Murray Plumbing and Heating Corp.: Los Angeles Government Payments

as recorded by Los Angeles: MURRAY PLUMBING AND HEATING CORP.

Murray Plumbing and Heating Corp. is the 97th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in SANITATION-PROJECT RELATED spending. Its payments amount to 1.2% of everything the Non_departmental has paid vendors in that span. Payments to it rose 27.1% year over year.

Primary spending category: SANITATION-PROJECT RELATED

$200,357,439total received
2,159payments
5agencies
Aug 1, 2011Jun 13, 2025first / last payment
Follow this vendorGet an email when Los Angeles publishes new payments to Murray Plumbing and Heating Corp.. No spam.

Payments by fiscal year

FY 2025$32,638,221
FY 2024$25,682,647
FY 2023$21,002,309
FY 2022$16,825,609
FY 2021$11,546,944
FY 2020$23,134,272
FY 2019$14,463,237
FY 2018$17,932,607
FY 2017$5,353,343
FY 2016$7,874,516
FY 2015$7,045,194
FY 2014$9,215,704
FY 2013$4,325,857
FY 2012$3,316,977

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Non_departmental336$32,440,977
FY 2025Public Works - Sanitation5$197,244
FY 2024Non_departmental279$25,655,099
FY 2024Public Works - Sanitation1$27,549
FY 2023Non_departmental239$20,970,226
FY 2023City Administrative Officer2$32,083
FY 2022Non_departmental157$16,747,306
FY 2022Recreation and Parks - Special Accounts2$67,719
FY 2022City Administrative Officer1$10,584
FY 2021Non_departmental159$11,546,944
FY 2020Non_departmental245$23,134,272
FY 2019Non_departmental133$14,463,237
FY 2018Non_departmental173$17,932,607
FY 2017Appropriations to Special Purpose Fund115$5,353,343
FY 2016Appropriations to Special Purpose Fund66$7,816,738
FY 2016Recreation and Parks - Special Accounts2$36,064
FY 2016City Administrative Officer3$21,715
FY 2015Appropriations to Special Purpose Fund43$7,045,194
FY 2014Appropriations to Special Purpose Fund63$9,091,579
FY 2014City Administrative Officer3$124,125
FY 2013Appropriations to Special Purpose Fund63$4,325,857
FY 2012Appropriations to Special Purpose Fund64$3,035,214
FY 2012Recreation and Parks - Special Accounts5$281,763
Total2,159$200,357,439

What the payments were for

Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
HWRP PREG BLD INTERIOR REFURB13$999,150Jan 23, 2019 Aug 26, 2020
LAGWRP TETRA FILTERS REHABILITATION2$98,547Feb 8, 2024 Feb 8, 2024
HWRP HARRINGTON BUILDING AIR QUALITY IMPROVEMENTS6$982,127Apr 2, 2024 May 16, 2025
HTP HDWRKS ODOR CTRL UPGRD2$9,800Dec 10, 2015 Jun 20, 2016
HTP HDWKS GRIT CLASS RELOC22$977,891Aug 26, 2013 Aug 18, 2017
HTP COMPRESSOR FAC ENHANCEM6$96,588Aug 8, 2016 Dec 26, 2017
ODOR CTR GENESEE CARBON SCRB FAC UPGRADE9$96,254Sep 27, 2019 Aug 25, 2020
TIWRP AWPF PROD WATER STABILIZ9$950,165Apr 1, 2013 Jul 10, 2015
PRJ-SHELDON ARLETA2$94,478May 15, 2014 May 15, 2014
HWRP INDUSTRIAL WATER DISTRIBUTION MODIFICATION15$933,643Oct 25, 2018 Aug 27, 2021
HWRP DIGESTER GAS PIPING SYSTEM CONTROLS3$92,974Sep 27, 2019 Feb 4, 2020
TIWRP AWPF CHEMICAL PIPING REPL15$919,550Jan 3, 2020 Apr 11, 2023
DCT SEC CLAR CRACK REHAB2$91,293May 17, 2012 Jun 18, 2012
DCT ADMIN BLD SEWER VENT REPL2$90,533Jun 26, 2017 Nov 29, 2017
HWRP PRIMARY INFLUENT SLLUICE GATES REPLACEMENT14$904,440Jan 17, 2020 Jul 13, 2021
LAG HEADWORKS ISOLATION GATES INSTALLATION4$87,148Nov 13, 2024 May 16, 2025
HTP HEADWORKS IMPROVEMENTS2$8,503Jun 20, 2016 Aug 8, 2016
TIWRP EPP PIPING SYSTEM IMPROVEMENTS19$842,244Mar 11, 2021 Apr 11, 2023
HTP PRIM SLUDGE CENTRIFUGE INS8$838,947Nov 29, 2011 Aug 3, 2017
TIWRP EPP PUMP TRAIN NO 3 REHABILITATION4$83,075Oct 27, 2023 May 23, 2024
TIWRP AWPF OPTIMIZATION MIXING UNIT2$81,993Jan 5, 2021 May 12, 2021
HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTS-SCMC4$814,318May 26, 2023 Aug 23, 2023
BALLONA CREEK LOW FLOW TREATMENT FACILITY2$79,678Nov 2, 2018 Apr 7, 2021
HTP AUX BOILER NO. 2 REPL4$783,785Sep 16, 2011 May 24, 2012
CLEAN WATER SERVICES DURING CONSTRUCTION4$78,205Jun 5, 2024 Jan 17, 2025
HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTS20$7,741,854Dec 14, 2023 Apr 29, 2025
CONSTRUCTION SERVICES CONTRACT (CISCO)206$7,701,084Jul 24, 2018 May 16, 2025
HWRP IPS SCREW PUMP NO 9 REPLACEMENT10$766,747May 12, 2021 May 15, 2023
TIWRP CAPITAL EQUIP REPLACEMENT PROG1$7,660Mar 11, 2025 Mar 11, 2025
HTP CLASS A BATCH PROCESS EX2$75,914Jan 11, 2012 Jul 8, 2013
HWRP PREGERSON BUILDING INTERIOR REFURBISHMENT2$75,000Feb 4, 2021 Sep 14, 2022
HWRP HEADWORKS ODOR CONTROL UPGRADE46$7,482,455Sep 13, 2019 Feb 6, 2025
TIWRP DIGESTER SLUDGE RECIRCULATION PIPING SUPPORT REHAB2$73,742Oct 3, 2019 Apr 9, 2020
HWRP BIOSOLIDS TRUCK LOADING FAC FAN & DUCTING PROCUMENT7$733,114May 12, 2021 Sep 26, 2022
HWRP OVERFLOW BYPASS CHANNEL GATE REPLACEMENT15$704,567Feb 3, 2021 Feb 21, 2023
HWRP HEADWORKS GRIT HANDLING IMPROVEMENTS2$70,220Jan 5, 2018 Feb 5, 2018
HTP DGUP FACILITY5$69,551Dec 10, 2015 Apr 5, 2017
TIWRP CAPITAL EQUIPMENT REPLACEMENT PROG (CERP)3$67,068Feb 10, 2023 Jun 20, 2024
HWRP BIOLOGICAL NUTRIENT REMOVAL MBR ODOR CONTROL SYSTEM9$668,297Jun 20, 2024 May 16, 2025
HWRP PRIMARY BATTERY B C D TANK COVER REPLAC & INSTALL9$666,535May 22, 2024 May 12, 2025
HTP LIQUID SLUDGE STORAGE FAC1$66,059Nov 28, 2011 Nov 28, 2011
HWRP EMERGENCY FLARE SYS REHAB3$65,835Dec 13, 2022 Feb 21, 2023
TIWRP HPE AND POTABLE WATER LINE REPLACEMENT16$656,564Dec 6, 2023 May 16, 2025
HWRP HDWRKS ODOR CTRL UPGRD24$6,559,420Oct 11, 2017 Sep 13, 2019
HWRP COLD BOX TURBO SYSTEM REPLACEMENT1$6,477Jan 27, 2025 Jan 27, 2025
HWRP HDWKS GRIT CLASS RELOC1$6,463Aug 18, 2017 Aug 18, 2017
HWRP LAWA ADVANCED WATER TREATMENT FACILITY SITE DEVELOPMENT1$64,052Nov 1, 2017 Nov 1, 2017
HTP MAIN SWITCH DGUP AUTOSYN9$637,301Jun 27, 2016 May 29, 2018
HWRP MAIN SWITCH DGUP AUTOSYNCRHONIZATION3$63,231Sep 11, 2017 May 29, 2018
HWRP COLD BOX TURBOEXPANDER CONTROL SYSTEM REPLACEMENT4$61,699Feb 26, 2025 May 16, 2025
HWRP PERIMETER ROAD EAST OF PRIMARY BATTERIES WASHOUT REHAB1$60,481Dec 21, 2021 Dec 21, 2021
CONSTRUCTION SERVICES CONTRACT222$6,037,885Aug 1, 2011 Apr 28, 2022
