Rockmore Contracting Corp is the 467th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 74th in CONSTRUCTION-BUILDINGS spending. Its payments amount to 0.2% of everything the Department of Citywide Administrative Services has paid vendors in that span. Payments to it rose 1135.8% year over year.
Primary spending category: CONSTRUCTION-BUILDINGS
You're on the list. We'll email you when there's something new here, and every email has one-click unsubscribe.
That didn't work; check the email address and try again.
Payments by fiscal year
Payments by fiscal year and agency
What the payments were for
Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.
| Category | Payments | Total | First / last |
|---|---|---|---|
| EQUIPMENT GENERAL | 4 | $702,011 | Mar 8, 2017 – Mar 19, 2018 |
| PROMPT PAYMENT INTEREST | 2 | $675 | Aug 18, 2010 – Feb 2, 2017 |
| JUDGMENTS AND CLAIMS-NOT REPORTABLE | 1 | $6,500 | Feb 4, 2021 – Feb 4, 2021 |
| PROF SERV COMPUTER SERVICES | 1 | $57,304 | Apr 21, 2021 – Apr 21, 2021 |
| DEMOLITION | 2 | $38,020 | Aug 7, 2014 – Mar 3, 2020 |
| JUDGMENTS AND CLAIMS-NONEMP COMP | 1 | $3,186,000 | May 14, 2025 – May 14, 2025 |
| CONTRACTUAL SERVICES GENERAL | 1 | $3,085 | Apr 18, 2022 – Apr 18, 2022 |
| POLLUTION REMEDIATION OBLIGATIONS | 11 | $2,172,415 | Sep 4, 2013 – Sep 16, 2021 |
| OTHR SERV AND CHRGS-GENERAL | 2 | $1,505 | Sep 1, 2015 – Mar 25, 2020 |
| CONSTRUCTION-BUILDINGS | 2,418 | $150,130,923 | Jan 4, 2010 – Jan 21, 2025 |
| PROF SERV ENGINEER & ARCHITECT | 5 | $135,640 | Apr 21, 2021 – Nov 21, 2022 |
| <Non-Applicable Expenditure Object> | 4 | -$1,400 | Nov 30, 2015 – Aug 23, 2022 |
Largest payments by fiscal year
The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.
Download this table as CSV (free, with source citation on every row)
FY 2025top 4 of 4 payments$3,234,867
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 14, 2025 | Miscellaneous | $3,186,000.00 | JUDGMENTS AND CLAIMS-NONEMP COMP | – |
| Jan 21, 2025 | Department of Cultural Affairs | $17,559.92 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2024 | Department of Citywide Administrative Services | $16,765.20 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2024 | Department of Citywide Administrative Services | $14,541.81 | CONSTRUCTION-BUILDINGS | – |
FY 2024top 10 of 10 payments$261,755
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 6, 2023 | Department of Citywide Administrative Services | $87,120.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $46,988.85 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2024 | Department of Citywide Administrative Services | $41,609.02 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2023 | Department of Citywide Administrative Services | $25,501.90 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $22,770.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $22,124.88 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2024 | Department of Citywide Administrative Services | $7,210.16 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $6,930.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $1,467.16 | CONSTRUCTION-BUILDINGS | – |
| Sep 6, 2023 | Department of Citywide Administrative Services | $32.86 | CONSTRUCTION-BUILDINGS | – |
FY 2023top 20 of 42 payments$356,726
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Feb 15, 2023 | Department of Citywide Administrative Services | $236,775.93 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2023 | School Construction Authority | $55,862.33 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2022 | Department of Cultural Affairs | $30,206.40 | CONSTRUCTION-BUILDINGS | – |
| Jan 10, 2023 | School Construction Authority | $14,508.80 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2022 | Department of Design and Construction | $7,918.69 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 21, 2022 | Department of Cultural Affairs | $1,644.27 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Design and Construction | $1,343.35 | PROF SERV ENGINEER & ARCHITECT | – |
