Phantom Carting Inc: New York City Government Payments

Phantom Carting Inc is the 1,090th-largest recipient of New York City government payments tracked by SpendLedger, and ranks 11th in N/A spending. Its payments amount to 1% of everything the Department of Design and Construction has paid vendors in that span. Payments to it fell 87.2% year over year.

Primary spending category: N/A

$49,892,874total received
2,231payments
3agencies
Jan 13, 2015Jun 6, 2025first / last payment
Follow this vendorGet an email when New York City publishes new payments to Phantom Carting Inc. No spam.

Payments by fiscal year

FY 2025$825,097
FY 2024$6,456,554
FY 2023$6,268,670
FY 2022$5,536,293
FY 2021$6,644,229
FY 2020$8,396,059
FY 2019$6,921,530
FY 2018$4,444,666
FY 2017$2,446,639
FY 2016$1,766,069
FY 2015$187,069

Payments by fiscal year and agency

Fiscal yearAgencyPaymentsTotal
FY 2025Department of Design and Construction39$825,097
FY 2024Department of Design and Construction171$6,379,750
FY 2024Department of Environmental Protection2$76,805
FY 2023Department of Design and Construction185$5,979,895
FY 2023Department of Environmental Protection38$244,066
FY 2023Department of Parks and Recreation1$44,710
FY 2022Department of Design and Construction212$4,883,577
FY 2022Department of Environmental Protection85$652,716
FY 2021Department of Design and Construction240$6,342,442
FY 2021Department of Environmental Protection35$301,786
FY 2020Department of Design and Construction294$8,364,448
FY 2020Department of Environmental Protection4$31,610
FY 2019Department of Design and Construction385$6,921,374
FY 2019Department of Environmental Protection1$156
FY 2018Department of Design and Construction233$4,444,666
FY 2017Department of Design and Construction164$2,446,639
FY 2016Department of Design and Construction120$1,766,069
FY 2015Department of Design and Construction22$187,069
Total2,231$49,892,874

What the payments were for

Spending categories exactly as New York City government codes them in its own accounting; we do not reclassify.

CategoryPaymentsTotalFirst / last
N/A2,231$49,892,874Jan 13, 2015 Jun 6, 2025

Largest payments by fiscal year

The biggest individual payments in each fiscal year, up to 20 per year. Where the source publishes a purchase order behind a payment, the PO description appears; older payments may carry a bare PO reference because the government's published PO files do not reach back that far.

Download this table as CSV (free, with source citation on every row)