TIWRP CHECK VALVES REPLACEMENT AT TERTIARY FILTER5$600,000Apr 11, 2023 Feb 26, 2025
WW SERVICES DURING CONST3$59,308Oct 25, 2016 Dec 26, 2017
HWRP HEADWORKS BAR SCREEN DCT INTEGRATION10$571,359Nov 1, 2023 Jun 20, 2024
TIWRP SITE AND DRAINAGE IMPROVEMENTS7$570,850Dec 6, 2019 Jun 19, 2020
HWRP EPP CONCRETE REHABILITATION2$56,406Feb 21, 2023 Feb 21, 2023
SMBLFD PACKAGE 13$56,283Jan 27, 2012 Jun 18, 2012
HWRP EMERGENCY STORM FLOOD REPAIR5$5,405,853Dec 10, 2024 May 14, 2025
GENESEE CARBON SCRUBBER PROC7$540,000Dec 26, 2017 Aug 25, 2020
HTP COMPRESSOR FAC ENHANCE3$53,988Jun 20, 2016 Apr 5, 2017
HWRP HEADWORKS BAR SCREEN DCS INTEGRATION5$535,572Sep 26, 2022 May 15, 2023
OPERATION AND MAINTENANCE - TMDL COMPLIANCE PROJECTS1$52,875Apr 13, 2022 Apr 13, 2022
TIWRP BLOWER CTRL SYS UPGRADE8$524,889Jun 18, 2012 Jul 10, 2015
LAG MAINTENANCE BUILDING LOCKER ROOM IMPROVEMENT4$520,136Aug 26, 2020 Feb 4, 2021
HTP DIG GAS DESULF FAC IMPR35$5,112,146Nov 5, 2013 Jul 17, 2018
ODOR CTR HUMBOLDT CARBON SCRB FAC UPGRADE1$5,088Sep 26, 2022 Sep 26, 2022
TIWRP EPP PIPING SYSTEM IMP3$504,682Jan 3, 2020 Nov 13, 2024
TIWRP AWPF AOP EFF RECIRCULATION1$50,000Nov 18, 2022 Nov 18, 2022
TIWRP AWPF AOP AMMONIA INJ SYS1$501Apr 27, 2020 Apr 27, 2020
HWRP COMPRESSOR FAC ENHANCEM7$497,295Nov 1, 2017 Feb 11, 2019
DCT AERATION TANKS REHAB16$4,928,384Sep 8, 2015 Jan 5, 2017
ODOR CTR DACOTAH CARBON SCRB FAC UPGRADE1$4,741Sep 26, 2022 Sep 26, 2022
ODOR CTR RICHMOND CARBON SCRB FAC UPGRADE1$4,741Sep 26, 2022 Sep 26, 2022
ODOR CTR BALLONA CARBON SCRB FAC UPGRADE1$4,741Sep 26, 2022 Sep 26, 2022
ODOR CTR RADFORD CARBON SCRB FAC UPGRADE1$4,738Sep 26, 2022 Sep 26, 2022
LAG ADMINISTRATION BUILDING HVAC REPLACEMENT6$470,913Sep 11, 2017 Oct 25, 2018
PRJ-RAP:SHELDON ARLETA3$46,766May 15, 2014 Oct 9, 2015
PRJ-RAP:SHELDON ARLETA(4TH CYC1$4,596Oct 9, 2015 Oct 9, 2015
TIWRP AWPF PHASE 1 PRODUCT WATER PUMPS REPLACEMENT4$445,799Jan 5, 2021 May 12, 2021
LAG CHANNEL 4 DIVERSION GATE INSTALLAATION12$429,631Sep 11, 2017 Aug 25, 2020
TIWRP INFLUENT HEADWORKS BARSCREEN PASSIVE BYPASS8$428,299Nov 13, 2024 May 16, 2025
GAP: ROBERTSON REC CENTER (S46)3$42,667Jan 10, 2022 Nov 3, 2022
PW-SANITATION EXPENSE & EQUIPMENT8$422,203Jan 11, 2017 Apr 11, 2025
SMB/BC MAR VISTA RECREATION CT6$416,240Jan 28, 2013 Feb 23, 2018
HWRP EMERGENCY BYPASS CHANNEL REHABILITATION3$415,496Dec 6, 2019 Jan 3, 2020
HWRP LOW PRESSURE GAS HOLDER SAFETY & PROCESS IMPROVEMENTS8$409,134May 29, 2018 Jul 12, 2019
TIWRP WAS LINE AND DIGESTER SLUDGE FEED PIPING REPLACEMENT13$408,963Nov 1, 2023 May 16, 2025
TIWRP PLANT INFLUENT MONITORING SYSTEM6$401,067Aug 17, 2017 May 29, 2018
DCT ELECT VAULTS 1-3 REPL1$40,000Jan 27, 2012 Jan 27, 2012
PP601 MANCHESTER IMPROVEMENTS4$393,567Oct 25, 2016 Apr 5, 2017
WW PLANNING & DESIGN SERVICES40$386,718Dec 10, 2015 May 14, 2019
LAG NDN BLOWER INSTALLATION21$3,793,560Feb 20, 2014 Aug 2, 2016
HTP AUX BOILER NO.2 REPL15$3,770,230May 24, 2012 Aug 14, 2014
HWRP PARKING STRUCTURE REHABILITATION7$375,432May 29, 2018 Apr 15, 2019
TIWRP AWPF ADVANCED OXIDATION PROCESS EFFLUENT RECIRCULATION15$3,619,735Nov 18, 2022 Mar 17, 2025
SUBDIVISION FEES TR/QUIMBY FND8$356,546Oct 4, 2011 Dec 28, 2021
DCT MAIN SWITCHGEAR AIR CONDITIONING SYSTEM8$355,838Feb 20, 2018 Jan 3, 2020
TIWRP HIGH PRESSURE GAS HOLDER REHAB4$354,669Oct 3, 2019 Jan 27, 2020
HTP SCREENING HANDLING IMPR25$3,545,294Aug 26, 2013 Aug 18, 2017
TIWRP DIGESTER GAS COMPRESSOR BUILDING EXHAUST FAN SYSTEM2$34,609Jan 16, 2024 Jan 16, 2024
HWRP DIGESTER GAS COMP FAC OPT7$340,791Mar 14, 2019 Jan 27, 2020
CAPITAL IMPROVEMENTS PROJECTS3$337,444Sep 10, 2024 Feb 24, 2025
HWRP SERVICE WATER FACILITY FLOW CONTROLS6$333,951Feb 20, 2018 Apr 15, 2019
TIWRP HEADWORKS BIOTRICKLING FILTER FACILITY4$3,254Feb 8, 2023 Apr 11, 2023
TIWRP HEADWORKS IN-PLANT LIFT STATEION BARSCREEN BYPASS4$303,542Feb 26, 2025 May 16, 2025
HWRP SERVICE WATER FAC FLOW CONTROLS1$3,000Nov 13, 2019 Nov 13, 2019
ON CALL CONTRACTORS (EMERGENCY FUNDS)3$298,424Mar 27, 2025 Jun 4, 2025
HTP HDWKS GRIT HANDL IMPROV10$2,983,511Oct 2, 2014 Feb 11, 2016
AIR TREATMENT FACILITY - ECIS - MISSION & JESSE REHAB10$298,126Oct 27, 2023 Nov 21, 2024
MAR VISTA RECREATION CENTER STORMWATER BMP6$298,039Mar 1, 2018 Jun 21, 2019
WEST REGION MAINTENANCE1$29,000Dec 28, 2021 Dec 28, 2021
SEPULVEDA CHANNEL LOW FLOW TREATMENT FACILITY1$2,897Nov 2, 2018 Nov 2, 2018
TIWRP BELOW GROUND LOW PRESSURE GAS PIPING REPLACEMENT2$289,246Apr 2, 2024 Apr 2, 2024
ODOR CTRL GENESEE SCRB FAC4$288,887Feb 11, 2019 Apr 21, 2020
HWRP IPS AFTERBAY ODOR CON MOD10$284,907Nov 13, 2024 May 16, 2025
ODOR CNTR GENESEE SCRB PROC1$27,839Apr 15, 2019 Apr 15, 2019
SUNSET PP 632 WALL REHAB2$27,679Apr 1, 2013 Jun 10, 2013
HWRP FLARES SYSTEM ACCESS PLATFORMS AND KNOCKOUT DRUM2$269,381Oct 25, 2018 Feb 11, 2019
DCT SODIUM HYPOCHLORITE MIXING CHAMBERS IMPROVEMENT8$267,795Oct 3, 2019 Aug 26, 2020
DCT ELECT VAULTS MH 1-3 REPL2$259,095Jan 27, 2012 May 17, 2012
DCT BERM IMPROVEMENTS1$2,558Dec 21, 2021 Dec 21, 2021
TIWRP HIGH PRESSURE EFFLUENT AND BRINE SEPARATION7$251,750Mar 14, 2019 Jan 27, 2020
HWRP TRUCK LOADING ODOR CNTL FAC ENHANCEMENTS10$248,424Mar 14, 2019 Aug 26, 2020
LAG PRIMARY COVER PLATES & GRATING REPLACEMENT3$247,947Jun 19, 2018 Oct 25, 2018
DCT LAB BUILDING WINCH7$233,322Oct 3, 2019 Jan 5, 2021
LAG VEHICLE ACCESS GATES4$231,867Dec 21, 2021 Jun 14, 2022
HWRP EMERG LPGH NO.1 REHAB2$230,890May 14, 2019 Jul 12, 2019
DCT LAB FACILITY1$22,851May 17, 2012 May 17, 2012
CONTRACTUAL SERVICES6$224,793Jun 17, 2024 Jun 13, 2025
AIR TREATMENT FACILITY - ECIS - MISSION AND JESSE REHA3$224,287Feb 21, 2023 Jun 8, 2023
HWRP CRYOGENIC FAC COLD BOX 1 & 2 IMPROVEMENTS22$2,214,142Oct 3, 2019 May 14, 2025
ODOR CTR NOTF CARBON SCRB FAC UPGRADE15$2,166,051Apr 2, 2019 Jul 15, 2021
TIWRP FINAL SKIMMER SYSTEM REPLACEMENT2$21,653May 14, 2019 Oct 3, 2019
HWRP LIQUID OXYGEN TANK NO 2 PRESSURE REDUCING VALV RPLCMNT3$213,438Oct 25, 2018 Mar 21, 2019
HWRP HYPERION INCIDENT INSURANCE3$2,115,608Feb 2, 2023 Jun 5, 2024
