Ohl USA Inc: Los Angeles Government Payments
as recorded by Los Angeles: OHL USA INC
Ohl USA Inc is the 215th-largest recipient of Los Angeles city government payments tracked by SpendLedger, and ranks first in MACHADO LAKE PIPELINE EASTERN REACH spending. Its payments amount to 0.6% of everything the Non_departmental has paid vendors in that span.
Primary spending category: MACHADO LAKE PIPELINE EASTERN REACH
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
| Fiscal year | Agency | Payments | Total |
|---|---|---|---|
| FY 2022 | Non_departmental | 35 | $6,753,400 |
| FY 2021 | Non_departmental | 96 | $14,883,357 |
| FY 2020 | Non_departmental | 79 | $37,898,612 |
| FY 2019 | Non_departmental | 30 | $15,076,420 |
| FY 2018 | Non_departmental | 2 | $1,877,437 |
| Total | 242 | $76,489,226 |
What the payments were for
Spending categories exactly as Los Angeles city government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| ARGO DRAIN SUB BASIN FACILITY | 29 | $9,552,805 | Feb 22, 2019 – Jan 19, 2022 |
| MACHADO LAKE ECOSYSTEM REHAB | 3 | $4,277,580 | Dec 26, 2017 – Sep 19, 2018 |
| MACHADO LAKE PIPELINE EASTERN REACH | 68 | $17,927,269 | Mar 21, 2019 – Apr 6, 2022 |
| POTRERO CANYON STABILIZ & PARK | 27 | $17,222,572 | Feb 11, 2019 – Mar 2, 2021 |
| ARGO DRAIN SUB BASIN FACILITY.1 | 41 | $14,410,774 | Nov 1, 2019 – Aug 27, 2021 |
| ARGO DRAIN SUB BASIN FACILITY.2 | 6 | $1,253,756 | Dec 10, 2019 – Feb 14, 2020 |
| PROP O-ARGO DRAINAGE BASIN PROJ | 68 | $11,844,469 | Jan 31, 2019 – Jan 18, 2022 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2022top 20 of 35 payments$6,753,400
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 6, 2022 | Non_departmental | $2,072,516.80 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Sep 8, 2021 | Non_departmental | $1,285,068.80 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Apr 6, 2022 | Non_departmental | $1,232,478.34 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Feb 16, 2022 | Non_departmental | $372,717.33 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Oct 27, 2021 | Non_departmental | $367,235.28 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Jul 22, 2021 | Non_departmental | $300,858.24 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Aug 27, 2021 | Non_departmental | $220,569.99 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Sep 8, 2021 | Non_departmental | $194,501.52 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Nov 17, 2021 | Non_departmental | $140,820.82 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Jul 22, 2021 | Non_departmental | $120,524.26 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Jan 12, 2022 | Non_departmental | $71,436.69 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Sep 9, 2021 | Non_departmental | $67,635.20 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Sep 1, 2021 | Non_departmental | $59,237.65 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Jul 22, 2021 | Non_departmental | $52,445.17 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Jul 22, 2021 | Non_departmental | $24,938.30 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Aug 27, 2021 | Non_departmental | $24,824.99 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Aug 16, 2021 | Non_departmental | $21,781.29 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Oct 25, 2021 | Non_departmental | $21,432.81 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Feb 16, 2022 | Non_departmental | $19,616.70 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Jan 19, 2022 | Non_departmental | $16,012.04 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
FY 2021top 20 of 96 payments$14,883,357
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 28, 2020 | Non_departmental | $1,086,043.13 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Jun 10, 2021 | Non_departmental | $1,041,432.16 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Jul 28, 2020 | Non_departmental | $1,015,006.09 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Mar 2, 2021 | Non_departmental | $861,128.60 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Sep 11, 2020 | Non_departmental | $812,817.54 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Oct 6, 2020 | Non_departmental | $730,753.14 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Oct 2, 2020 | Non_departmental | $606,633.25 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Apr 