FY 2025top 20 of 39 payments$825,097
DateAgencyAmountCategoryPurchase order
Aug 19, 2024Department of Design and Construction$183,151.28N/A
Jul 22, 2024Department of Design and Construction$161,325.76N/A
Jan 16, 2025Department of Design and Construction$89,534.81N/A
Apr 3, 2025Department of Design and Construction$57,553.13N/A
Feb 27, 2025Department of Design and Construction$47,551.25N/A
Apr 17, 2025Department of Design and Construction$47,375.09N/A
May 1, 2025Department of Design and Construction$29,668.83N/A
Jun 6, 2025Department of Design and Construction$23,702.50N/A
Jan 30, 2025Department of Design and Construction$22,818.76N/A
Jul 2, 2024Department of Design and Construction$20,796.26N/A
Dec 12, 2024Department of Design and Construction$15,243.54N/A
Mar 6, 2025Department of Design and Construction$15,070.00N/A
Jul 11, 2024Department of Design and Construction$13,255.63N/A
Jan 9, 2025Department of Design and Construction$12,560.00N/A
Dec 19, 2024Department of Design and Construction$12,330.00N/A
Jul 25, 2024Department of Design and Construction$8,800.00N/A
May 7, 2025Department of Design and Construction$5,956.33N/A
Jul 18, 2024Department of Design and Construction$5,480.00N/A
May 28, 2025Department of Design and Construction$5,317.29N/A
Sep 26, 2024Department of Design and Construction$4,517.50N/A
FY 2024top 20 of 173 payments$6,456,554
DateAgencyAmountCategoryPurchase order
Jan 11, 2024Department of Design and Construction$378,161.28N/A
Dec 26, 2023Department of Design and Construction$377,500.00N/A
Jun 10, 2024Department of Design and Construction$377,187.48N/A
Oct 23, 2023Department of Design and Construction$286,192.92N/A
Dec 26, 2023Department of Design and Construction$190,989.22N/A
Sep 11, 2023Department of Design and Construction$185,032.07N/A
Oct 10, 2023Department of Design and Construction$162,317.00N/A
Jan 29, 2024Department of Design and Construction$148,768.01N/A
May 28, 2024Department of Design and Construction$145,324.92N/A
Dec 26, 2023Department of Design and Construction$142,728.61N/A
Feb 26, 2024Department of Design and Construction$130,838.86N/A
Oct 10, 2023Department of Design and Construction$125,352.52N/A
Sep 5, 2023Department of Design and Construction$123,574.36N/A
Mar 25, 2024Department of Design and Construction$118,951.51N/A
Oct 17, 2023Department of Design and Construction$114,589.64N/A
Jul 18, 2023Department of Design and Construction$112,082.64N/A
Jan 22, 2024Department of Design and Construction$108,527.77N/A
Aug 28, 2023Department of Design and Construction$101,375.68N/A
Jul 18, 2023Department of Design and Construction$99,146.92N/A
May 28, 2024Department of Design and Construction$98,485.89N/A
FY 2023top 20 of 224 payments$6,268,670
DateAgencyAmountCategoryPurchase order
Feb 3, 2023Department of Design and Construction$636,608.50N/A
Dec 15, 2022Department of Design and Construction$241,406.55N/A
Mar 1, 2023Department of Design and Construction$219,549.92N/A
Feb 21, 2023Department of Design and Construction$199,709.56N/A
Sep 15, 2022Department of Design and Construction$187,707.33N/A
Apr 27, 2023Department of Design and Construction$186,182.26N/A
Nov 7, 2022Department of Design and Construction$184,427.12N/A
Dec 27, 2022Department of Design and Construction$175,635.44N/A
Feb 21, 2023Department of Design and Construction$167,134.87N/A
Sep 22, 2022Department of Design and Construction$159,463.82N/A
Apr 27, 2023Department of Design and Construction$146,696.42N/A
Apr 27, 2023Department of Design and Construction$145,585.14N/A
Feb 21, 2023Department of Design and Construction$133,587.95N/A
Oct 11, 2022Department of Design and Construction$127,391.92N/A
Apr 19, 2023Department of Design and Construction$120,863.63N/A
Jul 7, 2022Department of Design and Construction$109,991.23N/A
Jul 29, 2022Department of Design and Construction$108,274.20N/A
Dec 14, 2022Department of Design and Construction$82,350.45N/A
Jul 1, 2022Department of Design and Construction$81,580.66N/A
Jun 2, 2023Department of Design and Construction$81,272.58N/A
FY 2022top 20 of 297 payments$5,536,293
DateAgencyAmountCategoryPurchase order
Jan 6, 2022Department of Design and Construction$507,734.25N/A
Mar 9, 2022Department of Design and Construction$217,501.60N/A
May 16, 2022Department of Design and Construction$198,400.00N/A
Oct 26, 2021Department of Design and Construction$148,551.73N/A
Mar 22, 2022Department of Design and Construction$143,547.53N/A
May 3, 2022Department of Design and Construction$137,972.72N/A
Jul 29, 2021Department of Design and Construction$131,603.82N/A
Jun 2, 2022Department of Design and Construction$118,588.06N/A
Sep 10, 2021Department of Design and Construction$97,286.54N/A
Nov 16, 2021Department of Design and Construction$93,901.70N/A
Oct 12, 2021Department of Design and Construction$88,199.12N/A
Feb 4, 2022Department of Design and Construction$86,256.36N/A
Oct 13, 2021Department of Design and Construction$81,578.20N/A