DCT RETURN ACTIVATED SLUDGE PHASE 1 AND PHASE 2 TIE-IN2$199,297Feb 11, 2019 Feb 11, 2019
HIR HTP MST 9/10 FLOOD REPAIRS4$17,986Feb 27, 2024 May 12, 2025
HWRP HEADWORKS BAR SCREEN SLUICE GATE REPLACEMENT6$178,753Oct 25, 2018 Apr 21, 2020
TIWRP DCS SERVER ROOM11$178,167Jun 27, 2016 Jul 24, 2018
HIR HTP PRIMARY TREATMENT ELECTRICAL REFURBISHMENT1$173,823Feb 26, 2024 Feb 26, 2024
ODOR CTR SIERRA BONITA CARBON SCRB FAC UPGRADE10$1,722,332Apr 2, 2019 Jun 2, 2021
HWRP DSF DIGESTED SLUDGE PIPELINE EMERGENCY REHABILITATION9$1,718,955Dec 13, 2022 Nov 1, 2023
HYGIENE CENTER - 544 TOWNE7$1,711,867Apr 14, 2020 Jan 12, 2021
TIWRP EFFLUENT PUMPING PLANT PIPING SYSTEM IMPROVEMENTS1$17,075Dec 26, 2017 Dec 26, 2017
HWRP DIGESTER GAS COMPRESSOR FACILITY OPTIMIZATION2$169,857Jul 15, 2021 Aug 27, 2021
DCT PRELIMIARY TREATMENT ODOR CONTROL SYSTEM24$1,679,055Aug 22, 2022 May 16, 2025
TIWRP HIGH PRESSURE DIGESTER GAS PIPE REPLACEMENT5$158,595Mar 11, 2020 Oct 15, 2020
HWRP GAS MIXING SYSTEM DEMONSTRATION23$1,579,858Jun 14, 2022 Jan 29, 2025
GENESEE CARBON SCRUBBER PROCUREMENT1$157,000Apr 15, 2019 Apr 15, 2019
HTP SWF NORTH SIDE FILT REFURB2$15,651Aug 8, 2016 Feb 9, 2017
HWRP DILUTE POLYMER SYSTEM IMPROVEMENT1$15,628Aug 24, 2020 Aug 24, 2020
TIWRP LOW PRESSURE GAS PIPING REPLACEMENT17$1,550,207Nov 1, 2023 May 16, 2025
HWRP EMERGENCY LOW PRESSURE GAS HOLDER NO 1 REHABILITATION6$153,438Jan 3, 2020 May 14, 2021
TIWRP HEADWORKS IN-PLANT LIFT STATION BARSCREEN BYPASS4$151,549Nov 13, 2024 Jan 27, 2025
TIWRP AWPF ADVANCED OXYGEN PROCESS AMMONIA INJECTION SYSTEM20$1,498,304Jan 5, 2021 Feb 21, 2023
HWRP HEADWORKS IMPROVEMENTS34$14,947,145Aug 8, 2017 Feb 6, 2025
SANITATION-PROJECT RELATED189$14,585,955Aug 1, 2011 Jun 12, 2025
TIWRP AWPF CAPITAL EQUIP REPLACEMENT PROG2$14,445Jun 5, 2025 Jun 6, 2025
HWRP AWPF MEMBRANE BIOREACTORS PILOT3$143,732Apr 13, 2022 May 31, 2022
CAPITAL INFRASTRUCTURE1$14,185Jul 20, 2018 Jul 20, 2018
HWRP PRIMARY TANKS SKIMMER IMPROVEMENTS44$13,979,194Jan 17, 2020 Feb 11, 2025
PW-SANITATION EXPENSE AND EQUIPMENT97$13,412,515Nov 17, 2021 Jun 9, 2025
HWRP BIOSOLIDS TRUCK LOADING FAC FAN & DUCTING INSTALLATION16$1,315,021Aug 12, 2021 Oct 27, 2023
TIWRP DISSOLVED AIR FLOATATION THICKENER MODIFICATION1$13,104Feb 3, 2021 Feb 3, 2021
HWRP PRIMARY CENTRAL SCRUBBER FACILITY REHAB PHASE 12$130,916Feb 21, 2023 Feb 21, 2023
HTP HDWKS GRIT HANDL IMP6$1,273,805May 2, 2016 Nov 4, 2016
HWRP CENTRAL STORM DRAIN REROUTING2$12,599Feb 11, 2019 Apr 15, 2019
HWRP PRIMARY POLYMER STATION MODIFICATION8$119,759Nov 13, 2024 May 16, 2025
DCT SODIUM HYPOCHLORITE TANKS REHABILITATION21$1,184,920May 26, 2022 May 20, 2024
PP VENICE VIBRATION REHAB3$118,227Oct 25, 2016 Feb 9, 2017
SANITATION EXP & EQUIP-PROJ RE11$117,867Nov 16, 2011 Jun 10, 2013
DCT INFLUENT & EFFLUENT FLOW METERS2$116,727Apr 15, 2019 Jul 12, 2019
HWRP HARRINGTON BUILDING AIR QUALITY IMPROVEMENT1$11,637Aug 24, 2020 Aug 24, 2020
LAG BLOWER 1 INLET AIR SUPPLY2$11,378Sep 11, 2017 Dec 26, 2017
MICLA CLEAN STREETS15$1,133,155Mar 22, 2022 Dec 28, 2023
CLEAN WATER PLANNING & DESIGN SERVICES113$1,122,754Oct 25, 2018 May 16, 2025
TIWRP CENTRIFUGE FEED PUMPS3$109,812Dec 9, 2011 Jun 18, 2012
TIWRP DIGESTER GAS HIGH PRESSURE PIPE REPLACEMENT10$1,084,916Jan 5, 2021 Dec 21, 2021
PP 601 MANCHESTER IMPROVEMENTS1$10,452Dec 26, 2017 Dec 26, 2017
HWRP DIGESTER GAS DESULFURIZATION FACILITY IMPROVEMENTS1$103,641Jul 17, 2018 Jul 17, 2018
HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADES52$10,348,000Jan 17, 2020 Jun 11, 2025
HWRP CAPITAL EQP REPLC PROG16$1,020,643Oct 7, 2022 May 15, 2025
HTP HDWKS GRIT HANDLING IMPR8$1,000,000Nov 4, 2016 Jan 5, 2018
TEMESCAL CANYON PRK STORMWATER1$1Nov 16, 2011 Nov 16, 2011

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 341 payments$32,638,221
DateAgencyAmountCategoryPurchase order
Dec 10, 2024Non_departmental$2,878,720.44HWRP EMERGENCY STORM FLOOD REPAIRPO SC50CO19130183K
Oct 30, 2024Non_departmental$2,062,759.70SANITATION-PROJECT RELATEDPO SC50CO19130183K
Sep 3, 2024Non_departmental$1,787,080.15SANITATION-PROJECT RELATEDPO SC50CO19130183K
Apr 4, 2025Non_departmental$1,693,969.36HWRP EMERGENCY STORM FLOOD REPAIRPO SC50CO19130183K
Apr 4, 2025Non_departmental$1,266,387.05SANITATION-PROJECT RELATEDPO SC50CO19130183K
Dec 18, 2024Non_departmental$906,030.20SANITATION-PROJECT RELATEDPO SC50CO19130183K
Dec 26, 2024Non_departmental$877,214.80SANITATION-PROJECT RELATEDPO SC50CO19130183K
Feb 6, 2025Non_departmental$873,158.30SANITATION-PROJECT RELATEDPO SC50CO19130183K
Dec 10, 2024Non_departmental$827,969.85SANITATION-PROJECT RELATEDPO SC50CO19130183K
May 14, 2025Non_departmental$702,886.00SANITATION-PROJECT RELATEDPO SC50CO19130183K
Feb 6, 2025Non_departmental$660,071.90HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Jun 11, 2025Non_departmental$639,629.30SANITATION-PROJECT RELATEDPO SC50CO19130183K
Feb 6, 2025Non_departmental$583,018.54HWRP EMERGENCY STORM FLOOD REPAIRPO SC50CO19130183K
Sep 12, 2024Non_departmental$581,311.26HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Aug 16, 2024Non_departmental$553,066.28HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Apr 4, 2025Non_departmental$484,902.80SANITATION-PROJECT RELATEDPO SC50CO19130183K
Apr 29, 2025Non_departmental$484,433.29HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Jan 22, 2025Non_departmental$480,435.82HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Feb 11, 2025Non_departmental$335,695.41HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Sep 17, 2024Non_departmental$316,794.66HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
FY 2024top 20 of 280 payments$25,682,647
DateAgencyAmountCategoryPurchase order
Jan 31, 2024Non_departmental$2,039,144.78HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Oct 27, 2023Non_departmental$1,592,008.75TIWRP AWPF ADVANCED OXIDATION PROCESS EFFLUENT RECIRCULATIONPO SC50CO23140058K
