departmental | $3,143,856.37 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Sep 3, 2021 | Non_departmental | $2,749,480.55 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 8, 2021 | Non_departmental | $2,554,968.45 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 15, 2021 | Non_departmental | $2,521,494.86 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 20, 2021 | Non_departmental | $2,476,393.59 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 21, 2021 | Non_departmental | $2,292,177.19 | SIX STREET VIADUCT FUNDING-SACO | PO SC50MSACO13123545M |
| Nov 17, 2021 | Non_departmental | $2,243,407.46 | SIX STREET VIADUCT FUNDING-SACO | PO SC50MSACO13123545M |
| Aug 13, 2021 | Non_departmental | $2,055,980.58 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 1, 2022 | Non_departmental | $1,300,967.57 | SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | PO SC50MSACO13123545M |
| Feb 1, 2022 | Non_departmental | $1,125,326.37 | SIX STREET VIADUCT FUNDING-SACO | PO SC50MSACO13123545M |
| Aug 3, 2021 | Non_departmental | $1,103,315.13 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Mar 16, 2022 | Non_departmental | $326,460.79 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| May 17, 2022 | Non_departmental | $231,198.78 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
FY 2021top 20 of 26 payments$74,294,689
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 23, 2020 | Non_departmental | $40,000,003.82 | SIX STREET VIADUCT FUNDING-SACO | PO SC50MSACO13123545M |
| Jun 15, 2021 | Non_departmental | $5,557,017.83 | SIX STREET VIADUCT FUNDING-SACO | PO SC50MSACO13123545M |
| Jan 22, 2021 | Non_departmental | $3,453,569.32 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 14, 2020 | Non_departmental | $3,268,381.96 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 20, 2020 | Non_departmental | $3,147,886.82 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 5, 2020 | Non_departmental | $2,910,928.44 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 18, 2020 | Non_departmental | $2,382,882.46 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Sep 3, 2020 | Non_departmental | $2,382,257.83 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 15, 2021 | Non_departmental | $2,330,737.77 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 12, 2021 | Non_departmental | $1,826,100.45 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jun 15, 2021 | Non_departmental | $1,800,949.70 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 24, 2021 | Non_departmental | $1,698,123.09 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| May 19, 2021 | Non_departmental | $1,643,105.30 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 10, 2020 | Non_departmental | $1,510,619.32 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jan 22, 2021 | Non_departmental | $46,540.97 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Aug 18, 2020 | Non_departmental | $44,045.35 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Nov 24, 2020 | Non_departmental | $42,421.53 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Oct 5, 2020 | Non_departmental | $39,228.24 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Dec 22, 2020 | Non_departmental | $32,112.19 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Sep 3, 2020 | Non_departmental | $32,103.77 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
FY 2020top 20 of 33 payments$25,323,551
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 26, 2019 | Non_departmental | $4,519,613.95 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jun 11, 2020 | Non_departmental | $4,115,187.31 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 12, 2019 | Non_departmental | $2,976,599.08 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 25, 2019 | Non_departmental | $2,882,803.91 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| May 14, 2020 | Non_departmental | $2,170,691.26 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 2, 2020 | Non_departmental | $1,837,046.78 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 14, 2019 | Non_departmental | $1,560,033.91 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 1, 2020 | Non_departmental | $1,262,418.61 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 13, 2019 | Non_departmental | $1,053,101.83 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Sep 13, 2019 | Non_departmental | $774,879.06 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 2, 2020 | Non_departmental | $673,683.22 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 20, 2020 | Non_departmental | $500,000.00 | BSS REPLACEMENT YARD PROJECT | PO SC50MSACO13123545M |
| Oct 25, 2019 | Non_departmental | $234,585.27 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Jan 9, 2020 | Non_departmental | $178,450.00 | PACKAGE B CONSTRUCTION | PO SC50MSACO13123545M |
| Nov 27, 2019 | Non_departmental | $95,116.80 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
| Sep 9, 2019 | Non_departmental | $70,607.80 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Mar 17, 2020 | Non_departmental | $62,000.80 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Jun 11, 2020 | Non_departmental | $55,457.06 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Dec 26, 2019 | Non_departmental | $43,763.75 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Jan 24, 2020 | Non_departmental | $43,743.70 | PACKAGE D FUNDED SCOPE | PO SC50MSACO13123545M |