| Nov 21, 2022 | Department of Cultural Affairs | $1,304.76 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $1,096.91 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $990.06 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $947.16 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $758.17 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $732.10 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $692.48 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $346.33 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $332.91 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $285.55 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $247.26 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $236.87 | CONSTRUCTION-BUILDINGS | – |
| Nov 21, 2022 | Department of Cultural Affairs | $236.75 | CONSTRUCTION-BUILDINGS | – |
FY 2022top 20 of 290 payments$5,174,457
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Sep 16, 2021 | Department of Citywide Administrative Services | $535,620.21 | CONSTRUCTION-BUILDINGS | – |
| Jul 29, 2021 | Department of Parks and Recreation | $364,778.42 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2021 | Department of Parks and Recreation | $277,000.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 27, 2021 | Department of Parks and Recreation | $163,200.00 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2022 | Department of Parks and Recreation | $150,000.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 26, 2022 | Department of Parks and Recreation | $148,900.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2022 | Department of Parks and Recreation | $135,245.40 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2021 | Department of Parks and Recreation | $135,135.16 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2021 | Department of Parks and Recreation | $133,443.76 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2022 | Department of Parks and Recreation | $126,584.53 | CONSTRUCTION-BUILDINGS | – |
| Feb 28, 2022 | Department of Parks and Recreation | $125,858.58 | CONSTRUCTION-BUILDINGS | – |
| Jan 26, 2022 | Department of Parks and Recreation | $102,400.00 | CONSTRUCTION-BUILDINGS | – |
| May 2, 2022 | Department of Parks and Recreation | $97,452.36 | CONSTRUCTION-BUILDINGS | – |
| Oct 27, 2021 | Department of Parks and Recreation | $95,200.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2021 | Department of Parks and Recreation | $95,146.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 24, 2022 | Department of Parks and Recreation | $91,400.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2021 | Department of Parks and Recreation | $88,299.40 | CONSTRUCTION-BUILDINGS | – |
| Nov 29, 2021 | Department of Parks and Recreation | $77,313.55 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2021 | Department of Parks and Recreation | $75,854.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 16, 2021 | Department of Citywide Administrative Services | $70,688.14 | CONSTRUCTION-BUILDINGS | – |
FY 2021top 20 of 373 payments$7,576,958
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 3, 2020 | Department of Parks and Recreation | $478,260.36 | CONSTRUCTION-BUILDINGS | – |
| Jul 20, 2020 | Department of Parks and Recreation | $338,000.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 30, 2020 | Department of Parks and Recreation | $331,370.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 2, 2020 | Department of Parks and Recreation | $301,000.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 23, 2021 | Department of Parks and Recreation | $253,770.14 | CONSTRUCTION-BUILDINGS | – |
| Sep 30, 2020 | Department of Parks and Recreation | $227,025.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2021 | Department of Parks and Recreation | $187,387.78 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2020 | Department of Parks and Recreation | $185,523.16 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2021 | Department of Parks and Recreation | $185,052.58 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2020 | Department of Parks and Recreation | $167,000.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2020 | Department of Parks and Recreation | $158,000.00 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2020 | Department of Parks and Recreation | $140,115.22 | CONSTRUCTION-BUILDINGS | – |
| Dec 30, 2020 | Department of Parks and Recreation | $135,864.13 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2020 | Department of Parks and Recreation | $135,067.19 | CONSTRUCTION-BUILDINGS | – |