Jun 13, 2024Non_departmental$1,469,710.59HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Apr 10, 2024Non_departmental$1,158,225.22HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Jan 31, 2024Non_departmental$1,057,183.59HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Nov 1, 2023Non_departmental$924,810.94HWRP DSF DIGESTED SLUDGE PIPELINE EMERGENCY REHABILITATIONPO SC50CO23140498K
Mar 19, 2024Non_departmental$833,622.01HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Apr 30, 2024Non_departmental$805,888.82HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Apr 26, 2024Non_departmental$798,893.89HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
Aug 30, 2023Non_departmental$584,467.26PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO23136182M
Dec 14, 2023Non_departmental$569,399.31HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTSPO SC50CO19130183K
May 23, 2024Non_departmental$556,998.30HWRP CRYOGENIC FAC COLD BOX 1 & 2 IMPROVEMENTSPO SC50CO19131136K
Mar 20, 2024Non_departmental$486,062.75HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Jun 5, 2024Non_departmental$478,377.23TIWRP LOW PRESSURE GAS PIPING REPLACEMENTPO SC50CO23140498K
Jul 25, 2023Non_departmental$420,194.10HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Apr 2, 2024Non_departmental$410,197.37HWRP HARRINGTON BUILDING AIR QUALITY IMPROVEMENTSPO SC50CO23140498K
Apr 19, 2024Non_departmental$385,410.06SANITATION-PROJECT RELATEDPO SC50CO24136182M
Feb 8, 2024Non_departmental$336,442.26TIWRP LOW PRESSURE GAS PIPING REPLACEMENTPO SC50CO23140498K
Jan 31, 2024Non_departmental$332,848.70HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Jun 6, 2024Non_departmental$328,840.60HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
FY 2023top 20 of 241 payments$21,002,309
DateAgencyAmountCategoryPurchase order
Jul 19, 2022Non_departmental$1,432,048.69PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Feb 2, 2023Non_departmental$1,158,525.03HWRP HYPERION INCIDENT INSURANCEPO SC50CO23136182M
Nov 4, 2022Non_departmental$1,038,222.95PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Jun 22, 2023Non_departmental$956,067.69HWRP HYPERION INCIDENT INSURANCEPO SC50CO23136182M
Apr 11, 2023Non_departmental$546,726.52HWRP CRYOGENIC FAC COLD BOX 1 & 2 IMPROVEMENTSPO SC50CO19131136K
Jun 1, 2023Non_departmental$542,780.09TIWRP AWPF ADVANCED OXIDATION PROCESS EFFLUENT RECIRCULATIONPO SC50CO23140058K
Jun 9, 2023Non_departmental$495,814.50HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
May 26, 2023Non_departmental$492,637.09HWRP HEADWORKS OVERFLOW BYPASS IMPROVEMENTS-SCMCPO SC50CO19130183K
Nov 18, 2022Non_departmental$492,604.14TIWRP AWPF ADVANCED OXIDATION PROCESS EFFLUENT RECIRCULATIONPO SC50CO23140058K
Jan 4, 2023Non_departmental$441,578.50HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Nov 4, 2022Non_departmental$352,797.95PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Apr 10, 2023Non_departmental$340,564.83HWRP BIOSOLIDS TRUCK LOADING FAC FAN & DUCTING INSTALLATIONPO SC50CO20134055K
Oct 7, 2022Non_departmental$340,200.00HWRP CAPITAL EQP REPLC PROGPO SC50CO22136182M
Nov 10, 2022Non_departmental$319,442.92PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Jan 19, 2023Non_departmental$294,470.96HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Jan 12, 2023Non_departmental$283,151.76TIWRP AWPF ADVANCED OXIDATION PROCESS EFFLUENT RECIRCULATIONPO SC50CO23140058K
Sep 26, 2022Non_departmental$280,016.26DCT SODIUM HYPOCHLORITE TANKS REHABILITATIONPO SC50CO20134055K
Feb 8, 2023Non_departmental$276,216.16HWRP HEADWORKS BAR SCREEN DCS INTEGRATIONPO SC50CO23140498K
Jul 20, 2022Non_departmental$273,771.49HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Dec 13, 2022Non_departmental$266,294.03HWRP GAS MIXING SYSTEM DEMONSTRATIONPO SC50CO20134055K
FY 2022top 20 of 160 payments$16,825,609
DateAgencyAmountCategoryPurchase order
Jan 31, 2022Non_departmental$2,188,350.07PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Apr 11, 2022Non_departmental$1,599,942.29PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Nov 17, 2021Non_departmental$1,559,293.55PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Feb 2, 2022Non_departmental$605,645.87PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Feb 2, 2022Non_departmental$586,340.34PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO22136182M
Jan 14, 2022Non_departmental$519,433.89HWRP BIOSOLIDS TRUCK LOADING FAC FAN & DUCTING PROCUMENTPO SC50CO20134055K
Oct 26, 2021Non_departmental$478,171.24HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Aug 12, 2021Non_departmental$325,964.61HWRP IPS SCREW PUMP NO 9 REPLACEMENTPO SC50CO20134055K
Jan 14, 2022Non_departmental$256,645.38TIWRP EPP PIPING SYSTEM IMPROVEMENTSPO SC50CO19131136K
Nov 9, 2021Non_departmental$254,666.28TIWRP AWPF ADVANCED OXYGEN PROCESS AMMONIA INJECTION SYSTEMPO SC50CO20134055K
May 26, 2022Non_departmental$240,772.17TIWRP AWPF ADVANCED OXYGEN PROCESS AMMONIA INJECTION SYSTEMPO SC50CO20134055K
Mar 8, 2022Non_departmental$215,950.37HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Dec 29, 2021Non_departmental$208,626.16HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Dec 27, 2021Non_departmental$206,362.09HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Aug 12, 2021Non_departmental$206,325.85TIWRP DIGESTER GAS HIGH PRESSURE PIPE REPLACEMENTPO SC50CO20134055K
Dec 29, 2021Non_departmental$205,979.21HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Jun 6, 2022Non_departmental$202,004.44PW-SANITATION EXPENSE AND EQUIPMENTPO SC50CO21136182M
Dec 15, 2021Non_departmental$199,316.18TIWRP AWPF CHEMICAL PIPING REPLPO SC50CO19131136K
May 26, 2022Non_departmental$197,929.00CONSTRUCTION SERVICES CONTRACT (CISCO)PO SC50CO20134055K
Oct 27, 2021Non_departmental$197,428.81TIWRP AWPF CHEMICAL PIPING REPLPO SC50CO19131136K
FY 2021top 20 of 159 payments$11,546,944
DateAgencyAmountCategoryPurchase order
