Home New York City Vendors Koch Skanska, Inc. Koch Skanska, Inc.: New York City Government Payments as recorded by New York City: KOCH SKANSKA, INC.
Koch Skanska, Inc. is the 69th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 5th in IOTB CONSTRUCTION spending. Its payments amount to 4.4% of everything the Department of Transportation has paid vendors in that span.
Primary spending category: IOTB CONSTRUCTION
$888,179,320 total received
1,895 payments
1 agency
Jan 11, 2010 – Apr 17, 2018 first / last payment
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year FY 2018 $28,420,042
FY 2017 $64,825,156
FY 2016 $92,858,759
FY 2015 $85,070,043
FY 2014 $130,799,023
FY 2013 $140,182,386
FY 2012 $204,264,660
FY 2011 $97,996,176
FY 2010 $43,763,076
Payments by fiscal year and agency Fiscal year Agency Payments Total FY 2018 Department of Transportation 68 $28,420,042 FY 2017 Department of Transportation 110 $64,825,156 FY 2016 Department of Transportation 195 $92,858,759 FY 2015 Department of Transportation 108 $85,070,043 FY 2014 Department of Transportation 285 $130,799,023 FY 2013 Department of Transportation 333 $140,182,386 FY 2012 Department of Transportation 323 $204,264,660 FY 2011 Department of Transportation 360 $97,996,176 FY 2010 Department of Transportation 113 $43,763,076 Total 1,895 $888,179,320
What the payments were for Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
Category Payments Total First / last IOTB CONSTRUCTION 1,878 $888,184,045 Jan 11, 2010 – Apr 17, 2018 <Non-Applicable Expenditure Object> 17 -$4,725 Jan 12, 2011 – Jan 12, 2011
Largest payments by fiscal year The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2018 top 20 of 68 payments $28,420,042 Date Agency Amount Category Purchase order Sep 13, 2017 Department of Transportation $7,400,000.00 IOTB CONSTRUCTION – Sep 21, 2017 Department of Transportation $2,632,952.02 IOTB CONSTRUCTION – Sep 21, 2017 Department of Transportation $2,175,514.25 IOTB CONSTRUCTION – Sep 21, 2017 Department of Transportation $1,416,883.83 IOTB CONSTRUCTION – Dec 11, 2017 Department of Transportation $1,328,206.16 IOTB CONSTRUCTION – Aug 29, 2017 Department of Transportation $1,073,027.92 IOTB CONSTRUCTION – Feb 26, 2018 Department of Transportation $1,070,017.17 IOTB CONSTRUCTION – Jan 31, 2018 Department of Transportation $936,881.32 IOTB CONSTRUCTION – Dec 18, 2017 Department of Transportation $903,783.88 IOTB CONSTRUCTION – Dec 18, 2017 Department of Transportation $848,078.10 IOTB CONSTRUCTION – Mar 26, 2018 Department of Transportation $772,506.00 IOTB CONSTRUCTION – Jul 19, 2017 Department of Transportation $735,781.80 IOTB CONSTRUCTION – Nov 21, 2017 Department of Transportation $707,032.00 IOTB CONSTRUCTION – Sep 25, 2017 Department of Transportation $644,701.60 IOTB CONSTRUCTION – Oct 30, 2017 Department of Transportation $601,324.24 IOTB CONSTRUCTION – Apr 17, 2018 Department of Transportation $491,047.64 IOTB CONSTRUCTION – Jan 31, 2018 Department of Transportation $333,670.05 IOTB CONSTRUCTION – Dec 11, 2017 Department of Transportation $332,051.54 IOTB CONSTRUCTION – Aug 23, 2017 Department of Transportation $324,668.37 IOTB CONSTRUCTION – Aug 29, 2017 Department of Transportation $268,256.98 IOTB CONSTRUCTION –