| Aug 19, 2020 | Department of Parks and Recreation | $134,920.85 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2021 | Department of Parks and Recreation | $133,082.82 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2021 | Department of Parks and Recreation | $130,143.65 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2021 | Department of Parks and Recreation | $124,897.75 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2020 | Department of Parks and Recreation | $122,705.68 | CONSTRUCTION-BUILDINGS | – |
| Oct 26, 2020 | Department of Cultural Affairs | $122,340.92 | CONSTRUCTION-BUILDINGS | – |
FY 2020top 20 of 394 payments$8,939,695
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 7, 2019 | Department of Parks and Recreation | $505,835.89 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2019 | Department of Parks and Recreation | $378,556.54 | CONSTRUCTION-BUILDINGS | – |
| Jul 10, 2019 | Department of Cultural Affairs | $351,031.86 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2019 | Department of Parks and Recreation | $309,278.06 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2019 | Department of Parks and Recreation | $295,607.96 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2020 | Department of Parks and Recreation | $290,800.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 9, 2019 | Department of Parks and Recreation | $254,400.00 | CONSTRUCTION-BUILDINGS | – |
| Jul 8, 2019 | Department of Parks and Recreation | $231,959.86 | CONSTRUCTION-BUILDINGS | – |
| Aug 7, 2019 | Department of Parks and Recreation | $214,471.78 | CONSTRUCTION-BUILDINGS | – |
| Apr 30, 2020 | Department of Citywide Administrative Services | $168,349.95 | CONSTRUCTION-BUILDINGS | – |
| May 26, 2020 | Department of Parks and Recreation | $159,480.00 | CONSTRUCTION-BUILDINGS | – |
| May 26, 2020 | Department of Parks and Recreation | $156,350.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 18, 2020 | Department of Parks and Recreation | $153,000.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 10, 2019 | Department of Citywide Administrative Services | $149,098.41 | CONSTRUCTION-BUILDINGS | – |
| Apr 20, 2020 | Department of Parks and Recreation | $145,200.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 17, 2020 | Department of Parks and Recreation | $144,500.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2019 | Department of Parks and Recreation | $137,205.70 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2020 | Department of Parks and Recreation | $127,431.03 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2020 | Department of Parks and Recreation | $126,844.47 | CONSTRUCTION-BUILDINGS | – |
| Oct 28, 2019 | Department of Parks and Recreation | $119,745.38 | CONSTRUCTION-BUILDINGS | – |
FY 2019top 20 of 139 payments$10,722,599
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Jan 4, 2019 | Department of Cultural Affairs | $1,664,418.58 | CONSTRUCTION-BUILDINGS | – |
| Sep 11, 2018 | Department of Cultural Affairs | $974,054.30 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2019 | Department of Parks and Recreation | $482,608.37 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2019 | Department of Parks and Recreation | $481,269.10 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2018 | Department of Cultural Affairs | $464,276.84 | CONSTRUCTION-BUILDINGS | – |
| May 28, 2019 | Department of Parks and Recreation | $432,529.55 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2019 | Department of Cultural Affairs | $429,517.37 | CONSTRUCTION-BUILDINGS | – |
| Jan 9, 2019 | Department of Parks and Recreation | $361,871.44 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2018 | Department of Parks and Recreation | $353,628.82 | CONSTRUCTION-BUILDINGS | – |
| Mar 25, 2019 | Department of Parks and Recreation | $347,957.79 | CONSTRUCTION-BUILDINGS | – |
| Oct 25, 2018 | Department of Cultural Affairs | $342,371.71 | CONSTRUCTION-BUILDINGS | – |
| Feb 19, 2019 | Department of Parks and Recreation | $327,659.55 | CONSTRUCTION-BUILDINGS | – |
| Dec 3, 2018 | Department of Cultural Affairs | $297,332.52 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2018 | Department of Citywide Administrative Services | $275,717.51 | CONSTRUCTION-BUILDINGS | – |
| Sep 27, 2018 | Department of Cultural Affairs | $268,880.39 | CONSTRUCTION-BUILDINGS | – |
| Mar 7, 2019 | Department of Cultural Affairs | $254,746.46 | CONSTRUCTION-BUILDINGS | – |
