Skanska Stacy and Witbeck a Joint Venture is the 41st-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5 spending. Its payments amount to 2.2% of everything the Non_departmental has paid vendors in that span. Payments to it fell 95.7% year over year.

Primary spending category: CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5

$361,517,034total received
405payments
2agencies
Apr 16, 2014Jan 31, 2025first / last payment
Follow this vendorGet an email when Los Angeles publishes new payments to Skanska Stacy and Witbeck a Joint Venture. No spam.

Payments by fiscal year

FY 2025$405,760
FY 2024$9,359,941
FY 2023$48,601,317
FY 2022$63,263,568
FY 2021$74,294,689
FY 2020$25,323,551
FY 2019$30,348,225
FY 2018$42,965,831
FY 2017$48,529,285
FY 2016$14,288,076
FY 2015$3,092,373
FY 2014$1,044,416

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Non_departmental6$405,760
FY 2024Non_departmental16$9,359,941
FY 2023Non_departmental30$48,601,317
FY 2022Non_departmental37$63,263,568
FY 2021Non_departmental26$74,294,689
FY 2020Non_departmental33$25,323,551
FY 2019Non_departmental57$30,348,225
FY 2018Non_departmental71$42,965,831
FY 2017Appropriations to Special Purpose Fund43$48,529,285
FY 2016Appropriations to Special Purpose Fund46$14,288,076
FY 2015Appropriations to Special Purpose Fund34$3,092,373
FY 2014Appropriations to Special Purpose Fund6$1,044,416
Total405$361,517,034

What the payments were for

Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
PARC CONTAMINATED SOIL REMEDIATION1$845,200Oct 18, 2022 Oct 18, 2022
PROJECT DETOUR PLAN INTERSECTION WORK14$790,498Sep 22, 2015 May 3, 2018
CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTS73$7,074,519Jun 26, 2017 Jan 31, 2025
CONST. CONTRACT PE PHASE33$6,673,258Apr 16, 2014 May 3, 2018
SIXTH STREET VIADUCT CONSTRUCTION2$580,228Mar 3, 2023 May 1, 2023
PACKAGE D CONSTRUCTION21$5,690,791Jun 14, 2017 Dec 13, 2023
SIX STREET VIADUCT FUNDING-SACO8$51,358,529Sep 23, 2020 Apr 25, 2022
BSS REPLACEMENT YARD PROJECT1$500,000Mar 20, 2020 Mar 20, 2020
PACKAGE B CONSTRUCTION9$3,441,734Dec 11, 2015 Dec 14, 2023
STEEL ARCH SALVAGE FOR HISTORIC PRESERVATION3$324,000Jan 20, 2017 Dec 12, 2023
SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTR4$28,641,471Feb 1, 2022 Dec 21, 2023
6TH ST VIADUCT DEMOLITION39$25,526,921May 26, 2016 Dec 11, 2023
FOUNDATIONS-PACKAGE 424$25,282,359Nov 16, 2016 Feb 17, 2023
SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCY8$2,145,534Oct 8, 2021 Jul 17, 2024
CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 580$191,684,859Jun 26, 2017 Jan 31, 2025
PACKAGE C CONSTRUCTION11$1,888,654Oct 6, 2016 Apr 22, 2024
PACKAGE D FUNDED SCOPE10$1,856,656Jun 14, 2017 Dec 13, 2023
CONST. CONTRACT ROW PHASE15$1,628,024Apr 16, 2014 Nov 4, 2015
SSW CONSTRUCTION PACKAGE A10$1,590,466Apr 21, 2015 May 3, 2018
BIP-SIXTH S/LA S-188030$1,419,138Apr 16, 2014 May 3, 2018
SIXTH STREET VIADUCT INTERSECTION WORK5$1,300,000Jul 23, 2015 Apr 4, 2016
CONSTRUCTION OF TEST PILE4$1,274,196Apr 15, 2016 May 4, 2018