FY 2017 top 20 of 110 payments $64,825,156 Date Agency Amount Category Purchase order Aug 30, 2016 Department of Transportation $15,610,240.01 IOTB CONSTRUCTION – Dec 19, 2016 Department of Transportation $6,206,281.98 IOTB CONSTRUCTION – Jan 31, 2017 Department of Transportation $5,989,921.58 IOTB CONSTRUCTION – Oct 12, 2016 Department of Transportation $3,839,913.51 IOTB CONSTRUCTION – Jul 25, 2016 Department of Transportation $1,968,722.93 IOTB CONSTRUCTION – Jan 31, 2017 Department of Transportation $1,948,453.79 IOTB CONSTRUCTION – Oct 12, 2016 Department of Transportation $1,537,226.91 IOTB CONSTRUCTION – Nov 22, 2016 Department of Transportation $1,535,096.40 IOTB CONSTRUCTION – Jun 20, 2017 Department of Transportation $1,293,360.08 IOTB CONSTRUCTION – Mar 15, 2017 Department of Transportation $1,197,603.20 IOTB CONSTRUCTION – Dec 19, 2016 Department of Transportation $1,194,909.60 IOTB CONSTRUCTION – Apr 17, 2017 Department of Transportation $1,061,502.50 IOTB CONSTRUCTION – Dec 19, 2016 Department of Transportation $1,044,544.21 IOTB CONSTRUCTION – Feb 21, 2017 Department of Transportation $1,014,344.60 IOTB CONSTRUCTION – May 22, 2017 Department of Transportation $931,058.64 IOTB CONSTRUCTION – Oct 26, 2016 Department of Transportation $919,180.24 IOTB CONSTRUCTION – Apr 18, 2017 Department of Transportation $918,690.40 IOTB CONSTRUCTION – May 22, 2017 Department of Transportation $888,162.75 IOTB CONSTRUCTION – Jan 23, 2017 Department of Transportation $875,146.40 IOTB CONSTRUCTION – May 16, 2017 Department of Transportation $863,515.00 IOTB CONSTRUCTION –
FY 2016 top 20 of 195 payments $92,858,759 Date Agency Amount Category Purchase order Sep 30, 2015 Department of Transportation $4,803,476.93 IOTB CONSTRUCTION – Dec 28, 2015 Department of Transportation $3,695,411.86 IOTB CONSTRUCTION – Sep 8, 2015 Department of Transportation $3,342,368.63 IOTB CONSTRUCTION – Feb 17, 2016 Department of Transportation $2,793,550.76 IOTB CONSTRUCTION – Jul 27, 2015 Department of Transportation $2,671,499.43 IOTB CONSTRUCTION – Sep 8, 2015 Department of Transportation $2,603,296.08 IOTB CONSTRUCTION – Sep 8, 2015 Department of Transportation $2,588,399.03 IOTB CONSTRUCTION – Apr 25, 2016 Department of Transportation $2,508,449.57 IOTB CONSTRUCTION – Oct 13, 2015 Department of Transportation $2,441,444.33 IOTB CONSTRUCTION – Dec 14, 2015 Department of Transportation $2,401,734.57 IOTB CONSTRUCTION – Nov 9, 2015 Department of Transportation $2,349,544.38 IOTB CONSTRUCTION – Oct 26, 2015 Department of Transportation $2,346,720.00 IOTB CONSTRUCTION – May 23, 2016 Department of Transportation $2,322,025.59 IOTB CONSTRUCTION – Dec 28, 2015 Department of Transportation $2,234,960.08 IOTB CONSTRUCTION – Aug 18, 2015 Department of Transportation $2,095,920.00 IOTB CONSTRUCTION – Jul 2, 2015 Department of Transportation $1,782,572.86 IOTB CONSTRUCTION – Apr 4, 2016 Department of Transportation $1,707,394.33 IOTB CONSTRUCTION – Dec 14, 2015 Department of Transportation $1,690,229.58 IOTB CONSTRUCTION – Apr 4, 2016 Department of Transportation $1,549,280.43 IOTB CONSTRUCTION – Aug 13, 2015 Department of Transportation $1,449,439.40 IOTB CONSTRUCTION –