Sep 15, 2020Non_departmental$693,740.40ODOR CTR NOTF CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Sep 9, 2020Non_departmental$539,039.40HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Aug 25, 2020Non_departmental$435,499.94HYGIENE CENTER - 544 TOWNEPO SC54CO20131136K
Jan 5, 2021Non_departmental$366,103.60TIWRP AWPF PHASE 1 PRODUCT WATER PUMPS REPLACEMENTPO SC50CO20134055K
May 28, 2021Non_departmental$316,832.22TIWRP DIGESTER GAS HIGH PRESSURE PIPE REPLACEMENTPO SC50CO20134055K
Aug 4, 2020Non_departmental$308,854.19HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Mar 16, 2021Non_departmental$293,823.08HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Dec 22, 2020Non_departmental$292,169.14HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Jan 26, 2021Non_departmental$266,227.31HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
May 28, 2021Non_departmental$263,048.07HWRP OVERFLOW BYPASS CHANNEL GATE REPLACEMENTPO SC50CO20134055K
Apr 5, 2021Non_departmental$260,945.28HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Oct 19, 2020Non_departmental$213,831.15HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Sep 9, 2020Non_departmental$212,960.57HWRP PRIMARY INFLUENT SLLUICE GATES REPLACEMENTPO SC50CO20133245K
Sep 15, 2020Non_departmental$211,695.49ODOR CTR NOTF CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Aug 26, 2020Non_departmental$210,773.61LAG MAINTENANCE BUILDING LOCKER ROOM IMPROVEMENTPO SC50CO19131136K
Aug 26, 2020Non_departmental$206,016.91CONSTRUCTION SERVICES CONTRACT (CISCO)PO SC50CO19131136K
Oct 14, 2020Non_departmental$204,939.43LAG MAINTENANCE BUILDING LOCKER ROOM IMPROVEMENTPO SC50CO19131136K
Sep 2, 2020Non_departmental$201,462.56HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Mar 25, 2021Non_departmental$189,056.22ODOR CTR NOTF CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Nov 12, 2020Non_departmental$181,889.75HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
FY 2020top 20 of 245 payments$23,134,272
DateAgencyAmountCategoryPurchase order
Jun 15, 2020Non_departmental$2,109,000.00HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
May 6, 2020Non_departmental$1,569,136.00HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Jan 17, 2020Non_departmental$1,383,798.23HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Apr 17, 2020Non_departmental$1,061,068.45HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Jul 12, 2019Non_departmental$906,024.80CONSTRUCTION SERVICES CONTRACT (CISCO)PO SC50CO19131136K
Jan 17, 2020Non_departmental$719,850.00HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Dec 6, 2019Non_departmental$658,329.63ODOR CTR SIERRA BONITA CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Jun 18, 2020Non_departmental$589,134.91HYGIENE CENTER - 544 TOWNEPO SC54CO20131136K
Mar 31, 2020Non_departmental$463,539.44HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Apr 17, 2020Non_departmental$456,843.70HWRP PRIMARY TANKS SKIMMER IMPROVEMENTSPO SC50CO20133245K
Aug 9, 2019Non_departmental$395,216.19HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Jun 15, 2020Non_departmental$394,766.85HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
Apr 14, 2020Non_departmental$380,499.94HYGIENE CENTER - 544 TOWNEPO SC54CO20131136K
Jan 13, 2020Non_departmental$359,224.32ODOR CTR SIERRA BONITA CARBON SCRB FAC UPGRADEPO SC50CO19130183K
May 6, 2020Non_departmental$333,470.45HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESPO SC50CO20133245K
May 18, 2020Non_departmental$330,655.34HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Jul 12, 2019Non_departmental$308,503.26CONSTRUCTION SERVICES CONTRACT (CISCO)PO SC50MSACO15125471K
May 5, 2020Non_departmental$295,046.30HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Nov 27, 2019Non_departmental$287,983.36HWRP HEADWORKS ODOR CONTROL UPGRADEPO SC50CO18129405K
Jun 15, 2020Non_departmental$287,272.42HWRP PRIMARY INFLUENT SLLUICE GATES REPLACEMENTPO SC50CO20133245K
FY 2019top 20 of 133 payments$14,463,237
DateAgencyAmountCategoryPurchase order
Jul 6, 2018Non_departmental$1,047,999.09HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Aug 28, 2018Non_departmental$1,022,182.93HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Mar 6, 2019Non_departmental$649,774.34HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Jun 20, 2019Non_departmental$645,945.77HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Apr 15, 2019Non_departmental$541,410.11HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Jan 22, 2019Non_departmental$537,458.98HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Oct 25, 2018Non_departmental$329,935.08HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Dec 24, 2018Non_departmental$324,277.84HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Apr 2, 2019Non_departmental$320,999.92ODOR CTR NOTF CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Nov 19, 2018Non_departmental$313,782.70HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Oct 25, 2018Non_departmental$311,068.23HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Mar 14, 2019Non_departmental$298,663.72HWRP PREG BLD INTERIOR REFURBPO SC50CO19131136K
Jul 25, 2018Non_departmental$276,679.07HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Oct 25, 2018Non_departmental$264,380.52HWRP FLARES SYSTEM ACCESS PLATFORMS AND KNOCKOUT DRUMPO SC50MSACO15125471K
May 14, 2019Non_departmental$259,707.58HWRP PREG BLD INTERIOR REFURBPO SC50CO19131136K
Jul 6, 2018Non_departmental$254,825.85HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Jul 24, 2018Non_departmental$246,558.13HWRP PARKING STRUCTURE REHABILITATIONPO SC50MSACO15125471K
Apr 2, 2019Non_departmental$246,027.76ODOR CTR SIERRA BONITA CARBON SCRB FAC UPGRADEPO SC50CO19130183K
Mar 6, 2019Non_departmental$230,612.33HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
May 14, 2019Non_departmental$228,765.05HWRP EMERG LPGH NO.1 REHABPO SC50CO19131136K
FY 2018top 20 of 173 payments$17,932,607
DateAgencyAmountCategoryPurchase order