Dec 13, 2021Department of Design and Construction$81,416.01N/A
Aug 4, 2021Department of Design and Construction$80,693.58N/A
Dec 2, 2021Department of Design and Construction$76,082.66N/A
Jan 14, 2022Department of Design and Construction$71,110.88N/A
May 3, 2022Department of Design and Construction$69,675.06N/A
Feb 22, 2022Department of Design and Construction$65,371.45N/A
Jul 15, 2021Department of Design and Construction$62,344.24N/A
FY 2021top 20 of 275 payments$6,644,229
DateAgencyAmountCategoryPurchase order
Jul 22, 2020Department of Design and Construction$460,206.20N/A
Oct 6, 2020Department of Design and Construction$454,771.37N/A
Jan 21, 2021Department of Design and Construction$436,465.45N/A
Jul 10, 2020Department of Design and Construction$222,733.03N/A
Aug 20, 2020Department of Design and Construction$199,031.41N/A
Feb 3, 2021Department of Design and Construction$163,985.25N/A
Aug 28, 2020Department of Design and Construction$152,137.04N/A
Aug 27, 2020Department of Design and Construction$137,460.85N/A
Jun 30, 2021Department of Design and Construction$130,880.41N/A
Jul 22, 2020Department of Design and Construction$126,890.00N/A
Oct 22, 2020Department of Design and Construction$111,722.85N/A
May 11, 2021Department of Design and Construction$96,750.42N/A
Sep 28, 2020Department of Design and Construction$82,910.64N/A
Jun 8, 2021Department of Design and Construction$81,282.51N/A
Dec 17, 2020Department of Design and Construction$77,732.50N/A
Mar 25, 2021Department of Design and Construction$73,408.79N/A
Oct 29, 2020Department of Design and Construction$67,205.01N/A
Aug 27, 2020Department of Design and Construction$66,683.33N/A
May 25, 2021Department of Design and Construction$64,748.54N/A
May 24, 2021Department of Design and Construction$63,738.24N/A
FY 2020top 20 of 298 payments$8,396,059
DateAgencyAmountCategoryPurchase order
Jan 30, 2020Department of Design and Construction$595,390.98N/A
Jun 18, 2020Department of Design and Construction$539,180.46N/A
Oct 23, 2019Department of Design and Construction$493,666.30N/A
Feb 27, 2020Department of Design and Construction$400,000.00N/A
Feb 27, 2020Department of Design and Construction$246,000.00N/A
Oct 10, 2019Department of Design and Construction$101,781.00N/A
May 20, 2020Department of Design and Construction$100,000.00N/A
May 7, 2020Department of Design and Construction$94,907.10N/A
Mar 10, 2020Department of Design and Construction$79,253.85N/A
Jan 9, 2020Department of Design and Construction$78,043.10N/A
Jun 2, 2020Department of Design and Construction$76,543.50N/A
Jun 25, 2020Department of Design and Construction$75,619.44N/A
Feb 20, 2020Department of Design and Construction$74,787.50N/A
Jan 15, 2020Department of Design and Construction$71,781.69N/A
May 18, 2020Department of Design and Construction$70,494.53N/A
May 27, 2020Department of Design and Construction$68,576.40N/A
May 27, 2020Department of Design and Construction$68,576.40N/A
Dec 12, 2019Department of Design and Construction$66,784.14N/A
Feb 12, 2020Department of Design and Construction$66,579.00N/A
Sep 19, 2019Department of Design and Construction$65,159.81N/A
FY 2019top 20 of 386 payments$6,921,530
DateAgencyAmountCategoryPurchase order
Mar 27, 2019Department of Design and Construction$420,622.51N/A
Mar 22, 2019Department of Design and Construction$86,635.16N/A
Aug 30, 2018Department of Design and Construction$82,424.74N/A
Feb 15, 2019Department of Design and Construction$80,879.01N/A
Apr 26, 2019Department of Design and Construction$78,670.84N/A
May 17, 2019Department of Design and Construction$76,916.74N/A
Nov 8, 2018Department of Design and Construction$69,530.57N/A
Sep 14, 2018Department of Design and Construction$68,682.98N/A
Sep 27, 2018Department of Design and Construction$68,054.54N/A
Jul 26, 2018Department of Design and Construction$67,566.01N/A
Mar 22, 2019Department of Design and Construction$66,875.04N/A
Apr 26, 2019Department of Design and Construction$64,723.80N/A
Oct 26, 2018Department of Design and Construction$64,182.00N/A
Oct 19, 2018Department of Design and Construction$62,854.82N/A
May 31, 2019Department of Design and Construction$59,414.87N/A
Oct 19, 2018Department of Design and Construction$58,928.08N/A
Nov 15, 2018Department of Design and Construction$58,666.44N/A
Aug 3, 2018Department of Design and Construction$58,166.00N/A
Sep 5, 2018Department of Design and Construction$57,855.13N/A
Sep 26, 2018Department of Design and Construction$57,608.00N/A
FY 2018top 20 of 233 payments$4,444,666
DateAgencyAmountCategoryPurchase order
Jan 29, 2018Department of Design and Construction$123,070.00N/A
May 24, 2018Department of Design and Construction$111,733.96N/A
Mar 15, 2018Department of Design and Construction$93,155.00N/A
Mar 20, 2018Department of Design and Construction$90,281.13N/A
Apr 25, 2018Department of Design and Construction$82,005.90N/A