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 6 of 6 payments$405,760
DateAgencyAmountCategoryPurchase order
Jan 31, 2025Non_departmental$139,626.19CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Jul 15, 2024Non_departmental$82,605.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 17, 2024Non_departmental$60,000.00SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
Jul 15, 2024Non_departmental$58,950.60CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 17, 2024Non_departmental$38,310.25CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Jan 31, 2025Non_departmental$26,268.06CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
FY 2024top 16 of 16 payments$9,359,941
DateAgencyAmountCategoryPurchase order
Dec 21, 2023Non_departmental$4,000,000.00SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTRPO SC50MSACO13123545M
Dec 27, 2023Non_departmental$2,150,936.81CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 27, 2023Non_departmental$1,742,966.76CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 27, 2023Non_departmental$369,100.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 13, 2023Non_departmental$284,539.55PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Apr 4, 2024Non_departmental$268,629.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 4, 2024Non_departmental$198,727.00SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
Feb 12, 2024Non_departmental$94,170.20PACKAGE C CONSTRUCTIONPO SC50MSACO13123545M
Nov 15, 2023Non_departmental$93,039.42CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 13, 2023Non_departmental$92,832.80PACKAGE D FUNDED SCOPEPO SC50MSACO13123545M
Dec 11, 2023Non_departmental$49,325.186TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
Dec 21, 2023Non_departmental$6,322.40SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
Apr 22, 2024Non_departmental$5,250.00PACKAGE C CONSTRUCTIONPO SC50MSACO13123545M
May 28, 2024Non_departmental$2,772.50CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 12, 2023Non_departmental$729.68STEEL ARCH SALVAGE FOR HISTORIC PRESERVATIONPO SC50MSACO13123545M
Dec 14, 2023Non_departmental$600.10PACKAGE B CONSTRUCTIONPO SC50MSACO13123545M
FY 2023top 20 of 30 payments$48,601,317
DateAgencyAmountCategoryPurchase order
Sep 29, 2022Non_departmental$19,000,000.00SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTRPO SC50MSACO13123545M
Jul 25, 2022Non_departmental$7,173,161.87CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 17, 2022Non_departmental$6,670,009.82CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Sep 29, 2022Non_departmental$2,700,005.41CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 18, 2022Non_departmental$1,937,628.47CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 2, 2023Non_departmental$1,057,754.36CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 5, 2022Non_departmental$1,049,282.27CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 18, 2022Non_departmental$1,010,026.23CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Aug 18, 2022Non_departmental$975,018.71CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Aug 4, 2022Non_departmental$925,716.866TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
Oct 18, 2022Non_departmental$855,015.13SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
Oct 18, 2022Non_departmental$845,200.00PARC CONTAMINATED SOIL REMEDIATIONPO SC50MSACO13123545M
May 1, 2023Non_departmental$838,757.96CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 17, 2023Non_departmental$805,056.00FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Sep 23, 2022Non_departmental$651,448.32CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 3, 2023Non_departmental$486,680.20SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
May 1, 2023Non_departmental$326,277.64SIXTH STREET VIADUCT CONSTRUCTIONPO SC50MSACO13123545M
Mar 3, 2023Non_departmental$253,950.56SIXTH STREET VIADUCT CONSTRUCTIONPO SC50MSACO13123545M
Oct 18, 2022Non_departmental$215,831.00SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYPO SC50MSACO13123545M
Nov 7, 2022Non_departmental$209,778.006TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
FY 2022top 20 of 37 payments$63,263,568
DateAgencyAmountCategoryPurchase order
Dec 17, 2021Non_departmental$7,577,809.75CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
May 17, 2022Non_departmental$6,355,020.71CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 25, 2022Non_departmental$5,625,437.63CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 15, 2022Non_departmental$5,285,855.83CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jun 17, 2022Non_departmental$5,111,462.87CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 25, 2022Non_departmental$4,340,503.74SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTRPO SC50MSACO13123545M
Feb 1, 2022Non_departmental$4,065,234.98CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 15, 2022Non_departmental$3,143,856.37CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Sep 3, 2021Non_departmental$2,749,480.55CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 8, 2021Non_departmental$2,554,968.45CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 15, 2021Non_departmental$2,521,494.86CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 20, 2021Non_departmental$2,476,393.59CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 21, 2021Non_departmental$2,292,177.19SIX STREET VIADUCT FUNDING-SACOPO SC50MSACO13123545M
