Kiewit Infrastructure West Co: Los Angeles Government Payments
as recorded by Los Angeles: KIEWIT INFRASTRUCTURE WEST CO
Kiewit Infrastructure West Co is the 103rd-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in BALLONA CREEK TMDL PROJECT spending. Its payments amount to 1.1% of everything the Non_departmental has paid vendors in that span. Payments to it rose 114.6% year over year.
Primary spending category: BALLONA CREEK TMDL PROJECT
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2025 | Non_departmental | 89 | $50,760,998 |
| FY 2024 | Non_departmental | 60 | $23,658,449 |
| FY 2023 | Non_departmental | 21 | $5,804,296 |
| FY 2022 | Non_departmental | 26 | $3,972,623 |
| FY 2021 | Non_departmental | 42 | $12,568,907 |
| FY 2020 | Non_departmental | 77 | $22,265,233 |
| FY 2019 | Non_departmental | 64 | $22,914,140 |
| FY 2019 | Airports | 1 | $2,000,000 |
| FY 2018 | Water and Power | 1 | $9,239,392 |
| FY 2018 | Non_departmental | 34 | $5,064,667 |
| FY 2017 | Appropriations to Special Purpose Fund | 51 | $6,904,101 |
| FY 2017 | Capital Improvement Expense Program | 2 | $197,000 |
| FY 2016 | Appropriations to Special Purpose Fund | 60 | $17,561,287 |
| FY 2016 | Capital Improvement Expense Program | 5 | $473,376 |
| FY 2015 | Appropriations to Special Purpose Fund | 25 | $3,604,101 |
| Total | 558 | $186,988,571 |
What the payments were for
Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| DCT AWPF JAPANESE GARDEN LAKE EFFLUENT BYPASS | 2 | $991,869 | May 22, 2025 – Jun 5, 2025 |
| HTP EPP HEADER REPL | 32 | $9,668,327 | Feb 13, 2015 – Jan 31, 2020 |
| PP WEST LA YARD GEN REPL | 2 | $95,000 | Jan 24, 2019 – Feb 4, 2022 |
| LCIS REHAB BLACKWELDER TO OLYMPIC | 10 | $9,241,000 | Dec 20, 2017 – Nov 9, 2018 |
| WATER REVENUE FUND | 1 | $9,239,392 | Jul 31, 2017 – Jul 31, 2017 |
| HWRP AQUEOUS AMMONIA STORAGE AND CONTAINMENT ENHANCEMENTS | 6 | $836,851 | Oct 18, 2019 – Feb 11, 2020 |
| BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | 23 | $7,830,555 | May 20, 2024 – Jun 12, 2025 |
| BALLONA CREEK LOW FLOW TREATMENT FACILITY | 16 | $7,695,486 | Feb 23, 2023 – Mar 28, 2024 |
| HTP PRIMARY INFLUENT GATES REPL | 10 | $743,162 | Aug 6, 2015 – Apr 22, 2016 |
| PP 632 SUNSET GENERATOR REPLACEMENT | 7 | $716,673 | Jan 24, 2019 – Feb 4, 2022 |
| HWRP HIR EMERGENCY ELECTRICAL FEEDER REHABILITATION | 23 | $6,797,973 | Oct 5, 2023 – Jun 3, 2025 |
| DCT PRIMARY & SECONDARY TANK GUARDRAILS | 10 | $674,877 | Jul 27, 2017 – Aug 14, 2020 |
| HWRP DIGESTER CORROSION REHAB | 24 | $6,512,974 | Feb 26, 2019 – Sep 30, 2024 |
| 1680 SUNSET PLAZA DRIVE STREET REPAIRS | 1 | $613,000 | Oct 21, 2016 – Oct 21, 2016 |
| SIDEWALK REPAIR | 5 | $473,376 | Jul 15, 2015 – Sep 4, 2015 |
| HTP G ST PIPE RACK STRCT REHAB | 23 | $4,656,800 | Jul 29, 2014 – Jun 20, 2017 |
| PP NORTH YARD GENERATOR REPLACEMENT | 3 | $463,674 | Jan 24, 2019 – Feb 4, 2022 |
| LAG PRIMARY & SECONDARY TANK GUARDRAILS | 3 | $44,792 | Oct 11, 2019 – Oct 29, 2019 |
| DCT SCREW PUMP INLET GATE REHABILITATION | 13 | $4,231,793 | Feb 27, 2024 – Jun 5, 2025 |
| DCT CHLORINE CONTACT TANK GATE ACTUATORS | 6 | $400,277 | Jul 19, 2017 – Oct 18, 2019 |
| HTP FLARES SYSTEM UPGRADE | 28 | $4,002,137 | Oct 7, 2014 – Feb 7, 2017 |
| HWRP SEC CLARIF MODULES 1-5 UPGD | 11 | $3,817,000 | Jan 23, 2019 – Sep 13, 2019 |
| DCT SCREW PUMPS INST & UPGRD | 9 | $3,374,843 | Nov 13, 2015 – Aug 23, 2016 |
| DCT CHLORINE TANK GATE ACTUAT | 3 | $300,000 | Mar 21, 2017 – Jul 19, 2017 |
| PP 624 ROSCOMARE GENERATOR REPLACEMENT | 4 | $28,656 | Apr 15, 2020 – Feb 4, 2022 |
| HTP IPS SCREW PUMPS REHAB | 21 | $2,828,934 | Nov 20, 2015 – Nov 21, 2017 |
| DCT SCREW PUMPS INST & UPGR | 18 | $2,822,544 | Aug 23, 2016 – Dec 3, 2018 |
| PP 654 BALLONA CREEK GENERATOR REPLACEMENT | 13 | $2,727,711 | Aug 13, 2018 – Mar 15, 2022 |
| PP 648 THOMPSON YARD GENERATOR REPLACEMENT | 6 | $269,768 | Jan 24, 2019 – Feb 4, 2022 |
| CONSTRUCTION SERVICES CONTRACT (CISCO) | 2 | $26,033 | Oct 18, 2019 – Aug 14, 2020 |
| PP 638 PALISADES GENERATOR REPLACEMENT | 7 | $257,000 | Jan 24, 2019 – Feb 4, 2022 |
| LAG PRIMARY AND SECONDARY TANK GUARDRAILS | 1 | $224,000 | Oct 10, 2018 – Oct 10, 2018 |
| HWRP AQ AMMONIA STOR AND CONT | 7 | $2,125,000 | Feb 26, 2019 – Oct 18, 2019 |