| Apr 24, 2019 | Department of Parks and Recreation | $233,667.18 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2018 | Department of Parks and Recreation | $213,363.87 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2018 | Department of Parks and Recreation | $210,816.29 | CONSTRUCTION-BUILDINGS | – |
| Dec 26, 2018 | Department of Citywide Administrative Services | $168,358.68 | CONSTRUCTION-BUILDINGS | – |
FY 2018top 20 of 174 payments$12,678,675
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 27, 2017 | Department of Cultural Affairs | $856,023.18 | CONSTRUCTION-BUILDINGS | – |
| Oct 18, 2017 | Department of Parks and Recreation | $853,281.20 | CONSTRUCTION-BUILDINGS | – |
| Jan 17, 2018 | Department of Cultural Affairs | $688,019.69 | CONSTRUCTION-BUILDINGS | – |
| Aug 21, 2017 | Department of Parks and Recreation | $584,664.90 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2017 | Department of Cultural Affairs | $534,213.14 | CONSTRUCTION-BUILDINGS | – |
| Mar 5, 2018 | Department of Cultural Affairs | $514,028.30 | CONSTRUCTION-BUILDINGS | – |
| Feb 20, 2018 | Department of Citywide Administrative Services | $503,119.82 | CONSTRUCTION-BUILDINGS | – |
| Jul 5, 2017 | Department of Parks and Recreation | $491,960.56 | CONSTRUCTION-BUILDINGS | – |
| Sep 13, 2017 | Department of Citywide Administrative Services | $427,215.03 | CONSTRUCTION-BUILDINGS | – |
| May 14, 2018 | Department of Cultural Affairs | $397,542.17 | CONSTRUCTION-BUILDINGS | – |
| Oct 23, 2017 | Department of Cultural Affairs | $366,058.83 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2018 | School Construction Authority | $338,210.45 | CONSTRUCTION-BUILDINGS | – |
| Sep 11, 2017 | Department of Cultural Affairs | $331,049.81 | CONSTRUCTION-BUILDINGS | – |
| Aug 1, 2017 | Department of Citywide Administrative Services | $326,351.17 | CONSTRUCTION-BUILDINGS | – |
| Jul 12, 2017 | Department of Cultural Affairs | $284,845.14 | CONSTRUCTION-BUILDINGS | – |
| Jan 16, 2018 | Department of Parks and Recreation | $267,098.18 | CONSTRUCTION-BUILDINGS | – |
| Aug 28, 2017 | Department of Cultural Affairs | $257,039.13 | CONSTRUCTION-BUILDINGS | – |
| Apr 18, 2018 | School Construction Authority | $253,698.72 | CONSTRUCTION-BUILDINGS | – |
| Feb 20, 2018 | Department of Citywide Administrative Services | $246,048.45 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2018 | Department of Cultural Affairs | $238,000.68 | CONSTRUCTION-BUILDINGS | – |
FY 2017top 20 of 181 payments$13,063,383
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 8, 2017 | Department of Parks and Recreation | $799,124.14 | CONSTRUCTION-BUILDINGS | – |
| Apr 19, 2017 | Department of Parks and Recreation | $704,479.99 | CONSTRUCTION-BUILDINGS | – |
| Apr 26, 2017 | Department of Citywide Administrative Services | $656,014.95 | CONSTRUCTION-BUILDINGS | – |
| Mar 10, 2017 | Department of Cultural Affairs | $579,527.41 | CONSTRUCTION-BUILDINGS | – |
| Aug 17, 2016 | Department of Cultural Affairs | $559,146.46 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2016 | Department of Parks and Recreation | $538,616.49 | CONSTRUCTION-BUILDINGS | – |
| May 30, 2017 | Department of Cultural Affairs | $538,594.16 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2017 | Department of Parks and Recreation | $526,508.32 | EQUIPMENT GENERAL | – |
| Mar 15, 2017 | Department of Cultural Affairs | $511,133.51 | CONSTRUCTION-BUILDINGS | – |
| Feb 13, 2017 | Department of Cultural Affairs | $474,208.53 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2016 | School Construction Authority | $461,671.50 | CONSTRUCTION-BUILDINGS | – |
| Dec 20, 2016 | School Construction Authority | $461,671.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 25, 2016 | Department of Cultural Affairs | $420,942.67 | CONSTRUCTION-BUILDINGS | – |
| Mar 8, 2017 | Department of Parks and Recreation | $418,773.86 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2016 | School Construction Authority | $409,260.00 | CONSTRUCTION-BUILDINGS | – |
| Dec 20, 2016 | School Construction Authority | $409,260.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2016 | Department of Cultural Affairs | $405,734.59 | CONSTRUCTION-BUILDINGS | – |
| Dec 21, 2016 | Department of Cultural Affairs | $373,726.48 | CONSTRUCTION-BUILDINGS | – |
| Jan 13, 2017 | Department of Cultural Affairs | $373,726.48 | CONSTRUCTION-BUILDINGS | – |
| Dec 13, 2016 | School Construction Authority | $373,065.00 | CONSTRUCTION-BUILDINGS | – |