Nov 17, 2021Non_departmental$2,243,407.46SIX STREET VIADUCT FUNDING-SACOPO SC50MSACO13123545M
Aug 13, 2021Non_departmental$2,055,980.58CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 1, 2022Non_departmental$1,300,967.57SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTRPO SC50MSACO13123545M
Feb 1, 2022Non_departmental$1,125,326.37SIX STREET VIADUCT FUNDING-SACOPO SC50MSACO13123545M
Aug 3, 2021Non_departmental$1,103,315.13FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Mar 16, 2022Non_departmental$326,460.79CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
May 17, 2022Non_departmental$231,198.78CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
FY 2021top 20 of 26 payments$74,294,689
DateAgencyAmountCategoryPurchase order
Sep 23, 2020Non_departmental$40,000,003.82SIX STREET VIADUCT FUNDING-SACOPO SC50MSACO13123545M
Jun 15, 2021Non_departmental$5,557,017.83SIX STREET VIADUCT FUNDING-SACOPO SC50MSACO13123545M
Jan 22, 2021Non_departmental$3,453,569.32CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 14, 2020Non_departmental$3,268,381.96CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 20, 2020Non_departmental$3,147,886.82CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 5, 2020Non_departmental$2,910,928.44CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 18, 2020Non_departmental$2,382,882.46CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Sep 3, 2020Non_departmental$2,382,257.83CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 15, 2021Non_departmental$2,330,737.77CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 12, 2021Non_departmental$1,826,100.45CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jun 15, 2021Non_departmental$1,800,949.70CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 24, 2021Non_departmental$1,698,123.09CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
May 19, 2021Non_departmental$1,643,105.30CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 10, 2020Non_departmental$1,510,619.32CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jan 22, 2021Non_departmental$46,540.97CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Aug 18, 2020Non_departmental$44,045.35CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Nov 24, 2020Non_departmental$42,421.53CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Oct 5, 2020Non_departmental$39,228.24CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Dec 22, 2020Non_departmental$32,112.19CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Sep 3, 2020Non_departmental$32,103.77CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
FY 2020top 20 of 33 payments$25,323,551
DateAgencyAmountCategoryPurchase order
Dec 26, 2019Non_departmental$4,519,613.95CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jun 11, 2020Non_departmental$4,115,187.31CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 12, 2019Non_departmental$2,976,599.08CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 25, 2019Non_departmental$2,882,803.91CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
May 14, 2020Non_departmental$2,170,691.26CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 2, 2020Non_departmental$1,837,046.78CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 14, 2019Non_departmental$1,560,033.91CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 1, 2020Non_departmental$1,262,418.61CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 13, 2019Non_departmental$1,053,101.83CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Sep 13, 2019Non_departmental$774,879.06CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 2, 2020Non_departmental$673,683.22CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 20, 2020Non_departmental$500,000.00BSS REPLACEMENT YARD PROJECTPO SC50MSACO13123545M
Oct 25, 2019Non_departmental$234,585.27CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Jan 9, 2020Non_departmental$178,450.00PACKAGE B CONSTRUCTIONPO SC50MSACO13123545M
Nov 27, 2019Non_departmental$95,116.806TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
Sep 9, 2019Non_departmental$70,607.80PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Mar 17, 2020Non_departmental$62,000.80FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Jun 11, 2020Non_departmental$55,457.06CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Dec 26, 2019Non_departmental$43,763.75CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Jan 24, 2020Non_departmental$43,743.70PACKAGE D FUNDED SCOPEPO SC50MSACO13123545M
FY 2019top 20 of 57 payments$30,348,225
DateAgencyAmountCategoryPurchase order
Sep 14, 2018Non_departmental$6,742,320.36CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 15, 2018Non_departmental$3,207,854.42CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 13, 2018Non_departmental$2,765,414.54CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 14, 2018Non_departmental$2,764,792.88CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 15, 2018Non_departmental$2,736,214.17PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Oct 18, 2018Non_departmental$1,813,931.67CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 22, 2019Non_departmental$1,399,382.63CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 27, 2019Non_departmental$1,259,831.30CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Oct 18, 2018Non_departmental$1,045,775.716TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