Apr 25, 2018Department of Design and Construction$76,912.70N/A
Apr 25, 2018Department of Design and Construction$70,033.43N/A
Jul 26, 2017Department of Design and Construction$68,250.00N/A
Mar 15, 2018Department of Design and Construction$67,270.00N/A
Jun 8, 2018Department of Design and Construction$66,960.00N/A
Jun 8, 2018Department of Design and Construction$65,695.92N/A
May 23, 2018Department of Design and Construction$63,805.00N/A
Apr 13, 2018Department of Design and Construction$63,223.13N/A
Apr 25, 2018Department of Design and Construction$59,000.00N/A
Oct 13, 2017Department of Design and Construction$58,745.00N/A
Jun 6, 2018Department of Design and Construction$56,385.00N/A
Apr 25, 2018Department of Design and Construction$52,622.50N/A
Dec 7, 2017Department of Design and Construction$50,220.00N/A
May 9, 2018Department of Design and Construction$50,000.00N/A
Aug 3, 2017Department of Design and Construction$49,755.00N/A
FY 2017top 20 of 164 payments$2,446,639
DateAgencyAmountCategoryPurchase order
Mar 16, 2017Department of Design and Construction$108,965.00N/A
Dec 2, 2016Department of Design and Construction$90,985.00N/A
Sep 7, 2016Department of Design and Construction$81,150.00N/A
Jun 8, 2017Department of Design and Construction$74,087.00N/A
May 2, 2017Department of Design and Construction$65,875.00N/A
Aug 24, 2016Department of Design and Construction$60,795.00N/A
Sep 29, 2016Department of Design and Construction$57,892.50N/A
Sep 28, 2016Department of Design and Construction$51,380.00N/A
Dec 2, 2016Department of Design and Construction$49,987.00N/A
Jan 9, 2017Department of Design and Construction$49,677.50N/A
Jul 28, 2016Department of Design and Construction$38,905.00N/A
Oct 19, 2016Department of Design and Construction$36,750.00N/A
Jan 18, 2017Department of Design and Construction$35,525.00N/A
Dec 2, 2016Department of Design and Construction$34,100.00N/A
Apr 19, 2017Department of Design and Construction$33,285.00N/A
Dec 2, 2016Department of Design and Construction$32,317.50N/A
Jun 8, 2017Department of Design and Construction$30,922.50N/A
May 2, 2017Department of Design and Construction$30,147.50N/A
Jan 9, 2017Department of Design and Construction$29,760.00N/A
Aug 4, 2016Department of Design and Construction$28,675.00N/A
FY 2016top 20 of 120 payments$1,766,069
DateAgencyAmountCategoryPurchase order
Jan 14, 2016Department of Design and Construction$97,495.00N/A
Apr 5, 2016Department of Design and Construction$87,420.00N/A
Jun 3, 2016Department of Design and Construction$84,475.00N/A
Feb 17, 2016Department of Design and Construction$76,725.00N/A
Nov 13, 2015Department of Design and Construction$74,555.00N/A
Feb 17, 2016Department of Design and Construction$45,260.00N/A
Feb 17, 2016Department of Design and Construction$43,632.50N/A
Jun 29, 2016Department of Design and Construction$43,015.00N/A
May 25, 2016Department of Design and Construction$40,810.00N/A
Apr 5, 2016Department of Design and Construction$36,192.50N/A
Jan 14, 2016Department of Design and Construction$31,899.62N/A
Apr 22, 2016Department of Design and Construction$29,217.50N/A
Mar 30, 2016Department of Design and Construction$27,943.34N/A
Jun 3, 2016Department of Design and Construction$26,737.50N/A
Apr 20, 2016Department of Design and Construction$26,375.01N/A
Jun 8, 2016Department of Design and Construction$24,146.00N/A
Mar 19, 2016Department of Design and Construction$23,986.19N/A
May 4, 2016Department of Design and Construction$23,835.00N/A
Nov 13, 2015Department of Design and Construction$21,855.00N/A
Aug 26, 2015Department of Design and Construction$21,053.25N/A
FY 2015top 20 of 22 payments$187,069
DateAgencyAmountCategoryPurchase order
May 14, 2015Department of Design and Construction$18,313.68N/A
Jun 10, 2015Department of Design and Construction$15,750.00N/A
Apr 22, 2015Department of Design and Construction$15,220.00N/A
Jun 3, 2015Department of Design and Construction$14,700.00N/A
Jun 17, 2015Department of Design and Construction$14,700.00N/A
Apr 1, 2015Department of Design and Construction$11,740.00N/A
Jun 24, 2015Department of Design and Construction$11,690.00N/A
Apr 8, 2015Department of Design and Construction$11,540.00N/A
Feb 13, 2015Department of Design and Construction$10,493.75N/A
Jan 13, 2015Department of Design and Construction$10,421.88N/A
Apr 15, 2015Department of Design and Construction$10,370.00N/A
May 27, 2015Department of Design and Construction$7,350.00N/A
Mar 25, 2015Department of Design and Construction$6,020.00N/A
Mar 15, 2015Department of Design and Construction$5,820.00N/A
May 6, 2015Department of Design and Construction$4,650.00N/A
Apr 29, 2015Department of Design and Construction$3,580.00N/A
Apr 24, 2015Department of Design and Construction$3,450.00N/A
Jun 10, 2015Department of Design and Construction$2,710.00N/A
May 20, 2015Department of Design and Construction$2,660.00N/A
May 13, 2015Department of Design and Construction$2,610.00N/A