FY 2016top 20 of 296 payments$13,211,312
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 14, 2015 | Department of Cultural Affairs | $774,359.44 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2015 | School Construction Authority | $629,992.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 21, 2016 | School Construction Authority | $603,259.50 | CONSTRUCTION-BUILDINGS | – |
| Jan 11, 2016 | Department of Cultural Affairs | $518,628.47 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2016 | Department of Cultural Affairs | $503,717.78 | CONSTRUCTION-BUILDINGS | – |
| Sep 2, 2015 | School Construction Authority | $452,069.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 14, 2016 | Department of Cultural Affairs | $445,922.75 | CONSTRUCTION-BUILDINGS | – |
| Aug 31, 2015 | Department of Citywide Administrative Services | $406,345.75 | CONSTRUCTION-BUILDINGS | – |
| Jul 15, 2015 | Department of Citywide Administrative Services | $403,384.25 | CONSTRUCTION-BUILDINGS | – |
| Nov 2, 2015 | Department of Cultural Affairs | $313,439.08 | CONSTRUCTION-BUILDINGS | – |
| Apr 4, 2016 | Department of Parks and Recreation | $311,675.74 | CONSTRUCTION-BUILDINGS | – |
| Jul 27, 2015 | Department of Cultural Affairs | $311,600.00 | CONSTRUCTION-BUILDINGS | – |
| Feb 10, 2016 | Department of Cultural Affairs | $301,013.32 | CONSTRUCTION-BUILDINGS | – |
| Dec 14, 2015 | Department of Cultural Affairs | $223,874.57 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2015 | School Construction Authority | $220,875.00 | CONSTRUCTION-BUILDINGS | – |
| Oct 19, 2015 | School Construction Authority | $218,872.88 | CONSTRUCTION-BUILDINGS | – |
| Sep 28, 2015 | Department of Cultural Affairs | $216,431.78 | CONSTRUCTION-BUILDINGS | – |
| Aug 4, 2015 | Department of Cultural Affairs | $207,681.92 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2016 | Department of Cultural Affairs | $200,284.74 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2015 | School Construction Authority | $190,780.24 | CONSTRUCTION-BUILDINGS | – |
FY 2015top 20 of 215 payments$28,117,680
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Aug 8, 2014 | Department of Citywide Administrative Services | $3,182,949.18 | CONSTRUCTION-BUILDINGS | – |
| Oct 7, 2014 | Department of Citywide Administrative Services | $1,730,974.16 | CONSTRUCTION-BUILDINGS | – |
| Sep 15, 2014 | Department of Citywide Administrative Services | $1,609,147.62 | CONSTRUCTION-BUILDINGS | – |
| Jul 16, 2014 | Department of Citywide Administrative Services | $1,566,152.65 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2014 | Department of Citywide Administrative Services | $985,869.45 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2014 | Department of Cultural Affairs | $772,593.41 | CONSTRUCTION-BUILDINGS | – |
| Dec 18, 2014 | Department of Citywide Administrative Services | $742,376.39 | CONSTRUCTION-BUILDINGS | – |
| Dec 29, 2014 | Department of Citywide Administrative Services | $738,591.11 | CONSTRUCTION-BUILDINGS | – |
| Aug 26, 2014 | Department of Cultural Affairs | $721,640.59 | CONSTRUCTION-BUILDINGS | – |
| Jul 1, 2014 | Department of Cultural Affairs | $700,412.80 | CONSTRUCTION-BUILDINGS | – |
| Apr 27, 2015 | Department of Cultural Affairs | $699,447.02 | CONSTRUCTION-BUILDINGS | – |
| Jun 17, 2015 | Department of Citywide Administrative Services | $628,475.51 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2015 | Department of Cultural Affairs | $612,221.80 | CONSTRUCTION-BUILDINGS | – |
| Mar 11, 2015 | Department of Citywide Administrative Services | $581,222.12 | CONSTRUCTION-BUILDINGS | – |
| Sep 23, 2014 | Department of Cultural Affairs | $532,212.19 | CONSTRUCTION-BUILDINGS | – |
| Feb 24, 2015 | Department of Citywide Administrative Services | $523,626.89 | CONSTRUCTION-BUILDINGS | – |
| Feb 4, 2015 | Department of Cultural Affairs | $473,300.10 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2014 | Department of Cultural Affairs | $373,603.19 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2015 | Department of Cultural Affairs | $362,697.76 | CONSTRUCTION-BUILDINGS | – |
| Nov 17, 2014 | Department of Citywide Administrative Services | $359,766.00 | CONSTRUCTION-BUILDINGS | – |
FY 2014top 20 of 119 payments$31,174,945
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Nov 1, 2013 | Department of Citywide Administrative Services | $3,960,247.28 | CONSTRUCTION-BUILDINGS | – |
