The Rba Group New York: New York City Government Payments
as recorded by New York City: THE RBA GROUP NEW YORK
The Rba Group New York is the 1,490th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 53rd in DESIGN-CONSULTANT-IOTB spending. Its payments amount to 0.1% of everything the Department of Transportation has paid vendors in that span. Payments to it rose 1488.4% year over year.
Primary spending category: DESIGN-CONSULTANT-IOTB
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| PROF SERV OTHER | 76 | $810,092 | Jun 11, 2013 – Jan 3, 2017 |
| PROF SERV COMPUTER SERVICES | 4 | $59,767 | Jun 26, 2013 – Jul 18, 2013 |
| CONSTRUCTION-BUILDINGS | 128 | $525,845 | Jun 24, 2013 – Mar 6, 2017 |
| PROMPT PAYMENT INTEREST | 4 | $335 | Oct 29, 2015 – Dec 24, 2015 |
| IOTB CONSTRUCTION | 31 | $2,758,487 | Sep 21, 2015 – Mar 6, 2017 |
| PROF SERV ENGINEER & ARCHITECT | 111 | $2,515,510 | Jul 8, 2013 – Jan 25, 2017 |
| DESIGN-CONSULTANT-IOTB | 607 | $22,161,613 | Jun 10, 2013 – Mar 6, 2017 |
| CONTRACTUAL SERVICES GENERAL | 3 | $150,958 | Dec 15, 2014 – Aug 23, 2016 |
| MAINT & OPER OF INFRASTRUCTURE | 1 | $13,415 | Jan 25, 2017 – Jan 25, 2017 |
| N/A | 46 | $1,313,282 | Nov 6, 2014 – Sep 20, 2024 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 1 of 1 payments$642,361
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 20, 2024 | Department of Design and Construction | $642,360.60 | N/A | – |
FY 2024top 6 of 6 payments$40,440
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 19, 2023 | Department of Design and Construction | $11,851.30 | N/A | – |
| Dec 15, 2023 | Department of Design and Construction | $9,702.60 | N/A | – |
| Apr 1, 2024 | Department of Design and Construction | $5,683.15 | N/A | – |
| Jul 17, 2023 | Department of Design and Construction | $5,526.95 | N/A | – |
| Dec 29, 2023 | Department of Design and Construction | $4,175.65 | N/A | – |
| Feb 16, 2024 | Department of Design and Construction | $3,500.00 | N/A | – |
FY 2023top 8 of 8 payments$67,238
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 1, 2022 | Department of Design and Construction | $25,202.68 | N/A | – |
| Jun 15, 2023 | Department of Design and Construction | $10,256.68 | N/A | – |
| May 1, 2023 | Department of Design and Construction | $9,567.62 | N/A | – |
| Dec 9, 2022 | Department of Design and Construction | $6,806.69 | N/A | – |
| Aug 4, 2022 | Department of Design and Construction | $6,736.68 | N/A | – |
| Jan 12, 2023 | Department of Design and Construction | $5,846.81 | N/A | – |
| Sep 23, 2022 | Department of Design and Construction | $2,338.47 | N/A | – |
| Sep 9, 2022 | Department of Design and Construction | $482.85 | N/A | – |
FY 2022top 12 of 12 payments$250,053
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Apr 28, 2022 | Department of Design and Construction | $119,053.67 | N/A | – |
| May 17, 2022 | Department of Design and Construction | $32,873.52 | N/A | – |
| Dec 8, 2021 | Department of Design and Construction | $15,972.80 | N/A | – |
| Oct 18, 2021 | Department of Design and Construction | $15,279.12 | N/A | – |
| Jan 28, 2022 | Department of Design and Construction | $14,640.53 | N/A | – |
| May 26, 2022 | Department of Design and Construction | $10,759.96 | N/A | – |
| Jul 21, 2021 | Department of Design and Construction | $9,559.98 | N/A | – |
| May 4, 2022 | Department of Design and Construction | $9,418.44 | N/A | – |
| Sep 7, 2021 | Department of Design and Construction | $7,710.99 | N/A | – |
| Mar 25, 2022 | Department of Design and Construction | $5,074.66 | N/A | – |
| Mar 7, 2022 | Department of Design and Construction | $5,003.57 | N/A | – |
| Apr 7, 2022 | Department of Design and Construction | $4,705.87 | N/A | – |
FY 2021top 4 of 4 payments$119,892