FY 2019top 20 of 57 payments$30,348,225
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 14, 2018 | Non_departmental | $6,742,320.36 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 15, 2018 | Non_departmental | $3,207,854.42 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 13, 2018 | Non_departmental | $2,765,414.54 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 14, 2018 | Non_departmental | $2,764,792.88 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 15, 2018 | Non_departmental | $2,736,214.17 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Oct 18, 2018 | Non_departmental | $1,813,931.67 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 22, 2019 | Non_departmental | $1,399,382.63 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 27, 2019 | Non_departmental | $1,259,831.30 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Oct 18, 2018 | Non_departmental | $1,045,775.71 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
| Jan 14, 2019 | Non_departmental | $1,004,445.40 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Aug 15, 2018 | Non_departmental | $914,621.96 | PACKAGE D FUNDED SCOPE | PO SC50MSACO13123545M |
| Jul 9, 2018 | Non_departmental | $772,962.15 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jun 24, 2019 | Non_departmental | $686,919.50 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| May 17, 2019 | Non_departmental | $604,749.98 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 17, 2018 | Non_departmental | $589,552.05 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Oct 16, 2018 | Non_departmental | $272,891.29 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Jul 17, 2018 | Non_departmental | $252,242.10 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Sep 14, 2018 | Non_departmental | $251,183.19 | PACKAGE D CONSTRUCTION | PO SC50MSACO13123545M |
| Jul 17, 2018 | Non_departmental | $194,256.00 | PACKAGE D FUNDED SCOPE | PO SC50MSACO13123545M |
| Oct 16, 2018 | Non_departmental | $186,684.60 | PACKAGE B CONSTRUCTION | PO SC50MSACO13123545M |
FY 2018top 20 of 71 payments$42,965,831
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2017 | Non_departmental | $7,332,190.35 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jan 18, 2018 | Non_departmental | $6,244,960.54 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Apr 18, 2018 | Non_departmental | $3,512,963.74 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Feb 6, 2018 | Non_departmental | $2,134,185.18 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 13, 2017 | Non_departmental | $1,909,102.32 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Dec 13, 2017 | Non_departmental | $1,896,144.42 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jun 11, 2018 | Non_departmental | $1,419,910.63 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jan 18, 2018 | Non_departmental | $1,400,075.97 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO SC50MSACO13123545M |
| Feb 6, 2018 | Non_departmental | $1,393,313.34 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Jul 24, 2017 | Non_departmental | $1,328,855.06 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Mar 7, 2018 | Non_departmental | $1,271,115.10 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Sep 14, 2017 | Non_departmental | $1,206,251.18 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Jul 24, 2017 | Non_departmental | $1,162,326.88 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 20, 2017 | Non_departmental | $1,075,653.88 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 20, 2017 | Non_departmental | $1,064,881.97 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Mar 8, 2018 | Non_departmental | $1,055,202.55 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
| Nov 30, 2017 | Non_departmental | $908,296.20 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Jun 6, 2018 | Non_departmental | $725,043.65 | FOUNDATIONS-PACKAGE 4 | PO SC50MSACO13123545M |
| Aug 14, 2017 | Non_departmental | $687,111.47 | 6TH ST VIADUCT DEMOLITION | PO SC50MSACO13123545M |
| May 15, 2018 | Non_departmental | $583,564.81 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO SC50MSACO13123545M |
FY 2017top 20 of 43 payments$48,529,285
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 26, 2017 | Appropriations to Special Purpose Fund | $9,271,945.52 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | PO GAE50CO13123545M |