| Dec 9, 2013 | Department of Citywide Administrative Services | $3,036,724.76 | CONSTRUCTION-BUILDINGS | – |
| Apr 17, 2014 | Department of Citywide Administrative Services | $2,922,549.54 | CONSTRUCTION-BUILDINGS | – |
| Dec 26, 2013 | Department of Citywide Administrative Services | $2,016,405.68 | CONSTRUCTION-BUILDINGS | – |
| Feb 3, 2014 | Department of Citywide Administrative Services | $1,926,117.68 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2013 | Department of Citywide Administrative Services | $1,700,500.00 | POLLUTION REMEDIATION OBLIGATIONS | – |
| May 6, 2014 | Department of Citywide Administrative Services | $1,676,971.63 | CONSTRUCTION-BUILDINGS | – |
| Sep 4, 2013 | Department of Citywide Administrative Services | $1,301,585.32 | CONSTRUCTION-BUILDINGS | – |
| Sep 25, 2013 | Department of Cultural Affairs | $1,263,716.95 | CONSTRUCTION-BUILDINGS | – |
| Mar 12, 2014 | Department of Citywide Administrative Services | $1,154,877.36 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2014 | Department of Citywide Administrative Services | $945,005.57 | CONSTRUCTION-BUILDINGS | – |
| Jun 12, 2014 | Department of Citywide Administrative Services | $584,241.68 | CONSTRUCTION-BUILDINGS | – |
| Apr 21, 2014 | Department of Cultural Affairs | $472,211.44 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2014 | Department of Cultural Affairs | $420,186.31 | CONSTRUCTION-BUILDINGS | – |
| Aug 23, 2013 | School Construction Authority | $410,647.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 17, 2014 | Department of Citywide Administrative Services | $392,242.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 2, 2014 | Department of Cultural Affairs | $378,389.33 | CONSTRUCTION-BUILDINGS | – |
| Nov 12, 2013 | School Construction Authority | $344,787.30 | CONSTRUCTION-BUILDINGS | – |
| Sep 19, 2013 | School Construction Authority | $319,466.00 | CONSTRUCTION-BUILDINGS | – |
| Jun 9, 2014 | Department of Citywide Administrative Services | $286,835.77 | CONSTRUCTION-BUILDINGS | – |
FY 2013top 20 of 65 payments$7,110,827
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 20, 2013 | Department of Cultural Affairs | $640,699.35 | CONSTRUCTION-BUILDINGS | – |
| Oct 1, 2012 | School Construction Authority | $626,267.50 | CONSTRUCTION-BUILDINGS | – |
| Oct 22, 2012 | Department of Citywide Administrative Services | $621,953.12 | CONSTRUCTION-BUILDINGS | – |
| Oct 1, 2012 | School Construction Authority | $601,206.88 | CONSTRUCTION-BUILDINGS | – |
| Aug 6, 2012 | Department of Citywide Administrative Services | $491,260.65 | CONSTRUCTION-BUILDINGS | – |
| Jun 11, 2013 | Department of Citywide Administrative Services | $440,563.87 | CONSTRUCTION-BUILDINGS | – |
| Sep 17, 2012 | Department of Citywide Administrative Services | $424,420.43 | CONSTRUCTION-BUILDINGS | – |
| Dec 31, 2012 | Department of Citywide Administrative Services | $384,201.43 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2013 | Department of Citywide Administrative Services | $291,394.32 | CONSTRUCTION-BUILDINGS | – |
| May 20, 2013 | School Construction Authority | $218,853.40 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2013 | School Construction Authority | $216,543.00 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2013 | School Construction Authority | $195,852.00 | CONSTRUCTION-BUILDINGS | – |
| Sep 24, 2012 | School Construction Authority | $174,609.53 | CONSTRUCTION-BUILDINGS | – |
| Nov 13, 2012 | School Construction Authority | $155,866.50 | CONSTRUCTION-BUILDINGS | – |
| Apr 17, 2013 | School Construction Authority | $149,237.40 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2013 | School Construction Authority | $112,989.20 | CONSTRUCTION-BUILDINGS | – |
| Dec 17, 2012 | School Construction Authority | $112,667.44 | CONSTRUCTION-BUILDINGS | – |
| Oct 22, 2012 | Department of Citywide Administrative Services | $99,750.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 22, 2013 | School Construction Authority | $98,780.90 | CONSTRUCTION-BUILDINGS | – |
| Jun 18, 2013 | School Construction Authority | $83,493.45 | CONSTRUCTION-BUILDINGS | – |
FY 2012top 20 of 88 payments$6,833,150
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Mar 15, 2012 | Department of Citywide Administrative Services | $1,169,023.87 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2011 | School Construction Authority | $746,504.03 | CONSTRUCTION-BUILDINGS | – |