21, 2021 | Non_departmental | $559,321.26 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Aug 28, 2020 | Non_departmental | $549,977.09 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Mar 24, 2021 | Non_departmental | $495,084.39 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Sep 2, 2020 | Non_departmental | $441,128.60 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Mar 4, 2021 | Non_departmental | $403,222.30 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Nov 24, 2020 | Non_departmental | $369,186.23 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| May 12, 2021 | Non_departmental | $366,734.17 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Mar 2, 2021 | Non_departmental | $365,987.50 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Dec 17, 2020 | Non_departmental | $330,071.91 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Dec 28, 2020 | Non_departmental | $311,020.45 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Dec 2, 2020 | Non_departmental | $303,760.73 | MACHADO LAKE PIPELINE EASTERN REACH | – |
| Apr 19, 2021 | Non_departmental | $302,033.50 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Oct 29, 2020 | Non_departmental | $289,318.38 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
FY 2020top 20 of 79 payments$37,898,612
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 4, 2019 | Non_departmental | $2,043,845.03 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Feb 14, 2020 | Non_departmental | $1,671,108.20 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Dec 16, 2019 | Non_departmental | $1,616,555.01 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Mar 3, 2020 | Non_departmental | $1,554,205.06 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Dec 31, 2019 | Non_departmental | $1,536,179.90 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Dec 11, 2019 | Non_departmental | $1,485,820.39 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Sep 23, 2019 | Non_departmental | $1,292,242.94 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Aug 15, 2019 | Non_departmental | $1,268,440.01 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Dec 16, 2019 | Non_departmental | $1,197,254.84 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Nov 8, 2019 | Non_departmental | $1,102,646.08 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Nov 18, 2019 | Non_departmental | $1,074,576.49 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Jan 8, 2020 | Non_departmental | $1,074,333.45 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Aug 30, 2019 | Non_departmental | $1,060,609.69 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Dec 17, 2019 | Non_departmental | $1,039,325.07 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Jun 24, 2020 | Non_departmental | $1,016,042.04 | ARGO DRAIN SUB BASIN FACILITY.1 | PO SC50CO19131878KO |
| Jan 8, 2020 | Non_departmental | $932,477.68 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| May 28, 2020 | Non_departmental | $913,937.35 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50CO20131470K |
| Mar 4, 2020 | Non_departmental | $889,139.87 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| May 7, 2020 | Non_departmental | $872,810.78 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Jan 8, 2020 | Non_departmental | $816,764.74 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
FY 2019top 20 of 30 payments$15,076,420
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 19, 2018 | Non_departmental | $2,400,143.49 | MACHADO LAKE ECOSYSTEM REHAB | PO SC50MSACO14123672KO |
| Jun 10, 2019 | Non_departmental | $1,738,685.25 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| May 8, 2019 | Non_departmental | $1,622,655.10 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Mar 21, 2019 | Non_departmental | $1,525,810.86 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Mar 4, 2019 | Non_departmental | $785,919.33 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Apr 11, 2019 | Non_departmental | $676,431.04 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| May 20, 2019 | Non_departmental | $655,169.59 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Jun 5, 2019 | Non_departmental | $570,459.43 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Feb 22, 2019 | Non_departmental | $563,033.20 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| Mar 15, 2019 | Non_departmental | $522,414.29 | ARGO DRAIN SUB BASIN FACILITY | PO SC50CO19131878KO |