| DCT PRIM & SEC TNK GUARDRAILS | 2 | $211,650 | Oct 18, 2016 – Nov 14, 2016 |
| DCT EMERGENCY BACKUP POWER | 13 | $2,068,199 | Feb 27, 2024 – Jun 5, 2025 |
| SUPPLIES AND OTHER SERVICES | 1 | $2,000,000 | Oct 4, 2018 – Oct 4, 2018 |
| 1680 SUNSET PLAZA DRIVE EMERGENCY BULKHEAD | 2 | $197,000 | Oct 21, 2016 – Nov 4, 2016 |
| HWRP FLARES SYSTEM UPGRADE | 2 | $189,456 | Nov 20, 2017 – Sep 16, 2019 |
| BALLONA CREEK TMDL PROJECT | 22 | $18,694,993 | Jun 1, 2023 – Jun 10, 2025 |
| DCT AVORS & EVIS GATES REPLACEMENT | 26 | $18,541,657 | Feb 27, 2024 – Jun 5, 2025 |
| HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | 41 | $18,461,876 | Sep 13, 2019 – Apr 17, 2023 |
| LAG PRIM SEC TANK GUARD RAILS | 3 | $176,000 | Dec 29, 2016 – Jun 26, 2017 |
| LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | 21 | $14,027,109 | Nov 9, 2018 – Mar 3, 2022 |
| PP 616 CAHUENGA GENERATOR REPLACEMENT | 2 | $14,000 | Apr 15, 2020 – Feb 4, 2022 |
| HWRP SERVICE WATER FAC IMPROVEMENTS | 5 | $139,460 | Aug 17, 2021 – May 11, 2023 |
| HWRP SERVICE WATER FAC FLOW IMPROVEMENTS | 6 | $1,382,667 | Sep 22, 2020 – Aug 17, 2021 |
| HWRP IPS SCREW PUMPS INS & UPG | 2 | $133,008 | Nov 21, 2017 – Feb 5, 2018 |
| VISTA DEL MAR EMERGENCY REPAIR | 2 | $132,521 | Oct 23, 2018 – Oct 26, 2018 |
| CONCRETE STREETS | 10 | $1,129,992 | May 20, 2020 – Sep 22, 2020 |
| BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | 19 | $11,200,221 | Jul 13, 2023 – Jun 12, 2025 |
| PP624 ROSCOMARE GEN REPL | 2 | $112,000 | Jan 24, 2019 – Apr 15, 2020 |
| PP616 CAHUENGA GEN REPL | 3 | $110,000 | Jan 24, 2019 – Apr 15, 2020 |
| DCT GRIT CHAMBER FLUSH SYSTEM | 9 | $1,095,638 | Jul 24, 2017 – Apr 24, 2019 |
| HWRP SERVICE WATER FAC FLOW IMPROVEMENT | 7 | $1,072,727 | Mar 12, 2020 – Sep 22, 2020 |
| SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | 5 | $1,066,920 | Feb 23, 2023 – May 26, 2023 |
| DCT GRIT CHAMBER FLUSH SYS | 3 | $100,000 | Apr 12, 2017 – Jul 24, 2017 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 20 of 89 payments$50,760,998
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 14, 2024 | Non_departmental | $3,580,401.96 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Jan 27, 2025 | Non_departmental | $2,685,528.55 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Nov 7, 2024 | Non_departmental | $2,198,518.32 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO23141620K |
| Dec 19, 2024 | Non_departmental | $1,868,493.27 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO23141620K |
| Jan 27, 2025 | Non_departmental | $1,772,144.25 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | PO SC50CO24141620K |
| Nov 14, 2024 | Non_departmental | $1,700,000.00 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| May 14, 2025 | Non_departmental | $1,634,176.30 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Jul 31, 2024 | Non_departmental | $1,624,500.05 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Dec 19, 2024 | Non_departmental | $1,583,340.18 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Jan 17, 2025 | Non_departmental | $1,523,483.92 | HWRP HIR EMERGENCY ELECTRICAL FEEDER REHABILITATION | PO SC50CO19130181K |
| Jun 10, 2025 | Non_departmental | $1,466,253.14 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| May 7, 2025 | Non_departmental | $1,450,514.82 | DCT SCREW PUMP INLET GATE REHABILITATION | PO SC50CO24143308K |
| Oct 16, 2024 | Non_departmental | $1,267,467.69 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | PO SC50CO24141620K |
| Sep 10, 2024 | Non_departmental | $1,246,346.83 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Mar 4, 2025 | Non_departmental | $1,218,357.90 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Dec 16, 2024 | Non_departmental | $1,171,107.53 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Apr 30, 2025 | Non_departmental | $1,158,960.65 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Aug 22, 2024 | Non_departmental | $1,110,786.80 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Jun 5, 2025 | Non_departmental | $1,080,792.85 | DCT SCREW PUMP INLET GATE REHABILITATION | PO SC50CO24143308K |
| Feb 12, 2025 | Non_departmental | $996,583.97 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
FY 2024top 20 of 60 payments$23,658,449