| Sep 6, 2016 | Appropriations to Special Purpose Fund | $6,997,997.55 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Dec 20, 2016 | Appropriations to Special Purpose Fund | $3,968,338.51 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Jan 30, 2017 | Appropriations to Special Purpose Fund | $3,808,767.13 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Mar 8, 2017 | Appropriations to Special Purpose Fund | $3,730,359.05 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Jun 9, 2017 | Appropriations to Special Purpose Fund | $3,274,330.38 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Nov 16, 2016 | Appropriations to Special Purpose Fund | $3,138,356.13 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Apr 24, 2017 | Appropriations to Special Purpose Fund | $2,446,761.08 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Oct 5, 2016 | Appropriations to Special Purpose Fund | $1,800,565.02 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Dec 14, 2016 | Appropriations to Special Purpose Fund | $1,617,543.57 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Jan 20, 2017 | Appropriations to Special Purpose Fund | $1,539,646.91 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Apr 14, 2017 | Appropriations to Special Purpose Fund | $1,213,213.20 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| May 30, 2017 | Appropriations to Special Purpose Fund | $1,179,789.47 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Nov 16, 2016 | Appropriations to Special Purpose Fund | $745,792.73 | FOUNDATIONS-PACKAGE 4 | PO GAE50CO13123545M |
| Dec 14, 2016 | Appropriations to Special Purpose Fund | $544,285.85 | PACKAGE C CONSTRUCTION | PO GAE50CO13123545M |
| Oct 6, 2016 | Appropriations to Special Purpose Fund | $428,364.43 | PACKAGE C CONSTRUCTION | PO GAE50CO13123545M |
| Jan 4, 2017 | Appropriations to Special Purpose Fund | $333,637.15 | PACKAGE B CONSTRUCTION | PO GAE50CO13123545M |
| Jan 20, 2017 | Appropriations to Special Purpose Fund | $307,800.00 | STEEL ARCH SALVAGE FOR HISTORIC PRESERVATION | PO GAE50CO13123545M |
| Nov 16, 2016 | Appropriations to Special Purpose Fund | $292,630.00 | PACKAGE C CONSTRUCTION | PO GAE50CO13123545M |
| Jun 26, 2017 | Appropriations to Special Purpose Fund | $235,518.91 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | PO GAE50CO13123545M |
FY 2016top 20 of 46 payments$14,288,076
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 26, 2016 | Appropriations to Special Purpose Fund | $2,312,602.28 | 6TH ST VIADUCT DEMOLITION | PO GAE50CO13123545M |
| Feb 29, 2016 | Appropriations to Special Purpose Fund | $1,404,898.00 | PACKAGE B CONSTRUCTION | PO GAE50CO13123545M |
| Apr 15, 2016 | Appropriations to Special Purpose Fund | $1,178,273.79 | CONSTRUCTION OF TEST PILE | PO GAE50CO13123545M |
| Jul 16, 2015 | Appropriations to Special Purpose Fund | $1,047,468.07 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Dec 11, 2015 | Appropriations to Special Purpose Fund | $786,233.30 | PACKAGE B CONSTRUCTION | PO GAE50CO13123545M |
| Jul 17, 2015 | Appropriations to Special Purpose Fund | $601,457.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Sep 18, 2015 | Appropriations to Special Purpose Fund | $553,831.49 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Jul 16, 2015 | Appropriations to Special Purpose Fund | $534,381.09 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Sep 2, 2015 | Appropriations to Special Purpose Fund | $481,135.35 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Nov 30, 2015 | Appropriations to Special Purpose Fund | $445,256.59 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Jul 23, 2015 | Appropriations to Special Purpose Fund | $389,484.00 | SIXTH STREET VIADUCT INTERSECTION WORK | PO GAE50CO13123545M |
| Jul 16, 2015 | Appropriations to Special Purpose Fund | $369,413.03 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Dec 9, 2015 | Appropriations to Special Purpose Fund | $356,935.92 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Feb 18, 2016 | Appropriations to Special Purpose Fund | $298,212.39 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Jul 23, 2015 | Appropriations to Special Purpose Fund | $294,413.95 | SIXTH STREET VIADUCT INTERSECTION WORK | PO GAE50CO13123545M |
| Sep 2, 2015 | Appropriations to Special Purpose Fund | $289,616.60 | SIXTH STREET VIADUCT INTERSECTION WORK | PO GAE50CO13123545M |
| Nov 4, 2015 | Appropriations to Special Purpose Fund | $276,194.12 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Jul 23, 2015 | Appropriations to Special Purpose Fund | $255,532.78 | BIP-SIXTH S/LA S-1880 | PO GAE50CO13123545M |
| Jul 23, 2015 | Appropriations to Special Purpose Fund | $246,063.18 | SIXTH STREET VIADUCT INTERSECTION WORK | PO GAE50CO13123545M |
| Nov 30, 2015 | Appropriations to Special Purpose Fund | $240,741.40 | BIP-SIXTH S/LA S-1880 | PO GAE50CO13123545M |
FY 2015top 20 of 34 payments$3,092,373
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 21, 2015 | Appropriations to Special Purpose Fund | $554,545.26 | SSW CONSTRUCTION PACKAGE A | PO GAE50CO13123545M |
| Apr 21, 2015 | Appropriations to Special Purpose Fund | $498,689.46 | SSW CONSTRUCTION PACKAGE A | PO GAE50CO13123545M |
| Apr 21, 2015 | Appropriations to Special Purpose Fund | $274,741.56 | SSW CONSTRUCTION PACKAGE A | PO GAE50CO13123545M |