| Aug 29, 2011 | Department of Citywide Administrative Services | $579,173.86 | CONSTRUCTION-BUILDINGS | – |
| Nov 14, 2011 | School Construction Authority | $406,802.76 | CONSTRUCTION-BUILDINGS | – |
| Jul 25, 2011 | Department of Citywide Administrative Services | $311,492.21 | CONSTRUCTION-BUILDINGS | – |
| Jun 13, 2012 | Department of Citywide Administrative Services | $282,318.20 | CONSTRUCTION-BUILDINGS | – |
| Aug 17, 2011 | School Construction Authority | $273,209.56 | CONSTRUCTION-BUILDINGS | – |
| May 8, 2012 | Department of Citywide Administrative Services | $270,297.78 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | School Construction Authority | $151,371.52 | CONSTRUCTION-BUILDINGS | – |
| Nov 10, 2011 | School Construction Authority | $140,806.91 | CONSTRUCTION-BUILDINGS | – |
| Mar 20, 2012 | School Construction Authority | $136,360.62 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | School Construction Authority | $133,333.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 19, 2012 | School Construction Authority | $132,722.43 | CONSTRUCTION-BUILDINGS | – |
| Apr 5, 2012 | School Construction Authority | $130,824.69 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | School Construction Authority | $116,573.39 | CONSTRUCTION-BUILDINGS | – |
| Oct 17, 2011 | School Construction Authority | $112,338.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2012 | Department of Citywide Administrative Services | $109,678.80 | CONSTRUCTION-BUILDINGS | – |
| Jan 23, 2012 | Department of Citywide Administrative Services | $105,021.03 | CONSTRUCTION-BUILDINGS | – |
| Mar 2, 2012 | Department of Citywide Administrative Services | $87,459.12 | CONSTRUCTION-BUILDINGS | – |
| Dec 19, 2011 | School Construction Authority | $73,334.00 | CONSTRUCTION-BUILDINGS | – |
FY 2011top 20 of 33 payments$5,417,900
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| Dec 23, 2010 | Department of Citywide Administrative Services | $1,057,759.51 | CONSTRUCTION-BUILDINGS | – |
| Nov 15, 2010 | School Construction Authority | $409,459.50 | CONSTRUCTION-BUILDINGS | – |
| Aug 30, 2010 | School Construction Authority | $338,473.92 | CONSTRUCTION-BUILDINGS | – |
| Jun 28, 2011 | School Construction Authority | $324,780.21 | CONSTRUCTION-BUILDINGS | – |
| Mar 15, 2011 | Department of Citywide Administrative Services | $311,814.47 | CONSTRUCTION-BUILDINGS | – |
| Jan 14, 2011 | School Construction Authority | $297,890.74 | CONSTRUCTION-BUILDINGS | – |
| Sep 23, 2010 | School Construction Authority | $267,718.86 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2011 | Department of Citywide Administrative Services | $265,470.85 | CONSTRUCTION-BUILDINGS | – |
| Nov 3, 2010 | Department of Citywide Administrative Services | $211,793.47 | CONSTRUCTION-BUILDINGS | – |
| Jan 24, 2011 | Department of Citywide Administrative Services | $211,322.82 | CONSTRUCTION-BUILDINGS | – |
| Jun 14, 2011 | School Construction Authority | $194,356.42 | CONSTRUCTION-BUILDINGS | – |
| May 11, 2011 | School Construction Authority | $182,250.96 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2010 | Department of Citywide Administrative Services | $179,440.37 | CONSTRUCTION-BUILDINGS | – |
| Jun 15, 2011 | Department of Citywide Administrative Services | $156,287.89 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2011 | School Construction Authority | $123,498.14 | CONSTRUCTION-BUILDINGS | – |
| Sep 20, 2010 | Department of Citywide Administrative Services | $122,700.10 | CONSTRUCTION-BUILDINGS | – |
| Feb 18, 2011 | School Construction Authority | $111,105.76 | CONSTRUCTION-BUILDINGS | – |
| Jul 28, 2010 | School Construction Authority | $108,928.61 | CONSTRUCTION-BUILDINGS | – |
| Dec 15, 2010 | School Construction Authority | $102,921.20 | CONSTRUCTION-BUILDINGS | – |
| May 9, 2011 | School Construction Authority | $100,998.30 | CONSTRUCTION-BUILDINGS | – |
FY 2010top 20 of 29 payments$2,557,751
| Date | Agency | Amount | Category | Purchase order |
|---|---|---|---|---|
| May 7, 2010 | School Construction Authority | $538,870.60 | CONSTRUCTION-BUILDINGS | – |
| Mar 3, 2010 | School Construction Authority | $443,333.84 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2010 | School Construction Authority | $259,429.85 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2010 | School Construction Authority | $215,406.50 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2010 | School Construction Authority | $206,387.50 | CONSTRUCTION-BUILDINGS | – |