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 11, 2024 | Non_departmental | $1,929,985.19 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Oct 20, 2023 | Non_departmental | $1,439,430.66 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Sep 29, 2023 | Non_departmental | $1,378,593.84 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Jun 13, 2024 | Non_departmental | $1,241,410.60 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO24141620K |
| Jun 13, 2024 | Non_departmental | $1,214,374.22 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO24141620K |
| Jun 20, 2024 | Non_departmental | $1,213,622.87 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Apr 22, 2024 | Non_departmental | $1,034,799.13 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| May 20, 2024 | Non_departmental | $935,992.92 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO24141620K |
| Feb 29, 2024 | Non_departmental | $902,498.65 | DCT EMERGENCY BACKUP POWER | PO SC50CO24143308K |
| Feb 29, 2024 | Non_departmental | $857,374.56 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| May 2, 2024 | Non_departmental | $829,127.60 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Mar 6, 2024 | Non_departmental | $827,297.27 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| May 16, 2024 | Non_departmental | $740,399.31 | DCT AVORS & EVIS GATES REPLACEMENT | PO SC50CO24143308K |
| Oct 4, 2023 | Non_departmental | $702,597.51 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO23141620K |
| Apr 18, 2024 | Non_departmental | $604,118.25 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Mar 26, 2024 | Non_departmental | $513,342.92 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Apr 18, 2024 | Non_departmental | $500,526.51 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO24141620K |
| Jun 4, 2024 | Non_departmental | $498,803.52 | HWRP HIR EMERGENCY ELECTRICAL FEEDER REHABILITATION | PO SC50CO19130181K |
| Jun 13, 2024 | Non_departmental | $469,363.56 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | PO SC50CO24141620K |
| Dec 28, 2023 | Non_departmental | $468,594.65 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
FY 2023top 20 of 21 payments$5,804,296
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 16, 2023 | Non_departmental | $1,386,444.26 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Mar 17, 2023 | Non_departmental | $706,930.69 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Apr 21, 2023 | Non_departmental | $684,295.69 | SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Apr 17, 2023 | Non_departmental | $547,750.27 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| May 26, 2023 | Non_departmental | $502,634.67 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Apr 21, 2023 | Non_departmental | $353,848.62 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Apr 17, 2023 | Non_departmental | $338,827.76 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Apr 21, 2023 | Non_departmental | $314,244.83 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Mar 17, 2023 | Non_departmental | $215,554.17 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Mar 17, 2023 | Non_departmental | $201,355.16 | SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Feb 23, 2023 | Non_departmental | $160,575.21 | BALLONA CREEK LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Apr 17, 2023 | Non_departmental | $92,649.78 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| May 26, 2023 | Non_departmental | $70,870.90 | SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Nov 29, 2022 | Non_departmental | $70,269.90 | HWRP SERVICE WATER FAC IMPROVEMENTS | PO SC50CO20134916K |
| Apr 21, 2023 | Non_departmental | $68,375.97 | SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Feb 23, 2023 | Non_departmental | $42,021.87 | SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY | PO SC54CO23141620K |
| Sep 15, 2022 | Non_departmental | $41,783.49 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| May 11, 2023 | Non_departmental | $2,590.00 | HWRP SERVICE WATER FAC IMPROVEMENTS | PO SC50CO20134916K |
| Jun 1, 2023 | Non_departmental | $2,379.42 | BALLONA CREEK TMDL PROJECT | PO SC50CO23141620K |
| Apr 17, 2023 | Non_departmental | $892.19 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