Mar 27, 2018Non_departmental$2,247,472.74HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Jan 29, 2018Non_departmental$1,884,756.24HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
May 8, 2018Non_departmental$1,843,209.06HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
May 29, 2018Non_departmental$1,279,556.72HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Mar 9, 2018Non_departmental$1,157,142.16HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Nov 27, 2017Non_departmental$1,092,440.95HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Oct 11, 2017Non_departmental$611,289.22HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Jan 8, 2018Non_departmental$451,979.65HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
Sep 11, 2017Non_departmental$262,447.00SMB/BC MAR VISTA RECREATION CTPO SC50MSACO17125471KO
Jan 8, 2018Non_departmental$234,601.59HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
May 29, 2018Non_departmental$230,738.83HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Dec 26, 2017Non_departmental$230,466.43TIWRP PLANT INFLUENT MONITORING SYSTEMPO SC50MSACO15125471K
Jun 19, 2018Non_departmental$221,195.69HWRP COMPRESSOR FAC ENHANCEMPO SC50MSACO15125471K
Jan 29, 2018Non_departmental$216,013.64HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Nov 27, 2017Non_departmental$213,725.80HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Mar 27, 2018Non_departmental$208,521.07HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Oct 11, 2017Non_departmental$199,718.50HWRP HDWRKS ODOR CTRL UPGRDPO SC50CO18129405K
Nov 1, 2017Non_departmental$198,933.16LAG ADMINISTRATION BUILDING HVAC REPLACEMENTPO SC50MSACO15125471K
Jul 24, 2017Non_departmental$195,070.71HTP HDWKS GRIT HANDLING IMPRPO SC50MSACO15123724K
Aug 8, 2017Non_departmental$174,483.00HWRP HEADWORKS IMPROVEMENTSPO SC50CO18129405K
FY 2017top 20 of 115 payments$5,353,343
DateAgencyAmountCategoryPurchase order
Feb 8, 2017Appropriations to Special Purpose Fund$307,456.89HTP HDWKS GRIT HANDLING IMPRPO GAE50CO15123724K
Nov 21, 2016Appropriations to Special Purpose Fund$272,016.04HTP MAIN SWITCH DGUP AUTOSYNPO GAE50CO15125471K
Apr 4, 2017Appropriations to Special Purpose Fund$262,861.80HTP HDWKS GRIT HANDLING IMPRPO GAE50CO15123724K
Jan 11, 2017Appropriations to Special Purpose Fund$243,793.75PW-SANITATION EXPENSE & EQUIPMENTPO GAE50CO15125471K
Apr 5, 2017Appropriations to Special Purpose Fund$189,125.40PP601 MANCHESTER IMPROVEMENTSPO GAE50CO15125471K
Nov 18, 2016Appropriations to Special Purpose Fund$182,407.70DCT AERATION TANKS REHABPO GAE50CO15125540K
Aug 29, 2016Appropriations to Special Purpose Fund$174,715.82HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Mar 16, 2017Appropriations to Special Purpose Fund$159,971.58CONSTRUCTION SERVICES CONTRACTPO GAE50CO15125471K
Jan 11, 2017Appropriations to Special Purpose Fund$156,024.81HTP MAIN SWITCH DGUP AUTOSYNPO GAE50CO15125471K
Jul 21, 2016Appropriations to Special Purpose Fund$147,727.76DCT AERATION TANKS REHABPO GAE50CO15125540K
Oct 3, 2016Appropriations to Special Purpose Fund$143,725.07HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Apr 5, 2017Appropriations to Special Purpose Fund$129,077.64CONSTRUCTION SERVICES CONTRACTPO GAE50CO15125471K
Oct 25, 2016Appropriations to Special Purpose Fund$127,824.69HTP MAIN SWITCH DGUP AUTOSYNPO GAE50CO15125471K
Nov 4, 2016Appropriations to Special Purpose Fund$122,751.14HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Aug 8, 2016Appropriations to Special Purpose Fund$119,991.58HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Mar 16, 2017Appropriations to Special Purpose Fund$117,600.21PP601 MANCHESTER IMPROVEMENTSPO GAE50CO15125471K
Oct 20, 2016Appropriations to Special Purpose Fund$97,665.94DCT AERATION TANKS REHABPO GAE50CO15125540K
Feb 8, 2017Appropriations to Special Purpose Fund$90,654.67HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Oct 25, 2016Appropriations to Special Purpose Fund$87,752.15CONSTRUCTION SERVICES CONTRACTPO GAE50CO15125471K
Jun 26, 2017Appropriations to Special Purpose Fund$86,006.35DCT ADMIN BLD SEWER VENT REPLPO GAE50CO17114648K
FY 2016top 20 of 71 payments$7,874,516
DateAgencyAmountCategoryPurchase order
Nov 18, 2015Appropriations to Special Purpose Fund$1,493,696.30DCT AERATION TANKS REHABPO GAE50CO15125540K
May 24, 2016Appropriations to Special Purpose Fund$717,199.65DCT AERATION TANKS REHABPO GAE50CO15125540K
Sep 4, 2015Appropriations to Special Purpose Fund$559,047.03HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Jun 6, 2016Appropriations to Special Purpose Fund$532,469.80DCT AERATION TANKS REHABPO GAE50CO15125540K
Dec 18, 2015Appropriations to Special Purpose Fund$474,350.89DCT AERATION TANKS REHABPO GAE50CO15125540K
May 20, 2016Appropriations to Special Purpose Fund$453,956.22HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Sep 8, 2015Appropriations to Special Purpose Fund$408,468.75DCT AERATION TANKS REHABPO GAE50CO15125540K
Apr 28, 2016Appropriations to Special Purpose Fund$363,679.52DCT AERATION TANKS REHABPO GAE50CO15125540K
Oct 6, 2015Appropriations to Special Purpose Fund$322,773.56DCT AERATION TANKS REHABPO GAE50CO15125540K
May 2, 2016Appropriations to Special Purpose Fund$258,664.89HTP HDWKS GRIT HANDL IMPPO GAE50CO15123724K
Feb 9, 2016Appropriations to Special Purpose Fund$131,423.00LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Nov 16, 2015Appropriations to Special Purpose Fund$120,157.24HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
May 4, 2016Appropriations to Special Purpose Fund$114,797.71HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Oct 13, 2015Appropriations to Special Purpose Fund$113,271.87HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Dec 10, 2015Appropriations to Special Purpose Fund$89,891.00CONSTRUCTION SERVICES CONTRACTPO GAE50CO15125471K
Jun 27, 2016Appropriations to Special Purpose Fund$84,447.40TIWRP DCS SERVER ROOMPO GAE50CO15125471K
Jun 2, 2016Appropriations to Special Purpose Fund$82,391.77HTP PRIM SLUDGE CENTRIFUGE INSPO GAE50FMISCO9113978K