Jan 14, 2019Non_departmental$1,004,445.40CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Aug 15, 2018Non_departmental$914,621.96PACKAGE D FUNDED SCOPEPO SC50MSACO13123545M
Jul 9, 2018Non_departmental$772,962.15CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jun 24, 2019Non_departmental$686,919.50CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
May 17, 2019Non_departmental$604,749.98CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 17, 2018Non_departmental$589,552.05PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Oct 16, 2018Non_departmental$272,891.29PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Jul 17, 2018Non_departmental$252,242.10FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Sep 14, 2018Non_departmental$251,183.19PACKAGE D CONSTRUCTIONPO SC50MSACO13123545M
Jul 17, 2018Non_departmental$194,256.00PACKAGE D FUNDED SCOPEPO SC50MSACO13123545M
Oct 16, 2018Non_departmental$186,684.60PACKAGE B CONSTRUCTIONPO SC50MSACO13123545M
FY 2018top 20 of 71 payments$42,965,831
DateAgencyAmountCategoryPurchase order
Aug 8, 2017Non_departmental$7,332,190.35CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jan 18, 2018Non_departmental$6,244,960.54CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Apr 18, 2018Non_departmental$3,512,963.74CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Feb 6, 2018Non_departmental$2,134,185.18CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 13, 2017Non_departmental$1,909,102.32CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Dec 13, 2017Non_departmental$1,896,144.42CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jun 11, 2018Non_departmental$1,419,910.63CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jan 18, 2018Non_departmental$1,400,075.97CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO SC50MSACO13123545M
Feb 6, 2018Non_departmental$1,393,313.34FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Jul 24, 2017Non_departmental$1,328,855.06FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Mar 7, 2018Non_departmental$1,271,115.10FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Sep 14, 2017Non_departmental$1,206,251.18CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Jul 24, 2017Non_departmental$1,162,326.88CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 20, 2017Non_departmental$1,075,653.88CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 20, 2017Non_departmental$1,064,881.97CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Mar 8, 2018Non_departmental$1,055,202.55CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
Nov 30, 2017Non_departmental$908,296.20FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Jun 6, 2018Non_departmental$725,043.65FOUNDATIONS-PACKAGE 4PO SC50MSACO13123545M
Aug 14, 2017Non_departmental$687,111.476TH ST VIADUCT DEMOLITIONPO SC50MSACO13123545M
May 15, 2018Non_departmental$583,564.81CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO SC50MSACO13123545M
FY 2017top 20 of 43 payments$48,529,285
DateAgencyAmountCategoryPurchase order
Jun 26, 2017Appropriations to Special Purpose Fund$9,271,945.52CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5PO GAE50CO13123545M
Sep 6, 2016Appropriations to Special Purpose Fund$6,997,997.556TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Dec 20, 2016Appropriations to Special Purpose Fund$3,968,338.516TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Jan 30, 2017Appropriations to Special Purpose Fund$3,808,767.13FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Mar 8, 2017Appropriations to Special Purpose Fund$3,730,359.05FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Jun 9, 2017Appropriations to Special Purpose Fund$3,274,330.38FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Nov 16, 2016Appropriations to Special Purpose Fund$3,138,356.136TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Apr 24, 2017Appropriations to Special Purpose Fund$2,446,761.08FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Oct 5, 2016Appropriations to Special Purpose Fund$1,800,565.026TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Dec 14, 2016Appropriations to Special Purpose Fund$1,617,543.57FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Jan 20, 2017Appropriations to Special Purpose Fund$1,539,646.916TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Apr 14, 2017Appropriations to Special Purpose Fund$1,213,213.206TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
May 30, 2017Appropriations to Special Purpose Fund$1,179,789.476TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Nov 16, 2016Appropriations to Special Purpose Fund$745,792.73FOUNDATIONS-PACKAGE 4PO GAE50CO13123545M
Dec 14, 2016Appropriations to Special Purpose Fund$544,285.85PACKAGE C CONSTRUCTIONPO GAE50CO13123545M
Oct 6, 2016Appropriations to Special Purpose Fund$428,364.43PACKAGE C CONSTRUCTIONPO GAE50CO13123545M
Jan 4, 2017Appropriations to Special Purpose Fund$333,637.15PACKAGE B CONSTRUCTIONPO GAE50CO13123545M
Jan 20, 2017Appropriations to Special Purpose Fund$307,800.00STEEL ARCH SALVAGE FOR HISTORIC PRESERVATIONPO GAE50CO13123545M
Nov 16, 2016Appropriations to Special Purpose Fund$292,630.00PACKAGE C CONSTRUCTIONPO GAE50CO13123545M
Jun 26, 2017Appropriations to Special Purpose Fund$235,518.91CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSPO GAE50CO13123545M