| May 7, 2010 | School Construction Authority | $147,583.25 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2010 | School Construction Authority | $121,262.61 | CONSTRUCTION-BUILDINGS | – |
| Apr 8, 2010 | School Construction Authority | $86,450.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 4, 2010 | School Construction Authority | $80,891.84 | CONSTRUCTION-BUILDINGS | – |
| Jun 7, 2010 | School Construction Authority | $70,307.60 | CONSTRUCTION-BUILDINGS | – |
| Jan 25, 2010 | School Construction Authority | $66,614.00 | CONSTRUCTION-BUILDINGS | – |
| Jan 29, 2010 | School Construction Authority | $60,804.18 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2010 | School Construction Authority | $44,568.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2010 | School Construction Authority | $37,278.43 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2010 | School Construction Authority | $34,755.50 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2010 | School Construction Authority | $28,500.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 2, 2010 | School Construction Authority | $25,550.23 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2010 | School Construction Authority | $22,000.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 15, 2010 | School Construction Authority | $17,325.00 | CONSTRUCTION-BUILDINGS | – |
| Apr 1, 2010 | School Construction Authority | $11,144.90 | CONSTRUCTION-BUILDINGS | – |
Recent payments
| Date | Agency | Amount | Category | Method |
|---|---|---|---|---|
| May 14, 2025 | Miscellaneous | $3,186,000.00 | JUDGMENTS AND CLAIMS-NONEMP COMP | Others |
| Jan 21, 2025 | Department of Cultural Affairs | $17,559.92 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Oct 17, 2024 | Department of Citywide Administrative Services | $14,541.81 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Oct 17, 2024 | Department of Citywide Administrative Services | $16,765.20 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Apr 15, 2024 | Department of Citywide Administrative Services | $41,609.02 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Mar 7, 2024 | Department of Citywide Administrative Services | $7,210.16 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Oct 23, 2023 | Department of Citywide Administrative Services | $25,501.90 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $1,467.16 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $46,988.85 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $87,120.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $22,124.88 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $22,770.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $6,930.00 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Sep 6, 2023 | Department of Citywide Administrative Services | $32.86 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Feb 15, 2023 | Department of Citywide Administrative Services | $236,775.93 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jan 10, 2023 | School Construction Authority | $14,508.80 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Jan 10, 2023 | School Construction Authority | $55,862.33 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $37.65 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $148.04 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $26.89 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $732.10 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $3.01 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $85.26 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $1,304.76 | CONSTRUCTION-BUILDINGS | Capital Contracts |
| Nov 21, 2022 | Department of Cultural Affairs | $167.57 | CONSTRUCTION-BUILDINGS | Capital Contracts |
Other vendors serving Department of Citywide Administrative Services
- New York Power Authority $10,233,539,022
- Consolidated Edison Company of New York Inc $1,822,271,106
- The Brooklyn Union Gas Company $886,595,148
- Ipc Resiliency Partners $623,293,846
- Garner Environmental Services Inc $446,192,030
- Genuine Parts Company $358,037,604
- New York City Economic Development Corporation $356,177,598
- Brooklyn Renaissance Plaza LLC $318,838,329