FY 2015 top 20 of 108 payments $85,070,043 Date Agency Amount Category Purchase order Aug 18, 2014 Department of Transportation $6,686,766.77 IOTB CONSTRUCTION – Dec 11, 2014 Department of Transportation $5,769,787.48 IOTB CONSTRUCTION – Dec 31, 2014 Department of Transportation $4,480,229.92 IOTB CONSTRUCTION – Dec 11, 2014 Department of Transportation $4,223,653.96 IOTB CONSTRUCTION – Jul 8, 2014 Department of Transportation $3,662,214.62 IOTB CONSTRUCTION – May 18, 2015 Department of Transportation $3,404,978.70 IOTB CONSTRUCTION – Dec 23, 2014 Department of Transportation $2,942,032.08 IOTB CONSTRUCTION – Oct 9, 2014 Department of Transportation $2,609,495.29 IOTB CONSTRUCTION – Jul 8, 2014 Department of Transportation $2,516,370.77 IOTB CONSTRUCTION – Aug 18, 2014 Department of Transportation $2,376,199.55 IOTB CONSTRUCTION – Mar 9, 2015 Department of Transportation $2,241,017.08 IOTB CONSTRUCTION – Jul 8, 2014 Department of Transportation $1,863,446.35 IOTB CONSTRUCTION – Dec 11, 2014 Department of Transportation $1,782,024.80 IOTB CONSTRUCTION – Sep 8, 2014 Department of Transportation $1,758,116.56 IOTB CONSTRUCTION – Aug 18, 2014 Department of Transportation $1,716,103.42 IOTB CONSTRUCTION – Dec 23, 2014 Department of Transportation $1,635,188.55 IOTB CONSTRUCTION – Nov 5, 2014 Department of Transportation $1,352,313.50 IOTB CONSTRUCTION – Dec 31, 2014 Department of Transportation $1,317,198.29 IOTB CONSTRUCTION – Aug 6, 2014 Department of Transportation $1,316,963.30 IOTB CONSTRUCTION – Dec 23, 2014 Department of Transportation $1,313,270.37 IOTB CONSTRUCTION –
FY 2014 top 20 of 285 payments $130,799,023 Date Agency Amount Category Purchase order Nov 18, 2013 Department of Transportation $8,819,878.46 IOTB CONSTRUCTION – Dec 20, 2013 Department of Transportation $7,084,161.51 IOTB CONSTRUCTION – Dec 30, 2013 Department of Transportation $5,738,040.00 IOTB CONSTRUCTION – Jul 8, 2013 Department of Transportation $4,447,876.11 IOTB CONSTRUCTION – Mar 10, 2014 Department of Transportation $4,234,154.54 IOTB CONSTRUCTION – Nov 18, 2013 Department of Transportation $3,959,186.20 IOTB CONSTRUCTION – Mar 10, 2014 Department of Transportation $3,868,397.34 IOTB CONSTRUCTION – Dec 20, 2013 Department of Transportation $3,679,292.66 IOTB CONSTRUCTION – Oct 2, 2013 Department of Transportation $3,599,577.42 IOTB CONSTRUCTION – Sep 3, 2013 Department of Transportation $3,478,718.36 IOTB CONSTRUCTION – Dec 20, 2013 Department of Transportation $3,393,993.55 IOTB CONSTRUCTION – Nov 18, 2013 Department of Transportation $3,194,766.16 IOTB CONSTRUCTION – Jul 26, 2013 Department of Transportation $3,027,341.47 IOTB CONSTRUCTION – May 1, 2014 Department of Transportation $2,976,359.31 IOTB CONSTRUCTION – Dec 30, 2013 Department of Transportation $2,765,717.38 IOTB CONSTRUCTION – Aug 5, 2013 Department of Transportation $2,754,002.84 IOTB CONSTRUCTION – Oct 2, 2013 Department of Transportation $2,605,041.88 IOTB CONSTRUCTION – Nov 14, 2013 Department of Transportation $2,502,578.84 IOTB CONSTRUCTION – Sep 26, 2013 Department of Transportation $2,441,236.11 IOTB CONSTRUCTION – Aug 30, 2013 Department of Transportation $2,410,153.60 IOTB CONSTRUCTION –