FY 2016top 20 of 46 payments$14,288,076
DateAgencyAmountCategoryPurchase order
May 26, 2016Appropriations to Special Purpose Fund$2,312,602.286TH ST VIADUCT DEMOLITIONPO GAE50CO13123545M
Feb 29, 2016Appropriations to Special Purpose Fund$1,404,898.00PACKAGE B CONSTRUCTIONPO GAE50CO13123545M
Apr 15, 2016Appropriations to Special Purpose Fund$1,178,273.79CONSTRUCTION OF TEST PILEPO GAE50CO13123545M
Jul 16, 2015Appropriations to Special Purpose Fund$1,047,468.07CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Dec 11, 2015Appropriations to Special Purpose Fund$786,233.30PACKAGE B CONSTRUCTIONPO GAE50CO13123545M
Jul 17, 2015Appropriations to Special Purpose Fund$601,457.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Sep 18, 2015Appropriations to Special Purpose Fund$553,831.49CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Jul 16, 2015Appropriations to Special Purpose Fund$534,381.09CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Sep 2, 2015Appropriations to Special Purpose Fund$481,135.35CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Nov 30, 2015Appropriations to Special Purpose Fund$445,256.59CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Jul 23, 2015Appropriations to Special Purpose Fund$389,484.00SIXTH STREET VIADUCT INTERSECTION WORKPO GAE50CO13123545M
Jul 16, 2015Appropriations to Special Purpose Fund$369,413.03CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Dec 9, 2015Appropriations to Special Purpose Fund$356,935.92CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Feb 18, 2016Appropriations to Special Purpose Fund$298,212.39CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Jul 23, 2015Appropriations to Special Purpose Fund$294,413.95SIXTH STREET VIADUCT INTERSECTION WORKPO GAE50CO13123545M
Sep 2, 2015Appropriations to Special Purpose Fund$289,616.60SIXTH STREET VIADUCT INTERSECTION WORKPO GAE50CO13123545M
Nov 4, 2015Appropriations to Special Purpose Fund$276,194.12CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Jul 23, 2015Appropriations to Special Purpose Fund$255,532.78BIP-SIXTH S/LA S-1880PO GAE50CO13123545M
Jul 23, 2015Appropriations to Special Purpose Fund$246,063.18SIXTH STREET VIADUCT INTERSECTION WORKPO GAE50CO13123545M
Nov 30, 2015Appropriations to Special Purpose Fund$240,741.40BIP-SIXTH S/LA S-1880PO GAE50CO13123545M
FY 2015top 20 of 34 payments$3,092,373
DateAgencyAmountCategoryPurchase order
Apr 21, 2015Appropriations to Special Purpose Fund$554,545.26SSW CONSTRUCTION PACKAGE APO GAE50CO13123545M
Apr 21, 2015Appropriations to Special Purpose Fund$498,689.46SSW CONSTRUCTION PACKAGE APO GAE50CO13123545M
Apr 21, 2015Appropriations to Special Purpose Fund$274,741.56SSW CONSTRUCTION PACKAGE APO GAE50CO13123545M
Mar 26, 2015Appropriations to Special Purpose Fund$154,415.33CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Oct 9, 2014Appropriations to Special Purpose Fund$117,462.34CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Oct 2, 2014Appropriations to Special Purpose Fund$114,480.80CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Aug 8, 2014Appropriations to Special Purpose Fund$107,652.98CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Sep 4, 2014Appropriations to Special Purpose Fund$107,652.48CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Sep 4, 2014Appropriations to Special Purpose Fund$107,652.48CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Nov 4, 2014Appropriations to Special Purpose Fund$100,741.68CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Dec 29, 2014Appropriations to Special Purpose Fund$100,741.68CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Dec 3, 2014Appropriations to Special Purpose Fund$100,741.68CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Dec 3, 2014Appropriations to Special Purpose Fund$68,187.83CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Sep 4, 2014Appropriations to Special Purpose Fund$62,311.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Sep 4, 2014Appropriations to Special Purpose Fund$62,311.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Aug 8, 2014Appropriations to Special Purpose Fund$62,310.82CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Nov 4, 2014Appropriations to Special Purpose Fund$55,960.33CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Oct 2, 2014Appropriations to Special Purpose Fund$54,598.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Mar 26, 2015Appropriations to Special Purpose Fund$53,294.87CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Oct 9, 2014Appropriations to Special Purpose Fund$51,160.33CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
FY 2014top 6 of 6 payments$1,044,416
DateAgencyAmountCategoryPurchase order
Apr 16, 2014Appropriations to Special Purpose Fund$505,778.09CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Apr 16, 2014Appropriations to Special Purpose Fund$289,198.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Apr 16, 2014Appropriations to Special Purpose Fund$107,652.48CONST. CONTRACT PE PHASEPO GAE50CO13123545M
Apr 16, 2014Appropriations to Special Purpose Fund$65,528.91BIP-SIXTH S/LA S-1880PO GAE50CO13123545M
Apr 16, 2014Appropriations to Special Purpose Fund$62,311.00CONST. CONTRACT ROW PHASEPO GAE50CO13123545M
Apr 16, 2014Appropriations to Special Purpose Fund$13,947.52BIP-SIXTH S/LA S-1880PO GAE50CO13123545M