FY 2022top 20 of 26 payments$3,972,623
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 20, 2021 | Non_departmental | $772,594.18 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Aug 13, 2021 | Non_departmental | $705,522.67 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Oct 20, 2021 | Non_departmental | $459,916.19 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Mar 3, 2022 | Non_departmental | $459,020.60 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Sep 2, 2021 | Non_departmental | $394,125.86 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Apr 11, 2022 | Non_departmental | $366,516.98 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Oct 28, 2021 | Non_departmental | $197,421.83 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Feb 23, 2022 | Non_departmental | $155,008.60 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jun 2, 2022 | Non_departmental | $104,734.61 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Mar 15, 2022 | Non_departmental | $83,710.77 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Nov 5, 2021 | Non_departmental | $45,928.07 | HWRP SERVICE WATER FAC IMPROVEMENTS | PO SC50CO20134916K |
| Mar 15, 2022 | Non_departmental | $37,928.93 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Feb 4, 2022 | Non_departmental | $34,833.66 | PP 632 SUNSET GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Jul 20, 2021 | Non_departmental | $31,745.54 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Feb 4, 2022 | Non_departmental | $23,183.68 | PP NORTH YARD GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Dec 10, 2021 | Non_departmental | $16,492.00 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Aug 17, 2021 | Non_departmental | $16,377.13 | HWRP SERVICE WATER FAC IMPROVEMENTS | PO SC50CO20134916K |
| Feb 4, 2022 | Non_departmental | $13,188.41 | PP 648 THOMPSON YARD GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Feb 4, 2022 | Non_departmental | $12,245.84 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Feb 4, 2022 | Non_departmental | $11,600.00 | PP 638 PALISADES GENERATOR REPLACEMENT | PO SC50CO19129823K |
FY 2021top 20 of 42 payments$12,568,907
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 20, 2021 | Non_departmental | $1,313,248.80 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jul 28, 2020 | Non_departmental | $929,674.44 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Feb 2, 2021 | Non_departmental | $812,215.29 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Sep 16, 2020 | Non_departmental | $811,100.01 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Oct 23, 2020 | Non_departmental | $807,585.92 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Dec 3, 2020 | Non_departmental | $779,688.94 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Sep 9, 2020 | Non_departmental | $729,530.85 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Apr 14, 2021 | Non_departmental | $651,517.04 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| May 27, 2021 | Non_departmental | $619,753.89 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Mar 16, 2021 | Non_departmental | $461,824.45 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Jul 14, 2020 | Non_departmental | $418,109.79 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Sep 22, 2020 | Non_departmental | $401,155.21 | HWRP SERVICE WATER FAC FLOW IMPROVEMENTS | PO SC50CO20134916K |
| Oct 23, 2020 | Non_departmental | $396,960.71 | HWRP SERVICE WATER FAC FLOW IMPROVEMENTS | PO SC50CO20134916K |
| Apr 29, 2021 | Non_departmental | $365,159.08 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Mar 31, 2021 | Non_departmental | $350,239.93 | PP NORTH YARD GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Dec 8, 2020 | Non_departmental | $342,070.30 | HWRP SERVICE WATER FAC FLOW IMPROVEMENTS | PO SC50CO20134916K |
| Aug 17, 2020 | Non_departmental | $260,643.86 | HWRP SERVICE WATER FAC FLOW IMPROVEMENT | PO SC50CO20134916K |
| Sep 22, 2020 | Non_departmental | $250,000.00 | CONCRETE STREETS | PO SC50CO20133007M |
| Jul 22, 2020 | Non_departmental | $239,827.57 | CONCRETE STREETS | PO SC50CO20133007M |
| Mar 23, 2021 | Non_departmental | $225,036.19 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