FY 2013 top 20 of 333 payments $140,182,386 Date Agency Amount Category Purchase order Dec 17, 2012 Department of Transportation $11,368,511.36 IOTB CONSTRUCTION – Dec 17, 2012 Department of Transportation $5,385,767.98 IOTB CONSTRUCTION – Oct 30, 2012 Department of Transportation $5,299,441.96 IOTB CONSTRUCTION – Oct 22, 2012 Department of Transportation $4,181,161.60 IOTB CONSTRUCTION – Sep 12, 2012 Department of Transportation $3,981,956.81 IOTB CONSTRUCTION – Nov 21, 2012 Department of Transportation $3,858,503.30 IOTB CONSTRUCTION – Dec 17, 2012 Department of Transportation $3,828,504.96 IOTB CONSTRUCTION – Aug 13, 2012 Department of Transportation $3,612,749.11 IOTB CONSTRUCTION – May 23, 2013 Department of Transportation $3,499,025.85 IOTB CONSTRUCTION – Oct 1, 2012 Department of Transportation $3,368,252.87 IOTB CONSTRUCTION – Nov 21, 2012 Department of Transportation $3,279,071.10 IOTB CONSTRUCTION – Oct 30, 2012 Department of Transportation $3,031,361.34 IOTB CONSTRUCTION – Jul 30, 2012 Department of Transportation $2,883,338.38 IOTB CONSTRUCTION – Sep 11, 2012 Department of Transportation $2,785,982.73 IOTB CONSTRUCTION – Apr 22, 2013 Department of Transportation $2,722,427.31 IOTB CONSTRUCTION – Jul 5, 2012 Department of Transportation $2,682,105.89 IOTB CONSTRUCTION – Oct 30, 2012 Department of Transportation $2,672,376.78 IOTB CONSTRUCTION – Dec 6, 2012 Department of Transportation $2,654,534.92 IOTB CONSTRUCTION – Apr 1, 2013 Department of Transportation $2,563,049.22 IOTB CONSTRUCTION – Sep 11, 2012 Department of Transportation $2,554,169.80 IOTB CONSTRUCTION –
FY 2012 top 20 of 323 payments $204,264,660 Date Agency Amount Category Purchase order Apr 23, 2012 Department of Transportation $12,332,507.81 IOTB CONSTRUCTION – Dec 20, 2011 Department of Transportation $8,637,197.01 IOTB CONSTRUCTION – Mar 14, 2012 Department of Transportation $7,800,816.30 IOTB CONSTRUCTION – Nov 17, 2011 Department of Transportation $7,192,498.18 IOTB CONSTRUCTION – Feb 21, 2012 Department of Transportation $6,590,814.90 IOTB CONSTRUCTION – Dec 5, 2011 Department of Transportation $6,518,693.27 IOTB CONSTRUCTION – Mar 27, 2012 Department of Transportation $6,308,501.89 IOTB CONSTRUCTION – Aug 17, 2011 Department of Transportation $5,953,666.55 IOTB CONSTRUCTION – Oct 14, 2011 Department of Transportation $5,912,611.00 IOTB CONSTRUCTION – Nov 17, 2011 Department of Transportation $5,560,908.92 IOTB CONSTRUCTION – Dec 27, 2011 Department of Transportation $5,340,607.09 IOTB CONSTRUCTION – Dec 5, 2011 Department of Transportation $4,874,220.78 IOTB CONSTRUCTION – Jan 24, 2012 Department of Transportation $4,633,000.37 IOTB CONSTRUCTION – Sep 6, 2011 Department of Transportation $4,550,397.08 IOTB CONSTRUCTION – Aug 1, 2011 Department of Transportation $4,158,635.05 IOTB CONSTRUCTION – Mar 27, 2012 Department of Transportation $4,119,088.52 IOTB CONSTRUCTION – Mar 14, 2012 Department of Transportation $4,060,658.01 IOTB CONSTRUCTION – Nov 21, 2011 Department of Transportation $4,023,614.74 IOTB CONSTRUCTION – Jun 4, 2012 Department of Transportation $4,008,890.39 IOTB CONSTRUCTION – Dec 20, 2011 Department of Transportation $3,936,882.80 IOTB CONSTRUCTION –