Feb 11, 2016Appropriations to Special Purpose Fund$82,202.93HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Dec 7, 2015Appropriations to Special Purpose Fund$81,013.01DCT AERATION TANKS REHABPO GAE50CO15125540K
Jun 27, 2016Appropriations to Special Purpose Fund$77,302.25SANITATION-PROJECT RELATEDPO GAE50CO15125471K
FY 2015top 20 of 43 payments$7,045,194
DateAgencyAmountCategoryPurchase order
Aug 26, 2014Appropriations to Special Purpose Fund$616,571.06LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Jun 23, 2015Appropriations to Special Purpose Fund$610,585.65HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Mar 16, 2015Appropriations to Special Purpose Fund$536,392.88HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Nov 20, 2014Appropriations to Special Purpose Fund$513,471.09LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
May 27, 2015Appropriations to Special Purpose Fund$431,293.25HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Jul 21, 2014Appropriations to Special Purpose Fund$418,588.86HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Feb 6, 2015Appropriations to Special Purpose Fund$387,733.77LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Sep 24, 2014Appropriations to Special Purpose Fund$344,223.62LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Oct 2, 2014Appropriations to Special Purpose Fund$322,122.36HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Feb 23, 2015Appropriations to Special Purpose Fund$303,248.23LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Jan 28, 2015Appropriations to Special Purpose Fund$285,458.11HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Oct 23, 2014Appropriations to Special Purpose Fund$282,844.77LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Mar 27, 2015Appropriations to Special Purpose Fund$260,742.41HTP HDWKS GRIT HANDL IMPROVPO GAE50CO15123724K
Jul 24, 2014Appropriations to Special Purpose Fund$193,662.78LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Sep 24, 2014Appropriations to Special Purpose Fund$158,534.55LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Sep 22, 2014Appropriations to Special Purpose Fund$152,092.31HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Mar 27, 2015Appropriations to Special Purpose Fund$129,417.44LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Nov 3, 2014Appropriations to Special Purpose Fund$122,802.35HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Aug 18, 2014Appropriations to Special Purpose Fund$100,871.23HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Aug 14, 2014Appropriations to Special Purpose Fund$76,240.00HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
FY 2014top 20 of 66 payments$9,215,704
DateAgencyAmountCategoryPurchase order
Nov 5, 2013Appropriations to Special Purpose Fund$840,144.06HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Oct 24, 2013Appropriations to Special Purpose Fund$539,277.14HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Nov 26, 2013Appropriations to Special Purpose Fund$498,784.13HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
May 2, 2014Appropriations to Special Purpose Fund$474,487.72HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Feb 27, 2014Appropriations to Special Purpose Fund$467,573.35TIWRP AWPF PROD WATER STABILIZPO GAE50FMISCO0116635K
Feb 27, 2014Appropriations to Special Purpose Fund$454,736.62HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Mar 25, 2014Appropriations to Special Purpose Fund$440,104.42HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
May 28, 2014Appropriations to Special Purpose Fund$349,998.35HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Dec 5, 2013Appropriations to Special Purpose Fund$329,791.60HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Apr 14, 2014Appropriations to Special Purpose Fund$283,801.38HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Nov 21, 2013Appropriations to Special Purpose Fund$274,658.87HTP HDWKS GRIT CLASS RELOCPO GAE50CO13121818K
Dec 27, 2013Appropriations to Special Purpose Fund$263,103.79HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
Jan 29, 2014Appropriations to Special Purpose Fund$253,412.92HTP DIG GAS DESULF FAC IMPRPO GAE50CO14122537K
May 6, 2014Appropriations to Special Purpose Fund$230,944.55LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
May 5, 2014Appropriations to Special Purpose Fund$229,553.33HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Aug 21, 2013Appropriations to Special Purpose Fund$228,000.00TIWRP AWPF PROD WATER STABILIZPO GAE50FMISCO0116635K
Sep 25, 2013Appropriations to Special Purpose Fund$214,947.76HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
Jun 18, 2014Appropriations to Special Purpose Fund$200,861.02LAG NDN BLOWER INSTALLATIONPO GAE50CO14123101K
Nov 21, 2013Appropriations to Special Purpose Fund$198,293.56HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
May 1, 2014Appropriations to Special Purpose Fund$192,717.92HTP SCREENING HANDLING IMPRPO GAE50CO13121818K
FY 2013top 20 of 63 payments$4,325,857
DateAgencyAmountCategoryPurchase order
Nov 14, 2012Appropriations to Special Purpose Fund$629,684.45HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Dec 7, 2012Appropriations to Special Purpose Fund$456,225.11HTP PRIM SLUDGE CENTRIFUGE INSPO GAE50FMISCO9113978K
May 13, 2013Appropriations to Special Purpose Fund$431,865.26HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Apr 19, 2013Appropriations to Special Purpose Fund$402,828.60HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Nov 14, 2012Appropriations to Special Purpose Fund$300,131.24HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
May 22, 2013Appropriations to Special Purpose Fund$274,928.83HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Jun 21, 2013Appropriations to Special Purpose Fund$237,641.92HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Jun 10, 2013Appropriations to Special Purpose Fund$181,677.60TIWRP BLOWER CTRL SYS UPGRADEPO GAE50FMISCO0116635K