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 9, 2020 | Department of Design and Construction | $43,571.96 | N/A | – |
| Dec 9, 2020 | Department of Design and Construction | $39,313.04 | N/A | – |
| Mar 9, 2021 | Department of Design and Construction | $27,943.52 | N/A | – |
| Sep 8, 2020 | Department of Design and Construction | $9,063.04 | N/A | – |
FY 2020top 7 of 7 payments$136,237
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 8, 2019 | Department of Design and Construction | $60,329.43 | N/A | – |
| Mar 30, 2020 | Department of Environmental Protection | $28,045.08 | N/A | – |
| Aug 23, 2019 | Department of Design and Construction | $27,428.17 | N/A | – |
| Apr 7, 2020 | Department of Environmental Protection | $12,154.19 | N/A | – |
| May 22, 2020 | Department of Environmental Protection | $6,702.59 | N/A | – |
| Mar 30, 2020 | Department of Environmental Protection | $867.05 | N/A | – |
| Aug 13, 2019 | Department of Environmental Protection | $710.54 | N/A | – |
FY 2018top 2 of 2 payments$15,994
FY 2017top 20 of 124 payments$9,116,825
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 31, 2016 | Department of Environmental Protection | $1,164,796.24 | DESIGN-CONSULTANT-IOTB | – |
| Mar 6, 2017 | Department of Environmental Protection | $915,090.37 | DESIGN-CONSULTANT-IOTB | – |
| Aug 10, 2016 | Department of Parks and Recreation | $854,362.15 | DESIGN-CONSULTANT-IOTB | – |
| Dec 19, 2016 | Department of Environmental Protection | $668,714.10 | DESIGN-CONSULTANT-IOTB | – |
| Aug 15, 2016 | Department of Environmental Protection | $377,962.26 | IOTB CONSTRUCTION | – |
| Sep 6, 2016 | Department of Parks and Recreation | $369,337.50 | IOTB CONSTRUCTION | – |
| Feb 13, 2017 | Department of Environmental Protection | $301,604.76 | DESIGN-CONSULTANT-IOTB | – |
| Aug 23, 2016 | Department of Environmental Protection | $278,844.41 | IOTB CONSTRUCTION | – |
| Nov 7, 2016 | Department of Environmental Protection | $237,569.46 | IOTB CONSTRUCTION | – |
| Aug 15, 2016 | Department of Environmental Protection | $217,359.93 | IOTB CONSTRUCTION | – |
| Feb 15, 2017 | Department of Environmental Protection | $193,336.20 | IOTB CONSTRUCTION | – |
| Aug 1, 2016 | Department of Transportation | $181,223.32 | DESIGN-CONSULTANT-IOTB | – |
| Nov 28, 2016 | Department of Environmental Protection | $174,439.50 | DESIGN-CONSULTANT-IOTB | – |
| Dec 5, 2016 | Department of Parks and Recreation | $169,574.29 | DESIGN-CONSULTANT-IOTB | – |
| Aug 22, 2016 | Department of Environmental Protection | $125,914.30 | IOTB CONSTRUCTION | – |
| Nov 9, 2016 | Department of Environmental Protection | $121,011.10 | IOTB CONSTRUCTION | – |
| Sep 14, 2016 | Department of Transportation | $120,630.26 | DESIGN-CONSULTANT-IOTB | – |
| Aug 17, 2016 | Department of Environmental Protection | $107,657.92 | DESIGN-CONSULTANT-IOTB | – |
| Jan 11, 2017 | Department of Parks and Recreation | $93,007.10 | DESIGN-CONSULTANT-IOTB | – |
| Dec 13, 2016 | Department of Environmental Protection | $90,597.13 | IOTB CONSTRUCTION | – |
FY 2016top 20 of 170 payments$4,975,702
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 27, 2016 | Department of Transportation | $519,379.00 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2016 | Department of Transportation | $362,284.20 | DESIGN-CONSULTANT-IOTB | – |
| Apr 11, 2016 | Department of Environmental Protection | $169,105.80 | DESIGN-CONSULTANT-IOTB | – |
| May 31, 2016 | Department of Environmental Protection | $145,494.01 | DESIGN-CONSULTANT-IOTB | – |
| Jun 27, 2016 | Department of Transportation | $121,369.20 | DESIGN-CONSULTANT-IOTB | – |
| Jan 19, 2016 | Department of Environmental Protection | $112,162.00 | DESIGN-CONSULTANT-IOTB | – |
| Sep 21, 2015 | Department of Environmental Protection | $99,193.38 | IOTB CONSTRUCTION | – |
| Jun 29, 2016 | Department of Environmental Protection | $91,008.75 | DESIGN-CONSULTANT-IOTB | – |