| Mar 26, 2015 | Appropriations to Special Purpose Fund | $154,415.33 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Oct 9, 2014 | Appropriations to Special Purpose Fund | $117,462.34 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Oct 2, 2014 | Appropriations to Special Purpose Fund | $114,480.80 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Aug 8, 2014 | Appropriations to Special Purpose Fund | $107,652.98 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Sep 4, 2014 | Appropriations to Special Purpose Fund | $107,652.48 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Sep 4, 2014 | Appropriations to Special Purpose Fund | $107,652.48 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Nov 4, 2014 | Appropriations to Special Purpose Fund | $100,741.68 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Dec 29, 2014 | Appropriations to Special Purpose Fund | $100,741.68 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Dec 3, 2014 | Appropriations to Special Purpose Fund | $100,741.68 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Dec 3, 2014 | Appropriations to Special Purpose Fund | $68,187.83 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Sep 4, 2014 | Appropriations to Special Purpose Fund | $62,311.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Sep 4, 2014 | Appropriations to Special Purpose Fund | $62,311.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Aug 8, 2014 | Appropriations to Special Purpose Fund | $62,310.82 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Nov 4, 2014 | Appropriations to Special Purpose Fund | $55,960.33 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Oct 2, 2014 | Appropriations to Special Purpose Fund | $54,598.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Mar 26, 2015 | Appropriations to Special Purpose Fund | $53,294.87 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Oct 9, 2014 | Appropriations to Special Purpose Fund | $51,160.33 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
FY 2014top 6 of 6 payments$1,044,416
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $505,778.09 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $289,198.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $107,652.48 | CONST. CONTRACT PE PHASE | PO GAE50CO13123545M |
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $65,528.91 | BIP-SIXTH S/LA S-1880 | PO GAE50CO13123545M |
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $62,311.00 | CONST. CONTRACT ROW PHASE | PO GAE50CO13123545M |
| Apr 16, 2014 | Appropriations to Special Purpose Fund | $13,947.52 | BIP-SIXTH S/LA S-1880 | PO GAE50CO13123545M |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jan 31, 2025 | Non_departmental | $26,268.06 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Jan 31, 2025 | Non_departmental | $139,626.19 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | EFT |
| Jul 17, 2024 | Non_departmental | $60,000.00 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | EFT |
| Jul 17, 2024 | Non_departmental | $38,310.25 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | EFT |
| Jul 15, 2024 | Non_departmental | $82,605.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Jul 15, 2024 | Non_departmental | $58,950.60 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| May 28, 2024 | Non_departmental | $2,772.50 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Apr 22, 2024 | Non_departmental | $5,250.00 | PACKAGE C CONSTRUCTION | EFT |
| Apr 4, 2024 | Non_departmental | $198,727.00 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | EFT |
| Apr 4, 2024 | Non_departmental | $268,629.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Feb 12, 2024 | Non_departmental | $94,170.20 | PACKAGE C CONSTRUCTION | EFT |
| Dec 27, 2023 | Non_departmental | $2,150,936.81 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Dec 27, 2023 | Non_departmental | $1,742,966.76 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Dec 27, 2023 | Non_departmental | $369,100.00 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| Dec 21, 2023 | Non_departmental | $6,322.40 | SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY | EFT |
| Dec 21, 2023 | Non_departmental | $4,000,000.00 | SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR | EFT |
| Dec 14, 2023 | Non_departmental | $600.10 | PACKAGE B CONSTRUCTION | EFT |
| Dec 13, 2023 | Non_departmental | $284,539.55 | PACKAGE D CONSTRUCTION | EFT |
| Dec 13, 2023 | Non_departmental | $92,832.80 | PACKAGE D FUNDED SCOPE | EFT |
| Dec 12, 2023 | Non_departmental | $729.68 | STEEL ARCH SALVAGE FOR HISTORIC PRESERVATION | EFT |
| Dec 11, 2023 | Non_departmental | $49,325.18 | 6TH ST VIADUCT DEMOLITION | EFT |
| Nov 15, 2023 | Non_departmental | $93,039.42 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| May 1, 2023 | Non_departmental | $326,277.64 | SIXTH STREET VIADUCT CONSTRUCTION | EFT |
| May 1, 2023 | Non_departmental | $838,757.96 | CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 | EFT |
| May 1, 2023 | Non_departmental | $10,646.15 | CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS | EFT |
Other vendors serving Non_departmental
- Voya Holdings, Inc. $2,961,390,236
- Southern California Permanente Medical Group $1,777,333,480
- Blue Cross of California $1,144,613,651
- U S Bank Trust N a $269,356,884
- Browning-Ferris Industries of California Inc $255,037,189
- Standard Insurance Company $189,312,135
- USA Waste of California Inc $166,113,009
- Murray Plumbing and Heating Corp. $162,890,669
- Delta Dental of California $162,661,117
- Kiewit Infrastructure West Co $147,009,312
VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data