FY 2011 top 20 of 360 payments $97,996,176 Date Agency Amount Category Purchase order Nov 10, 2010 Department of Transportation $6,113,685.20 IOTB CONSTRUCTION – Sep 27, 2010 Department of Transportation $5,445,542.21 IOTB CONSTRUCTION – Feb 28, 2011 Department of Transportation $4,761,653.45 IOTB CONSTRUCTION – Jun 15, 2011 Department of Transportation $4,366,656.77 IOTB CONSTRUCTION – Apr 11, 2011 Department of Transportation $3,821,277.84 IOTB CONSTRUCTION – Jul 26, 2010 Department of Transportation $3,517,170.19 IOTB CONSTRUCTION – Jun 27, 2011 Department of Transportation $3,378,789.30 IOTB CONSTRUCTION – Nov 29, 2010 Department of Transportation $3,244,407.50 IOTB CONSTRUCTION – Dec 27, 2010 Department of Transportation $3,143,498.95 IOTB CONSTRUCTION – May 16, 2011 Department of Transportation $2,615,017.50 IOTB CONSTRUCTION – Jan 18, 2011 Department of Transportation $2,148,999.61 IOTB CONSTRUCTION – Jan 19, 2011 Department of Transportation $2,143,193.97 IOTB CONSTRUCTION – Aug 25, 2010 Department of Transportation $2,127,565.48 IOTB CONSTRUCTION – May 31, 2011 Department of Transportation $2,120,240.47 IOTB CONSTRUCTION – Nov 29, 2010 Department of Transportation $1,841,472.00 IOTB CONSTRUCTION – Dec 27, 2010 Department of Transportation $1,796,640.00 IOTB CONSTRUCTION – Feb 14, 2011 Department of Transportation $1,594,365.61 IOTB CONSTRUCTION – Sep 27, 2010 Department of Transportation $1,533,070.10 IOTB CONSTRUCTION – Aug 25, 2010 Department of Transportation $1,495,417.89 IOTB CONSTRUCTION – Nov 10, 2010 Department of Transportation $1,311,408.00 IOTB CONSTRUCTION –
FY 2010 top 20 of 113 payments $43,763,076 Date Agency Amount Category Purchase order Mar 23, 2010 Department of Transportation $8,293,758.35 IOTB CONSTRUCTION – Mar 23, 2010 Department of Transportation $5,118,635.48 IOTB CONSTRUCTION – May 3, 2010 Department of Transportation $4,927,875.00 IOTB CONSTRUCTION – Jun 21, 2010 Department of Transportation $4,662,859.26 IOTB CONSTRUCTION – May 4, 2010 Department of Transportation $4,323,701.20 IOTB CONSTRUCTION – Mar 22, 2010 Department of Transportation $1,494,841.95 IOTB CONSTRUCTION – May 3, 2010 Department of Transportation $1,267,974.11 IOTB CONSTRUCTION – Jan 19, 2010 Department of Transportation $1,255,739.56 IOTB CONSTRUCTION – Jun 7, 2010 Department of Transportation $1,003,978.11 IOTB CONSTRUCTION – Mar 23, 2010 Department of Transportation $866,735.05 IOTB CONSTRUCTION – May 4, 2010 Department of Transportation $810,693.98 IOTB CONSTRUCTION – Apr 6, 2010 Department of Transportation $739,927.28 IOTB CONSTRUCTION – Feb 19, 2010 Department of Transportation $717,192.62 IOTB CONSTRUCTION – Jan 27, 2010 Department of Transportation $676,283.15 IOTB CONSTRUCTION – Mar 8, 2010 Department of Transportation $592,623.17 IOTB CONSTRUCTION – Jun 22, 2010 Department of Transportation $577,936.16 IOTB CONSTRUCTION – Jun 14, 2010 Department of Transportation $539,330.20 IOTB CONSTRUCTION – Mar 23, 2010 Department of Transportation $504,496.12 IOTB CONSTRUCTION – May 10, 2010 Department of Transportation $487,485.87 IOTB CONSTRUCTION – Jan 11, 2010 Department of Transportation $469,700.94 IOTB CONSTRUCTION –