| May 9, 2016 | Department of Environmental Protection | $85,369.77 | DESIGN-CONSULTANT-IOTB | – |
| Mar 7, 2016 | Department of Environmental Protection | $81,557.80 | DESIGN-CONSULTANT-IOTB | – |
| May 16, 2016 | Department of Transportation | $81,349.12 | DESIGN-CONSULTANT-IOTB | – |
| Feb 16, 2016 | Department of Environmental Protection | $77,386.28 | IOTB CONSTRUCTION | – |
| Jul 27, 2015 | Department of Environmental Protection | $72,505.60 | DESIGN-CONSULTANT-IOTB | – |
| Mar 30, 2016 | Department of Transportation | $72,086.01 | DESIGN-CONSULTANT-IOTB | – |
| Mar 14, 2016 | Department of Design and Construction | $71,514.49 | PROF SERV ENGINEER & ARCHITECT | – |
| Dec 9, 2015 | Department of Transportation | $69,374.62 | DESIGN-CONSULTANT-IOTB | – |
| Jul 6, 2015 | Department of Transportation | $68,961.86 | DESIGN-CONSULTANT-IOTB | – |
| Mar 24, 2016 | Department of Transportation | $66,270.67 | PROF SERV ENGINEER & ARCHITECT | – |
| Jul 13, 2015 | Department of Transportation | $64,671.34 | DESIGN-CONSULTANT-IOTB | – |
| Apr 20, 2016 | Department of Transportation | $64,605.87 | DESIGN-CONSULTANT-IOTB | – |
FY 2015top 20 of 402 payments$8,269,631
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jul 21, 2014 | Department of Environmental Protection | $643,023.70 | DESIGN-CONSULTANT-IOTB | – |
| Feb 18, 2015 | Department of Environmental Protection | $187,448.39 | DESIGN-CONSULTANT-IOTB | – |
| Nov 5, 2014 | Department of Environmental Protection | $162,782.97 | DESIGN-CONSULTANT-IOTB | – |
| Mar 4, 2015 | Department of Design and Construction | $151,741.02 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 23, 2015 | Department of Transportation | $116,093.35 | DESIGN-CONSULTANT-IOTB | – |
| Oct 14, 2014 | Department of Cultural Affairs | $115,312.80 | DESIGN-CONSULTANT-IOTB | – |
| Jan 12, 2015 | Department of Parks and Recreation | $114,345.55 | DESIGN-CONSULTANT-IOTB | – |
| Jul 30, 2014 | Department of Parks and Recreation | $106,634.63 | DESIGN-CONSULTANT-IOTB | – |
| Jul 1, 2014 | Department of Parks and Recreation | $98,046.00 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2014 | Department of Transportation | $97,833.24 | DESIGN-CONSULTANT-IOTB | – |
| Dec 31, 2014 | Department of Transportation | $95,203.55 | DESIGN-CONSULTANT-IOTB | – |
| Aug 18, 2014 | Department of Transportation | $94,445.26 | DESIGN-CONSULTANT-IOTB | – |
| Nov 5, 2014 | Department of Transportation | $89,063.97 | DESIGN-CONSULTANT-IOTB | – |
| Oct 1, 2014 | Department of Parks and Recreation | $88,304.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 15, 2014 | Department of Transportation | $87,597.98 | DESIGN-CONSULTANT-IOTB | – |
| Mar 30, 2015 | Department of Transportation | $85,488.39 | DESIGN-CONSULTANT-IOTB | – |
| Nov 25, 2014 | Department of Transportation | $85,094.69 | DESIGN-CONSULTANT-IOTB | – |
| Mar 16, 2015 | Department of Transportation | $80,614.44 | DESIGN-CONSULTANT-IOTB | – |
| Aug 15, 2014 | Department of Transportation | $79,838.00 | DESIGN-CONSULTANT-IOTB | – |
| Dec 1, 2014 | Department of Transportation | $79,119.25 | DESIGN-CONSULTANT-IOTB | – |
FY 2014top 20 of 256 payments$6,374,267
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 30, 2013 | Department of Design and Construction | $279,536.00 | PROF SERV ENGINEER & ARCHITECT | – |
| Jan 15, 2014 | Department of Transportation | $247,390.72 | DESIGN-CONSULTANT-IOTB | – |
| Dec 31, 2013 | Department of Cultural Affairs | $222,963.85 | DESIGN-CONSULTANT-IOTB | – |
| Dec 11, 2013 | Department of Transportation | $151,916.00 | DESIGN-CONSULTANT-IOTB | – |
| Apr 14, 2014 | Department of Transportation | $149,508.14 | DESIGN-CONSULTANT-IOTB | – |
| Jul 16, 2013 | Department of Design and Construction | $143,510.69 | PROF SERV ENGINEER & ARCHITECT | – |