FY 2020top 20 of 77 payments$22,265,233
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 9, 2019 | Non_departmental | $2,247,296.44 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Apr 17, 2020 | Non_departmental | $1,344,259.37 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Dec 18, 2019 | Non_departmental | $1,341,707.60 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| May 21, 2020 | Non_departmental | $1,109,667.28 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Jun 12, 2020 | Non_departmental | $908,682.25 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Dec 18, 2019 | Non_departmental | $824,347.91 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Nov 15, 2019 | Non_departmental | $737,717.08 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Nov 6, 2019 | Non_departmental | $727,661.71 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jul 19, 2019 | Non_departmental | $704,184.67 | HWRP SEC CLARIF MODULES 1-5 UPGD | PO SC50CO19131509K |
| Aug 9, 2019 | Non_departmental | $665,004.81 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Sep 13, 2019 | Non_departmental | $618,426.23 | HWRP AQ AMMONIA STOR AND CONT | PO SC50CO19130181K |
| Aug 9, 2019 | Non_departmental | $599,701.38 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jan 16, 2020 | Non_departmental | $517,606.87 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Oct 17, 2019 | Non_departmental | $501,698.59 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Sep 13, 2019 | Non_departmental | $496,137.83 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Apr 17, 2020 | Non_departmental | $470,843.20 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Oct 30, 2019 | Non_departmental | $470,424.62 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
| Feb 7, 2020 | Non_departmental | $403,065.93 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Apr 15, 2020 | Non_departmental | $382,897.50 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| Jan 29, 2020 | Non_departmental | $379,655.09 | HWRP SECONDARY CLARIFIER MODULES 1-5 UPGRADE | PO SC50CO19131509K |
FY 2019top 20 of 65 payments$24,914,140
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 28, 2018 | Non_departmental | $3,529,118.90 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Nov 9, 2018 | Non_departmental | $2,877,329.76 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Oct 4, 2018 | Airports | $2,000,000.00 | SUPPLIES AND OTHER SERVICES | – |
| Nov 9, 2018 | Non_departmental | $1,317,314.37 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Feb 11, 2019 | Non_departmental | $1,260,147.54 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jan 14, 2019 | Non_departmental | $1,156,425.31 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Mar 28, 2019 | Non_departmental | $1,151,606.62 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jan 14, 2019 | Non_departmental | $980,770.50 | LA CIENEGA INTERCEPTOR SEWER REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| May 14, 2019 | Non_departmental | $852,011.90 | HWRP SEC CLARIF MODULES 1-5 UPGD | PO SC50CO19131509K |
| Jan 24, 2019 | Non_departmental | $819,924.71 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| May 14, 2019 | Non_departmental | $720,237.64 | HWRP SEC CLARIF MODULES 1-5 UPGD | PO SC50CO19131509K |
| May 8, 2019 | Non_departmental | $602,000.29 | PP 654 BALLONA CREEK GENERATOR REPLACEMENT | PO SC50CO19129823K |
| May 22, 2019 | Non_departmental | $550,874.97 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| May 22, 2019 | Non_departmental | $536,927.55 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Jun 11, 2019 | Non_departmental | $471,833.34 | HWRP AQ AMMONIA STOR AND CONT | PO SC50CO19130181K |
| Jul 5, 2018 | Non_departmental | $385,302.14 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jan 23, 2019 | Non_departmental | $301,387.88 | HWRP SEC CLARIF MODULES 1-5 UPGD | PO SC50CO19131509K |
| Mar 22, 2019 | Non_departmental | $297,418.93 | HWRP DIGESTER CORROSION REHAB | PO SC50CO19131458K |
| Feb 11, 2019 | Non_departmental | $287,374.76 | HWRP SEC CLARIF MODULES 1-5 UPGD | PO SC50CO19131509K |
| Apr 25, 2019 | Non_departmental | $283,499.95 | HWRP AQ AMMONIA STOR AND CONT | PO SC50CO19130181K |