Recent payments Date Agency Amount Category Method Apr 17, 2018 Department of Transportation $122,761.91 IOTB CONSTRUCTION Capital Contracts Apr 17, 2018 Department of Transportation $6,658.15 IOTB CONSTRUCTION Capital Contracts Apr 17, 2018 Department of Transportation $59,923.35 IOTB CONSTRUCTION Capital Contracts Apr 17, 2018 Department of Transportation $491,047.64 IOTB CONSTRUCTION Capital Contracts Mar 26, 2018 Department of Transportation $11,203.61 IOTB CONSTRUCTION Capital Contracts Mar 26, 2018 Department of Transportation $193,126.50 IOTB CONSTRUCTION Capital Contracts Mar 26, 2018 Department of Transportation $48,360.00 IOTB CONSTRUCTION Capital Contracts Mar 26, 2018 Department of Transportation $100,832.49 IOTB CONSTRUCTION Capital Contracts Mar 26, 2018 Department of Transportation $772,506.00 IOTB CONSTRUCTION Capital Contracts Feb 26, 2018 Department of Transportation $71,659.89 IOTB CONSTRUCTION Capital Contracts Feb 26, 2018 Department of Transportation $267,504.29 IOTB CONSTRUCTION Capital Contracts Feb 26, 2018 Department of Transportation $219,050.00 IOTB CONSTRUCTION Capital Contracts Feb 26, 2018 Department of Transportation $1,070,017.17 IOTB CONSTRUCTION Capital Contracts Feb 26, 2018 Department of Transportation $7,962.21 IOTB CONSTRUCTION Capital Contracts Jan 31, 2018 Department of Transportation $37,074.45 IOTB CONSTRUCTION Capital Contracts Jan 31, 2018 Department of Transportation $936,881.32 IOTB CONSTRUCTION Capital Contracts Jan 31, 2018 Department of Transportation $234,220.33 IOTB CONSTRUCTION Capital Contracts Jan 31, 2018 Department of Transportation $333,670.05 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $39,780.00 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $3,337.19 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $94,230.90 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $225,945.97 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $1,898.00 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $848,078.10 IOTB CONSTRUCTION Capital Contracts Dec 18, 2017 Department of Transportation $903,783.88 IOTB CONSTRUCTION Capital Contracts
Other vendors serving Department of Transportation American Traffic Solutions, Inc. $938,098,682 US Army Corps of Engineers Research & Developement Center $650,130,125 Welsbach Electric Corp $546,808,981 Tully Construction Co. Inc. $487,234,955 Tully-Posillico JV $380,764,773 E-J Electric Installation Company $333,038,207 Kiewit Constructors Inc, Weeks Marine, Inc $323,856,573 American Bridge Company $293,679,515 Navillus MLJ a Joint Venture $289,451,141 Restani Construction Corp $266,379,238 Verified Data refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data