| May 1, 2014 | Department of Transportation | $141,112.21 | DESIGN-CONSULTANT-IOTB | – |
| Jul 16, 2013 | Department of Transportation | $133,998.24 | DESIGN-CONSULTANT-IOTB | – |
| Aug 26, 2013 | Department of Transportation | $101,915.34 | DESIGN-CONSULTANT-IOTB | – |
| Feb 24, 2014 | Department of Transportation | $100,020.02 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2013 | Department of Transportation | $99,009.99 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2014 | Department of Transportation | $90,444.85 | PROF SERV ENGINEER & ARCHITECT | – |
| Sep 18, 2013 | Department of Transportation | $89,764.60 | DESIGN-CONSULTANT-IOTB | – |
| Oct 15, 2013 | Department of Transportation | $83,727.43 | DESIGN-CONSULTANT-IOTB | – |
| Aug 19, 2013 | Department of Transportation | $83,479.31 | DESIGN-CONSULTANT-IOTB | – |
| Jan 13, 2014 | Department of Transportation | $83,150.29 | DESIGN-CONSULTANT-IOTB | – |
| Feb 18, 2014 | Department of Transportation | $82,174.72 | DESIGN-CONSULTANT-IOTB | – |
| Oct 23, 2013 | Department of Design and Construction | $81,342.74 | PROF SERV ENGINEER & ARCHITECT | – |
| Jun 16, 2014 | Department of Transportation | $80,536.00 | DESIGN-CONSULTANT-IOTB | – |
| Jul 31, 2013 | Department of Environmental Protection | $80,265.92 | DESIGN-CONSULTANT-IOTB | – |
FY 2013top 19 of 19 payments$300,663
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jun 24, 2013 | Department of Transportation | $59,075.93 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2013 | Department of Transportation | $35,893.63 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2013 | Department of Transportation | $35,521.42 | PROF SERV OTHER | – |
| Jun 11, 2013 | Department of Environmental Protection | $34,712.30 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2013 | Department of Transportation | $32,006.86 | PROF SERV OTHER | – |
| Jun 10, 2013 | Department of Transportation | $27,130.22 | DESIGN-CONSULTANT-IOTB | – |
| Jun 10, 2013 | Department of Transportation | $17,934.91 | DESIGN-CONSULTANT-IOTB | – |
| Jun 26, 2013 | Department of Transportation | $11,689.45 | PROF SERV COMPUTER SERVICES | – |
| Jun 26, 2013 | Department of Transportation | $10,804.51 | PROF SERV COMPUTER SERVICES | – |
| Jun 10, 2013 | Department of Transportation | $8,041.10 | DESIGN-CONSULTANT-IOTB | – |
| Jun 11, 2013 | Department of Environmental Protection | $7,029.23 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2013 | Department of Transportation | $5,560.27 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2013 | Department of Environmental Protection | $5,135.18 | DESIGN-CONSULTANT-IOTB | – |
| Jun 10, 2013 | Department of Transportation | $3,391.28 | DESIGN-CONSULTANT-IOTB | – |
| Jun 10, 2013 | Department of Transportation | $3,391.28 | DESIGN-CONSULTANT-IOTB | – |
| Jun 24, 2013 | School Construction Authority | $1,155.23 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2013 | School Construction Authority | $1,081.13 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2013 | School Construction Authority | $625.11 | CONSTRUCTION-BUILDINGS | – |
| Jun 24, 2013 | School Construction Authority | $483.58 | CONSTRUCTION-BUILDINGS | – |
Recent payments
Other vendors serving Department of Transportation
- American Traffic Solutions, Inc. $938,098,682
- Koch Skanska, Inc. $888,179,320
- US Army Corps of Engineers Research & Developement Center $650,130,125
- Welsbach Electric Corp $546,808,981
- Tully Construction Co. Inc. $487,234,955
- Tully-Posillico JV $380,764,773
- E-J Electric Installation Company $333,038,207
- Kiewit Constructors Inc, Weeks Marine, Inc $323,856,573
- American Bridge Company $293,679,515
- Navillus MLJ a Joint Venture $289,451,141
VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data