FY 2018top 20 of 35 payments$14,304,059
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 31, 2017 | Water and Power | $9,239,392.44 | WATER REVENUE FUND | – |
| Jun 21, 2018 | Non_departmental | $584,995.83 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Feb 22, 2018 | Non_departmental | $459,016.25 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Feb 16, 2018 | Non_departmental | $357,482.50 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Dec 20, 2017 | Non_departmental | $356,272.79 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Aug 7, 2017 | Non_departmental | $288,824.33 | DCT SCREW PUMPS INST & UPGR | PO SC50MSACO16126106K |
| Apr 25, 2018 | Non_departmental | $248,226.07 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jan 22, 2018 | Non_departmental | $228,741.01 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Mar 22, 2018 | Non_departmental | $214,514.75 | LCIS REHAB BLACKWELDER TO OLYMPIC | PO SC50CO17129167K |
| Jul 24, 2017 | Non_departmental | $201,375.01 | DCT GRIT CHAMBER FLUSH SYSTEM | PO SC50MSACO17128409K |
| Aug 21, 2017 | Non_departmental | $199,500.00 | DCT GRIT CHAMBER FLUSH SYSTEM | PO SC50MSACO17128409K |
| Feb 23, 2018 | Non_departmental | $189,265.83 | DCT PRIMARY & SECONDARY TANK GUARDRAILS | PO SC50MSACO17127869K |
| Nov 20, 2017 | Non_departmental | $177,456.20 | HWRP FLARES SYSTEM UPGRADE | PO SC50MSACO15124071K |
| Feb 5, 2018 | Non_departmental | $171,950.02 | DCT GRIT CHAMBER FLUSH SYSTEM | PO SC50MSACO17128409K |
| Dec 7, 2017 | Non_departmental | $170,858.61 | DCT GRIT CHAMBER FLUSH SYSTEM | PO SC50MSACO17128409K |
| Jul 27, 2017 | Non_departmental | $165,333.69 | DCT PRIMARY & SECONDARY TANK GUARDRAILS | PO SC50MSACO17127869K |
| Nov 21, 2017 | Non_departmental | $157,220.08 | HTP IPS SCREW PUMPS REHAB | PO SC50MSACO16125848K |
| Feb 16, 2018 | Non_departmental | $146,826.19 | DCT GRIT CHAMBER FLUSH SYSTEM | PO SC50MSACO17128409K |
| Feb 5, 2018 | Non_departmental | $133,000.00 | HWRP IPS SCREW PUMPS INS & UPG | PO SC50MSACO16125848K |
| Feb 8, 2018 | Non_departmental | $118,719.69 | DCT PRIMARY & SECONDARY TANK GUARDRAILS | PO SC50MSACO17127869K |
FY 2017top 20 of 53 payments$7,101,101
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 21, 2016 | Appropriations to Special Purpose Fund | $613,000.00 | 1680 SUNSET PLAZA DRIVE STREET REPAIRS | PO GAE50CO17123911K |
| Jan 23, 2017 | Appropriations to Special Purpose Fund | $550,050.06 | DCT SCREW PUMPS INST & UPGR | PO GAE50CO16126106K |
| May 25, 2017 | Appropriations to Special Purpose Fund | $395,065.70 | DCT SCREW PUMPS INST & UPGR | PO GAE50CO16126106K |
| May 25, 2017 | Appropriations to Special Purpose Fund | $338,867.00 | HTP IPS SCREW PUMPS REHAB | PO GAE50CO16125848K |
| Jul 14, 2016 | Appropriations to Special Purpose Fund | $300,316.23 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Sep 26, 2016 | Appropriations to Special Purpose Fund | $257,172.08 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Oct 19, 2016 | Appropriations to Special Purpose Fund | $230,379.29 | DCT SCREW PUMPS INST & UPGR | PO GAE50CO16126106K |
| Aug 17, 2016 | Appropriations to Special Purpose Fund | $209,329.71 | HTP IPS SCREW PUMPS REHAB | PO GAE50CO16125848K |
| Aug 23, 2016 | Appropriations to Special Purpose Fund | $192,538.33 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Aug 17, 2016 | Appropriations to Special Purpose Fund | $179,678.13 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Sep 20, 2016 | Appropriations to Special Purpose Fund | $165,734.58 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Jun 20, 2017 | Appropriations to Special Purpose Fund | $163,617.49 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Jun 26, 2017 | Appropriations to Special Purpose Fund | $163,513.57 | HTP IPS SCREW PUMPS REHAB | PO GAE50CO16125848K |
| Oct 21, 2016 | Capital Improvement Expense Program | $156,500.00 | 1680 SUNSET PLAZA DRIVE EMERGENCY BULKHEAD | PO GAE54CO17123911K |
| Jul 14, 2016 | Appropriations to Special Purpose Fund | $150,056.31 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Mar 21, 2017 | Appropriations to Special Purpose Fund | $147,900.02 | DCT CHLORINE TANK GATE ACTUAT | PO GAE50CO17128410K |