Recent payments

DateAgencyAmountCategoryMethod
Jan 31, 2025Non_departmental$26,268.06CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Jan 31, 2025Non_departmental$139,626.19CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSEFT
Jul 17, 2024Non_departmental$60,000.00SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYEFT
Jul 17, 2024Non_departmental$38,310.25CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSEFT
Jul 15, 2024Non_departmental$82,605.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Jul 15, 2024Non_departmental$58,950.60CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
May 28, 2024Non_departmental$2,772.50CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Apr 22, 2024Non_departmental$5,250.00PACKAGE C CONSTRUCTIONEFT
Apr 4, 2024Non_departmental$198,727.00SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYEFT
Apr 4, 2024Non_departmental$268,629.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Feb 12, 2024Non_departmental$94,170.20PACKAGE C CONSTRUCTIONEFT
Dec 27, 2023Non_departmental$2,150,936.81CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Dec 27, 2023Non_departmental$1,742,966.76CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Dec 27, 2023Non_departmental$369,100.00CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
Dec 21, 2023Non_departmental$6,322.40SIXTH STREET VIADUCT PACKAGE 5 CONTINGENCYEFT
Dec 21, 2023Non_departmental$4,000,000.00SIXTH STREET VIADUCT-REPLACEMENT PROJECT-SUPPLEMENTAL CONSTREFT
Dec 14, 2023Non_departmental$600.10PACKAGE B CONSTRUCTIONEFT
Dec 13, 2023Non_departmental$284,539.55PACKAGE D CONSTRUCTIONEFT
Dec 13, 2023Non_departmental$92,832.80PACKAGE D FUNDED SCOPEEFT
Dec 12, 2023Non_departmental$729.68STEEL ARCH SALVAGE FOR HISTORIC PRESERVATIONEFT
Dec 11, 2023Non_departmental$49,325.186TH ST VIADUCT DEMOLITIONEFT
Nov 15, 2023Non_departmental$93,039.42CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
May 1, 2023Non_departmental$326,277.64SIXTH STREET VIADUCT CONSTRUCTIONEFT
May 1, 2023Non_departmental$838,757.96CONSTRUCTION OF NEW 6TH ST VIADUCT-PACKAGE 5EFT
May 1, 2023Non_departmental$10,646.15CONSTRUCTION UNFORESEEN TUNNEL ARCH ELEMENTSEFT

Other vendors serving Non_departmental

VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data