Mar 12, 2013Appropriations to Special Purpose Fund$160,692.86HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
May 22, 2013Appropriations to Special Purpose Fund$136,201.34HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Dec 19, 2012Appropriations to Special Purpose Fund$114,000.00CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Jun 10, 2013Appropriations to Special Purpose Fund$113,932.00TIWRP BLOWER CTRL SYS UPGRADEPO GAE50FMISCO0116635K
Sep 27, 2012Appropriations to Special Purpose Fund$99,728.15CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Feb 14, 2013Appropriations to Special Purpose Fund$84,641.20SANITATION EXP & EQUIP-PROJ REPO GAE50FMISCO0116635K
Sep 27, 2012Appropriations to Special Purpose Fund$75,182.05CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Sep 27, 2012Appropriations to Special Purpose Fund$62,225.00CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Apr 1, 2013Appropriations to Special Purpose Fund$45,910.65CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Dec 19, 2012Appropriations to Special Purpose Fund$43,210.56CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Dec 19, 2012Appropriations to Special Purpose Fund$39,369.24CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Feb 14, 2013Appropriations to Special Purpose Fund$38,283.04CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
FY 2012top 20 of 69 payments$3,316,977
DateAgencyAmountCategoryPurchase order
May 14, 2012Appropriations to Special Purpose Fund$370,470.15HTP AUX BOILER NO. 2 REPLPO GAE50FMISCO1114648K
Sep 16, 2011Appropriations to Special Purpose Fund$330,031.33HTP AUX BOILER NO. 2 REPLPO GAE50FMISCO1114648K
Jan 27, 2012Appropriations to Special Purpose Fund$244,140.25DCT ELECT VAULTS MH 1-3 REPLPO GAE50FMISCO0116635K
Nov 29, 2011Appropriations to Special Purpose Fund$192,918.00HTP PRIM SLUDGE CENTRIFUGE INSPO GAE50FMISCO9113978K
Jun 18, 2012Appropriations to Special Purpose Fund$181,514.60TIWRP BLOWER CTRL SYS UPGRADEPO GAE50FMISCO0116635K
Aug 1, 2011Appropriations to Special Purpose Fund$159,641.80CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Jun 21, 2012Appropriations to Special Purpose Fund$151,398.51HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Sep 16, 2011Appropriations to Special Purpose Fund$143,979.15CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Oct 4, 2011Recreation and Parks - Special Accounts$115,953.77SUBDIVISION FEES TR/QUIMBY FNDPO GAE89FMISCO1116635K
May 24, 2012Appropriations to Special Purpose Fund$98,014.87HTP AUX BOILER NO.2 REPLPO GAE50FMISCO1114648K
Oct 4, 2011Recreation and Parks - Special Accounts$96,627.35SUBDIVISION FEES TR/QUIMBY FNDPO GAE89FMISCO1116635K
Jun 18, 2012Appropriations to Special Purpose Fund$91,404.80CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Sep 16, 2011Appropriations to Special Purpose Fund$89,323.56CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
May 17, 2012Appropriations to Special Purpose Fund$86,728.35DCT SEC CLAR CRACK REHABPO GAE50FMISCO0116635K
May 17, 2012Appropriations to Special Purpose Fund$84,555.60TIWRP CENTRIFUGE FEED PUMPSPO GAE50FMISCO0116635K
Aug 1, 2011Appropriations to Special Purpose Fund$77,140.33CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Dec 9, 2011Appropriations to Special Purpose Fund$71,277.55CONSTRUCTION SERVICES CONTRACTPO GAE50FMISCO0116635K
Nov 28, 2011Appropriations to Special Purpose Fund$66,059.20HTP LIQUID SLUDGE STORAGE FACPO GAE50FMISCO8113352K
May 24, 2012Appropriations to Special Purpose Fund$59,789.63HTP AUX BOILER NO. 2 REPLPO GAE50FMISCO1114648K
Jan 27, 2012Appropriations to Special Purpose Fund$46,776.10SMBLFD PACKAGE 1PO GAE50FMISCO0116635K

Recent payments

DateAgencyAmountCategoryMethod
Jun 13, 2025Public Works - Sanitation$2,467.50CONTRACTUAL SERVICESCHECK
Jun 12, 2025Non_departmental$94,231.45SANITATION-PROJECT RELATEDCHECK
Jun 11, 2025Non_departmental$86,202.94HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESCHECK
Jun 11, 2025Non_departmental$639,629.30SANITATION-PROJECT RELATEDCHECK
Jun 9, 2025Non_departmental$3,864.55PW-SANITATION EXPENSE AND EQUIPMENTCHECK
Jun 6, 2025Non_departmental$20,430.90PW-SANITATION EXPENSE AND EQUIPMENTCHECK
Jun 6, 2025Non_departmental$10,709.47TIWRP AWPF CAPITAL EQUIP REPLACEMENT PROGCHECK
Jun 5, 2025Non_departmental$3,735.52TIWRP AWPF CAPITAL EQUIP REPLACEMENT PROGCHECK
Jun 4, 2025Non_departmental$152,534.67ON CALL CONTRACTORS (EMERGENCY FUNDS)CHECK
May 28, 2025Non_departmental$176,216.45SANITATION-PROJECT RELATEDCHECK
May 27, 2025Non_departmental$30,084.11HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESCHECK
May 27, 2025Non_departmental$57,638.76HWRP PRIMARY TANKS B0, B5 AND C0 UPGRADESCHECK
May 19, 2025Non_departmental$3,750.54PW-SANITATION EXPENSE AND EQUIPMENTCHECK
May 16, 2025Non_departmental$6,366.90HWRP IPS AFTERBAY ODOR CON MODCHECK
May 16, 2025Non_departmental$4,806.05TIWRP WAS LINE AND DIGESTER SLUDGE FEED PIPING REPLACEMENTCHECK
May 16, 2025Non_departmental$568.85TIWRP HEADWORKS IN-PLANT LIFT STATEION BARSCREEN BYPASSCHECK
May 16, 2025Non_departmental$252.95TIWRP WAS LINE AND DIGESTER SLUDGE FEED PIPING REPLACEMENTCHECK
May 16, 2025Non_departmental$5,000.00TIWRP LOW PRESSURE GAS PIPING REPLACEMENTCHECK
May 16, 2025Non_departmental$3,667.05SANITATION-PROJECT RELATEDCHECK
May 16, 2025Non_departmental$126,618.28TIWRP INFLUENT HEADWORKS BARSCREEN PASSIVE BYPASSCHECK
May 16, 2025Non_departmental$1,673.40SANITATION-PROJECT RELATEDCHECK
May 16, 2025Non_departmental$69,673.95SANITATION-PROJECT RELATEDCHECK
May 16, 2025Non_departmental$52,600.12LAG HEADWORKS ISOLATION GATES INSTALLATIONCHECK
May 16, 2025Non_departmental$2,990.36SANITATION-PROJECT RELATEDCHECK
May 16, 2025Non_departmental$2,667.60CLEAN WATER PLANNING & DESIGN SERVICESCHECK

Other vendors serving Non_departmental

VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data