| Apr 27, 2017 | Appropriations to Special Purpose Fund | $141,510.23 | HTP IPS SCREW PUMPS REHAB | PO GAE50CO16125848K |
| Dec 20, 2016 | Appropriations to Special Purpose Fund | $138,431.62 | DCT SCREW PUMPS INST & UPGR | PO GAE50CO16126106K |
| Aug 23, 2016 | Appropriations to Special Purpose Fund | $136,843.00 | DCT SCREW PUMPS INST & UPGR | PO GAE50CO16126106K |
| Jan 18, 2017 | Appropriations to Special Purpose Fund | $136,630.41 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
FY 2016top 20 of 65 payments$18,034,663
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Oct 22, 2015 | Appropriations to Special Purpose Fund | $2,711,529.68 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Nov 19, 2015 | Appropriations to Special Purpose Fund | $2,096,992.88 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Oct 22, 2015 | Appropriations to Special Purpose Fund | $856,869.80 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Nov 19, 2015 | Appropriations to Special Purpose Fund | $670,000.00 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Oct 22, 2015 | Appropriations to Special Purpose Fund | $670,000.00 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Jan 14, 2016 | Appropriations to Special Purpose Fund | $647,963.04 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Nov 20, 2015 | Appropriations to Special Purpose Fund | $633,688.72 | HTP IPS SCREW PUMPS REHAB | PO GAE50CO16125848K |
| Sep 8, 2015 | Appropriations to Special Purpose Fund | $620,688.06 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| May 16, 2016 | Appropriations to Special Purpose Fund | $538,931.78 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Nov 13, 2015 | Appropriations to Special Purpose Fund | $516,029.35 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Aug 6, 2015 | Appropriations to Special Purpose Fund | $500,343.54 | HTP PRIMARY INFLUENT GATES REPL | PO GAE50CO15124248K |
| Sep 29, 2015 | Appropriations to Special Purpose Fund | $469,752.49 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Oct 26, 2015 | Appropriations to Special Purpose Fund | $460,250.31 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Jul 24, 2015 | Appropriations to Special Purpose Fund | $441,992.29 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Dec 10, 2015 | Appropriations to Special Purpose Fund | $433,433.15 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Apr 19, 2016 | Appropriations to Special Purpose Fund | $419,059.88 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
| Aug 25, 2015 | Appropriations to Special Purpose Fund | $380,586.79 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Nov 19, 2015 | Appropriations to Special Purpose Fund | $348,995.29 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Jul 8, 2015 | Appropriations to Special Purpose Fund | $303,824.91 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Feb 12, 2016 | Appropriations to Special Purpose Fund | $262,292.55 | DCT SCREW PUMPS INST & UPGRD | PO GAE50CO16126106K |
FY 2015top 20 of 25 payments$3,604,101
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 7, 2015 | Appropriations to Special Purpose Fund | $503,019.29 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| May 29, 2015 | Appropriations to Special Purpose Fund | $397,264.78 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Oct 10, 2014 | Appropriations to Special Purpose Fund | $340,160.40 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Apr 13, 2015 | Appropriations to Special Purpose Fund | $303,504.56 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Nov 12, 2014 | Appropriations to Special Purpose Fund | $265,731.67 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Feb 13, 2015 | Appropriations to Special Purpose Fund | $240,034.92 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Jan 16, 2015 | Appropriations to Special Purpose Fund | $215,225.71 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Jan 16, 2015 | Appropriations to Special Purpose Fund | $214,243.19 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| May 14, 2015 | Appropriations to Special Purpose Fund | $182,669.12 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Oct 7, 2014 | Appropriations to Special Purpose Fund | $171,250.00 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Aug 