Recent payments

DateAgencyAmountCategoryMethod
Jun 6, 2025Department of Design and Construction$23,702.50N/AContracts
Jun 4, 2025Department of Design and Construction$1,325.04N/AContracts
May 28, 2025Department of Design and Construction$5,317.29N/AContracts
May 21, 2025Department of Design and Construction$1,261.00N/AContracts
May 13, 2025Department of Design and Construction$2,514.16N/AContracts
May 7, 2025Department of Design and Construction$5,956.33N/AContracts
May 7, 2025Department of Design and Construction$1,293.75N/AContracts
May 1, 2025Department of Design and Construction$29,668.83N/AContracts
Apr 23, 2025Department of Design and Construction$3,701.82N/AContracts
Apr 23, 2025Department of Design and Construction$4,062.66N/AContracts
Apr 17, 2025Department of Design and Construction$47,375.09N/AContracts
Apr 3, 2025Department of Design and Construction$57,553.13N/AContracts
Mar 6, 2025Department of Design and Construction$15,070.00N/AContracts
Feb 27, 2025Department of Design and Construction$47,551.25N/AContracts
Feb 21, 2025Department of Design and Construction$1,212.58N/AContracts
Feb 21, 2025Department of Design and Construction$1,284.45N/AContracts
Feb 6, 2025Department of Design and Construction$1,212.58N/AContracts
Jan 30, 2025Department of Design and Construction$22,818.76N/AContracts
Jan 29, 2025Department of Design and Construction$1,181.29N/AContracts
Jan 16, 2025Department of Design and Construction$89,534.81N/AContracts
Jan 9, 2025Department of Design and Construction$12,560.00N/AContracts
Dec 19, 2024Department of Design and Construction$12,330.00N/AContracts
Dec 12, 2024Department of Design and Construction$15,243.54N/AContracts
Nov 26, 2024Department of Design and Construction$4,110.00N/AContracts
Nov 22, 2024Department of Design and Construction$1,350.00N/AContracts

Other vendors serving Department of Design and Construction

VerifiedData refreshed Sep 7, 2026 from Checkbook NYC (checkbooknyc.com): 38,060,921 payments on record, Dec 22, 2009 to Jun 30, 2025. How we verify this data