| May 1, 2019 | Non_departmental | $436,103.63 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Jun 24, 2019 | Non_departmental | $409,336.00 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Mar 20, 2019 | Non_departmental | $397,993.05 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Apr 19, 2019 | Non_departmental | $342,547.70 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Jun 3, 2019 | Non_departmental | $331,780.81 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Apr 11, 2019 | Non_departmental | $308,707.90 | MACHADO LAKE PIPELINE EASTERN REACH | PO SC50C019131470K |
| Mar 4, 2019 | Non_departmental | $285,122.52 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Apr 18, 2019 | Non_departmental | $283,115.63 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
| Apr 1, 2019 | Non_departmental | $264,552.93 | PROP O-ARGO DRAINAGE BASIN PROJ | PO SC54CO19131878K |
| Mar 11, 2019 | Non_departmental | $247,752.40 | POTRERO CANYON STABILIZ & PARK | PO SC54CO19003644K |
FY 2018top 2 of 2 payments$1,877,437
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 26, 2017 | Non_departmental | $1,125,979.50 | MACHADO LAKE ECOSYSTEM REHAB | PO SC50MSACO14123672KO |
| Jan 17, 2018 | Non_departmental | $751,457.50 | MACHADO LAKE ECOSYSTEM REHAB | PO SC50MSACO14123672KO |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| Apr 6, 2022 | Non_departmental | $2,072,516.80 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Apr 6, 2022 | Non_departmental | $1,232,478.34 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Feb 16, 2022 | Non_departmental | $19,616.70 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Feb 16, 2022 | Non_departmental | $372,717.33 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Jan 19, 2022 | Non_departmental | $16,012.04 | ARGO DRAIN SUB BASIN FACILITY | EFT |
| Jan 18, 2022 | Non_departmental | $8.40 | PROP O-ARGO DRAINAGE BASIN PROJ | CHECK |
| Jan 18, 2022 | Non_departmental | $159.62 | PROP O-ARGO DRAINAGE BASIN PROJ | EFT |
| Jan 14, 2022 | Non_departmental | $842.74 | ARGO DRAIN SUB BASIN FACILITY | CHECK |
| Jan 12, 2022 | Non_departmental | $71,436.69 | ARGO DRAIN SUB BASIN FACILITY | EFT |
| Jan 10, 2022 | Non_departmental | $3,759.83 | ARGO DRAIN SUB BASIN FACILITY | CHECK |
| Dec 29, 2021 | Non_departmental | $35.30 | PROP O-ARGO DRAINAGE BASIN PROJ | CHECK |
| Dec 29, 2021 | Non_departmental | $670.88 | PROP O-ARGO DRAINAGE BASIN PROJ | EFT |
| Nov 18, 2021 | Non_departmental | $14,358.02 | PROP O-ARGO DRAINAGE BASIN PROJ | EFT |
| Nov 17, 2021 | Non_departmental | $140,820.82 | ARGO DRAIN SUB BASIN FACILITY | EFT |
| Nov 17, 2021 | Non_departmental | $755.69 | PROP O-ARGO DRAINAGE BASIN PROJ | CHECK |
| Nov 15, 2021 | Non_departmental | $7,411.62 | ARGO DRAIN SUB BASIN FACILITY | CHECK |
| Oct 27, 2021 | Non_departmental | $367,235.28 | ARGO DRAIN SUB BASIN FACILITY | EFT |
| Oct 25, 2021 | Non_departmental | $21,432.81 | ARGO DRAIN SUB BASIN FACILITY | CHECK |
| Oct 20, 2021 | Non_departmental | $10,762.41 | PROP O-ARGO DRAINAGE BASIN PROJ | EFT |
| Oct 18, 2021 | Non_departmental | $566.44 | PROP O-ARGO DRAINAGE BASIN PROJ | CHECK |
| Sep 9, 2021 | Non_departmental | $67,635.20 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Sep 8, 2021 | Non_departmental | $194,501.52 | ARGO DRAIN SUB BASIN FACILITY | EFT |
| Sep 8, 2021 | Non_departmental | $1,285,068.80 | MACHADO LAKE PIPELINE EASTERN REACH | EFT |
| Sep 3, 2021 | Non_departmental | $10,236.92 | ARGO DRAIN SUB BASIN FACILITY | CHECK |
| Sep 1, 2021 | Non_departmental | $59,237.65 | PROP O-ARGO DRAINAGE BASIN PROJ | EFT |
Other vendors serving Non_departmental
- Voya Holdings, Inc. $2,961,390,236
- Southern California Permanente Medical Group $1,777,333,480
- Blue Cross of California $1,144,613,651
- Skanska Stacy and Witbeck a Joint Venture $294,562,883
- U S Bank Trust N a $269,356,884
- Browning-Ferris Industries of California Inc $255,037,189
- Standard Insurance Company $189,312,135
- USA Waste of California Inc $166,113,009
- Murray Plumbing and Heating Corp. $162,890,669
- Delta Dental of California $162,661,117
VerifiedData refreshed Sep 7, 2026 from Los Angeles Open Data checkbook (data.lacity.org): 9,996,947 payments on record, Jul 5, 2011 to Jun 30, 2025. How we verify this data