22, 2014 | Appropriations to Special Purpose Fund | $153,319.44 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Jul 29, 2014 | Appropriations to Special Purpose Fund | $116,567.31 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Mar 12, 2015 | Appropriations to Special Purpose Fund | $82,633.26 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Apr 8, 2015 | Appropriations to Special Purpose Fund | $81,342.67 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Nov 5, 2014 | Appropriations to Special Purpose Fund | $71,250.00 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Jun 22, 2015 | Appropriations to Special Purpose Fund | $54,012.40 | HTP FLARES SYSTEM UPGRADE | PO GAE50CO15124071K |
| Sep 12, 2014 | Appropriations to Special Purpose Fund | $44,807.37 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| Mar 31, 2015 | Appropriations to Special Purpose Fund | $32,576.07 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
| Sep 12, 2014 | Appropriations to Special Purpose Fund | $30,113.25 | HTP G ST PIPE RACK STRCT REHAB | PO GAE50CO14123874K |
| May 4, 2015 | Appropriations to Special Purpose Fund | $20,000.00 | HTP EPP HEADER REPL | PO GAE50CO15124759K |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Jun 12, 2025 | Non_departmental | $578.48 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | EFT |
| Jun 12, 2025 | Non_departmental | $3,701.00 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
| Jun 12, 2025 | Non_departmental | $182,741.40 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
| Jun 10, 2025 | Non_departmental | $1,466,253.14 | BALLONA CREEK TMDL PROJECT | EFT |
| Jun 5, 2025 | Non_departmental | $263,594.93 | DCT EMERGENCY BACKUP POWER | EFT |
| Jun 5, 2025 | Non_departmental | $1,080,792.85 | DCT SCREW PUMP INLET GATE REHABILITATION | EFT |
| Jun 5, 2025 | Non_departmental | $249,485.18 | DCT SCREW PUMP INLET GATE REHABILITATION | EFT |
| Jun 5, 2025 | Non_departmental | $331,811.74 | DCT AWPF JAPANESE GARDEN LAKE EFFLUENT BYPASS | EFT |
| Jun 5, 2025 | Non_departmental | $34,738.39 | DCT AVORS & EVIS GATES REPLACEMENT | EFT |
| Jun 5, 2025 | Non_departmental | $278,276.45 | DCT AVORS & EVIS GATES REPLACEMENT | EFT |
| Jun 3, 2025 | Non_departmental | $645,227.95 | HWRP HIR EMERGENCY ELECTRICAL FEEDER REHABILITATION | EFT |
| May 22, 2025 | Non_departmental | $660,057.06 | DCT AWPF JAPANESE GARDEN LAKE EFFLUENT BYPASS | EFT |
| May 16, 2025 | Non_departmental | $520,881.49 | BALLONA CREEK TMDL PROJECT(LOW FLOW TREATMENT FACILITIES #1) | EFT |
| May 16, 2025 | Non_departmental | $44,253.30 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
| May 14, 2025 | Non_departmental | $1,634,176.30 | BALLONA CREEK TMDL PROJECT | EFT |
| May 12, 2025 | Non_departmental | $576,050.90 | HWRP HIR EMERGENCY ELECTRICAL FEEDER REHABILITATION | EFT |
| May 7, 2025 | Non_departmental | $1,450,514.82 | DCT SCREW PUMP INLET GATE REHABILITATION | EFT |
| May 7, 2025 | Non_departmental | $259,419.95 | DCT SCREW PUMP INLET GATE REHABILITATION | EFT |
| May 7, 2025 | Non_departmental | $53,864.62 | DCT EMERGENCY BACKUP POWER | EFT |
| May 7, 2025 | Non_departmental | $170,580.33 | DCT AVORS & EVIS GATES REPLACEMENT | EFT |
| Apr 30, 2025 | Non_departmental | $1,158,960.65 | BALLONA CREEK TMDL PROJECT | EFT |
| Apr 29, 2025 | Non_departmental | $642,928.83 | BALLONA CREEK TMDL PROJECT | EFT |
| Apr 24, 2025 | Non_departmental | $33,448.55 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
| Apr 24, 2025 | Non_departmental | $987,016.76 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
| Apr 24, 2025 | Non_departmental | $31,693.21 | BALLONA CREEK TMDL PROJECT LOW FLOW TREATMENT FACILITIES 1&2 | EFT |
Other vendors serving Non_departmental
- Voya Holdings, Inc. $2,961,390,236
- Southern California Permanente Medical Group $1,777,333,480
- Blue Cross of California $1,144,613,651
- Skanska Stacy and Witbeck a Joint Venture $294,562,883
- U S Bank Trust N a $269,356,884
- Browning-Ferris Industries of California Inc $255,037,189
- Standard Insurance Company $189,312,135
- USA Waste of California Inc $166,113,009
- Murray Plumbing and Heating Corp. $162,890,669
- Delta Dental of California $162,661,117
VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data